T y p e E s s e n t i a l N o n - E s s e n t i a l CRUDE PPRODUCTION UNIT 20-PA-501A Crude Oil Transfer Pump C X 20-PA-501B Crude Oil Transfer Pump C X 20-PA-501C Crude Oil Transfer Pump S X 20-VA-311 Dehydrator C X PRODUCED WATER SYSTEM PA-003A Produced Water Transfer Pump C X PA-003B Produced Water Transfer Pump C X PA-003C Produced Water Transfer Pump S X PA-004A Produced Water Booster Pump C X PA-004B Produced Water Booster Pump C X PA-004C Produced Water Booster Pump S X PA-005 Produced Water Recirculation Pump C X CLOSED DRAIN SYSTEM P-001A Closed Drain Pump I X P-001B Closed Drain Pump S X COMPRESSOR PACKAGE Cooling Fan C X Cooling Fan C X Cooling Fan C X Cooling Fan C X Cooling Fan S X Cooling Fan S X Oil Cooler C X Oil Cooler C X Oil Cooler S X VAPOUR RECOVERY COMPRESSOR Compressor Driver C X Cooling Fan C X ELECTRIC SUBMERSIBLE PUMPS ESP 1 C X ESP 2 C X ESP 3 C X SEA WATER TREATMENT SYSTEM Sea Water Lift Pump C X Sea Water Lift Pump C X Sea Water Lift Pump S X Coarse Strainer C X Coarse Strainer S X C-1401A Media Filter Air Scour Blower I X C-1401B Media Filter Air Scour Blower S X PX-1503A Vacuum Pump C X PX-1503B Vacuum Pump S X P-1501A Sea Water Injection Booster Pumps C X P-1501B Sea Water Injection Booster Pumps C X P-1501C Sea Water Injection Booster Pumps S X P-1502A Sea Water Injection Pumps C X P-1502B Sea Water Injection Pumps C X P-1502C Sea Water Injection Pumps S X FLARE SYSTEMS 43-PC-001A LP Flare Gas KO Drum Pump I X 43-PC-001B LP Flare Gas KO Drum Pump S X HP Flare Ignition Panel I X LP Flare Ignition Panel I X UTILITY SYSTEMS Hot Oil Heater Blower C X Hot Oil Heater Blower C X Hot Oil Circulation Pump C X Hot Oil Circulation Pump C X Hot Oil Circulation Pump S X 63-KA-002A Instrument Air Compressor C X 63-KA-002B Instrument Air Compressor S X Plant Water Pump A I X Plant Water Pump B S X Potable Water Distribution Pump A I X Potable Water Distribution Pump B I X External Lighting D X Process Area Lighting D X Workshop D X Control Room C X Laboratory D X E&I Workshop D X Switchroom C X External Power Sockets I X Telecomms C X Control Panels C X Cathodic Protection C X UPS C X Total Load (kVA) Total Load (kVA) +20% NOTES: 1) Duty type: C= Continuous; I= Intermittent; D= Discontinuous; R= Spare; S= Stand-by. 2) Simultaneous Load= Rated Load x Load Factor x Simultaneous Factor / Efficency Factor x Power Factor 3) The values for adsorbed power are calculated. The rated load is then calculated based on assumed effiencies. Final value shall be finalized with various Vendors. 4) The efficency and power factor are indicative only. To be finalized with various Vendors. 5) Essential users are those connected to the emergency power system 6) Power requirements for are taken from initial system simulations. Powers will need to be revised once system layout is finalised and vendor information is received. 