AN ENGINEERING CONSULTANCY FIRM

PROFILE
Design Group Project Consultants (P) Ltd
#.110/4, M.Krishnappa Layout, Lalbagh Road,Bangalore - 560 027. INDIA
Phone : +91 80 2223 8706, 2224 2658, 2224 2570 Fax: +91 80 2222 7308
E-mail: designgroup@vsnl.com; Website: www.designgroup.in
PROJECT CONSULTANTS PVT. LTD.
DESIGN GROUP
ISO 9001 COMPANY
DESIGN GROUP
Technical Consultancy Services Offered :
Hydro Power Projects
Irrigation Projects
Gas Based Power Plant (BOP)
Thermal Power Plants (BOP)
Wind Mill Power Projects (BOP)
Water & Waste Watert Treatment Plant
Gas Insulated Sub Stations
Outdoor Electrical switchyards
Electrical Sub stations
DESIGN GROUP
ISO 9001 COMPANY
Design Group Project Consultants Pvt Ltd
#.110/4, M.Krishnappa Layout, Lalbagh Road, Bangalore - 560 027.
Phone: +91 80 2223 8706, 2224 2658, 2224 2570 Fax: 2222 7308
E-mail: designgroup@vsnl.com; Website: www.designgroup.in
DESIGN GROUP
ISO 9001 COMPANY
AN ENGINEERING CONSULTANCY FIRM
DESIGN GROUP
PROJECT CONSULTANTS PVT. LTD.
PROFILE

Content
Sl.
No.
Description
Page
No.
1 Design Group A Profile 1
2 ISO Certificate 6
3 Membership Certificate of Consulting Engineers Association
of India
7
4 Certificate of Incorporation 8
5 MoU with
a M/s. WAPCOS Limited 9
b M/s. Maxiclean Energy Private Limited 17
c M/s. S.M. Energenco Limited 24
6 Empanelment with M/s. BHEL 26
7 Empanelment with M/s. Construction Industry Development
Council
29
8 Merger of M/s. Subhadra Consulting Engineers with M/s.
Design Group Project Consultants Pvt Ltd
30
9 Empanelment with Karnataka Neeravari Nigama Limited 32
10 Experience in Design Engineering A few important projects 33
11 Detailed Engineering Services completed and the project is
also completed
55
12 Ongoing Assignments and the projects under various stages
of execution
65

13 Preparation of Detailed Project Report 70
14 Preparation of Due Diligence Report 80
15 Preparation of feasibility report 82
16 Miscellaneous Assignments such as Pre-Tender Services,
Calibration of volume computation and efficiency of canal
etc.,
85
17 Organization Structure Panel of Advisors 104
18 Brief Profile of Consultants 117
19 Some of the Certificates for Successfully Completed Projects 136



Content







1. DESIGN GROUP A PROFILE

was established in the year 1979 to offer consultancy
services for civil and electrical engineering projects. Having completed over 100
prestigious and varied assignments in the last 5 years, DG is a leading consultancy
firm, offering full-fledged consultancy services across various fields of engineering
for projects in India and Abroad.

Equipped to provide Design Engineering Consultancy for very large engineering
projects, DG has been providing technical consultancy services to various
organizations and companies for planning, detailed design, and implementation of
Hydel, gas based thermal and other modes of power projects. These services,
besides project formulation and feasibility studies, include analysis of financial
aspects, design engineering for electrical installation of substations, switchyards and
transmission lines, design engineering for civil engineering structures including
large dams, tunnels, canals, power canals, cross drainage works, surge tanks,
penstock, and power houses and their implementation aspects including various
components of Irrigation projects. DG also provides services related to design and
implementation of projects in other civil engineering fields of Water Supply, and
Waste Water Treatment Plants.

DG, which has an annual turnover of over Rs.400 lakhs, provides various
consultancy services required for the implementation of projects, right from concept
to completion, commissioning, operation and maintenance, thereafter. DGs services
have been utilized by Large Industrial Houses, Firms, and Independent Power
Producers in India, and elsewhere, for the planning and design engineering of their
projects. In the year 2004, DG was honored with an ISO 9001:2008 certification for its
design engineering services and continues to hold the certification.

DESIGN GROUP
An Introduction
1





DG has entered into MOU / JV with a number of large engineering institutions in
India and other Countries to enhance the availability of the required engineering
consultancy Services to its clients and expand its horizon of its activities and
services. A few are named below:

1) WAPCO Limited, New Delhi.
2) ILF Consulting Engineer, Abu Dhabi
3) GEM Engineering Company Ltd., Uganda
4) IL&FS Ltd., Hyderabad
5) NihamShand Cape town South Africa
6) Land Mark Holding Ltd. Nairobi, Kenya
7) SSDC Damam KSA
8) SOUTH ASIA ENGINEERING(P) Ltd., Kathmandu, Nepal
9) Maxiclean Energy Pvt Ltd(MEPL), Gurgaon, New Delhi-48,
10) SM Engergenco, Guwahati, Assam, India


Corporate Office
An Introduction
2
DG has been empanelled as consultant in a few large public sector undertakings.
1) BHEL, for extending design engineering services in Civil works of Hydro
Power projects
2) Karnataka Neeravari Nigam Limited, for engineering services for Water
Resources Projects.
3) PFC consulting Limited, New Delhi for Power Projects.
Our clients include large organisations such as:
1) Nuclear Power Corporation Limited.
2) Gammon India Limited.
3) Fichtner Limited, Bangalore
4) GMR Energy Limited, Bangalore
5) ILFS Infra Limited, Hyderabad
6) NTPC, New Delhi
7) BHEL, Bangalore
8) Ritwik Energy Limited Hyderabad
9) Greenko Energy Limited Hyderabad
10) AMR Mitra JV Ltd., Hyderabad
In order to provide appropriate and quick Design Engineering Services more
than 100 engineering softwares have been developed in house, over a period of
20 years. In addition, more than a dozen engineering design softwares have been
acquired and are in use for day to day work .State of Art facilities have been
created to take up large Water Resources Projects.
Presently the major consultancy jobs on hand are:
1. Detailed Engineering Services for Shanmukha Subramanya Mini Hydel
Scheme, Dakshina Kannada District, Karnataka,
An Introduction
3





2. Detailed Design Engineering Services for Kumbenahalli Mini Hydel Scheme,
Kumbenahalli village, Channarayanapattana Taluk, Hassan district,
Karnataka

3. Two Multipurpose Projects in Afghanistan. namely
a. Machalgho Multipurpose Project, near Kabul
b. Pashdan Multipurpose Project in Herat region.
The assignment has been withdrawn due to security reasons.

4. Detailed Project Report for Hydro Power Generation Project of Khri Stage-I,
West Khasi Hill District, Meghalaya,

5. Detailed Project Report for Hydro Power Generation Project of Khri Stage-II,
West Khasi Hill District, Meghalaya, India

6. Detailed Engineering Services for Mahan Small Hydel Project Scheme-3
Across River Mahan, Korhapur village, Surjpur Tehsil, Sarguja District,
Chattisgarh State, India.

7. Detailed Design Engineering Services for Beedalli Mini Hydel Project,
Somavarapet taluk, Coorg District, Karnataka, India.

8. Detailed Engineering Consultancy for 50 KLPD Distillery with Fuel
Ethanol(with incineration boiler) project of Nandi Sahakari Sakkare Karkhane
Niyamit, Bagalkot district, Karnataka

9. Detailed Civil Design Engineering for Twin RCC thickners along with tunnels
and allied works for Tailing Thickner for gold benefication plant in Morroco,
Africa.

An Introduction
4





10 Detailed Engineering services for Kabeli B1 Hydro Electric Project, in Eastern
Province of Nepal.

11 Preparation of Detailed Project Report for Barachukki Hydro Electric Project
on Barachukki limb of River Cauvery(Upstream of Barachukki falls)
Malavalli Taluk, Mandya District, Karnataka

12 Preparation of Detailed Project Report for Fandarya Hydro Power Project,
Tajikistan.

13 Preparation of Detailed Project Report for Garm Hydro Power Project,
Tajikistan

14 Preparation of Detailed Project Report for Tavildara Hydro Power Project,
Tajikistan

15 Preparation of Detailed Project Report for 1000MW Thermal Power Plant in
Tajikistan

16 Detailed Design Engineering Services for Gatambe Small Scale Hydropower
Project (12MW), Kandy, Sri Lanka

17 Detailed Engineering Services for implementation of the Tinget HEP(140MW)
in Himachal Pradesh including Detailed Project Report preparation.

18 Preparation of Detailed Feasibility Report (i.e. DPR)for Trishuli Galchhi
HEP(75MW) in Nepal.

The details of many more projects under consultancy assignments of DG are
appended in this profile.
An Introduction
5





2. ISO CERTIFICATE

Certificate
6





3. MEMBERSHIP CERTIFICATE OF CEAI - INDIA

Certificate
7





4. CERTIFICATION OF INCORPORATION

Certificate
8





5. Memorandum of Understanding




MOU
9





5 (a)



MOU
10









MOU
11









MOU
12









MOU
13









MOU
14









MOU
15









MOU
16





5(b)
MOU for Project Assignments of NEEPCO



MOU
17








MOU
18








MOU
19








MOU
20








MOU
21








MOU
22









MOU
23





6. VENDOR EMPANELMENT WITH BHEL

Vendor Registration
24





7. Registration with CIDC


Registration
25





9. Empanelment with Karnataka Neeravari Nigama Limited



Empanelment
26





Brief on Power Project
27
10. Experience in Design Engineering - A Few Important Projects

10.1 Harangi Dam Power House-9.00MW



Harangi Irrigation Project is a multi-purpose project with right and left bank
irrigation canals with a total command area of 8000 Ha of irrigable land. The
available surplus water of the Harangi Reservoir during the monsoon and the
14.00m head available between the MWL/FRL of the Reservoir and the left bank
canal bed level has been harnessed to generate 9 MW of electrical power and
36GWHr of energy annually, at a total project cost of Rs. 360 million. The power
generation scheme comprises of the construction of an approach channel, circular
intake well with gates, 97.5m long RCC lined tunnel of 5.00m dia, M.S. penstocks,
bifurcated into two at the surface power house, tail pool and tail channel, leading
the water to the left bank canal and the bypass channel with an overflow weir and a
Harangi Dam Power House (2 x 4.5=9.00 MW)





Brief on Power Project
28
channel to lead off the excess discharge, from the power house, has been designed
and implemented. M/s. EDCL, Calcutta, Developers of the 9 MW Harangi Dam
Power House Scheme had awarded an EPC contract to M/s. Sulzer Flovel Ltd.,
Faridabad for implementation of the Project. Design of civil components and
switchyard portion of the Project has been successfully completed by DG.

10.2 Balance of Plant of Hail 2 Power Plant Saudi Arabia

M/s. Alfanar one of the leading EPC contractors in the Kingdom of Saudi Arabia,
was awarded the construction of Hail-2 Gas based Power Plant extension, by Saudi
Electric Company. M/s ILF Abu Dubai, UAE, were the principal consultants, M/s.
DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and
to issue all construction drawings and designs for complete plant except GTG.
Siemens were the GTG equipment suppliers.

This was a fast track project, involving issue of more than 600 drawings in a short
span of 4 months. The project was successfully commissioned on schedule in the
month of July 2011. The assignment included interaction with clients / SEC (Owners)
during approval stage of design and drawing.

The project comprised of extension of Hail 2 Power plant by adding 2 nos 55/70
MW output Gas Turbine Generator sets to the existing 6 nos Gas Turbine
Generators, 132 kV GIS and 380 kV AIS. The extension project consisted of

1. 132 kV, 220MVA Generator Transformer, 13.8kV / 4.16kV 15MVA unit
auxiliary transformers, 10 nos. service transformers, MV & LV Switchgears
and other BOP.
2. Crude oil / Distillate oil fired Gas Turbine Generator two units of 55/70MW
output.
3. Crude oil treatment and forwarding and distillate oil forwarding system for
new units.
4. Associated piping, cabling & services





Brief on Power Project
29



The Engineering services for the project consisted of

Detail Civil Engineering involving structural designs, Architectural layouts,
equipment foundations, for GTG Building, FOTP Building & Switchgear
Building, etc,.
Mechanical Engineering involving plant Layouts, piping, equipment sizing,
fire fighting system, HVAC, etc,.
Process Engineering involving overall Process Flow Diagram, P & IDs, etc,.
Electrical Engineering involving system studies, development of SLDs,
equipment sizing, for transformers, MV & LV, Switchgears, DC & UPS
Systems, Cable & inter connection schedules.
INC illumination Engineering involving interfacing new unit & BOP to
existing control system.




