2.1 EARTHWORKS
The Tenderer is strongly advise to visit the site to study the
drawings and familiarised himself to the conditioned of the
proposed site. No claims will later be entertained on the
grounds of lack of knowledge on the extent of the works
and shall held responsible for all charges, permits, the
requirement of the authorities,etc.
2.2.1 Clear the site of the works of all unwanted structures and
vegetation such as wooden shed, trees, shrubs, weeds and
undergrowth including grubbing up of roots and disposal of
all materials as Sub-Section 2.1. 2.50 Ha - - 1,260.00 1,260.00 3,150.00 - - 1,200.00 1,200.00 3,000.00 150.00
as per Sub-Section 2.1 and as diercted by the S.O. 2,850.00 Sq.m - - 2.23 2.23 6,355.50 - - 1.00 1.00 2,850.00 3,505.50
directed by S.O. 600.00 Cu.m - - 6.20 6.20 3,720.00 - - 4.50 4.50 2,700.00 1,020.00
2.5 TURFING
2.5.1 Supply turfs from approved source including top soil and
close turf to slopes and embankments and any other places
accordance with Sub-Section 2.3.2 4,800.00 Sq.m - 2.53 - 2.53 12,144.00 - 2.50 - 2.50 12,000.00 144.00
2.6.1 Excavate all the materials other than solid rock to the level
the river banks and river flow. 3,960.00 Cu.m 6.20 - - 6.20 24,552.00 4.50 - - 4.50 17,820.00 6,732.00
all machineries, labour, transport, materials, etc 1,417.00 Cu.m 3.15 3.05 - 6.20 8,785.40 4.50 - - 4.50 6,376.50 2,408.90