Shake - Machine - HTc602 - Cleaning Syrup Lines & Replacing Peristaltic Pump Tube, Duckbill Valve & O-Rings - SS144

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

60 Minutes

Shake Machines: Taylor C602


S
S
1
4
4
Frequenc
Cleaning Syrup lines & Replacing Peristaltic pump tube, Duckbill Valve & O-Rings
y
Models Taylor C602
Peristaltic Pump Tube replacement every 6 months. Duckbill and o-rings every 3 mths.
McDonalds Restaurants Ltd. May 2011. 204659
Estimated Time to Complete
Health & Safety Hazards Food Safety
Critical Control Point
Ensure nuts, bolts & screws are tight
Inspect equipment. Do not use if damaged
Wash & dry hands before performing task before and after
Chemicals
Slippery Floors / Tripping
1 Fresh APSC Solution
2 Red Border Cloth
3 Kay-5 Sanitiser
4 1 x Duck bill Valve
Taylor Part No X56200-15
Kit includes o-rings
and duckbill valves.
Taylor Part No X54979
5 Small O-Ring seals x 2
6 White Buckets x 2
7 Peristaltic Pump Tube
1
5
6
2
3
4
174921 Syrup Line Cleaning Card A4.indd 1 5/6/09 13:01:30
7
KAY-5
CLEANING SYRUP LINES
2
174921 Syrup Line Cleaning Card A4.indd 2 5/6/09 13:01:30
Remove syrup suction tube from
chocolate syrup pouch and place in a
2a 3
Pull metal clip up and pull chocolate
freezer door
1
inside an empty bucket
Press the calibration icon to display
menu options
Press Blue Up Arrow icon once to
select Syrup Prime
3a
Select and press chocolate syrup icon
Chocolate syrup pump will start to
Press calibration icon to stop pump
warm water being dispensed
Press Blue Up Arrow icon once to
select Syrup Prime
Press calibration icon to select prime
Press calibration icon to select prime
Remove chocolate syrup tube from
bucket of warm water
Select and press chocolate syrup icon
17
Repeat steps 2 to 16 inc on all the
other syrup lines
REPLACE PERISTALTIC PUMP TUBE,
DUCKBILL VALVE and O-RINGS
18
Remove peristaltic tube from pump
housing
4 5 6
7 8 9 10
11 12
the chocolate syrup line. Press the
calibration icon to display menu options
13 14
15 16
Press calibration icon to stop pump
when all water has been removed from
the chocolate syrup line
Remove all syrup bags and shelving
within syrup cupboard to expose
syrup pumps
19 19a 20
Lift up cover on chocolate sryup
pump to expose peristaltic tube inside
pump housing
21
22 24
25
Reconnect syrup feed and suction tubes
back into pump housing
23
Close pump housing cover
Remove plastic clips from both ends to
detach peristaltic tube. Install new tube
(6 months) and secure clips.
S
S
1
4
4
white plastic shake bucket of fresh
APSC solution.
174921 Syrup Line Cleaning Card A4.indd 2 5/6/09 13:01:30
25
Remove clip and detach nose fitting from door. Press metal tab underneath the QD
fitting on the chocolate syrup feed tube, and pull syrup line free.
26
Before reinstalling the Syrup Line Connectors, remove the Syrup Nose Fittings by
turning them anti-clockwise.
27
Remove the Duck Bill Valve and O-ring
from the Syrup Nose Fittings.
33
28
Using a Shake Brush, scrub the inside
of the Syrup Nose Fitting.
Using a sanitised Red Border Cloth,
wipe away a sanitised Red Border Cloth
wipe away any syrup from the Duck Bill
Valves and O-Rings. Replace every
three months.



Place the Syrup Nose Fittings and Duck
Bill Valves in sanitiser for 1-2 minutes.
29 30
31
Wearing clear gloves, reinstall the O-rings and Duck Bill Valves into the Syrup Nose
Fitting and place back onto the Syrup line fitting by turning it clockwise and hand tighten.
32
Reconnect the syrup lines into the Quick disconnect fittings on the front panel.
Then to syrup port holes on the freezer door and secure with the retainer pins.
Refit the restrictor cap.
Repeat steps 20-28 on all
syrup lines
34
SANITISE THE SYRUP LINES
Place chocolate syrup suction tube in
white plastic shake bucket of sanitiser
solution (1 packet Kay-5 sanitiser in
9.5l luke warm water)
35
Press Calibration icon to select
menu options
36
Press Up arrow icon once to select
Syrup Prime
37
Select and press chocolate syrup icon
to start sanitising the syrup line
Press calibration icon to select
prime mode
38
Sanitizer will be dispensed from the
line until chocolate syrup forces it out.
Wait for a steady stream
49
39 40
Press calibration icon to stop flow
when line is primed and leave sanitiser
in line to rest for 5 mins
Remove sanitiser suction tube from
bucket of sanitiser and connect to
chocolate pouch
41
Repeat steps 35-43
inc on all other
syrup lines.
Repeat steps 37-51
inc on all other
syrup lines.
PRIME SYRUP
LINES
42
Install nose fitting on chocolate syrup
feed tube back into freezer door and
secure with clip.
Press calibration icon to select
prime mode
Press Up arrow icon once to select
Syrup Prime Press calibration icon to select prime
Select and press chocolate syrup icon
to start priming of syrup line
Press calibration icon to stop
chocolate syrup pump after line has
been primed
44 43
45 46 47 48
50 51 52
Prime Syrup Lines
See PM Card SS140b
S
S
1
4
4

You might also like