70 Power factor and effiency factor are estimated and to be confirmed Page No. 1 Date: 31st October 2009 Rev No. A Essential & Non- Essential Simulatneous Load (kVA) Essential Simultaneous load (kVA) j k 33.6 0.0 33.6 0.0 0.0 0.0 5.0 0.0 29.8 0.0 29.8 0.0 0.0 0.0 56.0 0.0 56.0 0.0 0.0 0.0 16.3 0.0 28.8 0.0 VFD 0.0 0.0 VFD 22.5 0.0 22.5 0.0 22.5 0.0 22.5 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.4 0.0 0.0 0.0 70.3 0.0 15.0 0.0 FUTURE COMPRESSOR (PHASE 2) FUTURE COMPRESSOR FUTURE COMPRESSOR FUTURE COMPRESSOR (PHASE 2) Remarks FUTURE PUMP (PHASE 2) FUTURE PUMP (PHASE 2) FUTURE COMPRESSOR (PHASE 2) 140.6 0.0 140.6 0.0 FUTURE (PHASE 2) 140.6 0.0 FUTURE (PHASE 2) 254.7 254.7 254.7 254.7 0.0 0.0 0.4 0.0 0.0 0.0 4.4 0.0 0.0 0.0 9.8 0.0 0.0 0.0 17.6 0.0 17.6 0.0 0.0 0.0 469.7 0.0 469.7 0.0 0.0 0.0 9.8 0.0 0.0 0.0 5.0 5.0 5.0 5.0 30.9 0.0 30.9 0.0 FUTURE (PHASE 2) 98.8 0.0 98.8 0.0 0.0 0.0 FUTURE (PHASE 2) 49.4 49.4 0.0 0.0 15.7 15.7 0.0 0.0 20.5 0.0 20.5 0.0 30.0 30.0 30.0 30.0 10.0 0.0 10.0 10.0 2.0 0.0 10.0 10.0 10.0 10.0 20.0 0.0 Estimated power requirements FUTURE PUMP (PHASE 2) FUTURE PUMP (PHASE 2) 20.0 20.0 20.0 20.0 20.0 0.0 20.0 20.0 2972.5 734.5 3567.0 881.4 1) Duty type: C= Continuous; I= Intermittent; D= Discontinuous; R= Spare; S= Stand-by. 2) Simultaneous Load= Rated Load x Load Factor x Simultaneous Factor / Efficency Factor x Power Factor 3) The values for adsorbed power are calculated. The rated load is then calculated based on assumed effiencies. Final value shall be finalized with various Vendors. 4) The efficency and power factor are indicative only. To be finalized with various Vendors. 6) Power requirements for are taken from initial system simulations. Powers will need to be revised once system layout is finalised and vendor information is received. Okwok Tag No. Description D u t y
T y p e E s s e n t i a l N o n - E s s e n t i a l CRUDE PRODUCTION TRAINS 30-PA-001A Crude Oil Transfer Pump C X 30-PA-001B Crude Oil Transfer Pump C X 30-PA-201A Crude Oil Transfer Pump S X 20-VA-301 Dehydrator C X CRUDE EXPORT PUMPS 30-PA-002A Crude Oil Export Pump C X 30-PA-002B Crude Oil Export Pump C X 30-PA-002C Crude Oil Export Pump S X PRODUCED WATER SYSTEM 30-PA-003A Produced Water Booster Pumps C X 30-PA-003B Produced Water Booster Pumps C X 30-PA-003C Produced Water Booster Pumps S X 50-PA-005 Produced Water Recirculation Pump C X 50-PA-004A Produced Water Transfer Pumps C X 50-PA-004B Produced Water Transfer Pumps C X 50-PA-004C Produced Water Transfer Pumps S X CLOSED DRAIN SYSTEM 43-PA-008A Closed Drain Pump I X 43-PA-008B Closed Drain Pump S X 43-PX-007A Closed Drain Pump I X 43-PX-007B Closed Drain Pump S X COMPRESSOR PACKAGE KB-001A Cooling Fan C X KB-001A Cooling Fan C X KB-001B Cooling Fan C X KB-001B Cooling Fan C X KB-001C Cooling Fan C X KB-001C Cooling Fan C X KB-001D Cooling Fan S X KB-001D Cooling Fan S X KB-001A Oil Cooler C X KB-001B Oil Cooler C X KB-001C Oil Cooler C X KB-001D Oil Cooler S X FUEL GAS COMPRESSOR KA-102 Compressor Driver C X SEA WATER TREATMENT SYSTEM Sea Water Lift Pump C X Sea Water Lift Pump C X Sea Water Lift Pump S X Coarse Strainer C X Coarse Strainer S X C-1401A Media Filter Air Scour Blower I X C-1401B Media Filter Air Scour Blower S X PX-1503A Vacuum Pump C X PX-1503B Vacuum Pump S X P-1501A Sea Water Injection Booster Pumps C X P-1501B Sea Water Injection Booster Pumps C X P-1501C Sea Water Injection Booster Pumps S X P-1502A Sea Water Injection Pumps C X P-1502B Sea Water Injection Pumps C X P-1502C Sea Water Injection Pumps S X FLARE SYSTEMS HP Flare Ignition Panel I X LP Flare Ignition Panel I X UTILITY SYSTEMS Hot Oil Heater Blower C X Hot Oil Heater Blower C X Hot Oil Circulation Pump C X Hot Oil Circulation Pump C X Hot Oil Circulation Pump S X
