Q U A L I T Y
TP/TPD/PFS/TPC/QP-13
P R O C E D U R E
TITLE
REF.No
TP/TPD/PFS/TPC/QP - 13
Copy No.
AMENDMENTS
ISSUE /
REVISIO
N
NO.
1/0
2/0
Issue : 2
REVIEWED BY
& SIGNATURE
Rev:0
Date: 05.12.2011
AUTHORIZED BY
& SIGNATURE
DATE
05-12-11
Page 1 of 14
TP/TPD/PFS/TPC/QP-13
CONTENTS
1.0
PURPOSE
2.0
SCOPE
3.0
DEFINITIONS
4.0
CROSS REFERENCES
5.0
RESPONSIBILITY
6.0
PROCEDURE
7.0
RECORDS
8.0
DISTRIBUTION
9.0
ATTACHMENTS
Issue : 2
Rev:0
Date: 05.12.2011
Page 2 of 14
TP/TPD/PFS/TPC/QP-13
1.0
PURPOSE
1.1 This procedure is to explain in detail the steps to be followed for commissioning of
Transformer differential protection devices and schemes and to facilitate effective
control of documents.
2.0
SCOPE
2.1 This procedure applies to commissioning of Transformer differential protection devices
and schemes in 132 kV and 400 kV substations.
3.0
DEFINITIONS
3.1 Approved drawing: The general arrangement, scheme drawings which are approved by
TPE with status code A or B to execute the work at site.
3.2 Approved setting : The approved values, parameters & configuration of the protection
relays issued by PCS to be implemented in the protection
relays before putting the relay in service.
3.3
BI : Binary Inputs.
3.3
BO : Binary Outputs.
3.4
CB : Circuit breaker
3.5
CT : Current Transformer.
3.6
3.7
DO : Drop Off.
3.8
HV : High Voltage.
3.9
3.10
LV : Low Voltage.
3.11
3.12
3.13
PCS
3.14
POC
3.15
PPE
3.16
PU
: Pick-Up.
3.17
REF
3.18
RSI
Issue : 2
Rev:0
Date: 05.12.2011
Page 3 of 14
TP/TPD/PFS/TPC/QP-13
3.19
TPD
3.20
3.21
Testing Engineer: Engineer from contractor or manufacturer who performs the test
as per this procedure.
3.22
Witness Engineer: Engineer from DEWA / approved consultant who witness the
test
4.0
4.1
CROSS REFERENCES
Nil
4.2
5.0
RESPONSIBILITY
5.1 VP-TP : VP-TP is responsible for approval & modification of this procedure.
5.2 M-TPC : M-TPC is responsible for implementation of this procedure.
5.3 CM-TPC : CM-TPC is responsible to plan testing activities as per the details of this
procedure.
5.4 Witness Engineer : Witness engineer is responsible to witness the testing of
relay/scheme
6.0
PROCEDURE
6.1
General.
6.1.1
Ensure the availability of approved setting for the protection device from TPD-PCS.
The RSI number of the setting template to be filled in the test formats
6.1.2
Issue : 2
Rev:0
Date: 05.12.2011
Page 4 of 14
6.1.3
TP/TPD/PFS/TPC/QP-13
Establish a communication between the relay and the computer (lap-top) for
uploading / down loading settings using the appropriate application software and
connecting cables.
6.1.4
Download the default settings from the relay to computer and update the approved
settings with date and time.
6.1.5
Configure the input / output mappings in the application software as per the
approved drawings. The date and time setting to be updated as actual
6.1.6
Upload the updated file to the relay and confirm the relay is healthy.
6.1.7
Relay soft setting and configuration file should be downloaded from the protection
relay finally and saved with the filename provided on the footer of the specific
setting template. A printout of the same shall be signed and attached with the test
report. The setting template sheet, test reports are also to be signed by the
contractor and the witness engineer.
6.1.8
Test report shall be filled during testing and the same shall be signed on the same
day of testing.
6.2
A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.
