1 2 3 4 5 6 7 8 9 10 12 13
12 works(Providing BT & CC
roads and Drains) in
Prathipadu constituency
G.O.Rt No.477,Dt. 17.4.12 of
Planning (XVIII) Department &
Go.Rt No.802, Dt . 02.7.12 &
Progs. Rc.
No.228/Plg.I/SDFWDA/Prathipadu/
12-13 Dt. 05.01.13 of the District
Collector, Guntur.
12-2=10
5
15
EE, PRI,
Guntur
200.00 0.00 0.00 0.00 200.00 112.60 112.60
Sanction four road works
under SDF Funds
G.O.Rt.No.170/Plg.(XVII) Dept.,
dated 10.02.2014 & Progs
No.29/Plg.I/SDFWDA/Prathipadu/1
4, Dt. 01.03.14
4 4
EE, PRI,
Guntur
295.00 295.00
Guntur-II
(west)
Construction of Urdu Ghar
cum Shadi Khana at Guntur -
II , Guntur District
G.O.Rt.No.99 dated.21.01.2012 of
Planning (XVIII) Department & G.O.
Rt No.1049, Dt.21.11.13 of
Planning VIII Dept.
1 1
EE,PRI,
Guntur
300.00 0.00 0.00 0.00 300.00 250.00 250.00
Developmental Activities
(Providing additional facilities
to Urdhu Ghar cum
Shadikhana at Guntur-II
Assembly Constituency)
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg./I /
SDFWDA/Guntur West/2013, Dt. 08.11.2013
1 1
EE,PRI,
Guntur
47.00 47.00 47.00
Developmental Activities
(Providing additional
infrastructure to Urdu Ghar
cum Shadikhana building at
Pattabhipuram in Municipal
Corporation, Guntur)
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 &Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt. 08.01.2014
1 1
EE,PRI,
Guntur
49.00 49.00 49.00
DISTRICT ABSTRACT for Racha banda /Special DeVelopment Fund for welfare and Development Activities works as on 31.5.2014 in PR Circle, Guntur
S.No District
Constit
uency
Gist of Announcement Sanction Particulars
No. of works sanctioned
Only
SDF
SDF+PR Total Only SDF
SDF+PR
Executive
Agency
Amount
Only SDF
as on
APRIL 2014
SDF+PR
Total
Expenditur
e
Expenditure as on APRIL 2014
1 Guntur
Guntur
2
Prathipa
du
Guntur-II
(west)
Developmental Activities
(Providing Funds to Muslim
Shadi Khana for Completion
of Incomplete works ,
Pattabhipuram Div No 31 in
Guntur Muncipality)
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt. 28.02.2014
1 1
EE,PRI,
Guntur
15.00 15.00 15.00
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs.No.
77/Plg I/SDFWDA/Guntur west/13,
Dt. 10.12.2013
23 23
EE,PRI,
Guntur
264.35 264.35 264.35
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
08.01.2014
4 4
EE,PRI,
Guntur
43.50 43.50 43.50
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt. 31.01.2014
1 1
EE,PRI,
Guntur
8.60 8.60 8.60
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt. 06.02.2014 1 1
EE,PRI,
Guntur
3.65 3.65 3.65
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt. 20.02.2014 1 1
EE,PRI,
Guntur
15.75 15.75 15.75
3 Guntur
Guntur-II
(East)
Developmental Activities
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
No.76/Plg.I/SDFWDA/Guntur
West/13, Dt.06.02.14
7 7
EE,PRI,
Guntur
86 85 85
Construction of Side drains in
Bethapudi village
G.O.Rt.No.1027 dated.05.8.2012 of
Planning (XVIII) Department
1 1
EE,PRI,
Guntur
25.00 0.00 0.00 0.00 25.00 22.81 22.81
Construction of CC roads
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs Rc.No.79/Plg
I/SDFWDA/TDK/12-13, Dt.02.07.13
20+39 59
EE,PRI,
Guntur
100.00 195.00 295.00 295.00 111.64 111.64
Construction of CC roads,
Drains and Culverts
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 &
Progs.No.1279/Plg.I/SDFWDA/STN/2013,
dt.04.12.2013
4 4 20.00 20.00 20.00 4.95 4.95
Construction of CC roads
G.O.Rt.No.1058/Plg VII Dept., Dt.22.11.13 &
Progs.No.78/Plg.I/SDFWDA/Sattenapalli/201
3, dt.08.11.2013 29 29 100.00 100.00 100.00 68.35 68.35
Guntur
Developmental Activities
2
Guntur-II
(west)
Guntur
Guntur-II
(west)
4 Guntur
Tadikon
da
5 Guntur
Sattenap
alli
Repalle
Providing C.C Pavement to
the internal Roads in
Nizampatnam Village.
G.O. Rt No. 548 Planning (XV11I)
Department dated 11.07.2011.
1 1 75.00 0.00 0.00 0.00 75.00 49.38 49.38
Repalle
Completion of incomplete
Community Hall at
Nizamapatnam Village
G.O. Rt No. 548 Planning (XV11I)
Department dated 11.07.2011.
1 1 25.00 0.00 0.00 0.00 25.00 24.92 24.92
Repalle
Sanction of link Roads from
the main roads to all SC/ST
repalle Assembly
Consituency
G.O Rt No: 611 dt 23.07.2011 of Planning
(XVIII) Dept.
and G.O. RT. No. 95, DT.19.01.12
(Plg)(RPB) Dept.,
20 20 306.00 0.00 0.00 0.00 306.00 281.28 281.28
Bapatla
i) Completion of incomplete
PR road etrivaripalem and to
meet Baptla Guntur High
road and
G.O. Rt No. 797 Dated 15.09.2011
of Planning (XVIII) Department
1 1
EE, PR,
Tenali
35.00 0.00 0.00 0.00 35.00 30.04 30.04
Bapatla
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.21.3.2013 of the District Collector, Guntur
25 25
EE, PR,
Tenali
42.92 42.92 85.84 85.84
Bapatla
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 and Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.14.11.2013 of the District Collector, Guntur
21 21
EE, PR,
Tenali
60.99 60.99 60.99
G.O.Rt.No.242 dated.05.3.2013 of
Planning (XVIII) Department &
Proceedings No.
80/Plg/SDFWDAT/Tenali/2013 Dt:
19.12.2013
22 22
EE, PR,
Tenali
82.00 82.00 82.00
G.O.Rt.No.242 dated.05.3.2013 of
Planning (XVIII) Department &
Procgs.No. 80/ Plg I/ SDFWDA/
Tenali/2013,Dt.28.02.2014
8 8
EE, PR,
Tenali
23.00 23.00 23.00
9 Guntur Vemuru
Completion of Vemana
Vikaskendram building in
Modukuru (V) of Tsunduru
(M)
G.O.Rt.No.170/Plg.(XVII) Dept., dated
10.02.2014 & Procgs.No. 23/ Plg I/ SDFWDA/
Vemuru/2013,Dt.16.02.2014
1 1
EE, PR,
Tenali
25.00 25.00 25.00
10 Guntur
Macherl
a
Sanction four road works
under SDF Funds
G.O.Rt.No.170/Plg.(XVII) Dept.,
dated 10.02.2014 &
26/Plg.I/SDFWDA/ Macherla/2013,
dt.16.02.2014
5 5
EE, PR,
Tenali
25.00 25.00 25.00
11 Guntur
Vinukon
da
Sanction four road works
under SDF Funds
G.O.Rt.No.170/Plg.(XVII) Dept.,
dated 10.02.2014 &
25/Plg.I/SDFWDA/Vinukonda/2013,
dt.16.02.2014
21 21
EE, PR,
Tenali
100.00 100.00 100.00
Construction of CC roads and
Compound walls
EE, PR,
Tenali
8 Guntur Tenali Certain Developmental works
7 Guntur
Guntur 6
Grand total 44 235 279 1261.00 625.91 723.77 1348.68 2609.68 771.03 184.94 955.97
Superintending Engineer
Panchayat Raj Circle, Guntur
1 work in
progress, 12 works
completed, 2 works
proposed for
dropping
All works in T/S
stage
Completed FB tobe
paid
Completed FB tobe
paid
Completed FB tobe
paid
DISTRICT ABSTRACT for Racha banda /Special DeVelopment Fund for welfare and Development Activities works as on 31.5.2014 in PR Circle, Guntur
Remarks-
Physical stage
Progress
9 works completed
balance in
progress
1 work progress , 3
works not started
Tender stage
Tender stage
Tender stage
All works in Agt.
Stage
Completed, FB
Paid.
54 works
completed, 4
works progress & 1
work not started
All Works
completed FB
tobe Paid
All Works
completed FB
tobe Paid
Work is in Progress Part
Payment Made.
Completed,FB Paid
All Works
completed FB
Paid
Completed,FB Paid
All Works
completed FB
Paid
All Works
completed FB
tobe Paid
17 works
completed, 2 works
progress & 3 works
not started
1 work progress &
7 works not started
Tenders tobe
called for
All works Completed FB
to be paid
15 works
completed, 5 works
progress & 1 work
not started
Superintending Engineer
Panchayat Raj Circle, Guntur
SDF PR Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
5 Guntur Prathipadu
Providing 4 C.C. roads and
C.C. drains in the SC
Colony and
Obulunaidupalem village
1 1 1 20.00 20.00 20.00 20.00 10.00 10.00 8.00
Completed
FB tobe Paid
7 Guntur Prathipadu
Providing C.C. road from B.
Anjaneyulu house to
T.Basavaiah house in
Etukuru village
1 1 1 8.00 8.00 8.00 8.00 4.00 Completed
10 Guntur Prathipadu
Providing 3 internal C.C.
roads in Chowdavaram
village
1 1 1 6.00 6.00 6.00 6.00 3.00 Progress
11 Guntur Prathipadu
Formation of 3 Internal CC
roads in SC Colony
Bonthapadu with an
expenditure of Rs.3.33
loakhs per road
1 1 1 10.00 10.00 10.00 10.00 5.00 Completed
13 Guntur Prathipadu
Formation of 3 internal cc
roads in Chinapalakaluru
with an expenditure of
Rs.3.33 lakhs per road
1 1 1 10.00 10.00 10.00 10.00 5.00 5.00 4.50 Completed
14 Guntur Prathipadu
Formation of 3 internal CC
roads in SC Colony
Chowdavaram with an
expenditure of Rs.3.33 lakhs
per road
1 1 1 10.00 10.00 10.00 10.00 5.00 Completed
20 Guntur
Guntur-II
(west)
Construction of Urdu-Ghar-
cum-Shadi Khana at Guntur -
II
G.O.Rt.No.99,
Dt.21.01.12 &
G.O.Rt.No.1049,
Dt.22.11.13
1 1
EE, PR,
Guntur
1 300.00 300.00 300.00 300.00
Buildi
ng
work
250.00 250.00 34.00
Completed
FB tobe
paid
21 Guntur
Guntur-II
(west)
Providing additional facilities
to Urdhu Ghar cum
Shadikhana at Guntur-II
Assembly Constituency
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Progs.No.77/Plg./I /
SDFWDA/Guntur
West/2013, Dt.
08.11.2013
1 1
EE,PRI,
Guntur
1 47.00 47.00 47.00 47.00 23.50 Completed
22 Guntur
Guntur-II
(west)
Providing additional
infrastructure to Urdu Ghar
cum Shadikhana building at
Pattabhipuram in Municipal
Corporation, Guntur
Progs.No.77/Plg.I /
SDFWDA/Guntur
West/2013, Dt.
08.01.2014
1 1
EE,PRI,
Guntur
1 49.00 49.00 49.00 25.28 Completed
23 Guntur
Guntur-II
(west)
Construction of CC drain and CC
road at Vaddegudem ini Division
NO.21 in Municipal Corporation,
Guntur
1 1 1 25.00 25.00 25.00 25.00 14.30 Completed
Go.Rt No.802, Dt .
02.7.12 & Progs.
Rc.
No.228/Plg.I/SDFW
DA/Prathipadu/12-
13 Dt. 05.01.13 of
the District
Collector, Guntur.
EE, PRI,
Guntur
Go.Rt No.802, Dt .
02.7.12 & Progs.
Rc.
No.228/Plg.I/SDFW
DA/Prathipadu/12-
13 Dt. 05.01.13 of
the District
EE, PRI,
Guntur
Progs.No. 77/Plg
I/SDFWDA/Guntur
west/13, Dt.
10.12.2013
EE PRI
Guntur
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
EE, PRI,
Guntur
G.O.Rt No.477,Dt.
17.4.12
RACHA BANDA AND SPECIAL DEVELOPMENT FUND FOR WELFARE & DEVELOPMENT ACTIVITIES WORKS PROGRESS REPORT FOR THE MONTH OF JUNE 2014 IN PR CIRCLE, GUNTUR
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
24 Guntur
Guntur-II
(west)
Laying of CC road & CC drain at
Srinivasa Rao thota 6th lane to
9th lane in Division NO.21 (NRT
statue besides road) in Municipal
Corporation, Guntur
1 1 1 9.90 9.90 9.90 9.90 Completed
25 Guntur
Guntur-II
(west)
Providing CC road at 1st Lane
1st corss road Sysmala Nagar
Recruitment office back side in
Divisin NO.32 in Municipal
Corporation, Guntur
1 1 1 8.90 8.90 8.90 8.90 Progress
26 Guntur
Guntur-II
(west)
Laying of CC road and drain at
Veera Brahmamgari teple beside
road in Division No.21 in
Municipal Corporation, Guntur
1 1 1 9.90 9.90 9.90 9.90 7.08 Progress
27 Guntur
Guntur-II
(west)
Providing WBM road and RCC
culvert at Durga Nagar 2nd Lane
upto Narasaraopet road in
Division NO.27 in Municipal
Corporation, Guntur
1 1 1 14.00 14.00 14.00 14.00 Progress
28 Guntur
Guntur-II
(west)
Construction of 12 size of CC
drain at Peruguchettu road for
cross road upto Ramulavari
temple junction in
Stambalagaruvu in Division
No.32 in Municipal Corporation,
Guntur
1 1 1 2.80 2.80 2.80 2.80 Completed
29 Guntur
Guntur-II
(west)
Providing widening with CC road
at Syamala nagar main road
from 1st Lane cross culvert upto
East Recruitment office junction
in Division NO.32 in Municipal
Corporation, Guntur
1 1 1 19.95 19.95 19.95 19.95 Progress
30 Guntur
Guntur-II
(west)
Formation of WBM road at 2nd
lane from main road upto
Railway track road in Syamala
nagar in Divisin NO.32 in
Municipal Corporation, Guntur
1 1 1 2.70 2.70 2.70 2.70 Completed
31 Guntur
Guntur-II
(west)
Providing CC roads to 4th Lane
and 2nd cross road, Vidya Nagar
in Division NO.32 in Municipal
Corporation, Guntur
1 1 1 12.00 12.00 12.00 12.00 23.42 Completed
32 Guntur
Guntur-II
(west)
Construction of CC outfall drain
at Anjaneya swamy temple upto
East Sai baba road, idya Nagar
in Division NO.34 in Municipal
corporation, Guntur
1 1 1 25.00 25.00 25.00 25.00 Completed
Progs.No. 77/Plg
I/SDFWDA/Guntur
west/13, Dt.