Instrument Air Compressor C X
Instrument Air Compressor S X External Lighting D X Process Area Lighting D X Workshop D X Control Room C X Laboratory D X E&I Workshop D X Switchroom C X External Power Sockets I X Telecomms C X Control Panels C X Cathodic Protection C X UPS C X EXTERNAL LOADS Rig Load C X WHP POWER C X WHP POWER - ESSENTIAL C X Total Load (kVA) Total Load (kVA) +20% NOTES: 1) Duty type: C= Continuous; I= Intermittent; D= Discontinuous; R= Spare; S= Stand-by. 2) Simultaneous Load= Rated Load x Load Factor x Simultaneous Factor / Efficency Factor x Power Factor 3) The values for adsorbed power are calculated. The rated load is then calculated based on assumed effiencies. Final value shall be finalized with various Vendors. 4) The efficency and power factor are indicative only. To be finalized with various Vendors. 5) Essential users are those connected to the emergency power system 6) Power requirements for are taken from initial system simulations. Powers will need to be revised once system layout is finalised and vendor information is received. 70 Power factor and effiency factor are estimated and to be confirmed Page No. 1 Date: Rev No. A Essential & Non- Essential Simulatneous Load (kVA) Essential Simultaneous load (kVA) j k 15.0 0.0 15.0 0.0 0.0 0.0 52.5 0.0 150.0 0.0 150.0 0.0 0.0 0.0 50.0 0.0 50.0 0.0 0.0 0.0 20.3 0.0 39.0 0.0 39.0 0.0 0.0 0.0 14.4 0.0 0.0 0.0 14.4 0.0 VFD 0.0 0.0 VFD 28.1 0.0 28.1 0.0 28.1 0.0 28.1 0.0 28.1 0.0 28.1 0.0 0.0 0.0 0.0 0.0 Remarks 1.9 0.0 1.9 0.0 1.9 0.0 0.0 0.0 131.3 131.3 254.7 254.7 254.7 254.7 0.0 0.0 0.5 0.0 0.0 0.0 5.5 0.0 0.0 0.0 12.2 0.0 0.0 0.0 32.5 0.0 32.5 0.0 0.0 0.0 1212.5 0.0 1212.5 0.0 0.0 0.0 5.0 5.0 5.0 5.0 34.7 0.0 34.7 0.0
Dual duty seawater lift/firewater Dual duty seawater lift/firewater Dual duty seawater lift/firewater 20.0 20.0 20.0 0.0 20.0 20.0 585.0 0.0 2500.0 0.0 50.0 50.0 7543.7 906.2 9052.4 1087.4 1) Duty type: C= Continuous; I= Intermittent; D= Discontinuous; R= Spare; S= Stand-by. 2) Simultaneous Load= Rated Load x Load Factor x Simultaneous Factor / Efficency Factor x Power Factor 3) The values for adsorbed power are calculated. The rated load is then calculated based on assumed effiencies. Final value shall be finalized with various Vendors. 4) The efficency and power factor are indicative only. To be finalized with various Vendors. 6) Power requirements for are taken from initial system simulations. Powers will need to be revised once system layout is finalised and vendor information is received. Okoro East Development Tag No. Description D u t y