GTG Building under Construction





Brief on Power Project
30
10.3 Sea Water Intake for PFBR Plant Systems Kalpakkam, India:

Nuclear Power Corporation Limited, Kalpakkam, awarded the construction of
Seawater Intake Cooling Water System, under the ambitious project of generating
power through Plutonium Fast Breeder Reactor Project (PFBR), to M/s. Gammon
India Limited. The major components of the scheme were; off-shore intake shaft, on-
shore outlet shaft, and a submarine tunnel connecting the two structures at a depth
of about 45m below sea level. M/s. Design Group, were involved in the detailed
engineering for the sub marine tunnel and shafts.



As per the investigation report, the dry density of rock in the area is 2.66 to 2.99 gms
per cubic centimeter. The tunnel was driven 45m below the sea level without any
major geological surprises. The tunnel carries 29 cumecs of seawater required for
cooling the PFBR Plant, with a bed gradient of 1 in 96.4. The density of Sea Water
found to be 1.024 ton per cum.






Brief on Power Project
31
The total length of the sub marine tunnel is 565m. It is Horse shoe shaped with 3600
mm finished diameter. The outer diameter varied from 4300mm to 4600mm,
thickness of concrete lining adopted being 350mm in good rock zone and 500 thick
RCC in zones with inadequate rock cover region and using M-45 grade cement
concrete. The tunnel passes through Charnockyte type II rock medium, having
modulas of elasticity of 0.46 to 3.34 x 10
6
tons per square metre. The poissons ratio
adopted ranged between 0.14 to 0.25 in rock and 0.15 in concrete. The SBC of soil is
280 tonnes per sq. metre and strength of insitu rock is 75.60 Mpa.


Submarine Tunnel





Brief on Power Project
32


In addition, the inlet shaft (4250 / 5250 mm dia) and the outlet shaft (6000 / 7000 mm
dia) were sunk at either end of the tunnel and lined with 500mm, thick cement
concrete lining using M-45 grade concrete.

10.4 Varahi Tail Race Mini Hydel Scheme-37.50MW:


River Varahi is an important West flowing river of Karnataka State with large
Hydel power potential. Power development in the Varahi Valley with an installed
capacity of 239MW consisting of 2x4.5=9MW at Mani Dam Power House and
2x115=230MW at Varahi Underground Power House was completed by Karnataka
Power Corporation Ltd. in the year 1989.

The generating capacity of Under Ground Power House has been enhanced by 230
MW consisting of two units of 115 MW each.

The Varahi Tail Race Mini Hydel scheme has been planned and engineered by
Design Group for M/s. Sandur Power Co. Ltd. Varahi Tail Race Mini Hydel Scheme
utilizes the tailrace discharges of Varahi Underground Power house and the
Outlet Shaft as Viewed from Submarine Tunnel





Brief on Power Project
33
available level difference between the point of confluence of tailrace of Under round
Power House with Varahi River and the FRL of Varahi Irrigation Dam proposed
downstream, for generation of power. The scheme comprises of the construction of a
diversion weir across Varahi river just downstream of the confluence of tail race of
VUGPH with Varahi River, a gravity type intake, a 2290m long, 7m dia horse shoe
shaped head race tunnel, 22m Dia simple type surge tank, 7m dia penstock tunnel, 3
Nos. steel penstocks and a power house with three standard vertical shaft type full
Kaplan turbines coupled to Synchronous generator of 7.5 MW capacity each under
phase I and a tail race joining the Varahi River on its right flank. Under Phase II, two
more units of similar generating capacity have been added. The project has a total
installed capacity of 37.5MW.

The cost of the project inclusive of escalation in costs during construction and
financial charges is placed at Rs. 13,439 lakhs. The project has been successfully
commissioned during the year 2005 for phase-I and during the year 2007 for phase-II.



View of Diversion Weir Structure with radial gates





Brief on Power Project
34



Overview of Power House
Power House under Construction





Brief on Power Project
35




10.5 PERLA-24MW / SHAMBURI-24MW Mini Hydel Schemes:

M/s. AMR Power Pvt. Ltd. implemented the 24 MW (5 x4.8 MW) capacity Mini
Hydel Scheme across the lower reaches of river Nethravathi, a major west flowing
river in Karnataka. The power plant is situated 35kms from Mangalore, a major
Penstock Tunnel, Concrete Lining under Construction
22m dia Surge Shaft under construction





Brief on Power Project
36
costal city in western Karnataka. The project has a low power generating head
fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m. The
design flood at the barrage site is 11500 cumecs. The design discharge utilized as
power draft is 78.47 cumecs per unit. S type Kaplan turbines coupled to 4800 KW
synchronous generators through the gear box are adopted. The generating units are
capable of running at 15% continuous overload. During the initial stage of
construction, another developer M/s. Rithwik Energy Generation proposed a 24 MW
capacity power plant to utilize balance available flows. After mutual discussion, it
was agreed to utilize the existing facilities of the barrage proposed by M/s. AMR
Power at the site for the scheme proposed by M/s. Rithwik Energy also.



Thus, a power house accommodating 10x4.8MW was planned and developed, with
a combined annual energy generation of 115.14 GWHr. The scheme thus comprises
of, a barrage across river Nethravathi with 30 radial gates to safely pass the 11500
cumecs flood, non-overflow sections, a power block on the left bank, a surface
Power House, and a 95.86m x 32m x Tail Race Pool and 2km long Tail Race Channel
to lead the water back to the river. The power is evacuated to the nearest substation
at Netlamanur, 15 km away, by a single line 110 KV rating transmission line. The
construction took 27 months and the plant was synchronized. DG provided the total
Overview of Generator Equipment





Brief on Power Project
37
design engineering for the project services from concept to commissioning. The
project is successfully under operation.


10.6 Modernisation of Shivanasamudram Power Channel.

Shivanasamudram Power Project is the earliest of hydro power projects constructed
in India, way back in year 1902 to supply electrical power to Kolar Gold mines
situated 85kms away from Bangalore. Visveswaraiah Vidyut Nigam Limited
(VVNL), a Public Sector Company, owned by earstwhile Karnataka Electricity
Board, as a part of the Modernisation programme of the existing Shivanasamudram
Hydro Power Project, had proposed to increase the water carrying capacity of the
power channel upto the Shivanasamudram Balancing Reservoir and also increasing
the live capacity of the Shivanasamudram Balancing Reservoir to cater to the
increased needs of flow capacity of the power channel to meet the increased flow
demand of the Power House and also the increased needs of the drinking water
supply for Bangalore City which is being drawn from Netkal Balancing reservoir
further downstream. Visveswraya Vidhuth Nigama Limited(VVNL), entrusted the
work of planning for the improvements to the power channel and the detailed
engineering of the same to Design Group.


Divider wall under Construction





Brief on Power Project
38

Originally the 2000m long power channel connecting the Shiva head works and the
Shiva Balancing Reservoir had been constructed with a central earthen divider wall
and side slopes lined with stone pitching. The central divider wall was an earthen
bund with stone pitching on the side slopes. The overall dimension of the divider
wall has been 3.7m at the top and 8.2m at the bottom.

Over a period of the last 100 years, the water carrying capacity of the channel had
been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting,
vegetation growth, etc. In order to increase the discharge carrying capacity of the
channel, the existing divider wall was replaced by a thin RCC dividing wall; the
pitching of the side slopes was reset and covered with RCC lining. The vegetation
growth was completely removed. After modernization, discharge carrying capacity
of the power channel has increased to 59.5 cumecs. The live capacity of Shiva
Balancing Reservoir has been substantially increased by desilting the reservoir and
removal of weed growth. During Construction, DG was asked to suggest a simple
method of desilting of the Balancing Reservoir. A simple technique of using a shovel
mounted on a raft made out of a battery of empty steel drums for desilting was
suggested and was used along with the ejection of the silt by a mud pump and a
pipe line supported on empty floating drums, and thus silt being taken to the shores.
The project was completed successfully in the scheduled time and is functioning
satisfactorily.















Brief on Power Project
39
10.7 Singatalur Mini Hydel Scheme (4 x 4.5=18.00MW)



Power House of Singatalur Mini Hydel Scheme under Construction
A view of the Generator Floor, Equipment under Construction





Brief on Power Project
40
Tungabhadra River is a major river of Karnataka State, rising in the Western Ghats
and flowing east to join River Krishna near Kurnool in Andhra Pradesh. The waters
of the river are already harnessed for providing irrigation to large tracks of lands.
The water is also used for power generation at Tungabhadra dam and Kamalapur
power houses. Some more irrigation Projects both major and minor and lift
irrigation schemes are on the anvil to fully utilize the waters of the river as allocated
to Karnataka State. One such project is the Singatalur lift irrigation scheme, located a
short distance upstream of the back waters of Tungabhadra Reservoir. This project
envisages construction of the Singatalur barrage raising the water level in the river
at the site by about 10.0m and creating a small pondage for lifting the water to the
canals. Large quantum of water will flows down the barrage to the Tungabhadra
reservoir during the monsoon months and a few months thereafter. The Singatalur-
Huligudda Mini Hydel Scheme contemplates using a portion of this large quantum
of flow of the river and the head available at the Barrage for power generation.

The scheme comprises of the construction of:
I. A power block on the right bank of the Singatalur barrage located across
Tungabhadra River near Thimmalapur village.
II. An approach channel of a length 75.0m.
III. Intake structure.
IV. Power House to accommodate four horizontal full Kaplan units generating
4.5 MW capacity each.
V. Tail race pool
VI. Tail race channel of a length 474.0m
VII. The outdoor yard measuring 52.0m x 77.0m.

The project has a total installed capacity of 18 MW and generates an annual energy
of 52.34 Gwhr in an average year. The power is proposed to be fed to KPTCL grid
through a 7.58 km long 66kv transmission lines.

The total project cost of the scheme inclusive of Transmission Lines and related
financial costs as per the price level of the year 2005-06 is Rs.5997.00 lakhs. The cost





Brief on Power Project
41
at completion inclusive of escalation, IDC and financial charges will be Rs.6706.00
lakhs. The project was proposed to be implemented in 24 months from the zero date.
The project has been completed and commissioned.

The net average annual energy is estimated at 52.34 Gwhr. The evaluated cost of
energy generation as per CEA norms is Rs. 2.68 per kwhr. The sale rate of energy is
Rs. 2.80 per kwhr.

10.8 Link Canal Mini Hydel Scheme:

Karnataka Irrigation Department, as a part of the modernization of K.R. Sagar
project Irrigation Canal System, took up the scheme to construct a link canal taking
off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery
Branch canal at the 17th Mile (27.20 km) near Peehalli in Mandya District. At the tail
end of this link canal, there is a difference in level of about 8.3m between the bed of
the link canal and the bed of the Cauvery branch canal and is negotiated by the
construction of a drop structure. Link Canal Mini Hydel Scheme was formulated to
utilize the water flow of the link Canal and the head available at the drop at the end
of Link Canal, for power generation.



View of Power House as seen from Downstream





Brief on Power Project
42
The scheme is simple with minimum civil engineering works. The civil engineering
components comprise of a 70m long approach channel, intake structure, gated
bypass weir with provision of automatic falling shutters, surface power house, tail
channel leading the water back to the branch canal. The installed capacity of the
scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The
average annual energy generation is 10.10 GWHr. The cost of the scheme is Rs. 80
Million. The Project was completed in the year 2003 by the Developers M/s Graphite
India Ltd., Bangalore, The civil engineering works were contracted to M/s Mysore
Construction Co., Bangalore. The Planning and Detailed Design Engineering was
handled by Design Group.