The jumper settings to be set for the rated voltage, current and correct pick up
voltage of the binary inputs. This is to be done as per Siemens relay 7UT613
manual.
6.2.2
Issue : 2
Transformer data and differential protection settings are entered in the test report.
Rev:0
Date: 05.12.2011
Page 5 of 14
6.2.3
TP/TPD/PFS/TPC/QP-13
Measurements Checks:
Use the secondary injection test kit to inject current in HV side CT R phase and
note down the relay display reading. Repeat the current injection in Y & B phases
and note down the display readings in the test format.
6.2.4
side CT till the relay picks up. Note the value of differential pick-up. Repeat the
same for the other phases in HV side CT. Repeat the same for LV side CT.
6.2.5
Timing Tests:
Inject current 1.5 times setting current as mentioned in test format in R phase and
note down the operating times values in the test format. The operating time should
be less than that indicated in the test format.
6.2.6
side CT secondary, and then gradually increasing current in HV side till differential
pickup. Record the trip value of current in CT side-1.
Inject 4 times I diff>> setting current in each phase and check trip time. Record the
values. Also record LED operation.
16% 2nd Harmonic is generated using the secondary injection kit and applied to
6.2.7
relay for 5 periods (100 milli sec) and check differential is blocking.
6.2.8
in Y phase.
With cross block feature off, the relay should trip by R phase and B phase
differential protection.
Issue : 2
Rev:0
Date: 05.12.2011
Page 6 of 14
TP/TPD/PFS/TPC/QP-13
Set cross block feature YES and time for cross block as 80 milli sec. The
differential trip will be blocked for 80 milli sec.
6.2.9
6.2.10
functioning.
6.2.11
Other Checks:
Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.
Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Device - Areva relay Micom P 632(Refer attachment TP/TPD/PFS/TPC/QP13:A02)
6.2.12
The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.
A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.
6.2.13
Record the function of BI/BO in the test format. Apply voltage and check the BI is
functioning.
Issue : 2
Rev:0
Date: 05.12.2011
Page 7 of 14
TP/TPD/PFS/TPC/QP-13
6.2.14
Measurements Checks:
Use the secondary injection test kit to inject 1 amps current in HV side CTs and
note down the relay display reading. Repeat the current injection in LV side CTs
and note down the display readings in the test format. Compare with expected
current.
6.2.15
Using the secondary injection test kit, gradually raise the current in R phase of HV
side CT till the relay picks up. Note the value of differential pick-up. Repeat the
same for the R phase of LV side CT.
Check 3 phase pickup by gradually raising the current in all phases in HV side CT
till the relay picks up. Repeat the same for LV side CT.
6.2.16
6.2.17
6.2.18
Inject current 1.0 amp current as mentioned in test format in HV side R phase and
note down the operating time value in the test format. The operating time should be
less than that indicated in the test format.
Issue : 2
Rev:0
Date: 05.12.2011
Page 8 of 14
6.2.19
TP/TPD/PFS/TPC/QP-13
Repeat the test for other phases in HV side. Repeat the same for LV side also.
Testing 2nd Harmonic restraint.
16% 2nd Harmonic is generated using the secondary injection kit is applied to HV
side R phase of relay and check differential is blocking. Relay should not trip.
Reduce harmonics percentage in the injected current till the relay trips. Record the
value in the test format.
6.2.20
Inject in R phase a current below I diff>> setting and observe the tripping time.
The tripping time should be the normal differential tripping time.
Repeat injection, gradually raising the current till the tripping time is less than the
differential operating current. Record the threshold value of I diff>> pickup
current.
The operating time of HIGH SET will be tested by injecting 2 times of high set
differential setting current and record the time.
6.2.21
Other Checks
Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.
Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Device Duo Bias M (Refer attachment TP/TPD/PFS/TPC/QP-13:A03)
6.2.22
The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.
A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.
