DESCRIPTION OF ITEM NO 1: Loading or unloading into or from Railway
Wagons lead within one chain Shingle, sand,
ballast, surkhi ashes, kankar, brick bats, coal. Lime or 1000 Nos. tiles size 12"x6"x2" or 9"x4"x1" properly laid and stacked. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1250 Bricks Labour Unskilled Cooly 1.00 No 140.00 P. Day 140.00 Total 140.00 Sundries 10.00 Percent 14.00 Total 154.00 Contractor's Profit & Overheads 20.00 Percent 30.80 Total 184.80 Item Rates Labour Rate Per 100 Cft Rs. 147.84 Say 147.85 Labour Rate Per Cum Rs. 52.22 Say 52.20 CHAPTER NO. 2 LOADING UNLOADING AND STACKING Unit Rate (British System) per 100 Cft Page 1 DESCRIPTION OF ITEM NO 2: Loading or unloading bricks into or from Railway Wagons laid and stacked lead within one chain. a) Bricks 10" size. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1250 Bricks Labour Unskilled Cooly 1.25 No 140.00 P. Day 175.00 Total 175.00 Sundries 10.00 Percent 17.50 Total 192.50 Contractor's Profit & Overheads 20.00 Percent 38.50 Total 231.00 Item Rates Labour Rate Per 1000 Nos Rs. 184.80 Say 184.80 Unit Rate (British System) per 1000 Nos Page 2 Item No. 2 Loading or unloading bricks into or from Railway Wagons laid and stacked lead within one chain. b) Bricks 9" or smaller size. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1250 Bricks Labour Unskilled Cooly 1.00 No 140.00 P. Day 140.00 Total 140.00 Sundries 10.00 Percent 14.00 Total 154.00 Contractor's Profit & Overheads 20.00 Percent 30.80 Total 184.80 Item Rates Labour Rate Per 1000 Nos Rs. 147.84 Say 147.85 Unit Rate (British System) per 1000 Nos Page 3 DESCRIPTION OF ITEM NO 3: Loading or unloading into or from Railway Wagons cement in bags (from inside or outside the go-down) and stacking within one chain. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Bags Labour Unskilled Cooly 1.25 No 140.00 P. Day 175.00 Total 175.00 Sundries 10.00 Percent 17.50 Total 192.50 Contractor's Profit & Overheads 20.00 Percent 38.50 Total 231.00 Item Rates Labour Rate Per 100 Bags Rs. 184.80 Say 184.80 Unit Rate (British System) per 100 Bags Page 4 DESCRIPTION OF ITEM NO 4: Loading or unloading into of from Railway Wagons empty cement bags (from inside or outside the go-down) and stacking. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos. Labour Unskilled Cooly 0.12 No 140.00 P. Day 16.80 Total 16.80 Sundries 10.00 Percent 1.68 Total 18.48 Contractor's Profit & Overheads 20.00 Percent 3.70 Total 22.18 Item Rates Labour Rate Per 100 Nos Rs. 22.18 17.74 Say 17.75 125 Unit Rate (British System) per 100 Nos Page 5 DESCRIPTION OF ITEM NO 5: Loading or unloading into or from Railway Wagons (from inside or outside the go-down) and stacking white lime in bags. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Mds Labour Unskilled Cooly 0.75 No 140.00 P. Day 105.00 Total 105.00 Sundries 10.00 Percent 10.50 Total 115.50 Contractor's Profit & Overheads 20.00 Percent 23.10 Total 138.60 Item Rates Labour Rate Per 100 Mds Rs. 110.88 Say 110.90
Labour Rate Per 100 Kg Rs. 2.97 Say 2.95 Unit Rate (British System) per 100 Mds Page 6 DESCRIPTION OF ITEM NO 6: Loading or unloading into or from Railway Wagons structural steel, joists, broad, narrow or meter gauge rail and rail fastening etc. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Ton Labour Unskilled Cooly 0.60 No 140.00 P. Day 84.00 Total 84.00 Sundries 10.00 Percent 8.40 Total 92.40 Contractor's Profit & Overheads 20.00 Percent 18.48 Total 110.88 Item Rates