10.9 Captive Power Plant of 5.8 MW capacity at John Welch Research Centre,
Whitefield, Bangalore for M/s General Electric:




Overall view of DG Plant





Brief on Power Project
43

Design Group was associated as a major lead Consultants for the Planning, Detailed
Engineering and construction co-ordination of the 5.8 MW Diesel Engine based
Captive Thermal Station of the GE India Technology Centre at Bangalore, which has
been completed on a time bound schedule of 6 months.


10.10 Windmill Power

M/s. Doddanavar Brothers, who have planned to develop 100MW Wind Farm near
Chikkodi, Belgaum district of Karnataka, India, availed our technical support for
Engineering of balance of plant of the project. Critical main equipment of the
capacity 10x1.5MW was sourced from M/s. Sinovel, China, while the rest of the
equipment was sourced locally.

Inside view of Generator Room





Brief on Power Project
44




DG assisted the developers by drafting technical specifications, preparing data
sheets, floating tender for fabrication of towers, tower internals and electricals
right from generating voltage 690 volts to the grid connection. In addition,
assistance was extended for procurement activities. The Civil Raft Foundation
drawings were provided after detail designs, to suit to the local sub-surface soil
conditions. The entire assignment was completed in 9 months.

Foundation of Wind Mill
Wind Turbine Generator Hub





Brief on Power Project
45
The major tasks handled are as below:
i. DG designed 33 kV outdoor yard sub-station at Wind farm, 33 kV
transmission line from Wind farm to pooling 33 / 110 kV sub-station, 33 /
110 kV outdoor yard pooling station and 110 kV transmission line from
pooling station to KPTCL evacuating 110 kV sub-station.
ii. DG prepared technical specification for 33 kV substation at Wind farm, 33
kV transmission line, 33 / 110 kV pooling station and floated enquiry for the
procurement and scrutinized the Vendor offers and finalized placing the
orders on suppliers.
iii. Vendor drawings and specification scrutinized.
iv. Assisted in commissioning the sub-station and transmission line.

The first batch of 10x1.5MW wind generating units have been commissioned. Under
the second stage 20x1.6MW GE machines have been selected for installation , the
civil foundation work is under construction.


10.11 Scheme for Augmentation of Power Supply to John.F.Welch Technology
Centre, Bangalore



Overall Site View 66/11 KV Substation at JFWTC





Brief on Power Project
46
In March 2005, DG at the request of JFWTC, Bangalore, took up the study of the
various alternatives for Augmentation of reliable power supply to JFWTC to meet its
load requirements upto the year 2009, at economical costs. After detailed study, DG
formulated and suggested a scheme for drawing power at 66kv level from the newly
proposed 66kv EPIP MUSS of KPTCL, through a 900m 66kv cable upto the 66kv /
11kv captive sub-station within the JFWTC campus and there from connecting to the
11kv distribution system within the campus, along with the existing diesel sets as
backup. The scheme was the most economical one at Rs. 85 million and ensured
reliable power supply to meet the increasing load demand of JFWTC for the future
even upto 20MVA. The scheme was accepted and implemented by JFWTC, within a
period of 8 months with the Detailed Engineering and supervision assistance by DG.
The scheme was commissioned successfully in March / April 2006 and is functioning
satisfactorily with adequate reliability.


10.12 Design of Vacuum Chambers

M/s. Hind High Vacuum Co. Pvt. Ltd., specializing in manufacture of Pressure
Vessels and Vacuum Chambers for defence, pharmaceuticals, and solar panels,
entrusted to DG, design and preparation of fabrication drawings for a Robotic TIG
Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for
negative pressure of 1 kg per sq.cm, with a rider that the deflection of internal
structural members must be limited to 0.5 mm.







Brief on Power Project
47



The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit
chambers, tool chambers, etc. The robotic arm moves on rails. The welding will be
carried out under Argon gas atmosphere. The chambers were analysed for extreme
conditions using NISA Software package and the analysis has been validated by
Indian Institute of Science, Bangalore, the pioneer research institute, by using ETAB
software. The analysis, design, and fabrication drawings have been furnished as per
schedule to M/s. Hind High Vacuum Co. Pvt. Ltd. The fabrication of chamber has
been completed. The Robotic TIG Welding Chambers, is commissioned, and is one-
of-its-kind in the world.

10.13 Software for Detailed Drawing of transmission line towers:

Design Group has successfully developed inhouse CAD software to prepare detail
drawings of Latice steel structures of Transmission Lines of any configuration and
rating. Almost 8 years have been spent in developing accurate CAD drawing
software. Once a central line drawing of a transmission line tower structure is
furnished by the clients, about 2 days are required to produce individual component
drawings, including tower extensions, developmental length of all angle members,
central line distance between the bolt holes, BOQ of washers, HD bolt lengths,
Fabrication of Vacuum chamber under production





Brief on Power Project
48
gusset plates with configuration, base plates with configuration, foundation bolts,
lightening ground mats, fixing details etc.



The software provides material take off concurrently, including dynamic changes of
inputs for alternative studies. All the drawings are produced in A4 size sheets,
which can directly be sent to shop floor for manufacture of tower parts. There is a
facility to feed the output directly to CNC machines for automatic manufacture. It is
first of its kind in India, and a boon to manufactures of towers since the wastage of
material is minimal. The services of this software has successfully availed by CPRI,
KPTCL, Deepak Cables, L&T etc., DGs future plan is to develop a software for
accurate tower spotting as well for transmission lines .
220 KV Transmission lines Tower under Erection





Brief on Power Project
49
10.14 Pre-Tender and Post-Tender Services:

Design Group has been successfully providing pre-tender and post-tender services
for various public sector undertakings and several private sector undertakings, in as
much as preparing and providing preliminary design and drawings for component
works and structures involved and assessment of costs, detailed specifications of
various items of work, Conditions of Contracts, Tender Documents, Tender analysis
and Reports leading to selection of construction and supply agencies as per time
bound schedules and needs of clients.



11. DETAILED ENGINEERING SERVICES FOR PROJECTS COMPLETED

Sl.
No.
Assignment Client/s
Installed
Capacity in
MW
Completed
cost of
project
Rs. In lakhs
Cost of
assignment
Rs. In lakhs
Refer to Work Order after
Acceptance
Remarks

1

Preparation of Hydraulic,
Civil and Structural, Electro
Mechanical Designs and
drawings for BPT and Foot
Bridge for Water supply
scheme to Channagiri Town
and 70 En-route villages in
Davanagere District,
Karnataka


M/s.NCC Limited,
Bangalore

--

--

0.75

NCC/DG/KWB-
CNG/WO/12/05/2012

Assignment
completed
2 Detailed Design and
drawings including bill of
quantities and DPR for Water
pipeline from river Penna to
Bharathi Cement, Cuddaph,
Andhra Pradesh
Bharathi Cement
Ltd., Hyderabad
-- -- 27.575 No.5100000679 dated
03.01.2011
Assignment
completed
3 Design drawings and
detailed estimate for
construction of Diversion
weir across River Varada
near Halsur village in
Savanur Taluk, Haveri
district, Karnataka.

Karnataka Neeravari
Nigama Niyamitha,
Bangalore
Storage of
water for Rabi
crop sprinkler
irrigation
4400 4.187 Kaninini:mabada-
4:dibi:Tendara:10-11/3342 dt
17.2.2011
Assignment
completed.
Construction
work is
underway
Projects Completed
50


4 Designing of electricals for
benefication plant at
Bagalkot, Bagalkot district,
Karnataka
Doddanavar
Nanjinzhao Mining
and Metallurgy
Pvt.Ltd.,Belgaum
-- -- 5.515 DNMMPL/BP/2010-11/01A
Dated 9.5.2011
Assignment
completed

5

Design and Detailed
drawings for Caisson well
foundation in river, water
intake system(including
approach bridge foundation)
for 2x270 MW Thermal
Power Plant, Goindwal
Sahib, Punjab, India


Through Fichtner
India Consulting
Engineers(India)
Private Ltd.,
Bangalore

2x270MW

--

18

No.CNT/3160810001.3115 dt
7.4.2010 CNT
1110107/7126/18.6.2011
Amendment-2F1(B)-1110107-
PO(2011)-110 dt 16.8.2011

Assignment
completed
6 Civil Design Engineering
Services & Drawings for 18 m
dia x 30 SWD RCC Tank for
Thickener

M/s. Delkor Technik
India Pvt Ltd.,
Bangalore
-- -- 0.9 No.DTIPL/BGL/08.484/10068
Dated 10.02.2009
Assignment
completed
7 Civil design for 25 m dia
sludge thickner tank for
Hutti Gold Mines Ltd., Hutti
village , Lingasugur taluk,
Raichur district, Karnataka

M/s.Delkor Technik
India Pvt Ltd.,
Bangalore
-- -- 2.1 DTIPL/BGL/09.567 Dated
17.11.2009
Assignment
completed
8 Detailed Engineering
Services for foundation and
drawings for structural steel
works of water supply
scheme
M/s.HDO
Technologies Ltd.,
Mumbai
-- -- 6 No. HFC 1A007/001 Dated
21.11.2009
Assignment
completed
Projects Completed
51


9 Consultancy Services for
Design & Drawings for E&M
Package for Bhavani Barrage
turbine project in
Samayapuram village in
Coimbatore District,
Tamilnadu

M/s. Sri Saravana
Engineering Works,
Engineering
Contractors, 367,
Mettur Main Road,
Bhavani - 638 601.
2x5 MW -- 17.5 SSEW/BVN/F.Bbi/D.No.009-
2/2008, dtd: 09-01-2008
Assignment
completed
10 Consultancy Services for E &
M Package for Bulb Turbine
based Hydro Electric Power
Project of Capacity at
Bhavani Barrage - II at
Umaipalayam Village,
Coimbatore, District,
Tamilnadu.
M/s. Meclin
Fabricators Private
Limited, No,.148,
Iind Floor, Thambu
Street, Chennai - 600
001
2 x 5 MW -- 17.5 MFPL/BB II/DG/Wo/15/08,
dtd: 15.02.2008
Assignment
completed
11 Detailed Engineering for
construction water supply to
1050 MW GMR Kamalanga
Thermal Power Project,
Orissa, India

M/s.GMR
Kamalanga Energy
Ltd.,
1050 MW GKEL/KTPP/BLR/008 -
30.07.2008
Assignment
completed
12 Detailed Engineering for
construction of weir across
River Nethravathi at Thumbe
for providing Water Supply
to Mangalore City,
Karnataka.
Owner: M/s.
Mangalore City
Corporation,
Mangalore.
Work Order through
M/s Rithwik

Water Supply -- 10 No. DG/AGIVPL/01/09 dated
04.06.2009
Assignment
completed
13 Detailed Design Engineering
Services for Wind Power
Project near Chikodi,
Belgaum district, Karnataka
M/S. Doddanavar
Brothers, Belgaum,
Karnataka
1.5 x 10
=15MW
9000 15 No.DB-MO-WM-08-09/05
Dated 27.11.2008
Assignment
completed
Projects Completed
52


14 Design Engineering services
for Hosamatha MHS across
Gundia Hole near
Hosamatha Village Puttur
Taluk of Dakshina Kannada
District, Karnataka
M/s. Dishaa Power
Corporation Pvt
Ltd., Bangalore
3x1.20=3.60M
W
-- -- No.DPCPL/DG/052/2006-07
Dated 06.03.2007
Assignment
completed
15 Design of Spillway etc of the
Mid Manair Dam, Kerala
M/s. Sushee Hi-Tech
Constructions Pvt.
Ltd., 202, Raghava
Cottage, Plot No.2,
Dwarakapuri
Colony, Punjagutta,
Hyderabad - 500
082.