10.12.2013
EE PRI
Guntur
Progs.No. 77/Plg
I/SDFWDA/Guntur
west/13, Dt.
10.12.2013
EE PRI
Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
33 Guntur
Guntur-II
(west)
Providing improvements to
Junction and temple all round
with CC pavement at west side
of Anjaneyaswamy temple in 1st
line of Vidya nagar in Division
No.34 in Municipal Corporation,
Guntur
1 1 1 5.30 5.30 5.30 5.30 Progress
34 Guntur
Guntur-II
(west)
Providing CC road and CC drain
at Oxford School, Opp: Cut road
at H.No.483, Brundavan
Gardens in Division No.35 in
Municipal Corporation, Guntur
1 1 1 7.10 7.10 7.10 7.10 Completed
35 Guntur
Guntur-II
(west)
Providing CC road at 1/1,
Chandramouli nagar from Ring
road upto 1st cross road in
Division NO.36
1 1 1 7.90 7.90 7.90 7.90 Progress
36 Guntur
Guntur-II
(west)
Construction of RCC cross
culvert at 1/18, cross road at
Brodipet in Division NO.38 in
Municipal Corporation, Guntur
1 1 1 5.10 5.10 5.10 5.10 Progress
37 Guntur
Guntur-II
(west)
Construction of CC outfall drain
to Chaitanyapuri main road from
Chaitanyapuri 3rd lane upto to
Mutyala reddy nagar vagu in
Division NO.41 in Municipal
Corporation, Guntur
1 1 1 16.00 16.00 16.00 16.00 Progress
38 Guntur
Guntur-II
(west)
Providing Bore well at Sanjay
Gandhi nagar 4th Lane, Division
NO.42 in Municipal Corporation,
guntur
1 1 1 0.70 0.70 0.70 0.70 Progress
39 Guntur
Guntur-II
(west)
Construction of CC drains to
NTR colony 1st Lane and
Anjaneyapet main road (From
1st cross road to Amaravathi
road in Diviion NO.42 in
Municipal Corporation, Guntur
1 1 1 4.20 4.20 4.20 4.20 Progress
40 Guntur
Guntur-II
(west)
Construction of CC drains and
providing CC road to
Chaitanyapuri colony 4th lane
Sugali colony main road cross
road (Municipal School Road) in
Divisino NO.41 in Municiapl
corporation, Guntur
1 1 1 19.10 19.10 19.10 19.10 6.92 Completed
41 Guntur
Guntur-II
(west)
Providing CC road to Ambedkar
Nagar main road in Division
No.42 in Municipal Corporation,
Guntur
1 1 1 6.30 6.30 6.30 6.30 Progress
42 Guntur
Guntur-II
(west)
Construction of community hall
at Sugali colony in Division
NO.41 in Municipal Corporation,
Guntur
1 1 1 19.60 19.60 19.60 19.60 Progress
Progs.No. 77/Plg
I/SDFWDA/Guntur
west/13, Dt.
10.12.2013
EE PRI
Guntur
Progs.No. 77/Plg
I/SDFWDA/Guntur
west/13, Dt.
10.12.2013
EE,PRI,
Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
43 Guntur
Guntur-II
(west)
Construction of CC drains to
Mutyala Reddy nagar 9th & 10th
Lanes (East side) in Division
NO.41 in Municipal Corporation,
Guntur
1 1 1 9.90 9.90 9.90 9.90 Progress
44 Guntur
Guntur-II
(west)
Providing CC roads to 9th & 10th
Lanes of Mutyala Reddy Nagar
in Division NO.41 in Municipal
Corporation, Guntur
1 1 1 14.00 14.00 14.00 14.00 11.03 Completed
45 Guntur
Guntur-II
(west)
Construction of community hall
for SC's at Koritepadu tank bund
in Division NO.41 in Municipal
Corporation, Guntur
1 1 1 19.00 19.00 19.00 19.00 Progress
46 Guntur
Guntur-II
(west)
Providing UGD lines at
Rajaka Ramalayam,
Sakethapuram, PS Nagar
2nd Lane, Bharatpet and
postal Colony and
Construction of main holes at
Arundelpet area in Municipal
Corporation, Guntur.
1 1 1 23.00 23.00 23.00 23.00 Progress
53 Guntur
Guntur-II
(west)
Providing Funds to Muslim
Shadi Khana for Completion
of Incomplete works ,
Pattabhipuram Div No 31 in
Guntur Muncipality
Progs.No.77/Plg.I /
SDFWDA/Guntur
West/2013, Dt.
28.02.2014 1 1
EE,PRI,
Guntur
1
15.00 15.00 15.00 15.00
2.50 Progress
62 Guntur Tadikonda
Providing internal CC roads in
Yalavarthipadu (V) of
Medikonduru (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
63 Guntur Tadikonda
Providing internal CC roads in
SC colony in Tadikonda |(V&M) 1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 Progress
64 Guntur Tadikonda
Providing internal CC roads in
Muslim locality (south ) in
Tadikonda |(V&M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50. Progress
65 Guntur Tadikonda
Providing internal CC roads in
Chenchu colony in Tadikonda
|(V&M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.45 Completed
66 Guntur Tadikonda
Providing internal CC roads in
SC colony of Ponnekallu (V) of
Tadikonda |(M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
67 Guntur Tadikonda
Providing internal CC roads in
SC colony of Kantheru (V) of
Tadikonda |(M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.40 Completed
68 Guntur Tadikonda
Providing internal CC roads in
SC colony of Lam (V) of
Tadikonda |(M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 Progress
69 Guntur Tadikonda
Providing internal CC roads in
SC colony of Mandadam (V) of
Thulluru (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013
EE,PRI,
Guntur
EE,PRI,
Guntur
Progs.No.77/Plg.I /
SDFWDA/Guntur
West/2013, Dt.
08.01.2014
Progs.No. 77/Plg
I/SDFWDA/Guntur
west/13, Dt.
10.12.2013
EE,PRI,
Guntur
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013
EE,PRI,
Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
70 Guntur Tadikonda
Providing internal CC roads in
SC colony of Rayapudi (V) of
Thulluru (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
71 Guntur Tadikonda
Providing internal CC roads in
Velagapudi (V) of Thulluru (M) 1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 Completed
72 Guntur Tadikonda
Providing internal CC roads in
SC colony in Phirangipuram (V &
M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.45 Completed
73 Guntur Tadikonda
Providing internal CC roads in
Muslim Locality in Phirangipuram
(V & M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
74 Guntur Tadikonda
Providing internal CC roads in
BCLocality in Phirangipuram (V
& M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
76 Guntur Tadikonda
Providing internal CC roads in
Yarraguntlapadu (V) of
Phirangipuram (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.48 Completed
77 Guntur Tadikonda
Providing internal CC roads in
Muslim Locality (East ) in
Medikonduru (V &M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.40 Completed
78 Guntur Tadikonda
Providing internal CC roads in
SC colony in Medikonduru (V
&M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.40 Completed
79 Guntur Tadikonda
Providing internal CC roads in
SC colony in Perecharla (V) of
Medikonduru (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.40 Completed
80 Guntur Tadikonda
Providing internal CC roads in
Muslim Locality in Perecharla
(V) of Medikonduru (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.40 Completed
81 Guntur Tadikonda
Providing internal CC roads in
Muslim Locality in Siripuram (V)
of Medikonduru (M)
1 1 1
5.00 5.00 5.00 5.00 2.50 2.50 2.40 Completed
88 Guntur Tadikonda
Providing internal CC roads in
Sirangipalem (V) of
Phirangipuram (M)
1 1 1
5.00 5.00 5.00 5.00 4.63 Completed
89 Guntur Tadikonda
Providing internal CC roads in
Takkellapadu (V) of
Phirangipuram (M)
1 1 1
5.00 5.00 5.00 5.00 Completed
93 Guntur Tadikonda
Providing internal CC roads in
Bethapudi (V) of Phirangipuram
(M)
1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
94 Guntur Tadikonda
Providing internal CC roads in
BC Colony in Medikonduru
(V&M)
1 1 1
5.00 5.00 5.00 5.00 4.40 Completed
96 Guntur Tadikonda
Providing internal CC roads in
Medikonduru (V&M)
1 1 1
5.00 5.00 5.00 5.00 4.45 Completed
97 Guntur Tadikonda
Providing internal CC roads in
BC Colony in perecherla (V) of
Medikonduru (M)
1 1 1
5.00 5.00 5.00 5.00 4.23 Completed
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-
13, Dt.02.07.13
EE,PRI,
Guntur
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013
EE,PRI,
Guntur
Progs.No. 79/Plg
I/SDFWDA/TDK/13,
Dt. 02.07.2013
EE,PRI,
Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
98 Guntur Tadikonda
Providing internal CC roads in
perecherla (V) of Medikonduru
(M)
1 1 1
5.00 5.00 5.00 5.00 4.45 Completed
99 Guntur Tadikonda
Providing internal CC roads in
Siripuram (V) of Medikonduru
(M)
1 1 1
5.00 5.00 5.00 5.00 3.91 Completed
101 Guntur Tadikonda
Providing internal CC roads in
Paladugu (V) of Medikonduru
(M)
1 1 1
5.00 5.00 5.00 5.00 4.24 Completed
102 Guntur Tadikonda
Providing internal CC roads in
BC Colony in Badepurm road of
Tadikonda (V&M)
1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
103 Guntur Tadikonda
Providing internal CC roads in
Muslim locality South of
Tadikonda (V&M)
1 1 1
5.00 5.00 5.00 5.00 Progress
104 Guntur Tadikonda
Providing internal CC roads in
Tadikonda (V&M)
1 1 1
5.00 5.00 5.00 5.00 Completed
107 Guntur Tadikonda
Providing internal CC roads in
West Kantheru(V) of Tadikonda
(M)
1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
108 Guntur Tadikonda
Providing internal CC roads in
Kantheru(V) of Tadikonda (M) 1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
109 Guntur Tadikonda
Providing internal CC roads in
SC colony of Tadikonda (V&M) 1 1 1
5.00 5.00 5.00 5.00 Completed
111 Guntur Tadikonda
Providing internal CC roads in
BC colony of Tadikonda (V&M) 1 1 1
5.00 5.00 5.00 5.00 4.92 Completed
112 Guntur Tadikonda
Providing internal CC roads in
Minority locality of Tadikonda
(V&M)
1 1 1
5.00 5.00 5.00 5.00 4.84 Completed
113 Guntur Tadikonda
Providing internal CC roads in
SC Colony of Thullur (V&M)
1 1 1
5.00 5.00 5.00 5.00 4.92 Completed
114 Guntur Tadikonda
Providing internal CC roads in
BC locality of Thullur (V&M)
1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
115 Guntur Tadikonda
Providing internal CC roads in
Muslim locality of Thullur (V&M) 1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
116 Guntur Tadikonda
Providing internal CC roads in
Thullur (V&M)
1 1 1
5.00 5.00 5.00 5.00 4.96 Completed
117 Guntur Tadikonda
Providing internal CC roads in
Mandadam (V) of Thullur (M) 1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
120 Guntur Tadikonda
Providing internal CC roads in
Rayapudi (V) of Thullur (M)
1 1 1
5.00 5.00 5.00 5.00 4.95 Completed
121 Guntur Sattenapalli
Construction of CC road from
Dammavalam Srinu (H) to
Drining water well in
Kunkalagunta (v) of Nekarikallu
(M)
1 1 1
5.00 5.00 5.00 4.95 Completed
Progs.No. 79/Plg
I/SDFWDA/TDK/13,
Dt. 02.07.2013
EE, PRI,
Guntur
Progs.No. 79/Plg
I/SDFWDA/TDK/13,
Dt. 02.07.2013
EE,PRI,
Guntur
Progs.No.78/Plg.I/S
DFWDA/Sattenapal
li/2013,
dt.08.11.2013
EE,PRI,
Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
123 Guntur Sattenapalli
Construction of CC road from
New Mosque to R&B road in
Gundlapalli (V) of Nekarikallu (M)
1 1 1
5.00 5.00 5.00 Completed
124 Guntur Sattenapalli
Construction of CC road from
Nallabothula Gopalaiah (H) to
Ramalayam in Tripurapuram (V)
of Nekarikallu (M)
1 1 1
3.00 3.00 3.00 2.97 Completed
125 Guntur Sattenapalli
Construction of culverts at
Anjaneya Swamy temple &
Pinnaboina Brahmaiah (H) in
Tripurapuram (v) of Nekarikallu
(M)
1 1 1
1.00 1.00 1.00 Completed
127 Guntur Sattenapalli
Construction of CC road in
Papisettipalem tanda
(Kunkalagunta) (V) of Nekarikallu
(M)
1 1 1
3.00 3.00 3.00 2.95 completed
130 Guntur Sattenapalli
Construction of CC road from
Battula Nagarjuna House to
Garnepudi road in the
Pedamakkena (V) of Sattenapalli
(M)
1 1 1
3.00 3.00 3.00 2.94 Completed
131 Guntur Sattenapalli
Construction of CC road in BC
Colony of Kankanalapalli (V) of
Sattenapalli (M)
1 1 1
3.00 3.00 3.00 2.96 Completed
133 Guntur Sattenapalli
Construction of CC road in SC
Colony of Dhulipalla (V) of
Sattenapalli (M)
1 1 1
5.00 5.00 5.00 4.40 0.54 Completed
139 Guntur Sattenapalli
Construction of CC roat at ZP
road to Y. Peddi Reddy (H) in
Narnepadu (V) of Muppalla (M)
1 1 1
3.00 3.00 3.00 1.42 1.54 completed
141 Guntur Sattenapalli
Construction of CC road in SC
Colony of Lankela Kurapadu (V)
of Muppalla (M)
1 1 1
2.00 2.00 2.00 Completed
145 Guntur Sattenapalli
Construction of CC road
from Esireddy Anji Reddy (H)
to Srinivasa reddy (H) in
Balijepalli (V) of Rajupalem
(M)
1 1 1 2.00 2.00 2.00
1.75 completed
147 Guntur Sattenapalli
Windening of CC road in
Both sides of main road in
Anchulavaripalem (V) of
Rajupalem (M)
1 1 1 3.50 3.50 3.50
3.47 Completed
148 Guntur Sattenapalli
Construction of CC road
from R&B road to
Chelagapalli Antaiah (H) in
Pedanemalipuri (V) of
Rajupalem (M)
1 1 1 3.00 3.00 3.00
2.93 Completed
Progs.No.78/Plg.I/S
DFWDA/Sattenapal
li/2013,
dt.08.11.2013
Progs.No.78/Plg.I/S
DFWDA/Sattenapal
li/2013,
dt.08.11.2013
EE,PRI,
Guntur
EE, PRI,
Guntur
Progs.No.78/Plg.I/S
DFWDA/Sattenapal
li/2013,
dt.08.11.2013
EE,PRI,
Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
150 Guntur Sattenapalli
Proviiding CC road from SC
colony to ST colony in
Rajupalem (V) |& (M)
1 1 1 5.00 5.00 5.00 5.00 2.50
2.50 2.30 Completed
151 Guntur Sattenapalli
Providing CC road from BC
colony to ST colony Rajupalem
(V & (M)
1 1 1 5.00 5.00 5.00 5.00 2.50
2.50 2.40 Completed
152 Guntur Sattenapalli
Providing CC road from
Venkateswara swamy temple to
SC colony Rajupalem (V) & (M)
1 1 1 5.00 5.00 5.00 5.00 2.50
2.50 2.40 Completed
153 Guntur Sattenapalli
Providing CC road from SC
colony to SC colony Rajupalem
(V) & (M)
1 1 1 5.00 5.00 5.00 5.00 2.50
2.50 2.30 Completed
EE,PRI,
Guntur
G.O.Rt. No 1058,
Dt 22.11.2013 &
Progs.No.1279/Plg.
