This non-conformity report describes issues found with concrete columns during an inspection at the Suez-New Coal Grinding Plant Project. Most columns showed concrete segregation and honeycombing. The columns need to be repaired using bonding material, except some that may need to be demolished. To prevent this, concrete casting and vibrating methods need to follow standards to ensure proper mixing and eliminate air pockets.
This non-conformity report describes issues found with concrete columns during an inspection at the Suez-New Coal Grinding Plant Project. Most columns showed concrete segregation and honeycombing. The columns need to be repaired using bonding material, except some that may need to be demolished. To prevent this, concrete casting and vibrating methods need to follow standards to ensure proper mixing and eliminate air pockets.
This non-conformity report describes issues found with concrete columns during an inspection at the Suez-New Coal Grinding Plant Project. Most columns showed concrete segregation and honeycombing. The columns need to be repaired using bonding material, except some that may need to be demolished. To prevent this, concrete casting and vibrating methods need to follow standards to ensure proper mixing and eliminate air pockets.
This non-conformity report describes issues found with concrete columns during an inspection at the Suez-New Coal Grinding Plant Project. Most columns showed concrete segregation and honeycombing. The columns need to be repaired using bonding material, except some that may need to be demolished. To prevent this, concrete casting and vibrating methods need to follow standards to ensure proper mixing and eliminate air pockets.
7. Found during what activity Incoming Inspection Final Inspection In-Process Inspection Other:
8. Description of non-conformity (use continuation page if necessary) Most of Building Columns have Concrete Segregation resulting in honeycombs in columns.
Importance 9. Non Critical Critical
Disposition 10. Use-as-is Repair Reject Rework Return to supplier Description of proposed action (use continuation page if necessary) Workers Shall repair all columns using bonding material except for some columns that may be demolished.
Corrective/Preventive Action 11. Description of proposed action (use continuation page if necessary) Correct Concrete Casting topology according to standards and well vibrating shall prevent this problem. Project: Suez-New Coal Grinding Plant Project RIGA for construction & industries Quality Control Division
Non-Conformity Report No. (0001/00) Report no.: #0000 Date : 21/04/2014 Attached : 1Pages A4 + 0Page A3 Subject: Non Conformity of Concrete Columns.
Fax: +202 2559945 Email: info@rigaegypt.com Office: 2G/4 El Shiekh El Shaarawy st. Alasilky Division, Maadi, Cairo Tel.: +202 27652205 Workshop: Arab Abo Saed El Tabben. Mob: +201065519844 www.Rigaegypt.com Attachments The following captures indicate the problem mentioned earlier: