This document provides comments from Pöyry Energy on drawing MD1-0-V-114-01-00004 for the Outline Drawing for HP-7 Low Pressure FWH for the Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project. The status is listed as "Received for Information – Returned with Comments". There are 5 comments provided on revisions A and B of the drawing, with the contractor's replies addressed. The comments include issues like material selection for steam inlets, design pressures, location of the heater, and correcting data tables. All comments from revision B are now closed.
This document provides comments from Pöyry Energy on drawing MD1-0-V-114-01-00004 for the Outline Drawing for HP-7 Low Pressure FWH for the Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project. The status is listed as "Received for Information – Returned with Comments". There are 5 comments provided on revisions A and B of the drawing, with the contractor's replies addressed. The comments include issues like material selection for steam inlets, design pressures, location of the heater, and correcting data tables. All comments from revision B are now closed.
This document provides comments from Pöyry Energy on drawing MD1-0-V-114-01-00004 for the Outline Drawing for HP-7 Low Pressure FWH for the Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project. The status is listed as "Received for Information – Returned with Comments". There are 5 comments provided on revisions A and B of the drawing, with the contractor's replies addressed. The comments include issues like material selection for steam inlets, design pressures, location of the heater, and correcting data tables. All comments from revision B are now closed.
This document provides comments from Pöyry Energy on drawing MD1-0-V-114-01-00004 for the Outline Drawing for HP-7 Low Pressure FWH for the Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project. The status is listed as "Received for Information – Returned with Comments". There are 5 comments provided on revisions A and B of the drawing, with the contractor's replies addressed. The comments include issues like material selection for steam inlets, design pressures, location of the heater, and correcting data tables. All comments from revision B are now closed.
APPROVED WITH COMMENTS AC Approved Subject to Incorporation of comments RETURNED FOR CORRECTION RT Insufficient Information/ Detail Resubmit for Approval REJECTED RJ Complete redesign required RECEIVED FOR INFORMATION I Returned without comments RECEIVED FOR INFORMATION IC Returned with comments any obligations covered under contract Engineer: Discipline: Date: Note: Approval or comments does not relieve the Contractor of Pyry Energy TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT David Langhorne Senior Mec Engineer 5-Mar-13 Pyry Comment Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project
Dwg. / Doc. Title Outline Drawing for HP-7 Low Pressure FWH Dwg. / Doc. No. MD1-0-V-114-01-00004 HDEC DT No. MD1-HDH-EVN-X-1036 Submitted Date 2012.11.02 Rev. B Pyry TR No. 9A000323-002559 Received Date 2012.11.28 New HDEC DT No. MD1-HDH-EVN-X-2233 Re-Submitted Date 2013.02.05 Rev. C Status Received for Information Returned with Comments
Page1 / 1 No. Pyrys Comments Contractors Reply / Action 1 <Pyrys Comments on Rev.A> Please refer to general comments on MD1-0-V- 114-01-00001.
<Contractors Reply / Action on Rev.A> Reflected.
<Contractors Reply / Action on Rev.B> Closed.
2 <Pyrys Comments on Rev.A> Review the steam inlet nozzle material. The skirt design temperature is 490 deg C.
<Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> Reflected. Steam inlet material has been revised from A106-B to A335-P11. 3 <Pyrys Comments on Rev.A> Clause 6.4.3 of the ERQ states that the HP Heaters shall be designed to withstand the boiler feed water pump shut-off pressure. Please confirm this requirement is met in the heater calculations.
<Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> Boiler Feedwater Pump shut-off pressure is 300 barg. BFP shut-off pressure has been reflected as tube side design pressure of 300 barg.
4 <Pyrys Comments on Rev.A> At the key plan, please correct location of HP-7 FWH from Mezzanine floor to Operating floor.
<Pyrys Comments on Rev.B> Noted the drawing is for Heater No. 7.
<Pyrys Comments on Rev.C> Closed.
<Contractors Reply / Action on Rev.A> HP-6 FWH is on the HP heater floor. Please check the modified key plan.
<Contractors Reply / Action on Rev.B> Reflected.
5 <Pyrys Comments on Rev.A> Correct the nozzle bevel data table. It appears to be a cut and paste from MD1-0-V-114-01- 00001.