-- -- 14.59 DG/SHT/09/2007 Dated:
02.05.07
Assignment
completed
16 Detail Design Engineering
for Somanamaradi HEP at
55th Km, Narayanapur Right
Bank Canal (NRBC),
Deodurga Taluk, Raichur
District. Karnataka(II phase)

M/s. Narayanpur
Power Company (P)
Ltd., Bangalore
1x6=6MW
(II Phase)
12000 -- No. NPCPL/2D.1/016/2007-08
Dated.17.04.2007
Assignment
completed
17 Civil & Architectural Works
for Design & Construction of
Sea Water Intake Structure,
Intake Submarine Tunnel,
Approach Jetty & Seal Well
for Outfall Structure for 500
Mwe, Plutonium Fast
Breeder Reactor( PFBR)
Project, Bhavini-Kalpakkam,
Tamilnadu, India.
M/s. Gammon India
Ltd., Mumbai
500 Mwe -- 32 No.TMS/8615/ID/735 Dated
25.09.2007
Assignment
completed
Projects Completed
53


18 Detailed Engineering for
Shamburi Mini Hydel
Scheme, Shamburi village,
Dakshina Kannada District,
Karnataka.

M/s.Rithwik Energy
Generation Pvt. Ltd.
Hyderabad.
5 x 4.80=24MW 9726 -- No. NIL dated
23.12.2005
Assignment
completed
19 Consuiltancy Services for
Nandikere Small Hydel
Scheme , near Shimshapura,
Mandya district, Karnataka,
India

M/s, XS Hydro
Energy Pvt Ltd, Plot
No. 58, 15h Main,
Sector HSR Layout,
Bangalore - 560034.
5x4.90=24.50MW -- 5.612 XSHP/NSHS/01/2006, dtd:
28.08.2006
Assignment
completed
20 Design Engineering Service
for 33 kV Outdoor
Switchyard Structure and
civil foundations for Khauli
Project, HPSEB, Himachala
Pradesh, India

M/s. V A Tech
Escher Wyes Flovel
Ltd., 13/1, Mathura
Road, Faridabad -
121 003.
-- -- 0.825 4500006184/03.0-2.2004 Assignment
completed
21 Civil Works for Coal
Handling Plant at Sanjay
Gandhi TPS, Madhya
Pradesh, India
M/s. The Mysore
Construction Co.,
Industry House, 45,
Race Course Road,
bangalore - 560 001.
1x500 MW -- 0.4 MCC/916/2004, dtd: 07.05.2004 Assignment
completed
22 Detailed Engineering
Services for Hullahalla Mini
Hydel Scheme, Shimsha,
Malavalli Taluk, Mandya
District, Karnataka.
M/s. Limbavali
Power Pvt. Ltd.,
Bangalore
3 x 4=12MW 4740 24 No.LPPL/DG/01/104 dated
11.10.2004
Assignment
completed
Projects Completed
54


23 Design Engineering Services
Somavathi Mini Hydel
Scheme, Chickmagalur
District, Karnataka.
M/s.SRM Power Pvt.
Ltd. Bangalore
2 x 3=6.00MW 2746 25 Work Order
no.DG.SRMP/08/05 dated
2.4.2005
Assignment
completed
24


Design Engineering Service
of 66 KVA Substationm JFW
LT centre, Electronicity city
M/s. GE India
Technology Centre
Pvt Ltd., Bangalore
-- -- 5.5 20051157 - 09.05.2005 Assignment
completed


25
Processing Approval from
BESCOM/KPTCL, Bangalore
Provide Professional
Consultancy work for
Engineering Design for 66KV
Substation as per Contract
Terms & Conditions in
Addition to above Purchase
Order Terms & Conditions
M/s. GE India
Technology Centre
Pvt Ltd., Bangalore
-- -- 10 20051562 21.06.2005 Assignment
completed

26

Consultancy for evaluation of
Alaknanda HEP in
Uttaranchal

M/s. GMR Energy
Ltd., Bangalore

140 MW

--

15

GEL/Alaknanda/DG/329/05-
16.08.2005

Assignment
completed
27 Rehabilitation of Water
Conducting System for
Power Channel at existing
Shivanasamudram Hydro
Electric Project, Malavalli
taluk, Mandya district,
Karnataka

M/s. Visveswaraiah
Vidyuth Nigama
Ltd.,
Bangalore(KPCL)
-- 1000 1.14 No.VVNL/DIR(Tech)&JMD/D
GM(T)/7256-62 Dated
11.03.2003
Assignment
completed
Projects Completed
55



28
Detailed Engineering for
Kadamane MHP Scheme-1
near Maranahalli Village,
Sahakaleshpur Taluk of
Hassan District in Karnataka
M/s. Paschim
Holdings Pvt Ltd.,
Hyderabad
2 x 4.5=9.00
MW
5200 26 No.WO/PHPL/KMHS-
1DG/0001 Dated 21.04.2003
Assignment
completed
29 Detailed Design Engineering
Services for Singatalur
Huligudda MHS,
Harapanahalli taluk, Bellary
district, Karnataka
M/s. Thungabhadra
Power Company Pvt
Ltd.,Bangalore
4x4.50=18 MW 8300 27 No.TPCPL/1107/2003-04 Dated
12.11.2003
Assignment
completed
30 Detailed Engineering
Services for Varahi Tail Race
Mini Hydel Scheme,
Hosangadi, Kundapura
Taluk, Udupi District,
Karnataka

M/s Sandur Power
Company Pvt.Ltd.,
Hyderabad
3x7.50=22.50M
W 1st stage +
2x7.50=15MW
2nd stage
-- 46 No.DG/2002/01 dated
28.01.2002
Assignment
completed
31 Detailed Engineering
Services for civil works of
Link Canal Mini Hydel
Scheme, Peehalli village,
Bannur Taluk, Mandya
district, Karnataka.
M/s Mysore
Construction Co.,
Bangalore
1.50MW 400 6.5 No.MCC/B/771/2/001 dated
26.09.2001
Assignment
completed
32 Design, Drawings and
estimation of steel structural
works for 110 kV switchyard,
BPCL, Samayanallur,
Madurai district, Tamil Nadu

M/s Bharat Heavy
Electricals Ltd.,
Bangalore
2x25.00=50MW -- 1 No.IS-1-00-2007/WO/Strl
Dated 09.10.2000
Assignment
completed
Projects Completed
56


33 Design Engineering Services
for Somanamaradi HEP at
55th KM, Narayanapur Right
Bank Canal (NRBC),
Deodurga Taluk Raichur
District.

M/s. Narayanpur
Power Company (P)
Ltd., Bangalore
2x6=12MW
1st stage
6300 22.5 No. NPCPL/F05/D No.98/2000-
2001 Dated.16.09.2000
Assignment
completed
34 Detailed Engineering design
for Harangi Hydro Electric
Project at Harangi Dam,
Kushalnagar District,
Karnataka

Suzler Flovel Hydro
Ltd., Faridabad,
Haryana
2x4.50=9.00MW 3200 12 Work done during 1999 Assignment
completed
35 Detailed Engineering design
for Sheshadri Iyer Mini
Hydel Scheme,
Shivanasamudram, Malavalli
taluk, Mandya District,
Karnataka

Atria Power
Corporation
Limited, Bangalore
3x3.30=10.00MW 1200 11.25 Work done during 1999 Assignment
completed

36
Design of steel structures for
the proposed 66kV outdoor
switchyard at Avery Cycles,
Ludhiana, Punjab
Kirloskar Electric
Company,
Bangalore
66kV
switchyard
200 12 Work done during 1999 Assignment
completed

37
Detailed Design Engineering
Services for implementation
of DG sets for GEITC, White
field, Bangalore
M/s. GE Power
Controls, Bangalore
2x1.6+1.2=4.4MW
144 20 PO.No.G.5.1./ETD Dated
10.03.1999
Assignment
completed
38 Design & Engineering
Services for 66 kV Outdoor
Switchyard of Harangi HEP,
Kushanagar Taluk, Coorg
district, Karnataka, India
M/s.Sulzer Flovel
Hydro Ltd.,
Faridabad
2 X
4.5=9.00MW
80 0.45 Job Order No.1100016/D-
07/963/799 Dated 11.08.1998
Assignment
completed
Projects Completed
57



39 Design & Engineering
Services of 66 kV Outdoor
Switchyard of Hemavathy
LBC , near Gorur village,
Arakalagud Taluk, Hassan
District, Karnataka
M/s.Sulzer Flovel
Hydro Ltd.,
Faridabad
4 x 4
=16.00MW
100 1.3 Job Order No.1100016/D-
07/874/745 Dated 29.07.1998
Assignment
completed
40 Design of Outdoor yard Steel
Structures for KSEB,
Kozhikode, Kerala
M/s.Metallurgical &
Engineering
Consultants (India)
Ltd., Bangalore

8 x16 =128MW 384 0.6 No.01/83/9106/kseb/p-1785
Dated 07.05.1998
Assignment
completed
41 Design Engineering Services
to Maddur MHS, Mandya
district, Karnataka
M/s.L.K. Power
Corporation Ltd,
Bangalore
2X1.50=3MW -- -- No.LKPC/MDR/01/93-94
Dated 22.05.1993
Assignment
completed
42 Detailed Engineering for
Varahi Under Ground Power
House, Hosangadi, Udupi
District, Karnataka, India
Owner: Karnataka
Power Corporation
Ltd., Bangalore
Through M/s
Subhadra
Consultants,
Bangalore
2x215=430MW -- -- Work done during 2009 Assignment
completed
43 Detailed Engineering for
construction of earthen bund
for Sarvaraja Sarovara
Reservoir near Cuddaph,
Chittur District, Andhra
Pradesh.

M/s. ECC--CPPL Pvt
Ltd., Hyderabad.
Irrigation -- 20 Work done during 2007 Assignment
completed
Projects Completed
58


44 Preparation of Design
Engineering Services &
Drawings for 13 mtr dia x 3.5
SWD RCC Thickener
application plant.

M/s. Tenova-Delkor
Pvt Ltd
-- -- 0.84 No.DTIPL/BGL/06.279/2231
Dated 20.12.2006
Assignment
completed
45 Detailed Engineering
Services for Perla Mini Hydel
Scheme, Dakshina Kannada
District, Karnataka.
M/s.AMR Power
Pvt. Ltd.
Hyderabad.
5 x 4.80=24MW 9726 20 No. nil dated 23.12.2005 Assignment
completed
46 Detailed Engineering for
Nagarjuna Sagar Tail Pond
Dam and Hydro Power
Station, Nalgonda, Andhra
Pradesh
Through M/s. STUP
Consultants Private
Ltd., Bangalore
2 x 25=50MW 42500 -- Work done during 2005 Assignment
completed
47 Detailed Engineering for the
works of balance of plant for
Hail-2 Gas Based Power
Plant, Saudi Arabia
Through ILF
Consulting
Engineers, Abu
Dhabi
2 x 55 / 70 MW -- 120.00
(US$235,000)
ILF/D-365 July 2010 Assignment
completed
48 Detailed Engineering of
Gugal Mini Hydel Project,
Gugal barrage, Yadgir
district, Karnataka
M/s SRS Energy
Private Ltd.,
Bangalore
3x3.34=10.02M
W
-- 24 DG/SRSEPL/07/04 dated
29.07.2004
Assignment
completed
49 Design Consultancy Service
for Civil Foundation of 132
kV Sub-Station at
HINDALCo, Renukoot
M/s. Bharat Heavy
Electricals Ltd,
Industrial System,
Group, Group II,
CNR, Rao Circle,
IISc. Post,
Malleshwaram,
Bangalore - 560 012.
132 kV 9850.00 -- IS-I-02-2002-DG-36, dtd:
03-10-2002
Assignment
completed
Projects Completed
59


50 Consultancy Service for
Improvements to water
conducting system and
remodeling of power channel
at Shivanasamudram as per
the agreement made on 18-
08-1999 for KPCTCL,
Bangalore.
M/s. Visveswaraya
Vidyuth Nigama
Limited, Office of
the Director
(Technical), VVNL,
No.16, 1st Main
Road, Jayamahal
Extension,
Bangalore - 560046.
-- -- 5.00 Dir(Tech)/DGM(F&A)/Manage
r/AO1/AAO/797-800-2001-02,
dtd: 26/06/2001
Assignment
completed
51 Check Consultancy Services
of design and execution of
new derrrick supported
chimney at ITPL, Bangalore,
Karnataka

