Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Appd. Rev.

Revision Date
Prepared by
ABB AB - FACTS
Document No.
No. of sh.
Sheet
Rev Ind
Title (English)
Title (own language) Date
Issued by Dept
Approved by
Drawn by Assembly dwg
Vignesh
K Ekstrm 2011-05-17
DM
Vignesh
1JNS10150D1MK 1
1
Grounding plan
A
F10150
2011-06-29
Form
No
Design checked by
Sheet
Cont
Year W
eek
Dept
Rev Ind
Drawn by
2011-05-17 VENDOR'S DRG. NO.-
UNIT: PACKAGE :
SCALE -
TITLE :
DESIGN
DRAWN
CHKD
APPROVED
DATE
REV. SH.No.
PROJECT DRG.NO.-
CATEGORY OF DRG. APPROVAL INFORMATION REFERENCE RECORD CONSTRUCTION
SIZE A1
6MPTA INTEGRATED STEEL PLANT AT ANGUL, ORISSA
-
1 of 1
0
C
0
9
1 0
O
I
S
MP
O
A
N
Y
Vignesh
Vignesh
Katarina
Katarina
Grounding Plan
MECON LIMITED
JINDAL STEEL & POWER LIMITED
ASEA BROWN BOVERI
1:100
N
3.
1.
2.
4.
between parallel conduits and earthwire
NOTE:
Follow the instructions described
in dwg. XN 360 000-ACS "Guidlines
for installation of grounding conductors".
Where it is not stated the contrary
the earthwire is buried min. 600 mm
belowe the finished ground level.
The top layer of crushed stones shall be
between 100 - 150 mm. The resistivity
of the layer, wetted with groundwater,
shall be approx. 3000 Ohm-m.
Earthwire shall follow the route for
buried cable conduits. Maximum distance
is 500 mm.
X X
X
M5
b
b
b b
b
b
b b b
b b b
a a a
K3
b
b
b
a a
a
a
a a
a
a
F1
F1
F1
F1
F1
F1
K4 K4
K2
K2
K2
K2
K1 K1 K1 K1 K1 K1 K1
C1 C1 C1
F2 F2 F2
C1 C1 C1
M1 M1 M1
M2 M2 M2
F3 F3 F3
C1 C1 C1
K3
D1
K3
C2 C2
K6 K6 K6
K5
M4
K5
K5
a
M4
M4
M3
M3
M3
K3 K3
D1
K6 K6
K6
K6
K6
M5
M5
D1
K6
Fence
D1
SVC Building
earthing grid
Connect to 33kv Swtchyard
earthing grid
Cable trench
D1 D1 D1 D1 D1
Connect to 33kv Switchyard
Cable trench from 33kV switchyard
D1
Current transformer C1,C2
Disconnector D1
Jointing point to equipm. steel structure
Connection pionts
JSPL Angul SVC-Q, India
PVC conduits
MS Rod 40 mm Dia. approx L=1000 (INABB scope)
150mm2 Copper conductor (supplier by SEABB)
b=9m
No connection X
a=4m
else is noted)
(L=approx 1,0m above ground where nothing
Designation Foundation for
F1,F2,F3 Reactor
M1,M2,M3,M4,M5 Capacitor Banks
K1.K2,K3,K4,K5,K6 Pillars
A As per 1JNS10150D1ME-Rev A KE 2011-08-07
C
B
w
ill b
e
p
ro
s
e
cu
te
d
. A
B
B
A
B
u
s
e
d
fo
r a
n
y
u
n
a
u
th
o
riz
e
d
p
u
rp
o
s
e
. C
o
n
tra
v
e
n
tio
n
m
u
s
t n
o
t b
e
im
p
a
rte
d
to
a
th
ird
p
a
rty
n
o
r b
e
w
ritte
n
p
e
rm
is
s
io
n
, a
n
d
th
e
co
n
te
n
ts
th
e
re
o
f
T
h
is
d
o
cu
m
e
n
t m
u
s
t n
o
t b
e
co
p
ie
d
w
ith
o
u
t o
u
r
12 11 10 9 8 7 6 5 4 3 2
1
G
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10 11 12
H
G
F
E
D
A

You might also like