I/SDFWDA/STN/20
13, dt.04.12.2013
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
154 Guntur Repalle
CC Pavement at
Nizampatnam Village &
Mandal
1 1 1 75.00 75.00 75.00 75.00 1.500 49.38 25.00
Work is in
Progress Part
Payment
Made.
177 Guntur Bapatla
Providing CC Road from
R&B Road to Perli Drain via
Ramalayam in Pothuraju
Kothapalem
1 1 1
3.70 3.70 1.85 1.85 3.70 Completed
178 Guntur Bapatla
Providing CC Road from ZP
Road to Marri Venkanna
Reddy House in Asodivari
Palem
1 1 1
3.60 3.60 1.80 1.80 3.60 Completed
179 Guntur Bapatla
Providing CC Road from
B.Srinivasa Reddy house to
B.Venkateswara Reddy
House Bethapudi Village
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
180 Guntur Bapatla
Completion of incomplete CC
Road from Kota Koti Reddy
House to ZP Road in
Bethapudi
1 1 1
3.65 3.65 1.825 1.825 3.65 Completed
181 Guntur Bapatla
Providing CC Road from
R&B Road to Balla Ragha
House in Jillellamudi
1 1 1
3.00 3.00 1.50 1.5 3.00 Completed
182 Guntur Bapatla
Providing CC Road in
Nallamothuvari Veedhi in
Kankata Palem
1 1 1
2.00 2.00 1.00 1.00 2.00 Completed
183 Guntur Bapatla
Providing CC Road from
Maruprolu Pothuraju Reddy
House to Maruprolu
Singareddy House in
Maruproluvaripalem
1 1 1
4.00 4.00 2.00 2.00 4.00 Completed
184 Guntur Bapatla
Providing CC Road from
Boddurai to Maruprolu
Eswaramma House in
Maruproluvaripalemm
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
185 Guntur Bapatla
Providing CC Road from MP
Ele. School to
Kappalavaripalem Road in
Muthayapalem
1 1 1
4.00 4.00 2.00 2.00 4.00 Completed
186 Guntur Bapatla
Providing CC Road from
Ramalayam to Puli Veeraiah
House in East
Pinniboyinavari Palem
1 1 1
3.90 3.90 1.95 1.95 3.90 Completed
187 Guntur Bapatla
Providing CC Road from K.
Seshi Reddy House to K.
Nageswara Reddy House in
Vedullapalli Kothapalem
1 1 1
5.00 5.00 2.50 2.50 5.00 Completed
369.42
G.O Rt No: 548 dt:
11.07.2011 of
Planning (XVIII)
Dept.
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.21.3.2013 of the
District Collector,
Guntur
EE,PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.21.3.2013 of the
District Collector,
Guntur
EE,PR,
Tenali
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
188 Guntur Bapatla
Providing CC Road from
R&B Road to Middiboyina
Subba Rao House in
Yadavapalem of Buddam
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
189 Guntur Bapatla
Completion of incomplte CC
Road from Pedamallu
Ankammarao kostam to
Ramamandiram in
Turupupalem
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
190 Guntur Bapatla
Completion of incomplete
CC Road from Karlapalem
Ramulu House to
Karlapalem Adiseshu House
in BC Locality of
Chintayapalem
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
191 Guntur Bapatla
Completion of incomplete CC
Road from Imadabattuni
Samba Sivarao(H) to
Alaparthi Sambasivarao(H)
in Dammannavaripalem
1 1 1
1.70 1.70 0.85 0.85 1.70 Completed
192 Guntur Bapatla
Providing CC road from BT
road to Kasani
Venkateswarlu (h) in
Dammannavaripalem Village
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
193 Guntur Bapatla
Completion of incomplete CC
Road from Pitla Rami Reddy
House to Pitla Rami Reddy
House in MV Rajupalem
1 1 1
4.90 4.90 2.45 2.45 4.90 Completed
194 Guntur Bapatla
Providing CC Road from
Perli R&B Road to Manthena
Ramakrishna Raju House
in Karlapalem Village
1 1 1
3.25 3.25 1.63 1.63 3.25 Completed
195 Guntur Bapatla
Providing CC Road from
Akkala Bulli krishna Reddy
House to Akkala Mutchu
Yedukondal Reddy (H) in
Pedapuluguvaripalem
1 1 1
4.40 4.40 2.20 2.20 4.40 Completed
196 Guntur Bapatla
Providing CC road from
Pulugu Bulli Reddy House to
Seelam Venkata Reddy
House in Perli
1 1 1
3.00 3.00 1.50 1.50 3.00 Completed
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.21.3.2013 of the
District Collector,
Guntur
EE,PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.21.3.2013 of the
District Collector,
Guntur
EE, PR,
Tenali
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
197 Guntur Bapatla
Completion of incomplete CC
Road from Seelam Subba
Reddy House to Perlamma
Talli Temple in Seelamvari
Palem
1 1 1
3.94 3.94 1.97 1.97 3.94 Completed
198 Guntur Bapatla
Providing CC Road from
Arepalli Raghavulu House to
Bolagani Venkatarao House
in BC Locality (Gowda
Palem) of Bhavanamvari
Palem
1 1 1
3.30 3.30 1.65 1.65 3.30 Completed
199 Guntur Bapatla
Providing CC Road from
Captain Ansari House to
Saleh House in Chandolu
Village
1 1 1
5.00 5.00 2.97 2.03 5.00 Completed
200 Guntur Bapatla
Providing CC Road from
Karumuri Venkateswara
Reddy House to Syamala
Rama Mohana Reddy house
in Komali
1 1 1
3.50 3.50 1.75 1.75 3.50 Completed
201 Guntur Bapatla
Providing CC Road from
Reading Room to Maha
Lakshmi Chettu in Komali
Village
1 1 1
2.00 2.00 1.00 1.00 2.00 Completed
202 Guntur Bapatla
Providing Internal CC roads
in BC Locality of Alluru (V) in
PV Palem (M)
1 1 1 2.00 2.00 2.00 2.00
Completed
FB to be Paid
203 Guntur Bapatla
Construction of Cement
concrete roads in
Alakapuram (V) of PV Palem
(M)
1 1 1 3.00 3.00 3.00 3.00
Completed
FB to be Paid
204 Guntur Bapatla
Providing Internal CC roads
in Degalavaripalem (V) in PV
Palem (M)
1 1 1 2.00 2.00 2.00 2.00
Completed
FB to be Paid
205 Guntur Bapatla
Providing Internal CC roads
in Alakapuram (V) and GP of
PV Palem (M)
1 1 1 3.00 3.00 3.00 3.00
Completed
FB to be Paid
206 Guntur Bapatla
Providing Internal CC roads
in PV Palem (V) & (M)
1 1 1 3.00 3.00 3.00 3.00
Completed
FB to be Paid
207 Guntur Bapatla
Providing CC road from
Kapu Atchayamma (H) to
Kommineni Madhavara Rao
(H) in CJ Palem (V & G.P) of
Bapatla (M)
1 1 1 3.00 3.00 3.00 3.00 2.61
Completed
FB to be paid
208 Guntur Bapatla
Providing CC road from
Z.P.Road to Parvathamma
temple in CJ Palem (V &
G.P) of Bapatla (M)
1 1 1 2.00 2.00 2.00 2.00
Completed
FB to be paid
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.21.3.2013 of the
District Collector,
Guntur
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 and
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.14.11.2013 of
the District
Collector, Guntur
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 and
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.14.11.2013 of
the District
Collector, Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
209 Guntur Bapatla
Providing CC road from
M.Kondalu Reddy (H) to
Arava Satyanarayana Reddy
(H) in Dariwadakothapalem
of West Baptla (G.P) of
Bapatla (M)
1 1 1 4.45 4.45 4.45 4.45 3.86
Completed
FB to be paid
210 Guntur Bapatla
Providing CC road from
Dontina Rami Reddy (H) in
Nagendrapuram of West
Baptla (G.P) of Bapatla (M)
1 1 1 3.00 3.00 3.00 3.00 2.61
Completed
FB to be paid
211 Guntur Bapatla
Providing CC road from GBC
road to Gummadi China
Yedukondalu Reddy (H) in
Kukkalavaripalem of West
Baptla (G.P) of Bapatla (M)
1 1 1 4.20 4.20 4.20 4.20 3.64
Completed
FB to be paid
212 Guntur Bapatla
Completion of incomplete CC
Road from Putta addanki
Reddy (H) to Dundi Kumara
Reddy (H) in Dundivaripalem
(V&G.P) of Karalapalem (M)
1 1 1 3.40 3.40 3.40 3.40 3.34
Completed
213 Guntur Bapatla
Completion of incomplete CC
Road from Putta Govardana
Reddy (H) to Putta Singa
Reddy (H) in Nagarajuapelm
(V & GP) of Karalapalem
Mandal
1 1 1 2.20 2.20 2.20 2.20
Completed
FB to be Paid
214 Guntur Bapatla
Providing CC road from
Rama Mandiraam to
Elementry school in
Nakkalavaripalem of
Pedagollapalem (GP) of
Karlapalem Mandal
1 1 1 3.00 3.00 3.00 3.00 2.95
Completed
FB to be Paid
215 Guntur Bapatla
Proviuding CC road from BT
road to Akkala Venkata
Ram,ireddy (H) in
Tummalapalli (V & GP) of
Karlapalem Mandal
1 1 1 2.04 2.04 2.04 2.04
Completed
FB to be Paid
216 Guntur Bapatla
Providng CC road from R&B
road to Bethalam Subbaraju
(H) in Alkapuram (V & GP) of
P.V. Palem Mandal
1 1 1 3.50 3.50 3.50 3.50
Completed
FB to be Paid
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 and
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.14.11.2013 of
the District
Collector, Guntur
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
217 Guntur Bapatla
Proviidng CC road from Atla
Seetha Rami reddy (H) to
Akkala Sambireddy (H) in
Redlapalem of Alluru (V &
GP) of P.V. Palem
1 1 1 1.10 1.10 1.10 1.10
Completed
FB to be Paid
218 Guntur Bapatla
Providng CC road from ZP
road to Pulugu Edukondalu
reddy (H) in Redlapalem of
Alluru (V &GP) of P.V. Palem
1 1 1 3.00 3.00 3.00 3.00
Completed
FB to be Paid
219 Guntur Bapatla
Providng CC road from R&B
road to Maraka Narasa Raju
(H) in Punamma colony (BC
colony) of Alluru (V & GP) of
P.V. Palem Mandal
1 1 1 3.00 3.00 3.00 3.00
Completed
FB to be Paid
220 Guntur Bapatla
Providng CC road from
Manthena Bapiraju (H) to
Manthena Lakshmipathi (H)
in P.V. Palem (V , GP&M)
1 1 1 3.00 3.00 3.00 3.00
Completed
FB to be Paid
221 Guntur Bapatla
Providing CC road from S.
Krishna Rao (H) top
Enumula Venkateswarlu (H)
in Pothanakattavaripalem (V
&GP) of P.V. Palem (M)
1 1 1 3.10 3.10 3.10 3.10 3.04
Completed
FB to be Paid
222 Guntur Bapatla
Providing CC road from
G.P.Ofice to Budda
Balakrishna (H) in
Sangupalem (V &GP) of P.V.
Palem Mandal
1 1 1 4.00 4.00 4.00 4.00 3.93
Completed
FB to be Paid
223 Guntur Tenali
Providing CC road from
Dastagiri (H) to Sk.Abdulla
(H) in Kolakaluru (V) in
Tenali (M)
1 1 1 2.50 2.50 2.50 2.50 2.50
Completed
224 Guntur Tenali
Providing CC road from
K.Viswaroopam (H) to P.Siva
Prasad (H)
1 1 1 5.00 5.00 5.00 5.00 5.00
Completed
225 Guntur Tenali
Construction of Compound
Wall to SC Burrial Ground in
Kattevaram (V)
1 1 1 2.50 2.50 2.50 2.50 2.50
Completed
226 Guntur Tenali
Providing CC road from Pilli
Ratna Raju (H)Yathati
Rubenu (H)in Haaf peta (V)
in Tenali (M)
1 1 1 5.00 5.00 5.00 5.00 5.00
Completed
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 and
Procgs.
No.75/plg.I/SDFWD
A/Bapatla/2013,
Dt.14.11.2013 of
the District
Collector, Guntur
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Proceedings No.