6.2.23
Measurements Checks:
Issue : 2
Date: 05.12.2011
Page 9 of 14
TP/TPD/PFS/TPC/QP-13
Use the secondary injection test kit to inject 1 amps current in HV side CTs and
note down the relay display reading. Repeat the current injection in LV side CTs
and note down the display readings in the test format. Compare with expected
current.
6.2.24
Bias characteristics are checked by injecting a bias current as reference, and then
gradually increasing the operating current till differential pickup. Verify results with
expected and measured operating values. The readings are taken keeping bias
currents at 0, 1, 1.5, 2 and 4 amps for each phase.
6.2.25
Timing Tests:
Inject current 3 times setting current or as mentioned in test format in R phase and
note down the operating times values in the test format. Repeat the test for other
phases.
6.2.26
The operating time of HIGH SET will be tested by injecting 2 times of high set
differential setting current and record the time. Repeat the test for other phases.
6.2.27
Inject a current higher than differential setting with a harmonic content of more than
harmonic block settings in red phase and see that the relay blocks tripping and
gives correct LED indication.
6.2.28
the BI is functioning.
Issue : 2
Rev:0
Date: 05.12.2011
Page 10 of 14
6.2.29
TP/TPD/PFS/TPC/QP-13
Other Checks:
Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.
3.3
6.3.1
To avoid the operation of REF (High Imp) during the sensitivity and stability tests,
ensure the REF and stabilizing resistor are by passed.
6.3.2
Sensitivity on HV Side
The differential relay settings and calculated value of Primary Operating Current
(POC) are recorded in test format.
Primary current shall be injected on HV Side R Phase to earth and the same shall
be increased slowly form zero till the differential protection Operates. The Primary
current at which the protection operates is the minimum Primary Operating Current
for R Phase. Record on test formats the corresponding secondary currents and
relay display readings at this POC. The value shall be with in the limits of tolerance.
The same shall be confirmed for Y and B Phases.
The same injection is repeated for phase to phase injection (R-Y, Y-B and B-R)
and the POC is compared again with the calculated values.
When there are 2 sets of CTs on the HV side, the values are recorded for each set
as Bus-1 and Bus-2 CTs.
6.3.3
Sensitivity on LV Side
Primary current shall be injected to LV side CTs to repeat the test as in 6.3.2, to
find sensitivity of LV side.
6.3.4
Issue : 2
Stability Test.
Rev:0
Date: 05.12.2011
Page 11 of 14
TP/TPD/PFS/TPC/QP-13
Stability test in carried out as per the details given below. A 3 phase 415 Volts shall
be applied on LV (11kV Side) side of Transformer and all three phases of HV Side
shall be shorted and earthed. Actual values of current on HV and LV shall be
compared with the calculated value based on percentage impedance of
transformer. The differential and bias currents will be compared with the primary
current values.
Isolate the section of 11 kV where this IDT-LV is connected by keeping all CBs in
test position and opening the bus earth switch.
132 kV IDT bay is connected to either bus-1 or bus-2 and the connected bus earth
switch is closed. Line isolator and CB is kept closed for IDT.
Supply 3 phase 415 Volts to one of the outgoing feeder in that section of 11 kV.
Rack in the CB of that bay to service and close CB. 11 kV section is now energised
with 415 V supply.
Record all values of primary and secondary currents including the Differential
current and Restraint currents in the test formats. These are the normal values.
The differential Current shall be zero and Restraint current shall be high. The
currents are recorded while keeping the tap-changer in extreme low tap, middle tap
and high tap.
Keep the tap changer in middle tap. The R phase of HV side CT shall be reversed
without opening the CT. Record all values of primary and secondary currents
including the Differential current and Restraint currents in the test formats. In this
condition the Differential current shall be predominant and Restraint current shall
be less. If the Differential current is more than the setting, the protections shall
operate. After recording the currents, the R phase shall be normalized. Confirm the
currents are normal values again. The same shall be repeated for Y and B Phase.
Issue : 2
Rev:0
Date: 05.12.2011
Page 12 of 14
TP/TPD/PFS/TPC/QP-13
Keeping the tap changer in middle tap, the R phase of LV side CT shall be
reversed now without opening the CT and record all the above values as done for
HV side CTs. Again in this condition, the Differential current shall be high and
Restraint currents shall be less. If the Differential current is more than the setting
the protections shall operate. After Recording the currents the R phase shall be
normalized and confirm the currents are in order. The same shall be repeated for Y
and B Phase.
If HV side is provided with 2 sets of CTs, each set is compared individually with the
LV side CTs. Also normal values are also taken for each set of CTs in the
beginning and end of testing.
After normalizing the CTs on HV and LV the currents in Diff. Protection shall
measured and confirmed that the Diff current shall be zero and Restraint current
shall be high.
6.4
6.4.1
Risk assessment to be carried before the testing activity to identify areas of risk for
both personal and equipment safety while doing the testing activity.
6.4.2
6.4.3
6.4.4
Regarding the activity mentioned in the QP, The risk assessment & safety
Precautions are identified in,
6.5
KPI / measurements.
KPI are identified, measured & results analysed to monitor the process/activity
and implement actions to achieve planned results and work for continual
improvement.
Issue : 2
Rev:0
Date: 05.12.2011
Page 13 of 14
6.5.1
TP/TPD/PFS/TPC/QP-13
7.0
RECORDS
7.1
7.2
The relay configuration and settings file (soft copy)and signed setting template in
PDF format is submitted to TPD-PCS
8.0
DISTRIBUTION
8.1
VP-TP
8.2
M-TPC
9.0
ATTACHMENTS
9.1
9.2
9.3
9.4
9.5
9.6
9.7
Issue : 2
Rev:0
Date: 05.12.2011
Page 14 of 14
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
Manufacturer
RSI:
REFERENCE DOCUMENT:
SIPROTEC Transformer Differential PROTECTION 7UT612: ...
1- GENERAL DATA
Ordered MLFB:
Serial No.
Built in MLFB:
Ordered Version:
Software used:
DIGSI
Built-in Version:
4.5/4.6
Substation address:
Relay address:
By pick-up
Feeder address:
Baud rate: 38400
By trip command
Visual inspection
Differential Protection
Configured
Configured
Configured
Configured
TP/TPD/PFS/TPC/QP-13:A01
Page 1 of 5
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
RSI:
3- Transformer Data:
Transformer Data
Primary Winding
Secondary Winding
UN
132 kV
12kV
PN
50 MVA
50 MVA
IN (calculated)
218.7 A
2405.7
CT Ratio
300/1
3200/1
4- Settings of Diff. Protection:
I diff > :
I/ In =
t diff > delayed :
I diff >> : I/ In =
t diff >> delayed :
2nd. Harmonic :
Slope
1:
5th. Harmonic :
Slope
2:
Vector Group:
Base Point
1:
Base Point
2:
5- Measurements Checks:
Primary
I diff.
I Rest.
Tested
Secondary
Tested Winding
Measured
Measured
Measured
Phases
Injected (A)
(A)
(I/In)
(I/In)
1.0
R
Y
Winding side 1
1.0
B
1.0
1.0
R
Y
Winding side 2
1.0
B
1.0
6- Relay Pickup Values:
Test Function
Tested Winding
Phases
R
Y
Side 1
B
R
Y
Side 2
B
7- Timing Test:
Test
Tested Winding
Function
Side 1 or Side 2
Phases
R
Y
1.5 X Idiff >
B
Expected
TP/TPD/PFS/TPC/QP-13:A01
Page 2 of 5
Current (A)
P/U
Timing Test
Expected
(mSec)
38
38
38
D/O
Act (mSec)
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
RSI:
Current
Injection on
CT-1
(A)
Current
Injection on
CT-2
(A)
Expected Trip
Value
CT Side 1
Phases
Relay
Settings
0.2
0.2
0.2
0.4
0.2
0.2
0.2
0.4
0.2
0.2
0.2
0.4
Obtained Trip
Value at
Increasing
current on CT
Side-1
Trip Time
4 x Idiff
Inj.