M/s. Information
Technology Park
Ltd., Bangalore
-- NA 7.64 CE-ITPL-DPP-200754-13 dated
4.2.2013
Assignment
completed
52 Detailed Civil Engineering
Services for TP1 and TP2 of
Coal Conveyor System,
Tunnel in cut and cover, Box
pushing section and other
allied works for addition of
2x250MW for Sikka TPP,
Jamnagar District, Gujarat

Multi design
Infraworks pvt.Ltd.,
Bangalore
-- -- 11.91 MDIPL/DG/2011-12
dated 9.11.2011
Assignment
completed
53 Design of 35.58 MLD
capacity Sewage Treatment
Plant under UGD Scheme to
Shimoga City
M/s. GVPR
Engineers Limited,
Hyderabad
-- -- 4.50 -- Assignment
completed
54 Design and drawings for a
village road bridge of Span
7.50m, total length 24m and
width 5.2m across Barimaru
nalanear Barimaru Village
M/s. Perla Hydro
Power Pvt ltd.,
Bangalore
-- 35 1 SO.No.PHPPL/SO/Design
Group/07 Dated 17.12.2013
Assignment
completed

Projects Completed
60


12. ONGOING ASSIGNMENTAND PROJECTS UNDER VARIOUS STAGES OF EXECUTION

Sl
No
Assignment Client
Installed
Capacity in
MW
Cost of
completion
of project
Rs. In lakhs
Cost of
assignment
Rs. In lakhs
Work Order No. and Date Remarks

1

Civil Design Engineering Services of
Fly Ash Silos, Bufer Hopper and
Collecting Tank Tower and Vaccum
Pump House with allied works for
2x800MW Raichur Power
Corporation Limited, Yermaras TPS,
near Raichur, Karnataka, India


M/s Macawber
Beekay Pvt
Ltd.,Noida, NCR,
New Delhi


--

--

18.00

MBPL/PO/24723 WO No.C-
00001094 dated 18.2.2013

Under
execution
2






Detailed Design Engineering
Services for Kumbenahalli Mini
Hydel Scheme, Kumbenahalli
village, Channarayanapattana Taluk,
Hassan district, Karnataka

M/s.Aparimita Power
Ventures Pvt Ltd.,
Bangalore
2x2=4MW 2487 40.00 Work Order No.
DG/APVPL/KMHS/01/12
dated 19.02.2013
Under
process of
execution
3 Providing consultancy services for
400 KV, 63 MVAR, 3 phase reactor
foundation at 400 kV Reactor Bay at
RTPS, KPCL, Raichur, Karnataka
M/s Shreem Electric
Ltd., Bangalore
-- -- 1.45 RRD/RTPS/DG/9379/2013
dated 25.02.2013
Under
execution
4 Detailed Engineering Services for
Shanmukha Subramanya Mini Hydel
Scheme, Dakshina Kannada District,
Karnataka, India
M/s Perla Hydro
Power Private Ltd.,
Bangalore
2x5=10MW 5000 .00 30.00 No.PHPPL/SO/Design
Group/01/ dated
12/16.04.2013
Under
execution
Projects on Hand
61


5 Detailed Engineering Services for
Kollya Mini Hydel Scheme, near
Kollya village, Puttur taluk,
Dakshina Kannada District,
Karnataka

Greenko Energy
Private Limited,
Hyderabad
24MW 13611.00
(Projected)
37.00 -- Under
execution
6 Detailed Design Engineering
Services for Beedalli Mini Hydel
Project, Somavarapet taluk, Coorg
District, Karnataka
Kodagu Hydel Power
Private Ltd.,
Bangalore
2x1.50 =
3.00MW
2154 33.00 -- Under
execution

7

Detailed Engineering Consultancy
for 50 KLPD Distillery with Fuel
Ethanol(with incineration boiler)
project of Nandi Sahakari Sakkare
Karkhane Niyamit, Bagalkot district,
Karnataka


M/s.Nandi Sahakari
Sakkare Karkhane
Niyamit,
Krishananagar,
Bijapur

5.00MW

--

17.00

NSSK/Civil/Distillery/4060/20
11-12 dated 18.02.2012

Under
execution
8 Detailed Engineering services for
Civil and H&M works for
implementation of Kukke-I MHS,
Sulya taluk, Dakshina Kannada
district, Karnataka
M/s.Haridwar
Infrastructure
Limited, Hyderabad
5x4.80=24MW -- 38.00 HIL/KUKKE-
1/WO/HO/2012/01 Dt
21.02.2012
Under
execution
9 Detailed Civil Design Engineering
for Twin RCC thickners along with
tunnels and allied works for Tailing
Thickner for Khouribga Mine to
JorfLasfar Ore Slurry Transport,
Including construction drawings
including supply of soft copy of the
drawing, Moracco, Africa
M/s.Tenova-Delkor
Technik India
Pvt.Ltd., Bangalore
-- -- 19.38 Purchase Order No.
DTIPL/ADI/11.1040/28607
dated 26.10.2012
Under
execution
Projects on Hand
62


10 Detailed Engineering services for
Kabeli B1 Hydro Electric Project,
East of Nepal, Nepal
M/s.Arun Kabeli
Power Limited
(AKPL),Kathmandu,
Nepal
3x8.333=25M
W
Nepalese Rs.
20721.00
US$230,000 Agreement Dated 23.11.2012 Under
execution
11 Design Engineering for Rafha Power
Plant, Rafha, Saudi Arebia
Through ILF
Consulting
Engineers, Abu Dhabi
2 x 55/70 MW
+ 2 X 30/50
MW
-- US$375000 E351-ILFAb-AS-0011 dated
03.02.2011
Final stage
of
completion

12

Detailed Enginenering services for
Pashdan Hydro Electric Project,
Herat Region, Afganisthan

Hiwadwal Group,
Azeetq-JV, Char-e-
Sherpoor,
Afghanisthan

--

--

US $ 19,00,000

DG/HG/01/AA Dated
07.04.2011- Jointly signed by
Hiwadwal Group and
DGPCPL

Withdrawn
the services
Due to
Security
Reasons

13 Detailed Engineering Services for
implementation of the Tinget HEP in
Himachala Pradesh including
Detailed Project Report.
AMR-Mitra JV,
Hydereabad
2 x 70 MW -- 221.00 Accepted on offer
Ref.DG/AMR/2011 dtd
21.06.2011
Under
Planning
Stage
14 Detailed Enginenering services for
Machalgo Multipurpose project,
Machalgo, Afganisthan
Gulf Civil
Engineering and
construction
co.,Afghanisthan
-- -- US$704000 DG/GCE&CC/02/10 dated
1.12.2010 Jointly signed by
GCE&CC and DGPCPL
Withdrawn
the services
Due to
Security
Reasons
15 Design Engineering Services to
Mudhol MHS, Mudhol Taluk,
Bagalkot district, Karnataka
M/s.L.K. Power
Corporation Ltd,
Bangalore
1.00MW -- -- No.LKPC/MDR/01/93-94
Dated 22.05.1993
Work
under hold
Projects on Hand
63



16

Design Engineering Services to
Deverebelekere MHS, Davanagere
Taluk, Karnataka


M/s.L.K. Power
Corporation Ltd,
Bangalore

2x1=2MW

--

--

No.LKPC/MDR/01/93-94
Dated 22.05.1993

Work
under hold
17 Detailed Design Engineering
Services for Gatambe Small Scale
Hydropower Project, Kandy, Sri
Lanka
M/s. Asia
Hydropower
Generation Pvt Ltd.,
Sri Lanka
12 .00MW -- US$ 23001 No. nil Dated 11.06.2009 -
18 Detailed Engineering Services for
Mahan Small Hydel Project Scheme-
3 Across River Mahan, Korhapur
village, Surjpur Taluk, Sarguja
district, Chattisgarh State
M/s. Venika Hydro
Projects Pvt Ltd.
Bangalore
3x8.25=24.75
MW
12500 33.00 No. nil dated 12.11.2009
Inward No. 111 dated
13.11.2009 of DGPCPL
Under
execution
19 Design Engineering Services for
110/11 kV Substation, Transmission
Line and Terminal Bay at Savanur
Substation, Savanur

M/s.Vasuki Power
Pvt Ltd., Bangalore
3.75 PO.No.VPPL/PO/10/2013-14
Dated 21.2.14
Under
Execution
20 Construction of Gated Barrage across
Krishna River on the upstream of
confluence of Krishna & Bhima
rivers near Girijapur Village.


M/s.KPC Ltd.,
Bangalore



19.00 WO.CD/RTPS/BRG/Consult/2
499 Dated 21.2.14
Under
Execution
21 Design Engineering Services for EPC
Package of Natural Draught Cooling
Towers, Condenser Cooling Water
Pump house & Allied works for
RAPP 7 & 8.
Gammon India Ltd., 2 x 700 MW 73.00 WO:GIL/TNE/117 Dated
29.3.14
Under
Execution

Projects on Hand
64


13(a). PREPARATION OF DETAILED PROJECT REPORTS BY DGPCPL (ON HAND)
Sl.
No.
Assignment Client
Installed
Capacity
in MW
Cost of
completion
of project
Rs. In
lakhs
Cost of
assignment
Rs. In
lakhs
Work Order No. and
Date
Remarks

1

Detailed Project Report for Barachukki Hydro
Electric Project in Barachukki limb of River
Cauvery(Upstream of Barachukki falls) Malavalli
Taluk, Mandya District, Karnataka

M/s Sri Sreeram
Mallige, Bangalore

2x12=MW

7200

9.00

Work order No. nil
dated 14.06.2013

Ongoing
assignment

2

Detailed Project Report for Fandarya Hydro
Power Project, Tajikistan

M/s Fandarya Power
Company Limited,
Singapore

2x55+1X25
= 135MW

1928.5714

--

Work Order
No.KIPL-DG/01/12/13
Dated 10.01.2013

Ongoing
Assignment

3

Detailed Project Report for Garm Hydro Power
Project, Tajikistan

M/s Garm Power
Company Limited,
Singapore

4x115=
460MW

6571.4286

--
Work Order
No.KIPL-DG/01/12/13
Dated 10.01.2013


Ongoing
Assignment

4

Detailed Project Report for Tavildara Hydro
Power Project, Tajikistan

M/s Tavildara Power
Company Limited,
Singapore

4x100=
4 00MW

5714.2857

--
Work Order
No.KIPL-DG/01/12/13
Dated 10.01.2013

Ongoing
Assignment

5

Detailed Project Report for1000MWThermal
Power Plant in Tajikisthan

M/s Tavildara Power
Company Limited,
Singapore

1000MW

--

--

During the year, 2013

Ongoing
Assignment
6 DPR for Hydro Power Generation station of Khri
Stage-I, West Khasi Hill District, Meghalaya,
India
M/s SM Energenco Ltd.,
Guwahati, Assam
15 MW -- 23.60 SM
Energenco/3013/14/3
dated 12.4.2013
Assignment
completed
7 DPR for hydro power generation station of Khri
Stage-II, West Khasi Hill District, Meghalaya,
India
M/s.SM Energenco Ltd.,
Guwahati, Assam
10 MW -- 23.60 SM
Energenco/2013/14/4
dated 12.4.2013
Assignment
completed
Projects on Hand
65


13(b). PREPARATION OF DETAILED PROJECT REPORTS BY DGPCPL (COMPLETED)
Sl.
No.
Assignment Client
Installed
Capacity in MW
Cost of
completion
of project
Rs. In
lakhs
Cost of
assignment
Rs. In lakhs
Work Order No. and Date Remarks

1
DPR for Kolar Dam WS Small
Hydro Electric Project, Lawa
Khadi village, Ichhawar
taluk,Sehore district, Madhya
Pradesh, India

ClearGEN Power
Private Ltd., New
Delhi
2x0.75 =1.50MW 1455 5.00

Work Order
No.DG/CGPPL/01/13 and
Dated 13.06.2013
Assignment
completed

2
Detailed Project Report
Deogarh Mini Hydel Project,
near Deogarh Town, Deogarh
district, Orissa, India
Odisha Hydro
Power Corporation
Ltd., Bhuvaneswr,
through WAPCOS,
New Delhi
30KW 60 --
--
Assignment
completed