80/Plg/SDFWDAT/
Tenali/2013 Dt:
19.12.2013
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
227 Guntur Tenali
Providing CC Road from
Vuyyuru.Chenchu
Ramaiah(H) to N.Mugaiah(H)
in Somasundarapalem(V) in
Tenali (M)
1 1 1 3.50 3.50 3.50 3.50 3.50
Completed
228 Guntur Tenali
Providing CC Road from
R&B Road to
U.Sankararao(H) in
Somasundarapalem(V) in
Tenali (M)
1 1 1 2.50 2.50 2.50 2.50 2.50
Completed
229 Guntur Tenali
Providing CC Road from
Kolakaluri.Peda Jeorge(H) to
Mattupalli.Sambaiah(H) in
Gudiwada(V) of Tenali(M)
1 1 1
5
5.00 5.00 5.00 5.00
Completed
230 Guntur Tenali
Providing CC Road from
Kolakaluri.Neela Rao(H) to
K.Sattulu(H) in Gudiwada(V)
of Tenali(M)
1 1 1 1.00 1.00 1.00 1.00 1.00
Completed
231 Guntur Tenali
Providing CC Road from
Jyothula.Ramarao(H) to
Maddu.Prakash(H) in
Gudiwada(V) of Tenali(M)
1 1 1 1.00 1.00 1.00 1.00 1.00
Completed
232 Guntur Tenali
Providing CC Road from
K.Umamaheswarao(H) to
P.Bullaiah(H) in
Angalakuduru(V) of
Tenali(M)
1 1 1 5.00 5.00 5.00 5.00 5.00
Completed
233 Guntur Tenali
Construction of Compound
Wall and Providing Funeral
Platform in Hindu Burrial
Ground in Angalakuduru(V)
of Tenali(M)
1 1 1 5.00 5.00 5.00 5.00 3.00
Progress
234 Guntur Tenali
Providing CC Pavement to
the BSNL Tower Road in
Sangam Jagarlamudi(V) of
Tenali(M)
1 1 1 5.00 5.00 5.00 5.00 5.00
Completed
236 Guntur Tenali
Providing CC road from
Pattam Venkateswarlu (H) to
Canal Bund in Jaggadigunta
Palem (V) of Tenali (M)
1 1 1 2.50 2.50 2.50 2.50 2.50
Completed
239 Guntur Tenali
Providing CC Road from GH
road to Yadavapalem CC
road in Hanumanpalem (V)
in Kollipara (M)
1 1 1 5.00 5.00 5.00 5.00 5.00
Completed
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Proceedings No.
80/Plg/SDFWDAT/
Tenali/2013 Dt:
19.12.2013
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
240 Guntur Tenali
Providing CC Road from
R&B road toM. Simhadri (H)
in Pidaparru (V) in Kollipara
(M)
1 1 1 5.00 5.00 5.00 5.00 4.00
Progress
241 Guntur Tenali
Providing CC road from
Ganipisetty Somaiah (H) to
Ganipisetty Savithri (H) in
Danthaluru (V) in Kollipara
(M)
1 1 1 5.00 5.00 5.00 5.00 5.00
Completed
242 Guntur Tenali
Providing CC Road from B.
Sambanayak (H) to B.
Venkateswarlu Nayak (H) in
Munnangi (V) in Kollipara (M)
1 1 1 2.5 2.50 2.50 2.50 2.50
Completed
243 Guntur Tenali
Providing CC Road from K.
Adiyya (H) to Dulla Pullaiah
(H) in Munnangi (V) in
Kollipara (M)
1 1 1
2.5
2.50 2.50 2.50 2.50
Completed
244 Guntur Tenali
Providing CC Road from Old
CC Road to Varikuti
Venkaiah (H) in Athota (V) in
Kollipara (M)
1 1 1 2.50 2.50 2.50 2.50 2.50
Completed
247 Guntur Tenali
Providing CC road from
Yaram Bose (H) to donka
road in Vallabhapuram (V) in
Kollipara (M)
1 1 1 4.50 4.50 4.50 4.50 3.50
Progress G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Procgs.No. 80/ Plg
I/ SDFWDA/
EE,PR,
Tenali
EE, PR,
Tenali
G.O.Rt.No.242/Plan
ning(xVIII) dated
05.03.2013 &
Proceedings No.
80/Plg/SDFWDAT/
Tenali/2013 Dt:
19.12.2013
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
254 Guntur Macherla
Laying of CC road in
Sirigiripadu Village of
Veldurthy Mandal
1 1
EE, PRI,
Narasara
opet
1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
255 Guntur Macherla
Laying of CC road from
Boddurai to Vidella
Ranganayakulu (H) in
Sirigiripadu Village of
Veldurthy Mandal
1 1 1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
256 Guntur Macherla
Laying of CC road from
Ramalayam to Boddurai in
Sirigiripadu Village of
Veldurthy Mandal
1 1 1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
257 Guntur Macherla
Laying of CC road from
Videla Saidamma (H) to
Ramalayam in Sirigiripadu
Village of Veldurthy Mandal
1 1 1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
258 Guntur Macherla
Laying of CC road from
Ganduri Yellaiah (H) to
Videla Saidamma (H) in
Sirigiripadu Village of
Veldurthy Mandal
1 1 1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
259 Guntur Vinukonda
Providing CC road from
Boddurai to Gajula Kotaiah
(H) in Mupparajuvaripalem
Village of Nuzendla Mandal
1 1 1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
260 Guntur Vinukonda
Providing CC road from Kota
Subramanyam (H) to SC
Colony in
Mupparajuvaripalem Village
of Nuzendla Mandal
1 1 1
5.00 5.00 5.00 5.00 5.00 Completed
FB to be paid
261 Guntur Vinukonda
Providing CC road from
Yarram Veera Reddy Shop
to Ongole Suri (H) in
Nuzendla Village of
Nuzendla Mandal
1 1 1
5.00 5.00 5.00 5.00 3.50 CC road in
Progress
262 Guntur Vinukonda
Providing CC road from
Vemula Mangarao (H) to
Bathula Prasad (H) in BC
Colony of Savalyapuram
Village of Savalyapuram
Mandal
1 1 1
4.00 4.00 4.00 4.00 3.52 Completed
FB to be paid
263 Guntur Vinukonda
Providing CC road from
Kampa Santhaiah (H) to
Surthani Yallamanda (H) in
Sangineedupalem H/o
Naidupalem Village of
Bollapalli Mandal
1 1 1
5.00 5.00 5.00 5.00 3.50 CC road in
Progress
G.O.Rt.No.170/Plg.
(XVII) Dept., dated
10.02.2014 &
26/Plg.I/SDFWDA/
Macherla/2013,
dt.16.02.2014
G.O.Rt.No.170/Plg.
(XVII) Dept., dated
10.02.2014 &
25/Plg.I/SDFWDA/
Vinukonda/2013,
dt.16.02.2014
EE, PRI,
Narasara
opet
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
264 Guntur Vinukonda
Providing CC road from
Church (H) to Paladugu
Aseervadam (H) in SC
Colony of
Gonuguntlavaripalem Village
of Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.53 Completed
FB to be paid
265 Guntur Vinukonda
Providing CC road from
Paladugu Aseervadam (H) to
Kotta Maha Lakshmamma
(H) in SC Colony of
Gonuguntlavaripalem Village
of Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.60 Completed
FB to be paid
266 Guntur Vinukonda
Providing CC road from
S.China Kotaiah (H) to Kotte
Bhaskara Rao (H) in SC
Colony of
Gonuguntlavaripalem Village
of Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.60 Completed
FB to be paid
267 Guntur Vinukonda
Providing CC road from
Water Tank to Ramineni
Narasimharao (H) in
Pedakancherla Village of
Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.64 Completed
FB to be paid
268 Guntur Vinukonda
Providing CC road from
Anjaiah (H) to R.Pullamma
(H) in Pedakancherla Village
of Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.64 Completed
FB to be paid
269 Guntur Vinukonda
Providing CC road from
Rana Hussain (H) to
Muthineni Sambulu (H) in
Pedakancherla Village of
Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.64 Completed
FB to be paid
270 Guntur Vinukonda
Providing CC road from
Boddurai to Dudla Koteswara
Rao (H) in Pedakancherla
Village of Vinukonda Mandal

1 1 1
5.00 5.00 5.00 5.00 4.64 Completed
FB to be paid
271 Guntur Vinukonda
Providing CC road from
Srinu Mill to Kolakani
Yarraiah (H) in
Pedakancherla Village of
Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.64 Completed
FB to be paid
G.O.Rt.No.170/Plg.
(XVII) Dept., dated
10.02.2014 &
25/Plg.I/SDFWDA/
Vinukonda/2013,
dt.16.02.2014
EE, PRI,
Narasara
opet
SDF PR Total
SDF
SDF
+PR
Total
Tend
er
Agreem
ent
Not
started
Progr
ess
Complet
ed
Expendi
ture
upto
JUNE
2014
Releases
Value of
work
done but
not paid
Admini
strative
ly
sanctio
ned in
SDF
TSP
S.No
A
s
s
u
r
a
n
c
e
D
a
t
e
R
e
p
r
e
s
e
n
t
a
t
i
o
n
District Constituency Gist of Announcement
Sanction
Particulars
No. of works
sanctioned
Remarks-
Physical
stage
SDF+PR
Executive
Agency
Stage of work Estimated cost
Total
(17+18+1
9)
Amount
Lengt
h in
Mts. Plain SCP
272 Guntur Vinukonda
Providing CC road from
Sivalayam to Yeti
Nageswara Rao (H) in
Pedakancherla Village of
Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.64 Completed
FB to be paid
273 Guntur Vinukonda
Providing CC road from
Naguleti Venkateswarlu (H)
to Veera Raghavaiah
Kostam in Gandhinagar H/o
Gonuguntlavaripalem Village
of Vinukonda Mandal
1 1 1
3.00 3.00 3.00 3.00 2.79 Completed
FB to be paid
274 Guntur Vinukonda
Providing CC road from
Daggupati Anjaiah (H) to
Kothakolla Subbaiah (H) in
Koppukonda Village of
Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.00 CC road in
Progress
275 Guntur Vinukonda
Providing CC road from
Pogula Pattabhi Ramaiah (H)
to Devara Bala Swami (H) in
Nadigadda Village of
Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.54 Completed
FB to be paid
276 Guntur Vinukonda
Providing CC road and
drains from Kotha
Venkateswarlu (H) to
Ch.Srinivasarao Land in
Hassannayunipalem Village
of Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 3.90 CC road in
Progress
277 Guntur Vinukonda
Construction of Vented road
dam across local vagu on
Hassanayunipalem to
Pedakancherla in
Hassannayunipalem Village
of Vinukonda Mandal
1 1 1
5.00 5.00 5.00 5.00 4.00 In Progress
279 Guntur Vinukonda
Providing CC road from
Ramalayam to Musirika
China Venka Reddy (H) in
Chikateegalapalem Village of
Vinukonda Mandal
1 1 1
3.00 3.00 3.00 3.00 3.00 Completed
FB to be paid
G.O.Rt.No.170/Plg.
(XVII) Dept., dated
10.02.2014 &
25/Plg.I/SDFWDA/
Vinukonda/2013,
dt.16.02.2014
EE, PRI,
Narasara
opet
G.O.Rt.No.170/Plg.
(XVII) Dept., dated
10.02.2014 &
25/Plg.I/SDFWDA/
Vinukonda/2013,
dt.16.02.2014
EE, PRI,
Narasara
opet
Superintending Engineer
Panchayat Raj Circle, Guntur
No. of
works
Estimate Cost
No. of
works
Estimate Cost
No. of
works
Estimate
Cost
No.
of
work
s
Estimate
Cost
No.
of
work
s
Estimate
Cost
1 2 3 5 6 7 8 9 10 11 12
PRI Guntur
G.O.Rt No.477,Dt. 17.4.12
of Planning (XVIII)
Department & Go.Rt
No.802, Dt . 02.7.12 &
Progs. Rc. No.228/Plg.I/
SDFWDA/Prathipadu/12-13
Dt. 05.01.13 of the District
Collector, Guntur.
Executive Engineer,
PRI Division, Guntur
15 200.00 15 200.00 4 24.00 11 176.00
1 work in progress,
12 works completed,
2 works proposed for
dropping
PRI Guntur
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
Progs
No.29/Plg.I/SDFWDA/Prath
ipadu/14, Dt01.03.02.14
Executive Engineer,
PRI Division, Guntur
4 295.00 4 295.00 2 80.00 2 215
All works in T/S
stage
PRI Guntur
Guntur-II
(west)
G.O.Rt.No.99
dated.21.01.2012 of
Planning (XVIII)
Department & G.O. Rt
No.1049, Dt.21.11.13 of
Planning VIII Dept.
Executive Engineer,
PRI Division, Guntur
1 300.00 1 300.00 0 0.00 0 0.00 1 300.00
Completed FB tobe
paid
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg./I /
SDFWDA/Guntur West/2013, Dt.
08.11.2013
Executive Engineer,
PRI Division, Guntur
1 47.00 1 47.00 1 47.00
Completed FB tobe
paid
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013
&Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
08.01.2014
Executive Engineer,
PRI Division, Guntur
1 49.00 1 49.00 1 49.00
Completed FB tobe
paid
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
28.02.2014
Executive Engineer,
PRI Division, Guntur
1 15.00 1 15.00 1 15.00 Progress
Racha banda /Special DeVelopment Fund for welfare and Development Activities as on 31.5.2014 in PR Circle, Guntur
S.No District Division
Constituenc
y
G.O.No. and date Executive Agency
No of works
sanctioned in G.O
Category A,B & C
works for which
payment made
(EE,PR)
Category C
Works executed
above Rs 50.00
lakhs
4
1 Guntur
2
Guntur
Category A
Works executed by
EE below Rs 10
lakhs
Category B
Works executed
from Rs 10 lakhs to
Rs 50.00 lakhs
Remarks
Prathipadu
Guntur-II
(west)
PRI Guntur
G.O.Rt.No.242/Planning(xV
III) dated 05.03.2013 &
Progs.No. 77/Plg
I/SDFWDA/Guntur west/13,
Dt. 10.12.2013
Executive Engineer,
PRI Division, Guntur
23 264.35 23 264.35 13 80.7 10 183.65
9 works completed
balance in progress
PRI Guntur
G.O.Rt.No.242/Planning(xV
III) dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur
West/2013, Dt. 08.01.2014
Executive Engineer,
PRI Division, Guntur
4 43.50 4 43.50 2 7.50 2 36.00
1 work progress , 3
works not started
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
31.01.2014
Executive Engineer,
PRI Division, Guntur
1
8.60
1
8.60
1 8.60 Tender stage
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
06.02.2014
Executive Engineer,
PRI Division, Guntur
1 3.65 1 3.65 1 3.65 Tender stage
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
20.02.2014
Executive Engineer,
PRI Division, Guntur
1 15.75 1 15.75 1 15.75 Tender stage
3 Guntur PRI Guntur
Guntur-II
(East)
G.O.Rt.No.242/Planning(xV
III) dated 05.03.2013 &
Progs
No.76/Plg.I/SDFWDA/Gunt
ur West/13, Dt.06.02.14
Executive Engineer,
PRI Division, Guntur
7 85.00 7 85.00 7 85.00
All works in Agt.
Stage
PRI Guntur
G.O.Rt.No.1027
dated.05.8.2012 of Planning
(XVIII) Department
Executive Engineer,
PRI Division, Guntur
1 25.00 1 25.00 1 25.00 Completed, FB Paid.
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg I/SDFWDA/TDK/12-
13, Dt.02.07.13
Executive Engineer,
PRI Division, Guntur
59 295.00 59 295.00 59 295.00
54 works completed,
4 works progress & 1
work not started
2
Guntur
Guntur-II
(west)
Tadikonda 4 Guntur
PRI Guntur
G.O.Rt.No.1058/Plg VII Dept.,
Dt.22.11.13 &
Progs.No.78/Plg.I/SDFWDA/Satte
napalli/2013, dt.08.11.2013
Executive Engineer,
PRI Division, Guntur
29 100.00 29 100.00 29 100.00
All Works completed
FB tobe Paid
PRI Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.1279/Plg.I/SDFWDA/ST
N/2013, dt.04.12.2013
Executive Engineer,
PRI Division, Guntur
4 20.00 4 20.00 4 20.00
All Works completed
FB tobe Paid
PR Tenali Repalle
G.O. Rt No. 548 Planning
(XV11I) Department dated
11.07.2011.