(A)
TP/TPD/PFS/TPC/QP-13:A01
Page 3 of 5
LED Indication
TIME
(Sec)
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
Manufacturer
RSI:
Set Cross-block
time
(ms)
Injected
Current (A)
Phase
Frequency/
Harmonics
(Hz)
R
1.0
Y
0.30
B
1.0
9- Testing of Add on Stabilization for External faults :
100
3xI/In and
Measured
Cross-block
time
(ms)
50
100
50
200
Terminal No.
BO 1
F6 F7
BO 2
F8 F9
BO 3
F10 F11
BO 4
F12 F13
BO 5
F14 F15
Watch Dog
F3 F5
Assigned for
Test Result
F4 F5
Note: check status of Watch Dog contacts while the relay is energized and de-energized.
Terminal No.
BI 1
F14 F15
BI 2
F16 F15
BI 3
F17 F18
Assigned for
TP/TPD/PFS/TPC/QP-13:A01
Page 4 of 5
Test Result
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
Manufacturer
RSI:
LEDs
Assigned for
2
3
4
5
6
7
Test Result
RESETTING OPERATION
I. OTHER CHECKS:
A) Check Operation & Resetting Of All Front Panel LED's
C) DR, ER's Downloaded and print out attached/ Final setting print out attached: ..
Make
Type
Tested By (Manufacturer)
Signature
Name
TP/TPD/PFS/TPC/QP-13:A01
Page 5 of 5
Sr.No.
Witnessed By (DEWA)
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SCADA No:
Dt.
1- RELAY DATA
Current In
Voltage Vn
Frequency
Aux. Voltage
Model No.
SL.No.
Software Ref.
2- GENERAL INSPECTION
Visual inspection/ Correctness of Installation and wiring
Sr.No. on module, case and cover are identical
Relay case connected to a local earth bar
Installation & wiring correct to relevant drawings
Wiring and installation checks
Wiring and installation checks
Check for correct voltage polarity/Record the level at rear of the relay
3- LED CHECK
TP/TPD/PFS/TPC/QP-13:A02
Page 1 of 4
Result
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SCADA No:
Dt.
Terminal No.
X18:2 - X18:3
X18:5 - X18:6
X18:8 - X18:9
X18:11 - X18:12
X18:14 - X18:15
X18:17 - X18:18
X18:20 - X18:21
X18:23 - X18:24
X18:26 - X18:27
X20:1 - X20:2
X20:3 - X20:4
X20:6 - X20:7
X20:8 - X20:9
X20:10 - X20:11
X20:10 - X20:12
X20:10 - X20:13
X20:10 - X20:14
Contact Resistance
( <0.5 Ohms)
Result
K1801
K1801
K1802
K1802
K1803
K1803
K1804
K1805
K1806
K2001
K2001
K2002
K2003
K2004
K2005
K2006
K2007
Note: check status of Watch Dog contacts while the relay is energized and de-energized.
5- MEASUREMENT CHECK :
Winding HV CT ratio: , Winding LV CT ratio:..
HV Side
LV Side
Injected
Expected
Measured
Injected
Expected
Current
Current
Current
Current
Current
Amps
Amps
Amps
Amps
Amps
IR
IY
IB
Measured
Current
Amps
TP/TPD/PFS/TPC/QP-13:A02
Page 2 of 4
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SCADA No:
Dt.
Terminal No.
X20: 18 & 19
Pick up Volgage
Results
8. a.
Test
Winding
Expected operating current
Measured current
3-phase
current
a
= (Idiff>* Inom)/Kam,a
injection
=
=
3-phase
current
b
= (Idiff>* Inom)/Kam,b
injection
=
=
1-phase
current
a
= (Idiff>*Inom)/(Kam,a*Ks,1,a)
injection (R phase)
=
=
1-phase
current
b
= (Idiff>*Inom)/(Kam,b*Ks,1,b)
injection (R phase)
=
=
8. b.
