ASSIGNMENTON

CONSTRUCTION FINANCE MANAGEMENT PGPM 12


SUBMITTED BY
K.VINOTH KUMAR,PG PPM,REG NO: 211-05-31-9361-2133


NICMAR/CODE OFFFICE1.

Course No : PGPM 12
2.

Course title : Construction Finance Management
3.

Assignment No : 02
4.

Date of dispatch : 15-03-2012
5.

Last date of receipt of

Assignment at CODE office :AssignmentAn offer has been given by a charitable trust to develop and build afacility on a 10,000 sq.m. of plot in a prime locality of Pune where 5000 sq.m.of area will be used by the trust for housing, health
facilities for senior citizens.5000 sq.m.will be given free to developer as a cost of development.Cost of land is Rs.10, 000/ sq.m.Specification for flooring:10% Granite40% Kota stone50% Mosaic cement tilesR.C.C Framed structureAluminium
sliding windows

Class A.Rest specification as used for Class A. constructions.Discuss the final viability of the project and the financial planning of theproject. Developer would like to have minimum 18% net profit on hisinvestment. Developer can invest only
Rs.10 lakhs as his own funds and canrise not more than Rs. 50 lakhs as bank loan.


SOLUTION:1. PROJECT SCOPE / SPECIFICATIONS
The Scope of work consists of constructing a housing and health facility centerfor senior citizen on a 5000 sqm plot in a prime locality in Pune. The landbelongs to a charitable trust.


To utilize the space provided by charitable trust for a social & noblecause.


To provide a better place for senior citizens.


To make the society aware about the responsility towards our elders.Specification for flooring10% Granite40% Kota Stone.50% Mosaic TilesRCC Framed StructureAluminum sliding windows- Class AIt will be based on latest technology of
construction. The building will beof framed structure, Structural glazing, external cladding using compositealuminum sections will also be applied. Beside these finishes for internal aswell as external will be of the best type prevailing in the
industry referring to
Class- A

specifications
.The work will be completed in 12 months (365 days) as per Projectimplementation Schedule.


Facilities to be provided:


Parking facility


Security & Announcement Booth


Landscaping


Lighting Arrangement


Public Toilets


Fire Fighting System


Cafeteria


Health facilities


Elevators.