3
Detailed Project Report
including pre-selection of
technology for electrification of
un-electrified Habitations
(Hamlet/jc/db/tc/Thandas) and
BPL households through
decentralised distributed
generation (DDG) under
RGGVY Scheme in Mangalore
jurisdiction, Karnataka
M/s.Karnataka
Renewable Energy
Development
Limited, Bangalore
Varies from
1KW to 55KW
Rs.7307.00 14.50 Kredl/07/sog/ddg/2012/337
3 dt 12.12.2012
Assignment
completed
Completed Projects
66


4 Detailed Project Report for
Chikkodi Windmill project
9x1.6 MW-Toranahalli village
8x1.6MW- Jainapur village,
3x1.6 MW Chinchini village,
Chikkodi taluk, Belgaum
district, Karnataka, India


Doddanavar Global
Energy
Pvt.Ltd.,Chikkodi,
Belgaum district,
Karnataka
20x1.60=
32.00MW
-- 1.00 DGEPL/WM/10-11/01 dt
16.11.2011
Assignment
completed

5

Detailed Project Report for
Komaram Bheem Mini Hydro
Electric Project at Adilabad
District, Andhra Pradesh, India


M/s.Rohit Energy
Power Private Ltd.,
Hyderabad

1x3=3MW

--

1726.00

REPPL/Engg/2011/001
dated 21.12.2011

Assignment
completed
6 Detailed Project Report for
Dananahalli MHS, Mandya
District, Karnataka
M/s. Punam power
Pvt Ltd, Bangalore.
2 x 3=6.00MW 4750 5.00 During the year 2011
Assignment
completed

7
Detailed Project Report for
Augmentation of Water Supply
Scheme at Hutti Gold Mines
Raichur District, Karnataka
M/s. Hutti Gold
Mines Co Ltd.
Bangalore
Water Supply -- -- During the year 2010
Assignment
completed

8
Detailed Project Report on
MHS Reports on Idigan,
Karnataka
M/s. Punam Powers
(P) Ltd., No.228, 1st
Main, 5th phase, 60
ft. Road, WOC Road,
Shivanagar,
Bangalore - 560 010.
6MW -- 4.500 Punam/IMHS/2010-11/01,
dtd:- 18.09.2010
Assignment
completed

9
Detailed Project Report for
Tokapur Mini Hydel Scheme,
Shahapur Taluk, Yadgir
District, Karnataka, India

M/s. Adarsh Energy
Pvt Ltd, Shahapur
1x1.40=1.40MW 936 4.00
W.O. SEPL/DG/2008-09/106
dated 11.3.2009
Assignment
completed
Completed Projects
67



10
Detailed Project Report for
Magundi Mini Hydel Scheme
across river Bhadra near
Magundi village,
Chikkamagalur district,
Karnataka, India

M/s. Shakuntalam
Power Pvt Ltd.,
Bangalore
2x4.50=9.00MW 4962 2.50

No.SPPL/DG/JUNE/2009-
2010/001 Dated 30.06.2009
Assignment
completed

11

Detailed Project Report of
Anusha Mini Hydel Scheme
Near Jurreu and Kundu
confluence in Kurnool district,
Andhra Pradesh, India

Dhenu Hydro
pvt.Ltd.,Hyderabad

2x1.90= 3.80MW

2778

4.00

No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009

Assignment
completed

12

Detailed Project Report for
Ramya Mini Hydel Scheme on
d/s of Nandyal bridge near
Chapirevula village, Kurnool
district, Andhra Pradesh, India


Kurnool Energies
Private Ltd.,
hyderabad

2x2MW=4MW

2900

4.00

No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009

Assignment
completed
13 Detailed Project Report for
Navya Mini Hydel Scheme in
between Santhajuturu anicut
and Bandi Atmakuru village,
Kurnool district, Andhra
Pradesh, India
Mitra Energy
Pvt.Ltd., Hyderabad
2x1.3=2.60MW 2281 4.00 No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009
Assignment
completed
14 Detailed Project Report of
Koilakuntla Mini Hydel
Scheme Near Koilakuntla
village, Kurnool district,
Andhra Pradesh, India
Dhenu Hydro
pvt.Ltd., Hyderabad
2x3.8=7.60MW 3996 4.00 No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009
Assignment
completed
Completed Projects
68


15 Detailed Project Report for
Bellary Solar Power Project,
Bellary, Karnataka
M/s Vishrutha
Power Private Ltd.,
No.72, Crescent
Road, Bangalore 560
001
5x1=5.00MW 600 4.00 During the year 2009
Assignment
completed

16

Detailed Project Report for
Nimishamba Hydro Elecrtric
Project, Sriranganapattana
Taluk, Mandya District,
Karnataka


Nimishamba
Engineer India
Pvt.Ltd., Bangalore

2x1.50 =3.00MW

1751

4.00

No.NEIPL/DG/NMHP/01/0
9-10 dated 14.10.2009
Assignment
completed
17 Detailed Project Report for
Kodekal Basaveshwara MHS
Near Yadgir District,
Karnataka.
M/s. Kodekal
Basaveshwara
Power Generation
Pvt Ltd., Bangalore
2 x 5=10.00MW 4500 4.50 --
Assignment
completed
18 Detailed Project Report for
Cauvery SHEP(Right Bankj)-
Downstream of Barachukki
Falls, Malavalli Taluk, Mandya
District, Karnataka
M/s Vijaya Green
Power Private Ltd.,
Bangalore
2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated
8.8.2008
Assignment
completed
19 Detailed Project Report for
Cauvery SHEP(Left Bank)-
Down stream of Barachukki
Falls, Malavalli Taluk, Mandya
District, Karnataka
M/s Vijaya Green
Power Private Ltd.,
Bangalore
2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated
8.8.2008
Assignment
completed
Completed Projects
69


20 Detailed Project Report for
Perudoor MHS across River
Madisal Hole, Perdur village,
Udupi taluk, Udupi district,
Karnataka, India
M/s. Dishaa Power
Corporation Pvt
Ltd., Bangalore
2x2=4.00MW 2400 5.05 No.DPCPL/DG/64/2007-08
dated 3.07.2007
Assignment
completed
21 Detailed Feasibility Report (i.e.
DPR)for Trishuli Galchhi HEP
in Nepal.
M/s. Siddhakali
Power Pvt Ltd.,
Nepal
3x37.50=75MW Nepalese
Rs. 99231
US$
1,00,000
Dated 20.10.2008
Assignment
completed

22

Detailed Project Report for
Dabevadi MHS Uttara
Kannada District, Karnataka.


M/s. Dabevadi
Hydel Power Pvt.
Ltd., Uttara
Kannada Karnataka.


3 x 4=12.00MW

6271

4.00

During the year 2008

Assignment
completed
23 Detailed Project Report for
Hosamatha MHS across
Gundia Hole near Hosamatha
Village Puttur Taluk of
Dakshina Kannada District,
Karnataka
M/s. Dishaa Power
Corporation Pvt
Ltd., Bangalore
3x1.20= 3.60MW 18005 3.75 No.DPCPL/DG/052/2006-07
Dated 06.03.2007
Assignment
completed
24 Detailed Project Report for
Joldadgi MHS across Bhima
River in Yadagiri Taluk of
Gulbarga District, Karnataka
State

M/s. Sai Teja
Energies Pvt Ltd.,
Hyderabad.
4x4=16MW 8000 5.33 No.Nil dated 2.5.2007
Assignment
completed
25 Detailed Project Report for
Kurkamane MHS, near Patla
Betta, Sakaleshapura Taluk,
Hassan district, Karnataka,
India

M/S.Trimurthi
Power Pvt Ltd.,
Bangalore
2x12=24MW 9600 4.49 No.TPPL/DG/16/GM-
A/2007-08 Dated 25.05.2007
Assignment
completed
Completed Projects
70


26 DPR for Kunchikal Mini Hydel
Scheme - near Hosangadi in
Kundapura Taluk, Udupi
District in Karnataka.
M/s. South Canara
Electric Co. Pvt Ltd.,
No. 2680/A, 11th
Main, D Block, 2nd
Floor, 2nd Stage,
Rajajinagar,
bangalore - 560 010.
2x2.5=5.00MW -- 4.408 --
Assignment
completed

27

Detailed Project Report for
Addhole MHS, Near
Bisle/Kulkunda village,
Sakaleshapura Taluk, Hassan
district, Karnataka, India


M/S.Trimurthi
Power Pvt Ltd.,
Bangalore

3x8=24MW

106873

4.49

No.TPPL/DG/15/GM-
A/2007-08 Dated 25.05.2007
Assignment
completed
28 Detailed Design engineering
Services for Varahi Mini Hydel
Scheme
M/.s South Canara
Electric Co. Pvt. Ltd.,
No,. 2680/A, I11th
Main, D Block, 2nd
Floor, 2nd Stage,
Rajajinagar
Bangalore - 560 010.
2 x 4.50= 9 MW -- -- DG/SCECPL/09/06, dtd:
24.07.2006
Assignment
completed
29 Detailed Project Report for
Huvinahedagi MHS, near
Deodurga, Shahapur taluk, ,
Yadgir District, Karnataka.
M/s. XS Hydro
Energy Pvt Ltd
Hyderabad.
4 x 6=24.00MW 12000 8.00 No.XSHP/HHMHS/1/2006
dated 28.08.2006
Assignment
completed
30 Detailed Project Report for Adi
Shakti Maramma MHS in
Karnataka, Mandya district,
Karnataka
M/s. Pioneer Genco
Ltd., Hyderabad
3x8.25=24.75MW 9997 5.61 No.PGL/ASM
MHS/WO/001 Dated
27.10.2006
Assignment
completed
Completed Projects
71


31 DPR for Sorang HEP in Sorang
Dogri/Barakhamba village,
Nichar Tehsil, Kinnaur district,
Himachal Pradesh, India
M/s. Himachal
Sorang Power Pvt
Ltd., Shimla,
Himachala Pradesh,
India
2 x 50 MW 345000 32.00 No.
HSPPL/Sorang/General/200
6-07/060A Dated 04.08.2006
Assignment
completed

32

DPR for Chikka Small Hydel
Scheme near Dhanaguru in
Mandya District, Karnataka -
Reg.

M/s. Venika Green
Power Pvt Ltd.,
No.953/A, 1st Floor,
IV Block, II Main,
Rajajinagar
Entrance, Bangalore
- 560 010.


4 x 4.50=18 MW

--

5.612

DG/VGPPL/01/06, dated
16.8.2006

Assignment
completed
33 DPR for IBC (Yatnur) Mini
Hydel Scheme
The Director, M/s.
SKN Hydro Zenergy
(P) Ltd., No. S-70,
3rd Cross, 1stg
Main, KEC Housing
Colony,
Basaweshwaranagar,
Bangalore - 560 079.

2x2.5=5.00MW -- 2.093 DG/SKN-HEPL/02/05, dtd:
27.01.2005
Assignment
completed
34 Detailed Project Report for
Handihalla MHS, Mandya
District, Karnataka.