Checking of second/third section of tripping characteristic:
Section of
tripping char.
Under test
Theoretical diff.
current for
measured
restrain current
Second
Second
Third
Third
8. c.
CT Saturation Checks :
Connection
Phase
YY0
Current
Frequency
Current
Frequency
IR
IY
IB
8. d.
TP/TPD/PFS/TPC/QP-13:A02
Page 3 of 4
CONTRACT NO:
Main Contractor
Name of Bay:
Consultant:
Equipment:
Manufacturer
SCADA No:
Dt.
Injected current = 1A
Operating time
IR HV
IY HV
IB HV
Injected current =
1A
IR LV
IY LV
IB LV
8. e.
2nd Harmonic Magnetizing Inrush Restraint Checks:
Injected Current
1 Amp
nd
2 Harmonic inrush Block Setting
15 %
R
Phase
Y
Phase
Relay performance for 2nd Harmonic
BLK
TRIP
BLK
TRIP
content
Operating time
B Phase
BLK
TRIP
Phase
Operating Current
expected
Setting
Operating Current
(Actual)
Operating Time at
Twice the Setting
IR
IY
IB
10- OTHER CHECKS:
Check Operation Of All Front Panel LED's
Setting Printout taken and Confirmed with Approved Settings
Fault recorder and Events Print out taken and Verified
Operation of Trip Relay F94.1 Confirmed
SCADA Alarms Confirmed
Fault Recorder initiation Confirmed
Particulars
Make
Tested By (Contractor)
Signature
Name
TP/TPD/PFS/TPC/QP-13:A02
Page 4 of 4
: .
:
:
:
:
:
Sr.No.
Witnessed By (DEWA)
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Manufacturer
Dt.
1. GENERAL DATA
Relay Type
In
Serial No
:
:
:
Model No
Vx
:
:
2- GENERAL INSPECTION
i)
Visual inspection
: __________
ii)
: __________
iii)
: __________
iv)
: __________
v)
: __________
vi)
: __________
:___________
:___________
: __________
: ___________
L.V. CT RATIO
:___________
L.V.INTERPOSING CT :___________
CONNECTION
:___________
MULTIPLIER
:___________
4. METERING CHECK
WINDING
PHASES
I-APPLIED
TP/TPD/PFS/TPC/QP-13:A03
RELAY DISPLAY
RELAY CURRENT
L1
L2
Page 1 of 3
W1
W2
OPERATE
REST.
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Manufacturer
Dt.
BIAS SETTING
SETTINGINITIAL
PHASES
0
MEAS.
1
EXPT.
MEAS.
4
MEAS
EXPT
R
Y
B
5B. OPERATING TIME
CURRENT INJECTED
RELAY SETTING
OPERATING TIME AT 3 X Is
B
5 C. HIGHEST ELEMENT
CURRENT INJECTED
RELAY SETTING
OPERATING TIME AT 2 X Is
B
SETTING
R
Y
B
20%
20%
20%
RESULT
Opto
input no.
Terminal
No.
Pickup
(V)
Drop
Off
(V)
S1
S2
S3
S4
TP/TPD/PFS/TPC/QP-13:A03
Opto
input
no.
S7
S8
S9
S10
Page 2 of 3
Terminal
No.
Pickup
(V)
Drop
Off
(V)
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Manufacturer
Dt.
S5
S6
8- LED FUNCTIONAL LABEL AND OPERATION:
LED
FUNCTION
OPERATION
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
LED
NO.
FUNCTION
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
GENERAL TRIP
HIGHE SET OPTD
PHASE A TRIP
PHASE B TRIP
PHASE C TRIP
NEW DATA STORED
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
OPERATION
Terminal No.
Contact
Resistance
Result
RL1
RL2
RL3
RL4
RL5
RL6
RL7
Opto
input
no.
Terminal
No.
Contact
Resistance
Result
RL8
RL9
RL10
RL11
RL12
RL13
Note: check status of Watch Dog contacts while the relay is energized and de-energized.
