27k Crane Lifting Permit

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

JIHAR GTP STAGE 3 PROJECT

CRANE LIFTING PERMIT Permit No. CLP-021


Contractor
LEAD
Date
30 Septemer 200!
Description of Load
I"#t$%%$tio" o& '( ) * pipe $t PR-3
Crane Model
20 or 30 To"# Cr$"e
Weight of Load
+e%o, 20 To"#
Boom Length
Weight of Rigging and Crane
Block
Jib Length
Total Erection Load
Maximum Radius of
Lift
ercent Crane Capacit! at
Maximum Lift Radius
Crane Capacit! at
Maximum Radius of
Lift radius
"on#Engineered Lift Engineered Lift
$ttach supporting Rigging %tud!& Dra'ings and Lift lan for all T!pe (B)
and T!pe (C) Engineered Lifts*
RIGGING GEAR RE-.IRED / SI0E AND CAPACIT1
%hackles %preader
%lings Tailing +ook#,p
LOAD AND LIFTING L.G
1. +as the 'eight of the load been documented or accuratel!
calculated-
2. $re all items that 'ill be lifted 'ith the e.uipment included
in the 'eight-
3. +a/e the lifting lugs that 'ill be used to lift the load been
designed for that purpose-
4. Will the lifting lugs be used 'ith the correct shackle-
5. Will the lifting lugs be loaded onl! in the strong direction0s1
of the lug-
6. $re the lifting lugs /isibl! free of defects or damage-
7. +as the load been checked for loose or unsecured items&
'hich might fall off during the lift-
8. 2or a one#crane lift 'ill the crane hook be o/er the center of
gra/it! at the initial pick-
RIGGING GEAR
9. +a/e the capacities of the slings and shackles been checked
for the load-
10. +a/e the slings and shackles been /isuall! inspected for
defects or damage-
11. +a/e the sling angles been considered 'hen checking the
capacit! of the slings and shackles-
12. +as the center of gra/it! been considered 'hen checking
the capacities of the sling and shackles-
CRANE
13. 2or a crane that 2$# $ %o$3-i"3i4$ti"5 3e6i4e 'ith o/erload
cut#off& is the total load less than !07 of the allo'able
crane capacit!-
14. 2or a crane that does NOT 2$6e $ %o$3 i"3i4$ti"5 3e6i4e
'ith o/erload cut#off& is the total load less than *07 of the
allo'able crane capacit!-
15. +as the crane recei/ed a dail! inspection and operational
check b! the operator-
18. 3s the crane set up according to the manufacturer)s
specifications-
19. 3s the crane supported b! appro/ed crane mats-
22. 3f the lift in/ol/es more than one crane& can it be made
'ithout an! possibilit! of one of the cranes being
o/erloaded-
23. +as the soil been inspected and determined to be ade.uate-
LIFT
25. +as the radius of the lift been checked b! a tape measure- 26. 3s the lift area free of operating process e.uipment& piping&
or li/e electrical lines-
27. +as the area under the lift been barricaded or e/er!one
'arned to sta! a'a!-
28. 3s the 'ind less than 45 miles per hour-
29. 3f there is a possibilit! for boom or e.uipment interference&
has a rigging la!out or clearance stud! been made-
30. +as one person been designated 6%ignalman#in#Charge7 for
the lift-
"8TE9 $ll .uestions should be ans'ered 8e#& "o& or N9A 0not applicable1*
The Rigging %uperintendent must appro/e an! checklist item ans'ered b! 6"o7*
:::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::
Rigging %uperintendent 2ield Rigger Responsible for Lift
Date; :::::::::::::::::::::::: Date; :::::::::::::::::::::::::