Step by Step Process To Clear Extract Delta Queues During Patchupgrade in Ecc System

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

Generated by Jive on 2014-07-12+02:00

1
SAP Business Warehouse: Step by step
process to clear extract & delta queues during
patch/upgrade in ECC system
Posted by Puja Yerunkar Nov 25, 2013
I am writing this blog to give you the steps to be performed during ECC system patch/upgrade:

Process: In SAP ECC system any transaction posted into data base tables it will post entries in BW related
extract Queues (LBWQ or SMQ1) related to LO cockpit. These queues need to be cleared before applying any
Patches or upgrade into ECC to minimize data loss if any changes in extract structures.
This document show step by step method to clear LO queues before applying the patches/upgrade into SAP
ECC system.

Note: Below given JOBS/INFOPACKAGES names may vary in your scenario.
Procedure for V3 jobs of R/3 and Info packages scheduling before taking the down time:
1) Schedule the below mentioned V3 jobs 4- 5 hrs before taking the down time continuously on hourly basis
in SAP ECC system.
Ex. Jobs,
a. LIS-BW-VB_APPLICATION_02_500
b. LIS-BW-VB_APPLICATION_03_500
c. LIS-BW-VB_APPLICATION_11_500
d. LIS-BW-VB_APPLICATION_12_500
e. LIS-BW-VB-APPLICATION_17_500
f. PSD:DLY2330:LIS-BW-VB_APPLICATIO

2) 2) Schedule the below mentioned info packages 4-5 hrs before taking the downtime in SAP BW/BI
system.
BW client XXX.
Ex. Info Package Name:

a. MM_2LIS_03_BF_RegularDelta_1
b. MM_2LIS_03_UM_Regulardelta_1
c. 2LIS_13_VDKON(DELTA)1
d. Billing Document Item Data:2LIS_13_VDITM:Delta1
e. 2LIS_12_VCHDR(Delta)1
f. 2LIS_12_VCITM(delta)1
g. Sales Document Header Data:2LIS_11_VAHDR:
h. Order Item Delta update: 2LIS_11_VAITM:
i. Order Alloctn Item Delta1 updat :2LIS_11_V_ITM :

SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
2
3) 3) Ensure that there should be minimum data in Queues (i.e. in SMQ1or LBWQ and RSA7) if data is very
high then again schedule the V3 Jobs in R/3 & info packages.

Steps 1 to 3 are to be followed before taking down time to minimize data extraction time during down
time for patch application.

4) 4) After taking the Down time SAP Basis team will inform BW team for clearing the Queues in ECC
system.

5) 5) Follow the following procedure to clear Extract Queues (SMQ1 or LBWQ) and delta Queues (RSA7)
(i.e. Before Application of Patches or upgrade)
a) Request SAP basis team to Lock all users in SAP ECC system (except persons who clearing the queues)
and take down time of 45 minutes or depending
upon your data volume or plan.

b) Make sure that all jobs are terminated nothing should be in Active status except V3 & BW extraction Jobs in
SAP ECC system.

c) Take screen shot of Tr. Code: SMQ1 or LBWQ before scheduling the V3 Jobs

d) Screen shot of Tr Code: RSA7 before extracting the data to BW
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
3

e) Screen shot of LBWE extraction structure
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
4

6) 6) Copy following V3 Jobs in SAP ECC system - and schedule it immediately in down time for every five
minutes to move data from Extract Queues (SMQ1 or LBWQ) to Delta queues(RSA7).
Ex.V3 Jobs,


LIS-BW-VB_APPLICATION_02_500
LIS-BW-VB_APPLICATION_03_500
LIS-BW-VB_APPLICATION_11_500
LIS-BW-VB_APPLICATION_12_500
LIS-BW-VB-APPLICATION_17_500
PSD:DLY2330:LIS-BW-VB_APPLICATIO
6.1 To Delete unwanted Queues in SAP ECC system.
These queues Ex. MCEX04, MCEX17 & MCEX17_1 are not being used in your project hence you need to
delete these queues in ECC system.
Deleting procedure: Enter the Tr. Code SMQ1 and select the MCEX04 then press the delete button, it will take
few minutes to delete the entries.
Follow the same procedure to delete other not required queues in your project.

7) Then schedule the info packages in SAP BW (XXX client) until the RSA7 entries become 0.
BW client XXX.
Ex. Info Package Name:

MM_2LIS_03_BF_RegularDelta_1
MM_2LIS_03_UM_Regulardelta_1
2LIS_13_VDKON(DELTA)1
Billing Document Item Data:2LIS_13_VDITM:Delta1
2LIS_12_VCHDR(Delta)1
2LIS_12_VCITM(delta)1
Sales Document Header Data:2LIS_11_VAHDR:
Order Item Delta update: 2LIS_11_VAITM:
Order Alloctn Item Delta1 updat :2LIS_11_V_ITM :

8) If still Extraction queue (SMQ1 or LBWQ) has entries, repeat the step 6 to 7 until both the extract Queues
and delta Queues read ZERO records.