10- OTHER CHECKS:
1. Trip relay operation, protection operated signal verified in SCS and FRP
: .
2. Disturbance Recorder and Events printout attached
: .
3. Date and time set in the relay/ Final setting printout attached with test format
: .
Testing Instrument Details
Particulars
Make
Type
Tested By (Contractor)
TP/TPD/PFS/TPC/QP-13:A03
Page 3 of 3
Sr. No.
Witnessed By (DEWA)
Main Contractor
Name of Bay:
Consultant:
Equipment:
SCADA No:
Manufacturer
Dt.
Signature
Name
TP/TPD/PFS/TPC/QP-13:A03
Page 4 of 3
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
RELAY SETTING
I-DIFF > Setting
Calculated I POC
Slope 1
Base point 1
CT
Ratio
Phases
Injected
:
:
:
:
I/Inob
Amps
Primary
Current
(Amps)
: I/Inob
Slope-2
Base Point-2
:
:
X87 (mA)
21
22
23
24
X64 (mA)
25
26
27
28
25
27
26
28
RE
YE
BE
Relay Display
R
HV (A)
Y
HV
B
Q1
Q3
Q5
LV
Q6
R1
R3
R5
RE
YE
BE
Rest Current (IN)
Relay Display
R
Led Indication
Relay Display
B
I1
RE
YE
BE
I1
RE
YE
BE
TP/TPD/PFS/TPC/QP-13:A04
Page 1 of 7
Relay Display
R6
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
CT
Ratio
Phases
Injected
Primary
Current
(Amps)
XA (mA)
1
X87 (mA)
21
22
23
24
X64 (A)
25
26
27
28
25
26
27
28
RY
YB
BR
Relay Display
LV (kA)
HV (A)
R
HV
B
Q1
Q3
Q5
LV
Q6
R1
R3
R5
RY
YB
BR
Relay Display
Relay Display
Led Indication
B
RY
YB
BR
I1
RY
YB
BR
TP/TPD/PFS/TPC/QP-13:A04
Page 2 of 7
I1
Relay Display
R6
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
CT
Ratio
Phases
Injected
Primary
Current (A)
X87 (mA)
21
22
23
24
X64 (mA)
25
26
27
28
25
26
27
28
RE
YE
BE
Relay Display
LV (kA)
HV (A)
R
HV
B
Q1
Q3
Q5
LV
Q6
R1
R3
R5
RE
YE
BE
Relay Display
Relay Display
Led Indication
B
RE
YE
BE
I1
RE
YE
BE
TP/TPD/PFS/TPC/QP-13:A04
Page 3 of 7
I1
Relay Display
R6
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
CT
Ratio
Phases
Injected
Primary
Current
(Amps)
XA (mA)
1
X87 (mA)
21
22
23
24
X64 (A)
25
26
27
28
25
26
27
28
RY
YB
BR
Relay Display
LV (kA)
HV (A)
R
HV
B
Q1
Q3
Q5
LV
Q6
R1
R3
R5
RY
YB
BR
Rest Current (IN)
RELAY DISPLAY
R
Led Indication
RELAY DISPLAY
B
RY
YB
BR
I1
RY
YB
BR
TP/TPD/PFS/TPC/QP-13:A04
Page 4 of 7
I1
Relay Display
R6
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
CT
Ratio
Phases
Injected
Primary
Current
(Amps)
10
X87 (mA)
11
5
6
12
7
8
9
10
11
12
25
26
27
28
RE
YE
BE
Relay Display
LV (kA)
HV (A)
R
HV
B
Q1
Q3
Q5
LV
Q6
R1
R3
R5
RE
YE
BE
Relay Display
Relay Display
Led Indication
B
RE
YE
BE
I1
RE
YE
BE
TP/TPD/PFS/TPC/QP-13:A04
Page 5 of 7
I1
Relay display
R6
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
CT
Ratio
Phases
Injected
Primary
Current
(Amps)
10
X87 (mA)
11
5
6
12
7
8
9
10
11
12
25
26
27
28
RY
YB
BR
Relay Display
LV (kA)
HV (A)
R
HV
B
Q1
Q3
Q5
LV
Q6
R1
R3
R5
RY
YB
BR
Relay Display
Relay Display
Led Indication
B
RY
YB
BR
I1
RY
YB
BR
TP/TPD/PFS/TPC/QP-13:A04
Page 6 of 7
I1
Relay Display
R6
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Consultant:
Manufacturer
Particulars
Make
Tested By (Contractor)
Signature
Name
TP/TPD/PFS/TPC/QP-13:A04
Page 7 of 7
Sr.No.