Exeutive Engineer, PR
Division, Tenali
1 75.00 1 75.00 1 75.00
Work is in Progress Part
Payment Made.
PR Tenali Repalle
G.O. Rt No. 548 Planning
(XV11I) Department dated
11.07.2011.
Exeutive Engineer, PR
Division, Tenali
1 25.00 1 25.00 1 25.00 Completed,FB Paid
PR Tenali Repalle
G.O Rt No: 611 dt 23.07.2011 of
Planning (XVIII) Dept.
and G.O. RT. No. 95,
DT.19.01.12 (Plg)(RPB)
Dept.,
Exeutive Engineer, PR
Division, Tenali
20 306.00 20 306.00 5 31.00 15 275.00
All Works completed
FB Paid
PR Tenali Bapatla
G.O. Rt No. 797 Dated
15.09.2011 of Planning
(XVIII) Department
Exeutive Engineer, PR
Division, Tenali
1 35.00 1 35.00 1 35.00 Completed,FB Paid
PR Tenali Bapatla
G.O.Rt.No.242/Planning(xV
III) dated 05.03.2013 &
Procgs.
No.75/plg.I/SDFWDA/Bapat
la/2013, Dt.21.3.2013 of the
District Collector, Guntur
Exeutive Engineer, PR
Division, Tenali
25 85.84 25 85.84 25 85.84
All Works completed
FB Paid
PR Tenali Bapatla
G.O.Rt.No.242/Planning(xV
III) dated 05.03.2013 and
Procgs.
No.75/plg.I/SDFWDA/Bapat
la/2013, Dt.14.11.2013 of
the District Collector,
Guntur
Exeutive Engineer, PR
Division, Tenali
21 60.99 21 60.99 21 60.99
All Works completed
FB tobe Paid
Guntur
7 Guntur
Sattenapalli Guntur 5
6
PR Tenali
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Proceedings No.
80/Plg/SDFWDAT/Tenali/20
13 Dt: 19.12.2013
Exeutive Engineer, PR
Division, Tenali
22 82.00 22 82.00 21 72 1 10
17 works completed,
2 works progress & 3
works not started
PR Tenali
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Procgs.No. 80/ Plg I/
SDFWDA/
Tenali/2013,Dt.28.02.2014
Exeutive Engineer, PR
Division, Tenali
8 23.00 8 23.00 8 23.00
1 work progress & 7
works not started
9 Guntur PR Tenali Vemuru
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
Procgs.No. 23/ Plg I/
SDFWDA/
Vemuru/2013,Dt.16.02.201
4
Exeutive Engineer, PR
Division, Tenali
1 25.00 1 25.00 1 25.00
Tenders tobe called
for
10 Guntur
PRI
Narasaaro
pet
Macherla
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
26/Plg.I/SDFWDA/
Macherla/2013,
dt.16.02.2014
Executive Engineer,
PRI Division,
Narasaraopet
5 25.00 5 25.00 5 25.00
All works Completed FB to
be paid
11 Guntur
PRI
Narasaaro
pet
Vinukonda
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
25/Plg.I/SDFWDA/Vinukon
da/2013, dt.16.02.2014
Executive Engineer,
PRI Division,
Narasaraopet
21 100.00 21 100.00 21 100.00
15 works completed,
5 works progress & 1
work not started
279 2609.68 279 2609.68 219 937.28 56 1082.40 4 590.00
PR Circle, Guntur.
Superintending Engineer
8 Guntur Tenali
S.No District Division
Constituen
cy
Gist of Announcement Sanction Particulars
No. of
works
Total
Expenditu
re
Remarks- Physical
stage
1 2 3 4 5 6 7 8 9 10
1 Guntur PRI Division, Guntur Prathipadu Providing C.C. road from Church to Naidupet SC Colony G.O.Rt No.477,Dt. 17.4.12 1 5.00 3.84 Completed FB Paid
2 Guntur PRI Division, Guntur Prathipadu
Providing C.C. road from Peda Ankamma House to SC
Colony in Obulunaidupalem
G.O.Rt No.477,Dt. 17.4.12 1 5.00 4.78 Completed FB Paid
3 Guntur PRI Division, Guntur Prathipadu
Providing C.C. road from B. Anjaneyulu house to
T.Basavaiah house in Etukuru village
G.O.Rt No.477,Dt. 17.4.12 1 8.00 Completed
4 Guntur PRI Division, Guntur Prathipadu Providing 3 internal C.C. roads in Chowdavaram village G.O.Rt No.477,Dt. 17.4.12 1 6.00 Progress
5 Guntur PRI Division, Guntur
Guntur-II
(west)
Laying of CC road & CC drain at Srinivasa Rao thota 6th lane to
9th lane in Division NO.21 (NRT statue besides road) in
Municipal Corporation, Guntur
1 9.90 Completed
6 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing CC road at 1st Lane 1st corss road Sysmala Nagar
Recruitment office back side in Divisin NO.32 in Municipal
Corporation, Guntur
1 8.90 Progress
7 Guntur PRI Division, Guntur
Guntur-II
(west)
Laying of CC road and drain at Veera Brahmamgari teple beside
road in Division No.21 in Municipal Corporation, Guntur 1 9.90 Progress
8 Guntur PRI Division, Guntur
Guntur-II
(west)
Construction of 12 size of CC drain at Peruguchettu road for
cross road upto Ramulavari temple junction in Stambalagaruvu
in Division No.32 in Municipal Corporation, Guntur
1 2.80 Completed
9 Guntur PRI Division, Guntur
Guntur-II
(west)
Formation of WBM road at 2nd lane from main road upto
Railway track road in Syamala nagar in Divisin NO.32 in
Municipal Corporation, Guntur
1 2.70 Completed
10 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing improvements to Junction and temple all round with
CC pavement at west side of Anjaneyaswamy temple in 1st line
of Vidya nagar in Division No.34 in Municipal Corporation,
Guntur
1 5.30 Progress
11 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing CC road and CC drain at Oxford School, Opp: Cut
road at H.No.483, Brundavan Gardens in Division No.35 in
Municipal Corporation, Guntur
1 7.10 Completed
12 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing CC road at 1/1, Chandramouli nagar from Ring road
upto 1st cross road in Division NO.36
1 7.90 Progress
G.O.Rt.No.242/Planning(xVIII
) dated 05.03.2013 &
Progs.No. 77/Plg
I/SDFWDA/Guntur west/13,
Dt. 10.12.2013
CATEGORY A
RACHA BANDA AND SPECIAL DEVELOPMENT FUND FOR WELFARE & DEVELOPMENT ACTIVITIES WORKS PROGRESS REPORT FOR THE MONTH OF MAY 2014 IN PR CIRCLE, GUNTUR
13 Guntur PRI Division, Guntur
Guntur-II
(west)
Construction of RCC cross culvert at 1/18, cross road at
Brodipet in Division NO.38 in Municipal Corporation, Guntur
1 5.10 Progress
14 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing Bore well at Sanjay Gandhi nagar 4th Lane, Division
NO.42 in Municipal Corporation, guntur 1 0.70 Progress
15 Guntur PRI Division, Guntur
Guntur-II
(west)
Construction of CC drains to NTR colony 1st Lane and
Anjaneyapet main road (From 1st cross road to Amaravathi road
in Diviion NO.42 in Municipal Corporation, Guntur
1 4.20 Progress
16 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing CC road to Ambedkar Nagar main road in Division
No.42 in Municipal Corporation, Guntur
1 6.30 Progress
17 Guntur PRI Division, Guntur
Guntur-II
(west)
Construction of CC drains to Mutyala Reddy nagar 9th & 10th
Lanes (East side) in Division NO.41 in Municipal Corporation,
Guntur
1 9.90 Progress
18 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing CC road at 1/3, Ramanna pet near Koritipadu
Division.No. 41 in Muncicpal Corporation, Guntur.
1 5.00 Tender stage
19 Guntur PRI Division, Guntur
Guntur-II
(west)
Providing CC road at beside of Telugu Baptist Church
road at George pet in division.No. 31 in Municipal
Corporation, Guntur
1 2.50 Tender stage
20 Guntur PRI Division, Guntur
Guntur-II
(west)
Formation of CC road in 5th lane 2nd cross road at
Devapuram in Div No.35 in Muncipal Corporation, Guntur
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
31.01.2014
1
8.60
Tender stage
21 Guntur PRI Division, Guntur
Guntur-II
(west)
Formation of CC road in Seetharam Nagar Colony (NGO
Colony) Besides MLC Lakshmana Rao House road in Div
No.32 in Muncipal Corporation, Guntur
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
06.02.2014
1
3.65
Tender stage
22 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Yalavarthipadu (V) of
Medikonduru (M)
1
5.00 2.50 Completed
23 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony in Tadikonda |(V&M)
1
5.00 Progress
24 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim locality (south ) in
Tadikonda |(V&M)
1
5.00 Progress
25 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Chenchu colony in Tadikonda
|(V&M)
1
5.00 2.50 Completed
26 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony of Ponnekallu (V) of
Tadikonda |(M)
1
5.00 2.50 Completed
27 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony of Kantheru (V) of
Tadikonda |(M)
1
5.00 2.50 Completed
28 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony of Lam (V) of
Tadikonda |(M)
1
5.00 Progress
G.O.Rt.No.242/Planning(xVIII
) dated 05.03.2013 &
Progs.No. 77/Plg
I/SDFWDA/Guntur west/13,
Dt. 10.12.2013
G.O.Rt.No.242/Planning(xVIII
) dated 05.03.2013 &
Progs.No. 77/Plg
I/SDFWDA/Guntur west/13,
Dt. 10.12.2013
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
08.01.2014
29 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony of Mandadam (V) of
Thulluru (M)
1
5.00 2.50 Completed
30 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony of Rayapudi (V) of
Thulluru (M)
1
5.00 2.50 Completed
31 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Velagapudi (V) of Thulluru (M)
1
5.00 Completed
32 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony in Phirangipuram (V &
M)
1
5.00 2.50 Completed
33 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim Locality in Phirangipuram
(V & M)
1
5.00 2.50 Completed
34 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in BCLocality in Phirangipuram (V &
M)
1
5.00 2.50 Completed
35 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in 113 Tyallur (V) of Phirangipuram
(M)
1
5.00 4.88 Completed & FB paid
36 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Yarraguntlapadu (V) of
Phirangipuram (M)
1
5.00 2.50 Completed
37 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim Locality (East ) in
Medikonduru (V &M)
1
5.00 2.50 Completed
38 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony in Medikonduru (V
&M)
1
5.00 2.50 Completed
39 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony in Perecharla (V) of
Medikonduru (M)
1
5.00 2.50 Completed
40 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim Locality in Perecharla (V)
of Medikonduru (M)
1
5.00 2.50 Completed
41 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim Locality in Siripuram (V)
of Medikonduru (M)
1
5.00 2.50 Completed
42 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in (West) Phirangipuram (V & M)
1
5.00 4.95
Completed & FB paid
43 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Phirangipuram (V & M)
1
5.00 4.95
Completed & FB paid
44 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC Colony Vemulurupadu (V) of
Phirangipuram (M)
1
5.00 4.94
Completed & FB paid
45 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Vemulurupadu (V) of
Phirangipuram (M)
1
5.00 4.95
Completed & FB paid
46 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Ammenabad (V) of
Phirangipuram (M)
1
5.00 4.95
Completed & FB paid
47 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Repudi (V) of Phirangipuram (M)
1
5.00 Completed & FB paid
48 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Sirangipalem (V) of
Phirangipuram (M)
1
5.00 Completed
49 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Takkellapadu (V) of
Phirangipuram (M)
1
5.00 Completed
50 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Kandrika (V) of Phirangipuram
(M)
1
5.00 4.95
Completed & FB paid
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
51 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Nudurupadu (V) of Phirangipuram
(M)
1
5.00 4.94
Completed & FB paid
52 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Munagapadu (V) of
Phirangipuram (M)
1
5.00 4.95
Completed & FB paid
53 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Bethapudi (V) of Phirangipuram
(M)
1
5.00 Completed
54 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in BC Colony in Medikonduru (V&M)
1
5.00 Completed
55 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim Locality (West) in
Medikonduru (V&M)
1
5.00 4.95
Completed & FB paid
56 Guntur PRI Division, Guntur Tadikonda Providing internal CC roads in Medikonduru (V&M) 1 5.00 Completed
57 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in BC Colony in perecherla (V) of
Medikonduru (M)
1
5.00 Completed
58 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in perecherla (V) of Medikonduru
(M)
1
5.00 Completed
59 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Siripuram (V) of Medikonduru (M)
1
5.00 Completed
60 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Jangamguntlapalem (V) of
Medikonduru (M)
1
5.00 4.95
Completed & FB paid
61 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Paladugu (V) of Medikonduru (M)
1
5.00 Completed
62 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in BC Colony in Badepurm road of
Tadikonda (V&M)
1
5.00 Completed
63 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim locality South of
Tadikonda (V&M)
1
5.00 Progress
64 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Tadikonda (V&M)
1
5.00 Completed
65 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Ponnekallu (V) Tadikonda (M)
1
5.00 4.93
Completed & FB paid
66 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Ravela (V) of Tadikonda (M)
1
5.00 4.95
Completed & FB paid
67 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in West Kantheru(V) of Tadikonda
(M)
1
5.00 Completed
68 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Kantheru(V) of Tadikonda (M)
1
5.00 Completed
69 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC colony of Tadikonda (V&M)
1
5.00 Completed
70 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in ST colony of Tadikonda (V&M)
1
5.00 Not started
71 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in BC colony of Tadikonda (V&M)
1
5.00 Completed
72 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Minority locality of Tadikonda
(V&M)
1
5.00 Completed
73 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC Colony of Thullur (V&M)
1
5.00 Completed
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
74 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in BC locality of Thullur (V&M)
1
5.00 Completed
75 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Muslim locality of Thullur (V&M)
1
5.00 Completed
76 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Thullur (V&M)
1
5.00 Completed
77 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Mandadam (V) of Thullur (M)
1
5.00 Completed
78 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in SC Colony of Pedaparimi (V) of
Thullur (M)
1
5.00 4.95
Completed & FB paid
79 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Pedaparimi (V) of Thullur (M)
1
5.00 4.95
Completed & FB paid
80 Guntur PRI Division, Guntur Tadikonda
Providing internal CC roads in Rayapudi (V) of Thullur (M)
1
5.00 Completed
81 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Dammavalam Srinu (H) to Drining
water well in Kunkalagunta (v) of Nekarikallu (M)
1
5.00 Completed
82 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from R&B road to Kota Raveendra
Reddy (H) in Nekarikallu (V&M)
1
5.00 4.95 Completed & FB paid
83 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from New Mosque to R&B road in
Gundlapalli (V) of Nekarikallu (M)
1
5.00 Completed
84 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Nallabothula Gopalaiah (H) to
Ramalayam in Tripurapuram (V) of Nekarikallu (M)
1
3.00 Completed
85 Guntur PRI Division, Guntur Sattenapalli
Construction of culverts at Anjaneya Swamy temple &
Pinnaboina Brahmaiah (H) in Tripurapuram (v) of Nekarikallu (M)
1
1.00 Completed
86 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in Balaji Nagartanda (Gundlapalli (V) of