M/s. Penna Cement
Industries (P) Ltd.,
Bangalore
3 x 8.25=
24.75MW
12000 6.00 PCIL/DG/001 dated
27.10.2006 Assignment
completed
35 Detailed Project Report for 18
MW Kollya Mini Hydel
Scheme, Dakshina Kannada
District, Karnataka, India
M/s
Shankaranarayana
Construction Private
Ltd., Bangalore
24.00MW 13610 4.00 No.SNC/BNG/2005-06/001
dated 14.09.2005
Assignment
completed
Completed Projects
72


36 Detailed Project Report for
Mallalli MHS-II across
Kumaradhara river in
Somvarpet Taluk, Coorg
District, Karnataka.
M/s. Nandini Power
Co (Bangalore) Pvt
Ltd., Bangalore
3x8.30=24.90MW 10441 5.00 No.NPC/CONSUL/2005-06
Dated 30.11.2005
Assignment
completed
37 Detailed Project Report for
Doddahalla Mini Hydel
Scheme, Chikkamagalur
district, Karnataka.
Mr. Srinivas Rao,
Managing Director,
M/s.Limbavali
Power Pvt. Ltd., No.
1161, 26th "A' Main,
32nd "G" Cross, 4th
"T', Block, Jayanagar,
Bnagalore - 560041.
2x10=20MW -- 5.51 DG/DHMHS/01/05, dtd: 18-
10-2005
Assignment
completed
38 Detailed Project Report for
Dodda Betta MHS across
Kumaradhara river in
Somvarpet Taluk, Coorg
District, Karnataka.
M/s. Sanjivini Power
Pvt Ltd., Bangalore
3x7.00=
21.00MW
6863 5.51 No.SPPL/CONSUL/2004-05
Dated 30.11.2005
Assignment
completed
39 Detailed Project Report for
Akkihebbal MHS, Mandya
District, Karnataka.
M/s. Cauvery Hydro
Energy Ltd
Bangalore
2 x 1.25=4.50MW 700 4.00 Work done in the year 2002
Assignment
completed
40 Kadamane Mini Hydel Power
Project Scheme-1, near
Marnahalli village,
Sakaleshapur Taluk, Hassan
district, Karnataka, India
M/s Paschim
Holding Pvt.Ltd.,
Hyderabad
2x4.5=9.00MW -- -- LOI/PHPC/KMHS/0003
dated 1.3.2001
Assignment
completed
Completed Projects
73


41 Detailed Project Report for
Kadamane MHP Scheme-2
near Maranahalli Village,
Shakleshpur Taluk of Hassan
District in Karnataka
M/s. Nagarjuna
Holdings Pvt Ltd.,
Hyderabad
2x4.50= 9.00MW 5200 4.50 No.LOI/NHPL/KMHS/0000
3 Dated 01.03.2001
Assignment
completed
42 Detailed Project Report for
Remodeling of Shiva Power
Channel at Shivanasamudram,
Mandya District, Karnataka
M/s. Visvesvaraya
Vidyut Nigama
Limited (Now
KPCL), Bangalore.
Power Project 1000 20.00 Agreement dated 18.8.1999
Assignment
completed
43 Detailed Project Report for
Dinnekere MHS, Mandya
district, Karnataka
M/s. Jasper Energy
Pvt Ltd., Bangalore
2x0.5=1.00MW 500 3.14 No.JEPL/DG/DMHS/01/14
Dated 30.10.2004
Assignment
completed
44 Preparation and submission of
DPR for Astalakshmi Mini
Hydel Scheme - Reg
M/s.
Shankaranarayana
Power Enterprises
Pvt. Ltd., 12th Floor,
SN Towers, 25/2,
MG Road, Bangalore
- 560 001.

2x3.50=7.00MW -- 3.073 SNPEPL/MHS/BNG/04-
05/002, dtd: 05.06.2004
Assignment
completed
45 DPR for Mullibettu MHP
across Gurupur River in
Dakshina Kannada District,
Karnataka.

M/s. Mount Kailash
Power Projects Pvt
Ltd., Bangalore
-- -- 23.00 Dated 26.05.2003
Assignment
completed
Completed Projects
74



8
Detailed Project Report
including pre-selection of
technology for electrification of
un-electrified Habitations
(Hamlet/jc/db/tc/Thandas) and
BPL households through
decentralised distributed
generation (DDG) under
RGGVY Scheme in Mangalore
jurisdiction, Karnataka
M/s.Karnataka
Renewable Energy
Development
Limited, Bangalore
Varies from
1KW to 55KW
Rs.7307.00 14.50 Kredl/07/sog/ddg/2012/337
3 dt 12.12.2012
Assignment
completed
9 Detailed Project Report for
Chikkodi Windmill project
9x1.6 MW-Toranahalli village
8x1.6MW- Jainapur village,
3x1.6 MW Chinchini village,
Chikkodi taluk, Belgaum
district, Karnataka, India


Doddanavar Global
Energy
Pvt.Ltd.,Chikkodi,
Belgaum district,
Karnataka
20x1.60=
32.00MW
-- 1.00 DGEPL/WM/10-11/01 dt
16.11.2011
Assignment
completed

10

Detailed Project Report for
Komaram Bheem Mini Hydro
Electric Project at Adilabad
District, Andhra Pradesh, India


M/s.Rohit Energy
Power Private Ltd.,
Hyderabad

1x3=3MW

--

1726.00

REPPL/Engg/2011/001
dated 21.12.2011

Assignment
completed
11 Detailed Project Report for
Dananahalli MHS, Mandya
District, Karnataka
M/s. Punam power
Pvt Ltd, Bangalore.
2 x 3=6.00MW 4750 5.00 During the year 2011
Assignment
completed

12
Detailed Project Report for
Augmentation of Water Supply
Scheme at Hutti Gold Mines
Raichur District, Karnataka
M/s. Hutti Gold
Mines Co Ltd.
Bangalore
Water Supply -- -- During the year 2010
Assignment
completed
Completed Projects
75



13
Detailed Project Report on
MHS Reports on Idigan,
Karnataka
M/s. Punam Powers
(P) Ltd., No.228, 1st
Main, 5th phase, 60
ft. Road, WOC Road,
Shivanagar,
Bangalore - 560 010.
6MW -- 4.500 Punam/IMHS/2010-11/01,
dtd:- 18.09.2010
Assignment
completed

14
Detailed Project Report for
Tokapur Mini Hydel Scheme,
Shahapur Taluk, Yadgir
District, Karnataka, India

M/s. Adarsh Energy
Pvt Ltd, Shahapur
1x1.40=1.40MW 936 4.00
W.O. SEPL/DG/2008-09/106
dated 11.3.2009
Assignment
completed

15
Detailed Project Report for
Magundi Mini Hydel Scheme
across river Bhadra near
Magundi village,
Chikkamagalur district,
Karnataka, India

M/s. Shakuntalam
Power Pvt Ltd.,
Bangalore
2x4.50=9.00MW 4962 2.50

No.SPPL/DG/JUNE/2009-
2010/001 Dated 30.06.2009
Assignment
completed

16

Detailed Project Report of
Anusha Mini Hydel Scheme
Near Jurreu and Kundu
confluence in Kurnool district,
Andhra Pradesh, India

Dhenu Hydro
pvt.Ltd.,Hyderabad

2x1.90= 3.80MW

2778

4.00

No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009

Assignment
completed

17

Detailed Project Report for
Ramya Mini Hydel Scheme on
d/s of Nandyal bridge near
Chapirevula village, Kurnool
district, Andhra Pradesh, India


Kurnool Energies
Private Ltd.,
hyderabad

2x2MW=4MW

2900

4.00

No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009

Assignment
completed
Completed Projects
76


18 Detailed Project Report for
Navya Mini Hydel Scheme in
between Santhajuturu anicut
and Bandi Atmakuru village,
Kurnool district, Andhra
Pradesh, India
Mitra Energy
Pvt.Ltd., Hyderabad
2x1.3=2.60MW 2281 4.00 No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009
Assignment
completed
19 Detailed Project Report of
Koilakuntla Mini Hydel
Scheme Near Koilakuntla
village, Kurnool district,
Andhra Pradesh, India
Dhenu Hydro
pvt.Ltd., Hyderabad
2x3.8=7.60MW 3996 4.00 No.DG/DHPL/01/09 dated
26.08.2009 and No.34 dated
5.10.2009
Assignment
completed
20 Detailed Project Report for
Bellary Solar Power Project,
Bellary, Karnataka
M/s Vishrutha
Power Private Ltd.,
No.72, Crescent
Road, Bangalore 560
001
5x1=5.00MW 600 4.00 During the year 2009
Assignment
completed

21

Detailed Project Report for
Nimishamba Hydro Elecrtric
Project, Sriranganapattana
Taluk, Mandya District,
Karnataka


Nimishamba
Engineer India
Pvt.Ltd., Bangalore

2x1.50 =3.00MW

1751

4.00

No.NEIPL/DG/NMHP/01/0
9-10 dated 14.10.2009
Assignment
completed
22 Detailed Project Report for
Kodekal Basaveshwara MHS
Near Yadgir District,
Karnataka.
M/s. Kodekal
Basaveshwara
Power Generation
Pvt Ltd., Bangalore
2 x 5=10.00MW 4500 4.50 --
Assignment
completed
Completed Projects
77


23 Detailed Project Report for
Cauvery SHEP(Right Bankj)-
Downstream of Barachukki
Falls, Malavalli Taluk, Mandya
District, Karnataka
M/s Vijaya Green
Power Private Ltd.,
Bangalore
2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated
8.8.2008
Assignment
completed
24 Detailed Project Report for
Cauvery SHEP(Left Bank)-
Down stream of Barachukki
Falls, Malavalli Taluk, Mandya
District, Karnataka
M/s Vijaya Green
Power Private Ltd.,
Bangalore
2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated
8.8.2008
Assignment
completed
25 Detailed Project Report for
Perudoor MHS across River
Madisal Hole, Perdur village,
Udupi taluk, Udupi district,
Karnataka, India
M/s. Dishaa Power
Corporation Pvt
Ltd., Bangalore
2x2=4.00MW 2400 5.05 No.DPCPL/DG/64/2007-08
dated 3.07.2007
Assignment
completed
26 Detailed Feasibility Report (i.e.
DPR)for Trishuli Galchhi HEP
in Nepal.
M/s. Siddhakali
Power Pvt Ltd.,
Nepal
3x37.50=75MW Nepalese
Rs. 99231
US$
1,00,000
Dated 20.10.2008
Assignment
completed

27

Detailed Project Report for
Dabevadi MHS Uttara
Kannada District, Karnataka.


M/s. Dabevadi
Hydel Power Pvt.
Ltd., Uttara
Kannada Karnataka.


3 x 4=12.00MW

6271

4.00

During the year 2008

Assignment
completed
Completed Projects
78


28 Detailed Project Report for
Hosamatha MHS across
Gundia Hole near Hosamatha
Village Puttur Taluk of
Dakshina Kannada District,
Karnataka
M/s. Dishaa Power
Corporation Pvt
Ltd., Bangalore
3x1.20= 3.60MW 18005 3.75 No.DPCPL/DG/052/2006-07
Dated 06.03.2007
Assignment
completed
29 Detailed Project Report for
Joldadgi MHS across Bhima
River in Yadagiri Taluk of
Gulbarga District, Karnataka
State

M/s. Sai Teja
Energies Pvt Ltd.,
Hyderabad.
4x4=16MW 8000 5.33 No.Nil dated 2.5.2007
Assignment
completed
30 Detailed Project Report for
Kurkamane MHS, near Patla
Betta, Sakaleshapura Taluk,
Hassan district, Karnataka,
India

M/S.Trimurthi
Power Pvt Ltd.,
Bangalore
2x12=24MW 9600 4.49 No.TPPL/DG/16/GM-
A/2007-08 Dated 25.05.2007
Assignment
completed
31 DPR for Kunchikal Mini Hydel
Scheme - near Hosangadi in
Kundapura Taluk, Udupi
District in Karnataka.
M/s. South Canara
Electric Co. Pvt Ltd.,
No. 2680/A, 11th
Main, D Block, 2nd
Floor, 2nd Stage,
Rajajinagar,
bangalore - 560 010.
2x2.5=5.00MW -- 4.408 --
Assignment
completed

32

Detailed Project Report for
Addhole MHS, Near
Bisle/Kulkunda village,
Sakaleshapura Taluk, Hassan
district, Karnataka, India


M/S.Trimurthi
Power Pvt Ltd.,
Bangalore

3x8=24MW

106873

4.49

No.TPPL/DG/15/GM-
A/2007-08 Dated 25.05.2007
Assignment
completed
Completed Projects
79


33 Detailed Design engineering
Services for Varahi Mini Hydel
Scheme
M/.s South Canara
Electric Co. Pvt. Ltd.,
No,. 2680/A, I11th
Main, D Block, 2nd
Floor, 2nd Stage,
Rajajinagar
Bangalore - 560 010.
2 x 4.50= 9 MW -- -- DG/SCECPL/09/06, dtd:
24.07.2006
Assignment
completed
34 Detailed Project Report for
Huvinahedagi MHS, near
Deodurga, Shahapur taluk, ,
Yadgir District, Karnataka.
M/s. XS Hydro
Energy Pvt Ltd
Hyderabad.
4 x 6=24.00MW 12000 8.00 No.XSHP/HHMHS/1/2006
dated 28.08.2006
Assignment
completed
35 Detailed Project Report for Adi
Shakti Maramma MHS in
Karnataka, Mandya district,
Karnataka
M/s. Pioneer Genco
Ltd., Hyderabad
3x8.25=24.75MW 9997 5.61 No.PGL/ASM
MHS/WO/001 Dated
27.10.2006
Assignment
completed
36 DPR for Sorang HEP in Sorang
Dogri/Barakhamba village,
Nichar Tehsil, Kinnaur district,
Himachal Pradesh, India
M/s. Himachal
Sorang Power Pvt
Ltd., Shimla,
Himachala Pradesh,
India
2 x 50 MW 345000 32.00 No.
HSPPL/Sorang/General/200
6-07/060A Dated 04.08.2006
Assignment
completed

37

DPR for Chikka Small Hydel
Scheme near Dhanaguru in
Mandya District, Karnataka -
Reg.

