Section 01010 - Page 14

seams of interconnecting steel plates should be welded, or seamed and flattened and sealed
with chemical resistant sealant. All edges must be de-burred and polished.
4. All modifications shall be per the provided drawings.
2.8.2.6 PLACE T-WALLS AROUND FUEL POINT
Provide and place Alaska Type T-wall force protection barriers around existing fuel point. Refer to the
standard drawings in the Appendix B-1. Ground shall be scarified, compacted and made level for vertical
placement of walls.
2.8.2.7 SNOW & ICE GUARDS
Provide snow and ice guards on all sloped roofs above personal and overhead doors for each facility.
Snow guards shall extend 200 mm beyond the opening, on both sides. Guards shall not penetrate
existing roofing but shall utilize a clamp system, with rail or bar and ice stoppers. Reference snow & ice
guard detail provided in Appendix B-1.
3. EXECUTION
3.1 CONTRACT REQUIREMENTS
3.1.1 MODIFIED SITE ADAPT PROCESS
The Contractor shall modify the fully designed construction documents, to include plans and
specifications, to the extent necessary to provide a complete construction set, and construct the facilities
identified in this Section as a Modified Site Adapt effort. Modified site adapt facilities shall be in
accordance with the requirements stated in Section 01015 TECHNICAL REQUIREMENTS. Refer to the
appendices for designs and reference drawings to which the Contractor should adhere for programmatic
requirements. The modified design and construction work shall include and be limited to that described
herein. All building systems shall be modified as required by the design changes shown in the drawings
in Appendix B-1, and only to the extent necessary to support the required modifications.
3.1.2 SUBMITTALS
The design analysis and Contractor-developed drawings and construction specifications shall be
submitted for review in accordance with Section 01335 SUBMITTAL PROCEDURES.
3.2 CONTRACT DOCUMENTS
3.2.1 TECHNICAL SPECIFICATIONS
a. The Technical Specifications, included in Appendix A-1, are provided for work to be performed and
materials to be installed by the Contractor as directed by the designs provided by the Government.
All technical, testing and submittal requirements shall be adhered to as described in each respective
specification.
b. The Contractor shall prepare and submit for approval in accordance with Section 01335 SUBMITTAL
PROCEDURES any technical specification required for construction of the designs provided by the
Government.
3.2.2 TECHNICAL REQUIREMENTS
Section 01015 TECHNICAL REQUIREMENTS provides performance criteria to which the Contractor shall
design any scope of work identified as Design-Build. These requirements are not intended to supersede
nor conflict with the Technical Specifications included in Appendix A-1 as they are design requirements to
which the Contractor, or his Design Agent, shall adhere.