Nekarikallu (M)
1
3.00 2.97 Completed & FB paid
87 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in Papisettipalem tanda (Kunkalagunta)
(V) of Nekarikallu (M)
1
3.00 completed
88 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in BC Colony of Phanidam (V) of
Sattenapalli (M)
1
3.00 2.91 Completed & FB paid
89 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Majeti Pattabhi (H) to Prathipati
Sivannarayana (H) in Abburu (V) of Sattenapalli (M)
1
3.00 2.91 Completed & FB paid
90 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Battula Nagarjuna House to
Garnepudi road in the Pedamakkena (V) of Sattenapalli (M)
1
3.00 Completed
91 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in BC Colony of Kankanalapalli (V) of
Sattenapalli (M)
1
3.00 Completed
92 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in SC Colony of Lakkaraju Garlapadu
(V) of Sattenapalli (M)
1
5.00 4.94 Completed & FB paid
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
G.O.Rt.No.1058/Plg VII Dept.,
Dt.22.11.13 &
Progs.No.78/Plg.I/SDFWDA/Sattena
palli/2013, dt.08.11.2013
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 & Progs
Rc.No.79/Plg
I/SDFWDA/TDK/12-13,
Dt.02.07.13
93 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in SC Colony of Dhulipalla (V) of
Sattenapalli (M)
1
5.00 4.40 Completed
94 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in SC Colony of Komerapudi (V) of
Sattenapalli (M)
1
5.00 4.95 Completed & FB paid
95 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in Muslim Area of Gujjarlapudi (V) of
Sattenapalli (M)
1
3.00 2.91 Completed & FB paid
96 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Sk. Moulali (H) to Pulli Sambaiah
(H) in Gollapadu (V) of Muppalla (M)
1
3.00 2.94 Completed & FB paid
97 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Boddirai to Broton School in
Muppalla (V&M)
1
5.00 4.88 Completed & FB paid
98 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road at M.Lingareddy (H) to A.Polireddy (H)
in Chagantivaripalem (V) of Muppalla (M)
1
5.00 4.89 Completed & FB paid
99 Guntur PRI Division, Guntur Sattenapalli
Construction of CC roat at ZP road to Y. Peddi Reddy (H) in
Narnepadu (V) of Muppalla (M)
1
3.00 1.42 completed
100 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Sk. Babu (H) to Tirupatamma
Temple in Bollavaram (V) of Muppalla (M)
1
4.00 3.96 Completed & FB paid
101 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road in SC Colony of Lankela Kurapadu (V)
of Muppalla (M)
1
2.00 Completed
102 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road at SC Colony in Bollavaram (v) of
Muppalla (M)
1
3.00 2.97 Completed & FB paid
103 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Hassan (H) to R&B road in
Ganapavaram (V) of Rajupalem (M)
1 3.00
2.93
Completed & FB paid
104 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road at Ramalayam Bazar in Kotturu
(V) of Rajupalem (M)
1 3.00
2.95
Completed & FB paid
105 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Esireddy Anji Reddy (H) to
Srinivasa reddy (H) in Balijepalli (V) of Rajupalem (M)
1 2.00
completed
106 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from Urdu School to Sk. Bade
Shaab (H) in Inumetla (V) of Rajupalem (M)
1 3.00
2.98
Completed & FB paid
107 Guntur PRI Division, Guntur Sattenapalli
Windening of CC road in Both sides of main road in
Anchulavaripalem (V) of Rajupalem (M)
1 3.50
Completed
108 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road from R&B road to Chelagapalli
Antaiah (H) in Pedanemalipuri (V) of Rajupalem (M)
1 3.00
Completed
109 Guntur PRI Division, Guntur Sattenapalli
Construction of CC road at ST Colony of Ganapavaram
(V) of Rajupalem (M)
1 2.50
2.44
Completed & FB paid
110 Guntur PRI Division, Guntur Sattenapalli
Proviiding CC road from SC colony to ST colony in Rajupalem
(V) |& (M)
1 5.00 2.50
Completed
G.O.Rt.No.1058/Plg VII Dept.,
Dt.22.11.13 &
Progs.No.78/Plg.I/SDFWDA/Sattena
palli/2013, dt.08.11.2013
G.O.Rt.No.1058/Plg VII Dept.,
Dt.22.11.13 &
Progs.No.78/Plg.I/SDFWDA/Sattena
palli/2013, dt.08.11.2013
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 &
Progs.No.1279/Plg.I/SDFWDA/STN/
2013, dt.04.12.2013
111 Guntur PRI Division, Guntur Sattenapalli
Providing CC road from BC colony to St colony Rajupalem (V &
(M)
1 5.00 2.50
Completed
112 Guntur PRI Division, Guntur Sattenapalli
Providing CC road from Venkateswara swamy temple to SC
colony Rajupalem (V) & (M)
1 5.00 2.50
Completed
113 Guntur PRI Division, Guntur Sattenapalli
Providing CC road from SC colony to SC colony Rajupalem (V)
& (M)
1 5.00 2.50
Completed
114 Guntur PR Division, Tenali Repalle
Approach road toDonepudi Dalithawada of
Gurunadhanagar
1 5.00
Completed,FB Paid
115 Guntur PR Division, Tenali Repalle Approach road to Piratlanka Harijanawada 1 5.00
Completed,FB Paid
116 Guntur PR Division, Tenali Repalle
Extension of Approach road to Raviananthavaram
Harijanawada of penumudi
1 8.00
Completed,FB Paid
117 Guntur PR Division, Tenali Repalle
Approach road to Visweswaram Harijanawada of (balance
length)
1 4.00
Completed,FB Paid
118 Guntur PR Division, Tenali Repalle Nagaram Approach road Allaparru SC colony 1 9.00
Completed,FB Paid
119 Guntur PR Division, Tenali Bapatla
Providing CC Road from R&B Road to Perli Drain via
Ramalayam in Pothuraju Kothapalem
1
3.70
Completed
120 Guntur PR Division, Tenali Bapatla
Providing CC Road from ZP Road to Marri Venkanna
Reddy House in Asodivari Palem
1
3.60
Completed
121 Guntur PR Division, Tenali Bapatla
Providing CC Road from B.Srinivasa Reddy house to
B.Venkateswara Reddy House Bethapudi Village
1
3.00
Completed
122 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Kota Koti Reddy
House to ZP Road in Bethapudi
1
3.65
Completed
123 Guntur PR Division, Tenali Bapatla
Providing CC Road from R&B Road to Balla Ragha House
in Jillellamudi
1
3.00
Completed
124 Guntur PR Division, Tenali Bapatla
Providing CC Road in Nallamothuvari Veedhi in Kankata
Palem
1
2.00
Completed
125 Guntur PR Division, Tenali Bapatla
Providing CC Road from Maruprolu Pothuraju Reddy
House to Maruprolu Singareddy House in
Maruproluvaripalem
1
4.00
Completed
126 Guntur PR Division, Tenali Bapatla
Providing CC Road from Boddurai to Maruprolu
Eswaramma House in Maruproluvaripalemm
1
3.00
Completed
127 Guntur PR Division, Tenali Bapatla
Providing CC Road from MP Ele. School to
Kappalavaripalem Road in Muthayapalem
1
4.00
Completed
128 Guntur PR Division, Tenali Bapatla
Providing CC Road from Ramalayam to Puli Veeraiah
House in East Pinniboyinavari Palem
1
3.90
Completed
129 Guntur PR Division, Tenali Bapatla
Providing CC Road from K. Seshi Reddy House to K.
Nageswara Reddy House in Vedullapalli Kothapalem
1
5.00
Completed
130 Guntur PR Division, Tenali Bapatla
Providing CC Road from R&B Road to Middiboyina Subba
Rao House in Yadavapalem of Buddam
1
3.00
Completed
131 Guntur PR Division, Tenali Bapatla
Completion of incomplte CC Road from Pedamallu
Ankammarao kostam to Ramamandiram in Turupupalem 1
3.00
Completed
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 &
Progs.No.1279/Plg.I/SDFWDA/STN/
2013, dt.04.12.2013
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.21.3.2013 of the District
Collector, Guntur
G.O Rt No: 611 dt
23.07.2011 of Planning
(XVIII) Dept./ 95,
DT.19.01.12 (Plg)(RPB)
Dept.,
Package No: AP-GNT-RB01
(12 WORKS)
132 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Karlapalem
Ramulu House to Karlapalem Adiseshu House in BC
Locality of Chintayapalem
1
3.00
Completed
133 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Imadabattuni
Samba Sivarao(H) to Alaparthi Sambasivarao(H) in
Dammannavaripalem
1
1.70
Completed
134 Guntur PR Division, Tenali Bapatla
Providing CC road from BT road to Kasani Venkateswarlu
(h) in Dammannavaripalem Village
1
3.00
Completed
135 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Pitla Rami Reddy
House to Pitla Rami Reddy House in MV Rajupalem 1
4.90
Completed
136 Guntur PR Division, Tenali Bapatla
Providing CC Road from Perli R&B Road to Manthena
Ramakrishna Raju House in Karlapalem Village
1
3.25
Completed
137 Guntur PR Division, Tenali Bapatla
Providing CC Road from Akkala Bulli krishna Reddy
House to Akkala Mutchu Yedukondal Reddy (H) in
Pedapuluguvaripalem
1
4.40
Completed
138 Guntur PR Division, Tenali Bapatla
Providing CC road from Pulugu Bulli Reddy House to
Seelam Venkata Reddy House in Perli
1
3.00
Completed
139 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Seelam Subba
Reddy House to Perlamma Talli Temple in Seelamvari
Palem
1
3.94
Completed
140 Guntur PR Division, Tenali Bapatla
Providing CC Road from Arepalli Raghavulu House to
Bolagani Venkatarao House in BC Locality (Gowda Palem)
of Bhavanamvari Palem
1
3.30
Completed
141 Guntur PR Division, Tenali Bapatla
Providing CC Road from Captain Ansari House to Saleh
House in Chandolu Village
1
5.00
Completed
142 Guntur PR Division, Tenali Bapatla
Providing CC Road from Karumuri Venkateswara Reddy
House to Syamala Rama Mohana Reddy house in Komali 1
3.50
Completed
143 Guntur PR Division, Tenali Bapatla
Providing CC Road from Reading Room to Maha Lakshmi
Chettu in Komali Village
1
2.00
Completed
144 Guntur PR Division, Tenali Bapatla
Providing Internal CC roads in BC Locality of Alluru (V) in
PV Palem (M)
1 2.00
Completed FB to be Paid
145 Guntur PR Division, Tenali Bapatla
Construction of Cement concrete roads in Alakapuram (V)
of PV Palem (M)
1 3.00
Completed FB to be Paid
146 Guntur PR Division, Tenali Bapatla
Providing Internal CC roads in Degalavaripalem (V) in PV
Palem (M)
1 2.00
Completed FB to be Paid
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.21.3.2013 of the District
Collector, Guntur
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 & Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.21.3.2013 of the District
Collector, Guntur
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 and Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.14.11.2013 of the District
Collector, Guntur
147 Guntur PR Division, Tenali Bapatla
Providing Internal CC roads in Alakapuram (V) and GP of
PV Palem (M)
1 3.00
Completed FB to be Paid
148 Guntur PR Division, Tenali Bapatla Providing Internal CC roads in PV Palem (V) & (M) 1 3.00
Completed FB to be Paid
149 Guntur PR Division, Tenali Bapatla
Providing CC road from Kapu Atchayamma (H) to
Kommineni Madhavara Rao (H) in CJ Palem (V & G.P) of
Bapatla (M)
1 3.00
Completed FB to be paid
150 Guntur PR Division, Tenali Bapatla
Providing CC road from Z.P.Road to Parvathamma temple
in CJ Palem (V & G.P) of Bapatla (M)
1 2.00
Completed FB to be paid
151 Guntur PR Division, Tenali Bapatla
Providing CC road from M.Kondalu Reddy (H) to Arava
Satyanarayana Reddy (H) in Dariwadakothapalem of West
Baptla (G.P) of Bapatla (M)
1 4.45
Completed FB to be paid
152 Guntur PR Division, Tenali Bapatla
Providing CC road from Dontina Rami Reddy (H) in
Nagendrapuram of West Baptla (G.P) of Bapatla (M)
1 3.00
Completed FB to be paid
153 Guntur PR Division, Tenali Bapatla
Providing CC road from GBC road to Gummadi China
Yedukondalu Reddy (H) in Kukkalavaripalem of West
Baptla (G.P) of Bapatla (M)
1 4.20
Completed FB to be paid
154 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Putta addanki
Reddy (H) to Dundi Kumara Reddy (H) in Dundivaripalem
(V&G.P) of Karalapalem (M)
1 3.40
Completed
155 Guntur PR Division, Tenali Bapatla
Completion of incomplete CC Road from Putta Govardana
Reddy (H) to Putta Singa Reddy (H) in Nagarajuapelm (V
& GP) of Karalapalem Mandal
1 2.20
Completed FB to be Paid
156 Guntur PR Division, Tenali Bapatla
Providing CC road from Rama Mandiraam to Elementry
school in Nakkalavaripalem of Pedagollapalem (GP) of
Karlapalem Mandal
1 3.00
Completed FB to be Paid
157 Guntur PR Division, Tenali Bapatla
Proviuding CC road from BT road to Akkala Venkata
Ram,ireddy (H) in Tummalapalli (V & GP) of Karlapalem
Mandal
1 2.04
Completed FB to be Paid
158 Guntur PR Division, Tenali Bapatla
Providng CC road from R&B road to Bethalam Subbaraju
(H) in Alkapuram (V & GP) of P.V. Palem Mandal
1 3.50
Completed FB to be Paid
159 Guntur PR Division, Tenali Bapatla
Proviidng CC road from Atla Seetha Rami reddy (H) to
Akkala Sambireddy (H) in Redlapalem of Alluru (V & GP)
of P.V. Palem
1 1.10
Completed FB to be Paid
160 Guntur PR Division, Tenali Bapatla
Providng CC road from ZP road to Pulugu Edukondalu
reddy (H) in Redlapalem of Alluru (V &GP) of P.V. Palem
1 3.00
Completed FB to be Paid
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 and Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.14.11.2013 of the District
Collector, Guntur
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 and Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.14.11.2013 of the District
Collector, Guntur
161 Guntur PR Division, Tenali Bapatla
Providng CC road from R&B road to Maraka Narasa Raju
(H) in Punamma colony (BC colony) of Alluru (V & GP) of
P.V. Palem Mandal
1 3.00
Completed FB to be Paid
162 Guntur PR Division, Tenali Bapatla
Providng CC road from Manthena Bapiraju (H) to
Manthena Lakshmipathi (H) in P.V. Palem (V , GP&M)
1 3.00
Completed FB to be Paid
163 Guntur PR Division, Tenali Bapatla
Providing CC road from S. Krishna Rao (H) top Enumula
Venkateswarlu (H) in Pothanakattavaripalem (V &GP) of
P.V. Palem (M)
1 3.10
Completed FB to be Paid
164 Guntur PR Division, Tenali Bapatla
Providing CC road from G.P.Ofice to Budda Balakrishna
(H) in Sangupalem (V &GP) of P.V. Palem Mandal
1 4.00
Completed FB to be Paid
165 Guntur PR Division, Tenali Tenali
Providing CC road from Dastagiri (H) to Sk.Abdulla (H) in
Kolakaluru (V) in Tenali (M)
1 2.50
Completed
166 Guntur PR Division, Tenali Tenali
Providing CC road from K.Viswaroopam (H) to P.Siva
Prasad (H)
1 5.00
Completed
167 Guntur PR Division, Tenali Tenali
Construction of Compound Wall to SC Burrial Ground in
Kattevaram (V) 1 2.50
Completed
168 Guntur PR Division, Tenali Tenali
Providing CC road from Pilli Ratna Raju (H)Yathati
Rubenu (H)in Haaf peta (V) in Tenali (M)
1 5.00
Completed
169 Guntur PR Division, Tenali Tenali
Providing CC Road from Vuyyuru.Chenchu Ramaiah(H)
to N.Mugaiah(H) in Somasundarapalem(V) in Tenali (M)
1 3.50
Completed
170 Guntur PR Division, Tenali Tenali
Providing CC Road from R&B Road to U.Sankararao(H)
in Somasundarapalem(V) in Tenali (M)
1 2.50
Completed
171 Guntur PR Division, Tenali Tenali
Providing CC Road from Kolakaluri.Peda Jeorge(H) to
Mattupalli.Sambaiah(H) in Gudiwada(V) of Tenali(M) 1 5.00
Completed
172 Guntur PR Division, Tenali Tenali
Providing CC Road from Kolakaluri.Neela Rao(H) to
K.Sattulu(H) in Gudiwada(V) of Tenali(M)
1 1.00
Completed
173 Guntur PR Division, Tenali Tenali
Providing CC Road from Jyothula.Ramarao(H) to
Maddu.Prakash(H) in Gudiwada(V) of Tenali(M)
1 1.00
Completed
174 Guntur PR Division, Tenali Tenali
Providing CC Road from K.Umamaheswarao(H) to
P.Bullaiah(H) in Angalakuduru(V) of Tenali(M)
1 5.00
Completed
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Proceedings No.