T y p e E s s e n t i a l N o n - E s s e n t i a l CRUDE PRODUCTION TRAINS 20-PA-001A Crude Oil Transfer Pump C X 20-PA-001B Crude Oil Transfer Pump C X 20-PA-201A Crude Oil Transfer Pump S X 20-VA-006 Dehydrator C X CRUDE EXPORT PUMPS 30-PA-301A Crude Oil Export Pump C X 30-PA-301B Crude Oil Export Pump C X 30-PA-301C Crude Oil Export Pump S X PRODUCED WATER SYSTEM 22-PA-103A LP Hydrocyclone Feed Pumps C X 22-PA-103B LP Hydrocyclone Feed Pumps S X 22-PA-005 Produced Water Recirculation Pump C X 22-PA-004A Produced Water Transfer Pumps C X 22-PA-004B Produced Water Transfer Pumps C X 22-PA-004C Produced Water Transfer Pumps S X CLOSED DRAIN SYSTEM 43-PA-008A Closed Drain Pump I X 43-PA-008B Closed Drain Pump S X 43-PX-007A Closed Drain Pump I X 43-PX-007B Closed Drain Pump S X COMPRESSOR PACKAGE KB-001A Cooling Fan C X KB-001A Cooling Fan C X KB-001B Cooling Fan C X KB-001B Cooling Fan C X KB-001C Cooling Fan C X KB-001C Cooling Fan C X KB-001D Cooling Fan S X KB-001D Cooling Fan S X KB-001A Oil Cooler C X KB-001B Oil Cooler C X KB-001C Oil Cooler C X KB-001D Oil Cooler S X VAPOUR RECOVERY COMPRESSOR KB-002A Compressor Driver C X KB-002A Cooling Fan C X KB-002B Compressor Driver S X KB-002B Cooling Fan S X FUEL GAS COMPRESSOR KA-102 Compressor Driver C X SEA WATER TREATMENT SYSTEM Sea Water Lift Pump C X Sea Water Lift Pump C X Sea Water Lift Pump S X Coarse Strainer C X Coarse Strainer S X C-1401A Media Filter Air Scour Blower I X C-1401B Media Filter Air Scour Blower S X PX-1503A Vacuum Pump C X PX-1503B Vacuum Pump S X P-1501A Sea Water Injection Booster Pumps C X P-1501B Sea Water Injection Booster Pumps C X P-1501C Sea Water Injection Booster Pumps S X P-1502A Sea Water Injection Pumps C X P-1502B Sea Water Injection Pumps C X P-1502C Sea Water Injection Pumps S X FLARE SYSTEMS HP Flare Ignition Panel I X LP Flare Ignition Panel I X UTILITY SYSTEMS Hot Oil Heater Blower C X Hot Oil Heater Blower C X Hot Oil Circulation Pump C X Hot Oil Circulation Pump C X Hot Oil Circulation Pump S X
Instrument Air Compressor C X
Instrument Air Compressor S X External Lighting D X Process Area Lighting D X Workshop D X Control Room C X Laboratory D X E&I Workshop D X Switchroom C X External Power Sockets I X Telecomms C X Control Panels C X Cathodic Protection C X UPS C X EXTERNAL LOADS Rig Load C X WHP POWER C X WHP POWER - ESSENTIAL C X Total Load (kVA) Total Load (kVA) +20% NOTES: 1) Duty type: C= Continuous; I= Intermittent; D= Discontinuous; R= Spare; S= Stand-by. 2) Simultaneous Load= Rated Load x Load Factor x Simultaneous Factor / Efficency Factor x Power Factor 3) The values for adsorbed power are calculated. The rated load is then calculated based on assumed effiencies. Final value shall be finalized with various Vendors. 4) The efficency and power factor are indicative only. To be finalized with various Vendors. 5) Essential users are those connected to the emergency power system 6) Power requirements for are taken from initial system simulations. Powers will need to be revised once system layout is finalised and vendor information is received. 70 Power factor and effiency factor are estimated and to be confirmed Page No. 1 Date: 20th DEC 2012 Rev No. 1 Essential & Non- Essential Simulatneous Load (kVA) Essential Simultaneous load (kVA) j k 25.0 0.0 25.0 0.0 0.0 0.0 52.5 0.0 180.0 0.0 60KM PIPELINE 180.0 0.0 60KM PIPELINE 0.0 0.0 60KM PIPELINE 15.0 0.0 0.0 0.0 20.3 0.0 24.4 0.0 24.4 0.0 0.0 0.0 28.8 0.0 0.0 0.0 28.8 0.0 VFD 0.0 0.0 VFD 28.1 0.0 28.1 0.0 28.1 0.0 28.1 0.0 28.1 0.0 28.1 0.0 0.0 0.0 0.0 0.0 1.9 0.0 Remarks