Witnessed By (DEWA)
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Consultant:
Manufacturer
RELAY SETTING
I-DIFF > Setting
Calculated I POC
Slope 1
Base point 1
:
:
:
:
I/Inob
Amps
: I/Inob
Slope-2
Base Point-2
:
:
Relay Display
HV REF
11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current
(L.V) (KA)
Differential
current
Restraining
current
Relay current
(mA)
Tap position: 1
R
Tap position: 10
N
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Relay current
(mA)
Operation
TP/TPD/PFS/TPC/QP-13:A05
---
Operation
LV REF
Tap position: 19
Page 1 of 5
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Consultant:
Manufacturer
11 KV (A)
132 KV (F87T)
mA
11 KV (f87T)
mA
Line current (H.V)
(A)
Line current (L.V)
(KA)
Relay Display
Differential
current
Restraining
current
Relay current
(mA)
HV REF
Operation
Relay current
(mA)
LV REF
Operation
132 Reversal
Tap position: 1
R
Tap position: 10
N
Tap position: 19
N
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Tap position: 10
R - REVERSE
R
Y
B
N
Tap position: 10
Y- REVERSE
Y
B
N
Tap position: 10
B - REVERSE
Y
B
N
Secondary
current
Relay Display
HV REF
LV REF
11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation
TP/TPD/PFS/TPC/QP-13:A05
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Page 2 of 5
Main Contractor
Name of Bay:
Consultant:
Manufacturer
Relay Display
HV REF
LV REF
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Tap position: 10
Tap position: 10
R - REVERSE
Y- REVERSE
R
Y
B
N
R
Y
B
N
R
11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation
Tap position: 10
B - REVERSE
Y
B
N
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Tap position: 10
R - REVERSE
R
Y
B
N
Tap position: 10
Y- REVERSE
Y
B
N
Tap position: 10
B - REVERSE
Y
B
N
11kV Reversal
132KV BUS-1 CT : NORMAL
11KV CT
: REVERSE
Primary
Current
Secondary
current
Relay Display
HV REF
LV REF
11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation
TP/TPD/PFS/TPC/QP-13:A05
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Page 3 of 5
Main Contractor
Name of Bay:
Consultant:
Manufacturer
Relay Display
HV REF
LV REF
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Tap position: 10
Tap position: 10
R - REVERSE
Y- REVERSE
R
Y
B
N
R
Y
B
N
R
11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation
Tap position: 10
B - REVERSE
Y
B
N
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Normalising
132KV BUS-1 CT : NORMAL
11KV CT
: NORMAL
Primary
Current
Secondary
current
Relay Display
HV REF
TAP POSISTION: 10
R
11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current (H.V)
(A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
---------
Relay current
(mA)
Operation
TP/TPD/PFS/TPC/QP-13:A05
N
---
Operation
LV REF
Page 4 of 5
Main Contractor
Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Consultant:
Manufacturer
TAP POSISTION: 10
11 KV (A)
Secondary
current
Relay Display
HV REF
---
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current (H.V)
(A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
---------
Operation
Relay current
(mA)
LV REF
Operation
Particulars
Make
Tested By (Contractor)
Signature
Name
TP/TPD/PFS/TPC/QP-13:A05
Page 5 of 5
Sr.No.
Witnessed By (DEWA)