80/Plg/SDFWDAT/Tenali/201
3 Dt: 19.12.2013
G.O.Rt.No.242/Planning(xVIII) dated
05.03.2013 and Procgs.
No.75/plg.I/SDFWDA/Bapatla/2013,
Dt.14.11.2013 of the District
Collector, Guntur
175 Guntur PR Division, Tenali Tenali
Construction of Compound Wall and Providing Funeral
Platform in Hindu Burrial Ground in Angalakuduru(V) of
Tenali(M)
1 5.00
Progress
176 Guntur PR Division, Tenali Tenali
Providing CC Pavement to the BSNL Tower Road in
Sangam Jagarlamudi(V) of Tenali(M)
1 5.00
Completed
177 Guntur PR Division, Tenali Tenali
Providing CC Pavement to the road from
Davuluri.Subbamma(H) to Neli.Krishna Murthy(H) in
Burripalem(V) of Tenali(M)
1 2.50
Not Started
178 Guntur PR Division, Tenali Tenali
Providing CC road from Pattam Venkateswarlu (H) to
Canal Bund in Jaggadigunta Palem (V) of Tenali (M) 1 2.50
Completed
179 Guntur PR Division, Tenali Tenali
Improvements to the Donkaroad from B. Arivinda Bose
Fields to Marowthu Sambasivarao Fields in
Pidaparthipalem.
1 1.50
Not started
180 Guntur PR Division, Tenali Tenali
Providing CC Road from GH road to Yadavapalem CC
road in Hanumanpalem (V) in Kollipara (M) 1 5.00
Completed
181 Guntur PR Division, Tenali Tenali
Providing CC Road from R&B road toM. Simhadri (H) in
Pidaparru (V) in Kollipara (M) 1 5.00
Progress
182 Guntur PR Division, Tenali Tenali
Providing CC road from Ganipisetty Somaiah (H) to
Ganipisetty Savithri (H) in Danthaluru (V) in Kollipara (M)
1 5.00
Completed
183 Guntur PR Division, Tenali Tenali
Providing CC Road from B. Sambanayak (H) to B.
Venkateswarlu Nayak (H) in Munnangi (V) in Kollipara (M)
1 2.50
Completed
184 Guntur PR Division, Tenali Tenali
Providing CC Road from K. Adiyya (H) to Dulla Pullaiah
(H) in Munnangi (V) in Kollipara (M) 1 2.50
Completed
185 Guntur PR Division, Tenali Tenali
Providing CC Road from Old CC Road to Varikuti
Venkaiah (H) in Athota (V) in Kollipara (M) 1 2.50
Completed
186 Guntur PR Division, Tenali Tenali
Providing Additional Improvements to Community hall in
Hanumanpalem (V) of Kollipara (M)
1 2.00
Not started
187 Guntur PR Division, Tenali Tenali
Providing additional Improvements to community hall in
Davuluru (V) of Kollipara (M) 1 2.00
Not started
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Procgs.No. 80/ Plg I/
SDFWDA/
Tenali/2013,Dt.28.02.2014
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Proceedings No.
80/Plg/SDFWDAT/Tenali/201
3 Dt: 19.12.2013
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Proceedings No.
80/Plg/SDFWDAT/Tenali/201
3 Dt: 19.12.2013
188 Guntur PR Division, Tenali Tenali
Providing CC road from Yaram Bose (H) to donka road in
Vallabhapuram (V) in Kollipara (M) 1 4.50
Progress
189 Guntur PR Division, Tenali Tenali
Providing CC road from K. Apparao (H) to Mangalapalem
CC road in Thumuluru (V) in Kollipara (M)
1 3.50
Not started
190 Guntur PR Division, Tenali Tenali
Providing Gravelling and metalling to Pacha Subba Rao
(H) to ZP High School in Kattevaram (V)of Tenali (M)
1 1.50
Not Started
191 Guntur PR Division, Tenali Tenali
Providing CC road from Radha Mohan singh (H) to Kodali
Samba Siva Rao (H) in Angalakuduru (V) in Tenali (M)
1 3.50
Not Started
192 Guntur PR Division, Tenali Tenali
Construction of Incomplete Compound Wall to SC Burrial
Ground in Kattevaram (V) in Tenali (M) 1 2.50
Not Started
193 Guntur PR Division, Tenali Tenali
Providing CC road from Ch. Venkaiah (H) to Sunkara
Veeraiah (H) in Khazipeta of Kolakaluru (V) in Tenali (M)
1 3.50
Not Started
194 Guntur
PRI Division,
Narasaraopet
Macherla
Laying of CC road in Sirigiripadu Village of Veldurthy
Mandal
1
5.00
Completed FB to be paid
195 Guntur
PRI Division,
Narasaraopet
Macherla
Laying of CC road from Boddurai to Vidella
Ranganayakulu (H) in Sirigiripadu Village of Veldurthy
Mandal
1
5.00
Completed FB to be paid
196 Guntur
PRI Division,
Narasaraopet
Macherla
Laying of CC road from Ramalayam to Boddurai in
Sirigiripadu Village of Veldurthy Mandal
1
5.00
Completed FB to be paid
197 Guntur
PRI Division,
Narasaraopet
Macherla
Laying of CC road from Videla Saidamma (H) to
Ramalayam in Sirigiripadu Village of Veldurthy Mandal 1
5.00
Completed FB to be paid
198 Guntur
PRI Division,
Narasaraopet
Macherla
Laying of CC road from Ganduri Yellaiah (H) to Videla
Saidamma (H) in Sirigiripadu Village of Veldurthy Mandal 1
5.00
Completed FB to be paid
199 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Boddurai to Gajula Kotaiah (H) in
Mupparajuvaripalem Village of Nuzendla Mandal
1
5.00
Completed FB to be paid
200 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Kota Subramanyam (H) to SC
Colony in Mupparajuvaripalem Village of Nuzendla Mandal

1
5.00
Completed FB to be paid
201 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Yarram Veera Reddy Shop to
Ongole Suri (H) in Nuzendla Village of Nuzendla Mandal
1
5.00
CC road in Progress
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
25/Plg.I/SDFWDA/Vinukonda
/2013, dt.16.02.2014
G.O.Rt.No.242
dated.05.3.2013 of Planning
(XVIII) Department &
Procgs.No. 80/ Plg I/
SDFWDA/
Tenali/2013,Dt.28.02.2014
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
26/Plg.I/SDFWDA/
Macherla/2013,
dt.16.02.2014
202 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Vemula Mangarao (H) to Bathula
Prasad (H) in BC Colony of Savalyapuram Village of
Savalyapuram Mandal
1
4.00
Completed FB to be paid
203 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Kampa Santhaiah (H) to Surthani
Yallamanda (H) in Sangineedupalem H/o Naidupalem
Village of Bollapalli Mandal
1
5.00
CC road in Progress
204 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Church (H) to Paladugu
Aseervadam (H) in SC Colony of Gonuguntlavaripalem
Village of Vinukonda Mandal
1
5.00
Completed FB to be paid
205 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Paladugu Aseervadam (H) to
Kotta Maha Lakshmamma (H) in SC Colony of
Gonuguntlavaripalem Village of Vinukonda Mandal
1
5.00
Completed FB to be paid
206 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from S.China Kotaiah (H) to Kotte
Bhaskara Rao (H) in SC Colony of Gonuguntlavaripalem
Village of Vinukonda Mandal
1
5.00
Completed FB to be paid
207 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Water Tank to Ramineni
Narasimharao (H) in Pedakancherla Village of Vinukonda
Mandal
1
5.00
Completed FB to be paid
208 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Anjaiah (H) to R.Pullamma (H) in
Pedakancherla Village of Vinukonda Mandal 1
5.00
Completed FB to be paid
209 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Rana Hussain (H) to Muthineni
Sambulu (H) in Pedakancherla Village of Vinukonda
Mandal
1
5.00
Completed FB to be paid
210 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Boddurai to Dudla Koteswara Rao
(H) in Pedakancherla Village of Vinukonda Mandal 1
5.00
Completed FB to be paid
211 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Srinu Mill to Kolakani Yarraiah (H)
in Pedakancherla Village of Vinukonda Mandal 1
5.00
Completed FB to be paid
212 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Sivalayam to Yeti Nageswara Rao
(H) in Pedakancherla Village of Vinukonda Mandal 1
5.00
Completed FB to be paid
213 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Naguleti Venkateswarlu (H) to
Veera Raghavaiah Kostam in Gandhinagar H/o
Gonuguntlavaripalem Village of Vinukonda Mandal
1
3.00
Completed FB to be paid
214 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Daggupati Anjaiah (H) to
Kothakolla Subbaiah (H) in Koppukonda Village of
Vinukonda Mandal
1
5.00
CC road in Progress
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
25/Plg.I/SDFWDA/Vinukonda
/2013, dt.16.02.2014
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
25/Plg.I/SDFWDA/Vinukonda
/2013, dt.16.02.2014
215 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Pogula Pattabhi Ramaiah (H) to
Devara Bala Swami (H) in Nadigadda Village of Vinukonda
Mandal
1
5.00
Completed FB to be paid
216 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road and drains from Kotha Venkateswarlu
(H) to Ch.Srinivasarao Land in Hassannayunipalem Village
of Vinukonda Mandal
1
5.00
CC road in Progress
217 Guntur
PRI Division,
Narasaraopet
Vinukonda
Construction of Vented road dam across local vagu on
Hassanayunipalem to Pedakancherla in
Hassannayunipalem Village of Vinukonda Mandal
1
5.00
In Progress
218 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Existing CC road to Ammavari
Temple in Venkupalem Village of Vinukonda Mandal
1
5.00
Not Started
219 Guntur
PRI Division,
Narasaraopet
Vinukonda
Providing CC road from Ramalayam to Musirika China
Venka Reddy (H) in Chikateegalapalem Village of
Vinukonda Mandal
1
3.00
Completed FB to be paid
District Total: 219 937.28 193.56
Superintending Engineer
P.R. Circle, Guntur
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
25/Plg.I/SDFWDA/Vinukonda
/2013, dt.16.02.2014
1 2 3 4 5 6 7 8 9 10
1 Guntur
PRI Division,
Guntur
Prathipadu
Providing B.T. road from Turakapalem to Chebrolu
Hanumaiah Company road upto GMC limits
G.O.Rt No.477,Dt. 17.4.12 1 30.00 23.03 Completed FB Paid
2 Guntur
PRI Division,
Guntur
Prathipadu Providing B.T. road from NH-5 to Pothuru village G.O.Rt No.477,Dt. 17.4.12 1 20.00 16.56 Completed FB Paid
3 Guntur
PRI Division,
Guntur
Prathipadu
Providing 4 C.C. roads and C.C. drains in the SC Colony
and Obulunaidupalem village
G.O.Rt No.477,Dt. 17.4.12 1 20.00 10.00 Completed FB tobe Paid
4 Guntur
PRI Division,
Guntur
Prathipadu
Providing C.C. drains from Anjaneya Swamy Temple to B.