Labour Rate Per Ton Rs. 88.70 Say 88.70 Labour Rate per Tonne Rs. 87.30 Say 87.30 Unit Rate (British System) per Ton Page 7 DESCRIPTION OF ITEM NO 7: Loading or unloading 45 gallons drum full into or from Railway Wagons lead upto one chain. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Labour Unskilled Cooly 0.06 No 140.00 P. Day 8.40 Total 8.40 Sundries 10.00 Percent 0.84 Total 9.24 Contractor's Profit & Overheads 20.00 Percent 1.85 Total 11.09 Item Rates Labour Rate Per Each Rs. 11.09 Say 11.10 Unit Rate (British System) per Each Page 8 DESCRIPTION OF ITEM NO 8: Loading or unloading packages or stock of all sorts upto I cwt. except cement in jute or paper bags. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Labour Unskilled Cooly 0.03 No 140.00 P. Day 4.20 Total 4.20 Sundries 10.00 Percent 0.42 Total 4.62 Contractor's Profit & Overheads 20.00 Percent 0.92 Total 5.54 Item Rates Labour Rate Per Each No. Rs. 5.54 Say 5.55 Unit Rate (British System) per Each Page 9 DESCRIPTION OF ITEM NO 9: Loading or unloading sleepers other than wooden including stacking lead within one chan in. a) Broad gauge sleepers. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos. Labour Unskilled Cooly 2.50 Nos 140.00 P. Day 350.00 Total 350.00 Sundries 10.00 Percent 35.00 Total 385.00 Contractor's Profit & Overheads 20.00 Percent 77.00 Total 462.00 Item Rates Labour Rate Per 100 Nos Rs. 369.60 Say 369.60 Unit Rate (British System) per 100 Nos Page 10 Item No. 9 Loading or unloading sleepers other than wooden including stacking load within one chan in. b) Metre guage and narrow guage sleepers. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos Labour Unskilled Cooly 1.25 No 140.00 P. Day 175.00 Total 175.00 Sundries 10.00 Percent 17.50 Total 192.50 Contractor's Profit & Overheads 20.00 Percent 38.50 Total 231.00 Item Rates Labour Rate Per 100 Nos Rs. 184.80 Say 184.80 Unit Rate (British System) per 100 Nos Page 11 DESCRIPTION OF ITEM NO 10: Loading or unloading timber logs or timber for shuttering into or from Railway Wagons of any gauge including stacking, lead within one chain. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 20 Ton Labour Unskilled Cooly 5.00 Nos 140.00 P. Day 700.00 Total 700.00 Sundries 10.00 Percent 70.00 Total 770.00 Contractor's Profit & Overheads 20.00 Percent 154.00 Total 924.00 Item Rates Labour Rate Per Ton Rs. 46.20 Say 46.20 Per Tonne Rs. 45.47 Say 45.45 Unit Rate (British System) per Ton Page 12 DESCRIPTION OF ITEM NO 11: Loading or unloading bhoosa in Railway Wagons lead upto 150 feet. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Mds Labour Unskilled Cooly 3.00 Nos 140.00 P. Day 420.00 Total 420.00 Sundries 10.00 Percent 42.00 Total 462.00 Contractor's Profit & Overheads 20.00 Percent 92.40 Total 554.40 Item Rates Labour Rate Per 100 Mds. Rs. 443.52 Say 443.50 Labour Rate Per 100 Kg Rs. 11.88 Say 11.90 Unit Rate (British System) per 100 Mds Page 13 DESCRIPTION OF ITEM NO 12: Loading or unloading timber scrap or wooden plugs into or from Railway Wagons and stacking within one chain lead. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1.25 Ton Labour Unskilled Cooly 0.50 No 140.00 P. Day 70.00 Total 70.00 Sundries 10.00 Percent 7.00 Total 77.00 Contractor's Profit & Overheads 20.00 Percent 15.40 Total 92.40 Item Rates Labour Rate Per Ton Rs. 73.92 Say 73.90 Labour Rate Per Tonne Rs. 72.75 Say 72.75 Unit Rate (British System) per Ton Page 14 DESCRIPTION OF ITEM NO 13: Loading or unloading pitching stone or spawl from Railway Wagons of any gauge (including clearing 5 feet away from the rail) Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Cft. Labour Unskilled Cooly 0.37 No 140.00 P. Day 51.80 Total 51.80 Sundries 10.00 Percent 5.18 Total 56.98 Contractor's Profit & Overheads 20.00 Percent 11.40 Total 68.38 Item Rates Labour Rate Per 100 Cft Rs. 54.70 Say 54.70 Labour Rate Per Cum Rs. 19.32 Say 19.30 Unit Rate (British System) per 100 Cft Page 15 DESCRIPTION OF ITEM NO 14: Loading or unloading building stone (including clearing 5 feet away from rails) Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Cft. Labour Unskilled Cooly 0.48 No 140.00 P. Day 67.20 Total 67.20 Sundries 10.00 Percent 6.72 Total 73.92 Contractor's Profit & Overheads 20.00 Percent 14.78 Total 88.70 Item Rates Labour Rate Per 100 Cft Rs. 70.96 Say 70.95 Labour Rate Per Cum Rs. 25.06 Say 25.05 Unit Rate (British System) per 100 Cft Page 16 DESCRIPTION OF ITEM NO 15: Unloading oil, bitumen tar etc. a) Crude oil (to be pumped from tank wagon, into tank). Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1250 Gallons Labour Unskilled Cooly 1.25 No 140.00 P. Day 175.00 Total 175.00 Sundries 10.00 Percent 17.50 Total 192.50 Contractor's Profit & Overheads 20.00 Percent 38.50 Total 231.00 Item Rates Labour Rate Per 1000 Gln. Rs. 184.80 Say 184.80 Labour Rate Per 100 Liters Rs. 4.07 Say 4.05 Unit Rate (British System) per 1000 Gln Page 17 Item No. 15 Unloading oil, bitumen tar etc. b) Crude oil (drained by gravity). Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1250 Gallons Labour Unskilled Cooly 1.25 No 140.00 P. Day 175.00 Total 175.00 Sundries 10.00 Percent 17.50 Total 192.50 Contractor's Profit & Overheads 20.00 Percent 38.50 Total 231.00 Item Rates
Labour Rate Per 1000 Gln. Rs. 184.80 Say 184.80
Labour Rate Per 100 Liters Rs. 4.07 Say 4.05
Unit Rate (British System) per 1000 Gln Page 18 Item No. 15 Unloading oil, bitumen tar etc. c) Crude oil materials from Railway Wagons. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Cft Labour Unskilled Cooly 0.16 No 140.00 P. Day 22.40 Total 22.40 Sundries 10.00 Percent 2.24 Total 24.64 Contractor's Profit & Overheads 20.00 Percent 4.93 Total 29.57 Item Rates Labour Rate Per 100 Cft Rs. 23.65 Say 23.65 Labour Rate Per Cum Rs. 8.35 Say 8.35 Unit Rate (British System) per 100 Cft Page 19 Item No. 15 Unloading oil, bitumen tar etc. d) Fuel oil from tank into empty drums and stacking within one chain. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 45 Ton Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates
Labour Rate Per Ton Rs. 65.71 Say 65.70 Labour Rate Per Tonne Rs. 64.67 Say 64.65 Unit Rate (British System) per Ton Page 20 Item No. 15 Unloading oil, bitumen tar etc. e) Petrol (2 gallon tin) Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos Labour Unskilled Cooly 0.63 Nos 140.00 P. Day 88.20 Total 88.20 Sundries 10.00 Percent 8.82 Total 97.02 Contractor's Profit & Overheads 20.00 Percent 19.40 Total 116.42 Item Rates Labour Rate Per 100 Nos Rs. 93.14 Say 93.15 Unit Rate (British System) per 100 Nos Page 21 Item No. 15 Unloading oil, bitumen tar etc. f) Kerosine oil (4 gallons tin). Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos Labour Unskilled Cooly 1.25 Nos 140.00 P. Day 175.00 Total 175.00 Sundries 10.00 Percent 17.50 Total 192.50 Contractor's Profit & Overheads 20.00 Percent 38.50 Total 231.00 Item Rates Labour Rate Per 100 Nos Rs. 184.80 Say 184.80 Unit Rate (British System) per 100 Nos Page 22 DESCRIPTION OF ITEM NO 16: Removing and stacking within one chain lead. a) Stones, Spawl, Brick Bats, shingle, sand, lime. Surki, ashes, Kankar & Coal etc. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Cft Labour Unskilled Cooly 0.50 No 140.00 P. Day 70.00 Total 70.00 Sundries 10.00 Percent 7.00 Total 77.00 Contractor's Profit & Overheads 20.00 Percent 15.40 Total 92.40 Item Rates Labour Rate Per 100 Cft Rs. 73.92 Say 73.90 Labour Rate Per Cum Rs. 26.11 Say 26.10 Unit Rate (British System) per 100 Cft Page 23 Item No. 16 Removing and stacking within one chain lead. b) Bricks Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 15,000 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 1000 Nos Rs. 197.12 Say 197.10 Unit Rate (British System) per 1000 Nos Page 24 Item No. 16 Removing and stacking within one chain lead. c) Broad gauge wooden sleepers Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 2,500 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 118.27 Say 118.25 Unit Rate (British System) per 100 Nos Page 25 Item No. 16 Removing and stacking within one chain lead. d) Metre gauge or narrow gauge wooden sleepers. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 4,200 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 70.40 Say 70.40 Unit Rate (British System) per 100 Nos Page 26 Item No. 16 Removing and stacking within one chain lead. e) Rails, girders, pipes, cement etc. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 90 Ton Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per Ton Rs. 32.85 Say 32.85 Labour Rate Per Tonne Rs. 32.33 Say 32.35 Unit Rate (British System) per Ton Page 27 Item No. 16 Removing and stacking within one chain lead. f) Bridge and crossing timber etc. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 750 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 394.24 Say 394.25 Unit Rate (British System) per 100 Nos Page 28 DESCRIPTION OF ITEM NO 17: Loading into Wagons Girders, Rails, permanent way material (except wooden sleepers) iron work, M.S. Bars, Pipes, etc. including lead one chain and stacking inside Wagons. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 40 Ton Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per Ton Rs. 73.92 Say 73.90 Labour Rate Per Tonne Rs. 72.75 Say 72.75 Unit Rate (British System) per Ton Page 29 DESCRIPTION OF ITEM NO 18: Unloading from Wagons Girders, Rails, permanent way material (except wooden sleepers) iron work, M.S. Bars, Pipes, etc. lead upto one chain but excluding stacking. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 70 Ton Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per Ton Rs. 42.24 Say 42.25 Labour Rate Per Tonne Rs. 41.57 Say 41.55 Unit Rate (British System) per Ton Page 30 DESCRIPTION OF ITEM NO 19: Loading into Wagons, wooden broad gauge sleepers including one chain lead and stacking. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1,000 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 295.68 Say 295.70 Unit Rate (British System) per 100 Nos Page 31 DESCRIPTION OF ITEM NO 20: Unloading wooden broad gauge sleepers from Wagons including one chain lead and stacking. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 2,100 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 140.80 Say 140.80 Unit Rate (British System) per 100 Nos Page 32 DESCRIPTION OF ITEM NO 21: Loading metre gauge or narrow gauge wooden sleepers including one chain lead and stacking inside Wagons. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 2,000 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 147.84 Say 147.85 Unit Rate (British System) per 100 Nos Page 33 DESCRIPTION OF ITEM NO 22: Unloading metre gauge or narrow gauge wooden sleepers including one chain lead but excluding stacking Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 3,800 Nos Labour Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Total 2,240.00 Sundries 10.00 Percent 224.00 Total 2,464.00 Contractor's Profit & Overheads 20.00 Percent 492.80 Total 2,956.80 Item Rates Labour Rate Per 100 Nos Rs. 77.81 Say 77.80 Unit Rate (British System) per 100 Nos Page 34 DESCRIPTION OF ITEM NO 23: Loading Bridge and grossing timber including one chain lead and stacking. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos Labour Unskilled Cooly 4.00 Nos 140.00 P. Day 560.00 Total 560.00 Sundries 10.00 Percent 56.00 Total 616.00 Contractor's Profit & Overheads 20.00 Percent 123.20 Total 739.20 Item Rates Labour Rate Per 100 Nos Rs. 591.36 Say 591.35 Unit Rate (British System) per 100 Nos Page 35 DESCRIPTION OF ITEM NO 24: Unloading Bridge and crossing timber including one chain lead but excluding stacking. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 125 Nos Labour Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00 Total 280.00 Sundries 10.00 Percent 28.00 Total 308.00 Contractor's Profit & Overheads 20.00 Percent 61.60 Total 369.60 Item Rates Labour Rate Per 100 Nos Rs. 295.68 Say 295.70 NOTE : Rate for loading and unloading for Mobile trucks/ boats, item 1-15 will be 80% of the rate of Railway Wagons. Unit Rate (British System) per 100 Nos Page 36 DESCRIPTION OF ITEM NO 25: Loading or unloading bitumen, asphalt or tar in drums, into or from Railway Wagons lead upto one chain. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 25 Ton Labour Unskilled Cooly 6.00 Nos 140.00 P. Day 840.00 Total 840.00 Sundries 10.00 Percent 84.00 Total 924.00 Contractor's Profit & Overheads 20.00 Percent 184.80 Total 1,108.80 Item Rates Labour Rate Per Ton Rs. 44.35 Say 44.35 Labour Rate Per Tonne Rs. 43.65 Say 43.65 Unit Rate (British System) per Ton Page 37