9) After zero records repeat the step 6 to 7 for double confirmation to avoid any possible data entries.

10) Screen shot of Tr Code: SMQ1 after become ZERO.
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
5


11) Screen shot of Tr. Code: RSA7 after become ZERO.
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
6

12) After ensuring that SMQ1 or LBWQ and RSA7 read ZERO entries, release the system for Basis for any
upgrade or patch application.

13) After patch or upgrade is over SAP Basis team will inform SAP BW team to check the extract Queues
and delta Queues are getting populated or not.

14) Request SAP Basis team Restore the all V3 jobs in ECC system to Original position and unlock all the
users or system/communication users.

15) Check the Tr. Code: SMQ1 and RSA7 whether the entries are getting posted or not after restoring the
V3 jobs in ECC system.
See the screen shot
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
7

RSA7
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
8

16) Check the Tr, code LBWE whether all the Extract structure or active or not see the screen shot after
patch application.
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
9

17) Schedule the any of the info package in SAP BW ( from above list)
See the screen shot

This ends the Queues clearing activity.

Thanks & Regards
Puja Yerunkar.
4055 Views
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
10
kodanda pani KV
Jan 17, 2014 7:23 PM
Thanks for sharing and very useful.

Thanks,
Phani.
SOMESH DAS
Jan 17, 2014 5:52 PM
Very useful document..

Thanks.
abilash n
Dec 16, 2013 12:27 PM
Excellent Blog Puja. Great work.
If you have any idea on how to debug the data coming from ECC to BI. please share that in New blog ...
Puja Yerunkar in response to Prashanth Konduru on page 10
Dec 14, 2013 11:58 AM
Thanks for your feedback

Regards
Puja
Debasisha panda
Dec 11, 2013 12:19 PM
Good info in details...

Thanks. DP
Hari Reddy
Dec 9, 2013 10:15 AM
Useful Info.

Thanks,
Hari
Prashanth Konduru
Dec 7, 2013 5:09 AM
Gr8 ... useful document and handy points while upgrading ...
Thanks for sharing

SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
11
Cheers
KP
Puja Yerunkar in response to Venu Gopal Boddapati on page 11
Dec 6, 2013 12:29 PM
Thanks for your feedback

Regards
Puja
Venu Gopal Boddapati
Dec 5, 2013 1:45 PM
Thank you... Big & Gud effort

Best Regards,
Venu Gopal
Giri Prasad
Dec 4, 2013 11:34 AM
Good man.
Puja Yerunkar in response to Krishna Chaitanya on page 11
Dec 4, 2013 11:02 AM
Thanks for your feedback.
Krishna Chaitanya
Dec 3, 2013 8:16 AM
Very helpful document. Good job. Thanks for sharing.
Lalit Peswani
Nov 29, 2013 3:23 PM
Hi Puja,

Very helpful document,day by day my knowledge is increasing
thanks for sharing it.

Regards,
Lalit
vinai surepelli
Nov 29, 2013 12:23 PM
Very informative thanks
Anshu Lilhori
Nov 27, 2013 7:59 AM
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
12
Useful info.Puja.Thanks for sharing this.

Definitely come handy for BASIS team as well.We can simply share this document with them and they will also
be aware of activities need to be carried out during any sort of upgradations.

Regards,
AL
Veeramalla V
Nov 27, 2013 7:47 AM
valuable inputs for upgrade, we can keep these in cut over checklist.
Vijay Chandra.R
Nov 26, 2013 6:46 AM
Helpful document...
Puja Yerunkar in response to SK S on page 12
Nov 26, 2013 6:27 AM
Hi,
1) For scheduling V3 Jobs:
Enter T code LBWE -->
select particular Application Area say Purchasing-->
Drill down to extract structures-->
check all the required data sources are active or not-->
select "Job Control"-->
new window will open as "Job Maintenance for collective update"-->
Enter Job parameters like-->
Start date, time,Period values etc..->
and in control parameters-->
click on schedule job tab to schedule the JOB.
it will create background job as per above given parameters like
LIS-BW-VB_APPLICATION_02_500.
this completes V3 job schedule.
2. All the Suspended Process chains will start immediatly after server goes up but load on the source system
will increase drastically, it will impact on transactions. hence best practise will be stop all the process chains at
the time of upgrade or patch application and reschedule all the jobs as per suitable timings once the servers
goes up.
Manna Das
Nov 26, 2013 5:22 AM
thanks for the detailed explanation on how to clear the delta queues.

KR,
Manna Das
SK S
SAP Business Warehouse: Step by step process to clear extract & delta queues during patch/upgrade in ECC
system
Generated by Jive on 2014-07-12+02:00
13
Nov 26, 2013 12:41 AM
Thanks,
1. Can you please detail how to run and clear V3 jobs in ECC
2. Can you please detail suspend process chains which are scheduled for nightly load or delete/release
PCs...do we need to change timings in their variants ?
3. post upgrade, how to reschedule the process chains
Mandeep Kalyan
Nov 25, 2013 11:23 AM
Nice one!

You might also like