Anjaneyulu house in Etukuru village
G.O.Rt No.477,Dt. 17.4.12 1 11.00 10.42 Completed, FB Paid
5 Guntur
PRI Division,
Guntur
Prathipadu
Providing C.C. road from R & B road to S.C. Colony in
Budampadu village
G.O.Rt No.477,Dt. 17.4.12 1 25.00 22.03 Completed, FB Paid
6 Guntur
PRI Division,
Guntur
Prathipadu Providing 4 internal C.C. roads in Jonnalagadda village G.O.Rt No.477,Dt. 17.4.12 1 20.00 16.94 Completed, FB Paid
7 Guntur
PRI Division,
Guntur
Prathipadu
Formation of 3 Internal CC roads in SC Colony Bonthapadu with an
expenditure of Rs.3.33 loakhs per road
1 10.00 Completed
8 Guntur
PRI Division,
Guntur
Prathipadu
Formation of 3 Internal CC roads in lalpuram with an expenditure of
Rs.3.33 lakhs per road
1 10.00 Proposed for dropping
9 Guntur
PRI Division,
Guntur
Prathipadu
Formation of 3 internal cc roads in Chinapalakaluru with an
expenditure of Rs.3.33 lakhs per road
1 10.00 5.00 Completed
10 Guntur
PRI Division,
Guntur
Prathipadu
Formation of 3 internal CC roads in SC Colony Chowdavaram with
an expenditure of Rs.3.33 lakhs per road
1 10.00 Completed
11 Guntur
PRI Division,
Guntur
Prathipadu
Formation of 3 internal roads in Kothuru (V) of with an expenditure
of Rs.3.33 lakhs per road
1 10.00 Proposed for dropping
12 Guntur
PRI Division,
Guntur
Prathipadu
Providing internal CC roads in SC Colony of
Ananthavarapadu (V) of Vatticherukuru (M)
1 40.00 Estimate T/ S stage
13 Guntur
PRI Division,
Guntur
Prathipadu
Providing internal CC roads in SC Localities of Anaparru (V)
of Pedanandipadu (M) 1 40.00 Estimate T/ S stage
CATEGORY B
RACHA BANDA AND SPECIAL DEVELOPMENT FUND FOR WELFARE & DEVELOPMENT ACTIVITIES WORKS PROGRESS REPORT FOR THE MONTH OF MAY 2014 IN PR CIRCLE, GUNTUR
S.No District Division Constituency Gist of Announcement Sanction Particulars
No. of
works
Total Expenditure
Remarks- Physical
stage
Go.Rt No.802, Dt . 02.7.12 &
Progs. Rc.
No.228/Plg.I/SDFWDA/Prath
ipadu/12-13 Dt. 05.01.13 of
the District Collector, Guntur.
G.O.Rt.No.170/Plg.(XVII)
Dept., dated 10.02.2014 &
Progs
No.29/Plg.I/SDFWDA/Prathi
padu/14, Dt.01.03.14
1 2 3 4 5 6 7 8 9 10
S.No District Division Constituency Gist of Announcement Sanction Particulars
No. of
works
Total Expenditure
Remarks- Physical
stage
14 Guntur
PRI Division,
Guntur
Guntur-II
(west)
Providing additional facilities to Urdhu Ghar cum
Shadikhana at Guntur-II Assembly Constituency
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg./I /
SDFWDA/Guntur West/2013, Dt.
08.11.2013
1 47.00 Completed
15 Guntur
PRI Division,
Guntur
Guntur-II
(west)
Providing additional infrastructure to Urdu Ghar cum
Shadikhana building at Pattabhipuram in Municipal
Corporation, Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013
&Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
08.01.2014
1 49.00 Completed
16 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of CC drain and CC road at Vaddegudem ini Division
NO.21 in Municipal Corporation, Guntur 1 25.00 Completed
17 Guntur
PRI Division,
Guntur
Guntur-II (west)
Providing WBM road and RCC culvert at Durga Nagar 2nd Lane
upto Narasaraopet road in Division NO.27 in Municipal Corporation,
Guntur
1 14.00 Progress
18 Guntur
PRI Division,
Guntur
Guntur-II (west)
Providing widening with CC road at Syamala nagar main road from
1st Lane cross culvert upto East Recruitment office junction in
Division NO.32 in Municipal Corporation, Guntur
1 19.95 Progress
19 Guntur
PRI Division,
Guntur
Guntur-II (west)
Providing CC roads to 4th Lane and 2nd cross road, Vidya Nagar in
Division NO.32 in Municipal Corporation, Guntur
1 12.00 Completed
20 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of CC outfall drain at Anjaneya swamy temple upto
East Sai baba road, idya Nagar in Division NO.34 in Municipal
corporation, Guntur
1 25.00 Completed
21 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of CC outfall drain to Chaitanyapuri main road from
Chaitanyapuri 3rd lane upto to Mutyala reddy nagar vagu in Division
NO.41 in Municipal Corporation, Guntur
1 16.00 Progress
22 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of CC drains and providing CC road to Chaitanyapuri
colony 4th lane Sugali colony main road cross road (Municipal
School Road) in Divisino NO.41 in Municiapl corporation, Guntur
1 19.10 Completed
23 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of community hall at Sugali colony in Division NO.41 in
Municipal Corporation, Guntur
1 19.60 Progress
24 Guntur
PRI Division,
Guntur
Guntur-II (west)
Providing CC roads to 9th & 10th Lanes of Mutyala Reddy Nagar in
Division NO.41 in Municipal Corporation, Guntur 1 14.00 Completed
25 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of community hall for SC's at Koritepadu tank bund in
Division NO.41 in Municipal Corporation, Guntur
1 19.00 Progress
G.O.Rt.No.242/Planning(xVII
I) dated 05.03.2013 &
Progs.No. 77/Plg
I/SDFWDA/Guntur west/13,
Dt. 10.12.2013
1 2 3 4 5 6 7 8 9 10
S.No District Division Constituency Gist of Announcement Sanction Particulars
No. of
works
Total Expenditure
Remarks- Physical
stage
26 Guntur
PRI Division,
Guntur
Guntur-II
(west)
Providing UGD lines at Rajaka Ramalayam, Sakethapuram,
PS Nagar 2nd Lane, Bharatpet and postal Colony and
Construction of main holes at Arundelpet area in Municipal
Corporation, Guntur.
1 23.00 Progress
27 Guntur
PRI Division,
Guntur
Guntur-II
(west)
Formation of WBM road in Vidya Nagr 3/10 and other cross
roads upto JKC college road in Division No. 34 in Muncipal
corporation, Guntur
1 13.00 Agt. Stage
28 Guntur
PRI Division,
Guntur
Guntur-II (west)
Providing WBM road in 1st to 9th cross roads in 1st lane
Krishna Babu Colony in Div No.26 in Muncipal Corporation,
Guntur
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
20.02.2014
1
15.75
Tender stage
29 Guntur
PRI Division,
Guntur
Guntur-II (west)
Providing Funds to Muslim Shadi Khana for Completion of
Incomplete works , Pattabhipuram Div No 31 in Guntur
Muncipality
G.O.Rt.No.242/Planning(xVIII)
dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur West/2013, Dt.
28.02.2014
1
15.00
Progress
30 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing BT road from Hosanna Mandir to Papidi Mill in Suddapalli
Donka in Div.No.6 of GMC
1
10.00 Agreement not entered
31 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing BT road Sri Kanyaka Parameswari Temple to Ramulavari
Temple (Etukuru road) in Div.No.17 & 19 in GMC
1
25.00 Agt. Stage
32 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing CC road from Avula Sunkanna (H) to K.Venkata
Subbaiah (H) in Prasanthi Nagar 11th Line 5th cross road in
Div.No.17 in GMC
1
10.00 Agreement not entered
33 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing waiting room at Government Degree College, Div.No.11
in GMC
1
10.00 Agreement not entered
34 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing BT renewal to the road from Ponnur road to Yadava High
School Centre in Div.No.6 in GMC 1
10.00 Agreement not entered
35 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing BT road from Vinoba Nagar 7th line to Maruthi Nagar 1st
line (Jakir Hussain Nagar) in Div No. 3 1
10.00 Agreement not entered
36 Guntur
PRI Division,
Guntur
Guntur-II (East)
Providing BT road from Papidi Mill to GMC pump (H) in Suddapalli
Donka Div No. 5 of GMC
1
10.00 Agreement not entered
37 Guntur
PRI Division,
Guntur
Tadikonda
Construction of Side drains in Bethapudi village of
Phirangipuram (M) of Guntur District
G.O.Rt.No.1027,Dt.05.8.12 1 25.00 22.81 Completed, FB Paid
38 Guntur
PR Division,
Tenali
Repalle
Completion of Incomplete Community Hall at Nizampatnam
Village & Mandal
G.O Rt No: 548 dt:
11.07.2011 of Planning
(XVIII) Dept.
1 25.00 24.92
Completed,FB Paid
39 Guntur
PR Division,
Tenali
Repalle
Approach road toKarravaripalem Dalithawada of
Kuchinapudi
1 12.00
Completed,FB Paid
140.47
G.O.Rt.No.242/Planning(xVII
I) dated 05.03.2013 &
Progs.No.77/Plg.I /
SDFWDA/Guntur
West/2013, Dt. 08.01.2014
G.O.Rt.No.242/Planning(xVII
I) dated 05.03.2013 & Progs
No.76/Plg.I/SDFWDA/Guntu
r West/13, Dt.06.02.14
G.O Rt No: 611 dt
23.07.2011 of Planning
(XVIII) Dept./ 95,
DT.19.01.12 (Plg)(RPB)
Dept.,
Package No: AP-GNT-RB01
(12 WORKS)
1 2 3 4 5 6 7 8 9 10
S.No District Division Constituency Gist of Announcement Sanction Particulars
No. of
works
Total Expenditure
Remarks- Physical
stage
40 Guntur
PR Division,
Tenali
Repalle Approach road to Bapaiah Nagar ST colony of Amudalapalli 1 15.00
Completed,FB Paid
41 Guntur
PR Division,
Tenali
Repalle Approach road to Komaravolu Dalithawada of Amudalapalli 1 30.00
Completed,FB Paid
42 Guntur
PR Division,
Tenali
Repalle Approach road to Nalluru South (Madigapalli) 1 18.00
Completed,FB Paid
43 Guntur
PR Division,
Tenali
Repalle Approach road to Singupalem Dalithawada up to Kaithepalli 1 10.00
Completed,FB Paid
44 Guntur
PR Division,
Tenali
Repalle Approach road to Pothumeraka Harijanawada 1 12.00
Completed,FB Paid
45 Guntur
PR Division,
Tenali
Repalle
Approach road from RTG R&B road Thurpu Harijanawada of
Uppudi
1 12.00
Completed,FB Paid
46 Guntur
PR Division,
Tenali
Repalle
Nalluru R&B road @ KM 4/5 to Cheruvulomalapalli
habitation of Nalluru
1 23.00
Completed,FB Paid
47 Guntur
PR Division,
Tenali
Repalle Approach road toMallapalli of Cherukupalli via Bus stand 1 32.00
Completed,FB Paid
48 Guntur
PR Division,
Tenali
Repalle Approach road to Dasaripalem Dalithawada of Gudavalli GP 1 30.00
Completed,FB Paid
49 Guntur
PR Division,
Tenali
Repalle
Approach road to Vinayashram ST Colony of
Rambhotlapalem
1 12.00
Completed,FB Paid
50 Guntur
PR Division,
Tenali
Repalle Approach road to Yettivanimalapalli H/o. Dhulipudi 1 19.00
Completed,FB Paid
51 Guntur
PR Division,
Tenali
Repalle Approach road to Pamidimarru SC Colony (Malapalli) 1 20.00
Completed,FB Paid
52 Guntur
PR Division,
Tenali
Repalle Approach road to SC Colony of Pedapalli Gollapalem 1 15.00
Completed,FB Paid
53 Guntur
PR Division,
Tenali
Repalle
Extension of Approach road to SC Colony of Allaparru
Agraharam H/o. Sajjavaripalem
1 15.00
Completed,FB Paid
54 Guntur
PR Division,
Tenali
Bapatla
Completion of incomplete PR road Etrivaripalem and to meet
Bapatla-Guntur High road
G.O Rt No: 797 dt 15.9.2011 of
Planning (XVIII) Dept.
1 35.00 30.04
Completed,FB Paid
55 Guntur
PR Division,
Tenali
Tenali
Completion of Incomplete Community Hall in SC Colony in
Kollipara (V)
G.O.Rt.No.242 dated.05.3.2013 of
Planning (XVIII) Department &
Proceedings No.
80/Plg/SDFWDAT/Tenali/2013 Dt:
19.12.2013
1 10.00 Not started
140.47
140.81
G.O Rt No: 611 dt
23.07.2011 of Planning
(XVIII) Dept./ 95,
DT.19.01.12 (Plg)(RPB)
Dept.,
Package No: AP-GNT-RB01
(12 WORKS)
G.O Rt No: 611 dt
23.07.2011 of Planning
(XVIII) Dept./ 95,
DT.19.01.12 (Plg)(RPB)
Dept.,
Package No: AP-GNT-RB01
(8 WORKS)
1 2 3 4 5 6 7 8 9 10
S.No District Division Constituency Gist of Announcement Sanction Particulars
No. of
works
Total Expenditure
Remarks- Physical
stage
56 Guntur
PR Division,
Tenali
Vemuru
Completion of Vemana Vikaskendram building in Modukuru
(V) of Tsunduru (M)
G.O.Rt.No.170/Plg.(XVII) Dept.,
dated 10.02.2014 & Procgs.No. 23/
Plg I/ SDFWDA/
Vemuru/2013,Dt.16.02.2014
1 25.00
Tenders tobe called
for
District Total: 56 1082.40 463.03
Superintending Engineer,
P.R. Circle, Guntur
1 2 3 4 5 6 7 8 9 10
1 Guntur
PRI Division,
Guntur
Prathipadu
Formation of BT road from Ananthavarapadu to NH5
PR road in Vatticherukuru (M)
1 110.00 Estimate submitted to ENC for T/S
2 Guntur
PRI Division,
Guntur
Prathipadu
Providing BT to the road from Varagani to Anaparru
in Pedanandipadu (M)
1 105.00 Estimate submitted to ENC for T/S
3 Guntur
PRI Division,
Guntur
Guntur-II (west)
Construction of Urdu-Ghar-cum-Shadi Khana at
Guntur -II
G.O.Rt.No.99, Dt.21.01.12
& G.O.Rt.No.1049,
Dt.22.11.13
1 300.00 250.00 Completed FB tobe paid
4 Guntur
PR Division,
Tenali
Repalle CC Pavement at Nizampatnam Village & Mandal
G.O Rt No: 548 dt:
11.07.2011 of Planning
(XVIII) Dept.
1 75.00 49.38
Work is in Progress Part Payment
Made.
District Total: 4 590.00 299.38
Superintending Engineer
P.R. Circle, Guntur
G.O.Rt.No.170/Plg.(XVII) Dept.,
dated 10.02.2014 & Progs
No.29/Plg.I/SDFWDA/Prathipadu/1
4, Dt.01.03.14
CATEGORY C
RACHA BANDA AND SPECIAL DEVELOPMENT FUND FOR WELFARE & DEVELOPMENT ACTIVITIES WORKS PROGRESS REPORT FOR THE MONTH OF MAY 2014 IN PR CIRCLE, GUNTUR
S.No District Division Constituency Gist of Announcement Sanction Particulars
No. of
works
Total Expenditure Remarks- Physical stage

You might also like