M/s. Venika Green
Power Pvt Ltd.,
No.953/A, 1st Floor,
IV Block, II Main,
Rajajinagar
Entrance, Bangalore
- 560 010.


4 x 4.50=18 MW

--

5.612

DG/VGPPL/01/06, dated
16.8.2006

Assignment
completed
Completed Projects
80


38 DPR for IBC (Yatnur) Mini
Hydel Scheme
The Director, M/s.
SKN Hydro Zenergy
(P) Ltd., No. S-70,
3rd Cross, 1stg
Main, KEC Housing
Colony,
Basaweshwaranagar,
Bangalore - 560 079.

2x2.5=5.00MW -- 2.093 DG/SKN-HEPL/02/05, dtd:
27.01.2005
Assignment
completed
39 Detailed Project Report for
Handihalla MHS, Mandya
District, Karnataka.

M/s. Penna Cement
Industries (P) Ltd.,
Bangalore
3 x 8.25=
24.75MW
12000 6.00 PCIL/DG/001 dated
27.10.2006 Assignment
completed
40 Detailed Project Report for 18
MW Kollya Mini Hydel
Scheme, Dakshina Kannada
District, Karnataka, India
M/s
Shankaranarayana
Construction Private
Ltd., Bangalore
24.00MW 13610 4.00 No.SNC/BNG/2005-06/001
dated 14.09.2005
Assignment
completed
41 Detailed Project Report for
Mallalli MHS-II across
Kumaradhara river in
Somvarpet Taluk, Coorg
District, Karnataka.
M/s. Nandini Power
Co (Bangalore) Pvt
Ltd., Bangalore
3x8.30=24.90MW 10441 5.00 No.NPC/CONSUL/2005-06
Dated 30.11.2005
Assignment
completed
42 Detailed Project Report for
Doddahalla Mini Hydel
Scheme, Chikkamagalur
district, Karnataka.
Mr. Srinivas Rao,
Managing Director,
M/s.Limbavali
Power Pvt. Ltd., No.
1161, 26th "A' Main,
32nd "G" Cross, 4th
"T', Block, Jayanagar,
Bnagalore - 560041.
2x10=20MW -- 5.51 DG/DHMHS/01/05, dtd: 18-
10-2005
Assignment
completed
Completed Projects
81


43 Detailed Project Report for
Dodda Betta MHS across
Kumaradhara river in
Somvarpet Taluk, Coorg
District, Karnataka.
M/s. Sanjivini Power
Pvt Ltd., Bangalore
3x7.00=
21.00MW
6863 5.51 No.SPPL/CONSUL/2004-05
Dated 30.11.2005
Assignment
completed
44 Detailed Project Report for
Akkihebbal MHS, Mandya
District, Karnataka.
M/s. Cauvery Hydro
Energy Ltd
Bangalore
2 x 1.25=4.50MW 700 4.00 Work done in the year 2002
Assignment
completed
45 Kadamane Mini Hydel Power
Project Scheme-1, near
Marnahalli village,
Sakaleshapur Taluk, Hassan
district, Karnataka, India
M/s Paschim
Holding Pvt.Ltd.,
Hyderabad
2x4.5=9.00MW -- -- LOI/PHPC/KMHS/0003
dated 1.3.2001
Assignment
completed
46 Detailed Project Report for
Kadamane MHP Scheme-2
near Maranahalli Village,
Shakleshpur Taluk of Hassan
District in Karnataka
M/s. Nagarjuna
Holdings Pvt Ltd.,
Hyderabad
2x4.50= 9.00MW 5200 4.50 No.LOI/NHPL/KMHS/0000
3 Dated 01.03.2001
Assignment
completed
47 Detailed Project Report for
Remodeling of Shiva Power
Channel at Shivanasamudram,
Mandya District, Karnataka
M/s. Visvesvaraya
Vidyut Nigama
Limited (Now
KPCL), Bangalore.
Power Project 1000 20.00 Agreement dated 18.8.1999
Assignment
completed
48 Detailed Project Report for
Dinnekere MHS, Mandya
district, Karnataka
M/s. Jasper Energy
Pvt Ltd., Bangalore
2x0.5=1.00MW 500 3.14 No.JEPL/DG/DMHS/01/14
Dated 30.10.2004 Assignment
completed
Completed Projects
82


49 Preparation and submission of
DPR for Astalakshmi Mini
Hydel Scheme - Reg
M/s.
Shankaranarayana
Power Enterprises
Pvt. Ltd., 12th Floor,
SN Towers, 25/2,
MG Road, Bangalore
- 560 001.

2x3.50=7.00MW -- 3.073 SNPEPL/MHS/BNG/04-
05/002, dtd: 05.06.2004
Assignment
completed
50 DPR for Mullibettu MHP
across Gurupur River in
Dakshina Kannada District,
Karnataka.
M/s. Mount Kailash
Power Projects Pvt
Ltd., Bangalore
-- -- 23.00 Dated 26.05.2003 Assignment
completed
51 DPR for 2nd phase Wind
Power Plant including
preparation of Detailed Project
Report at Girgaon, Belgaum
District
M/s Doddanavar
Global Energy Pvt.
Ltd.,Belgaum,
Kakrnataka
32 MW 192 2.81 DGEPL/WM/13-14/02
dt.6.05.2013
Assignment
completed


Completed Projects
83


14. PPREPARATION OF DUE DILIGENCE REPORT ASSIGNMENT COMPLETED

Sl.
No.
Assignment Client Installed Capacity
Cost of
project
Rs. In lakhs
Cost of
assignment
Rs. In lakhs
Work Order No. and
Date
Remarks

1

Review of DPR and designs and
Drawings of Sirivada SHP and
Jeypore SHP in Odisha

M/s.WAPCOS, New Delhi

Sirivada=3x8.25=24.75M
W Jeypur-4.50-MW

Sirivada SHP
Rs.18695.00
Jepore SHP

10.00

WAP/WRD/DG/ODIS
HA/SHP/2013/482 Dt
3.01.2013

Assignment
completed
2 Sarju I Small Hydro Electric
Project, Munar/Saung village,
Kapkot Tehsil, Bageswara
district, Uttarkhand state, India
M/s Hemavathi Power and
Light Private Ltd.,
Bangalore
7.50MW 3750 3.00 HPLPL/09-10 dated
22.09.2009
Assignment
completed
3 Sarju II Small Hydro Electric
Project, near Kapkot, Kapkot
Tehsil , Bageswara district,
Uttarkhand state, India
M/s Hemavathi Power and
Light Private Ltd.,
Bangalore
15.00MW 9000 3.00 HPLPL/09-10 dated
22.09.2009
Assignment
completed
4 Sarju III Small Hydro Electric
Project, Parmati/Kanyuti village,
Kapkot tehsil, Bageswara
District, Uttarkhand state, India
M/s Hemavathi Power and
Light Private Ltd.,
Bangalore
7.50MW -- 3.00 HPLPL/09-10 dated
22.09.2009
Assignment
completed
5 Chunchi Doddi MHS, Bangalore
Rural District, Karnataka
M/s Greenko Energies Pvt.
Ltd., Hyderabad
3x3.559MW 4800 2.00 No.GEPL/WO
110/2009-10/15 dated
15.02.2010
Assignment
completed
Due Deligence Report
84



6

Bhadra Left Bank Canal MHS,
Shimoga District, Karnataka

M/s Shree Matha
Vaishanavi Infra-Build Pvt.
Ltd., Mysore


1x1.50MW

1051

2.00

During the year 2010

Assignment
completed
7 Palar I Small Hydro Project,
Palor, Sirmur district, Himachala
Pradesh
M/s Tulaja Bhavani Energy
Projects Pvt.Ltd.,
3.00MW 1800 6.00 During the year 2009 Assignment
completed
8 Somavathi MHS, Chikkamagalur
district, Karnataka
M/s Velankini Renewable
Energy Pvt Ltd., Bangalore
2x3MW 2964 5.00 No.VRE/Hyd/SRM/000
2/WO dated 23.09.2010
Assignment
completed
9 Hemavathi Left Bank Canal
Power House, Gorur,
Arakalagud Taluk, Hassan
district, Karnataka

M/s Greenko Energies Pvt.
Ltd., Hyderabad
4x4=16MW -- 4.00 -- Assignment
completed
10 Hemavathi River Bed l Power
House, Gorur, Arakalagud
Taluk, Hassan district,Karnataka
M/s Greenko Energies Pvt.
Ltd., Hyderabad
2x4=8MW -- 5.00 -- Assignment
completed
11 Dikhu hydro electric project
Techno - Economic viability
Study - Reg
Himurja Infra Pvt Ltd -- -- 1.00 Lakhs Dikhu HEP/2010-2011-
01
Assignment
completed
12 Techno Economical Valuation
Report for Sonnathi SHEP
M/s.Sugnaneshwara Hydel
Power Pvt Ltd., Bangalore
3 x 4.5 MW 4.5 WO.SH001-187 Dated
19.02.2014
Assignment
completed



Due Deligence Report
85


15. PREPARATION OF FEASIBILITY REPORT - ASSIGNMENT COMPLETED BY DGPCPL

Sl.
No.
Assignment Client
Installed
Capacity in MW
Cost of
completion
of project
Rs. In lakhs
Cost of
assignment
Rs. In lakhs
Work Order No.
and Date
Remarks

1

Feasibility Report based on toposheet
for bringing 10 tmc of raw water from
Sakaleshapura (west) (Keeping
Yettinahole and Kerihole as source) to
Chikkaballapur and Kolar
District(east)


M/s.Larsen and Tubro
Limited, Bangalore

Water Supply
Scheme

--

10.48

WO No. E199 dated
1.12.2011

Assignment
completed
2 Pre-feasibility report for SHP on South
Bank of KRS near Srirangapatna,
Mandya District, Karnataka state, India
M/s. Cauvery hydro
Energy Limited, 67,
Lavina Courts, 1st
Floor, 102, 8th Main,
7th Cross, R.M.V.
Extn, Bangalore - 560
080.
6MW 41000 0.9927 CHEL/ASHP/85/20
09-10,
dtd:12/03/2010
Assignment
completed
3 Feasibility Report for Ropum,
Arunachala pradesh, India
M/s. Rajaratna Metal
Industries Ltd.,
Mumbai.
40 MW 32000 10.00 W.O. No. NS1-
Design Group/01
dated 26.3.2010
Assignment
completed
4 Feasibility Report for Kangtangshiri
Hydel Project, Arunachala pradesh,
India
M/s. Rajaratna Metal
Industries Ltd.,
Mumbai.
35 MW 26000 10.00 W.O. No. NS1-
Design Group/01
dated 26.3.2009
Assignment
completed

5

Feasibility Report for Barpu Hydel
project, Arunachala pradesh, India

M/s. Rajaratna Metal
Industries Ltd.,

70 MW

111645

10.00

W.O. No. NS1-
Design Group/01

Assignment
completed
Feasibility Report
86


Mumbai.

dated 26.3.2008
6 Feasibility Report for Dardu and Par
HEPs in Arunachal Pradesh
M/s. Maytas Infra Limited, Hyderabad 27.00 No.MIL/DG/HEP-
AP/2007-08/1 Dated
03.03.2008.
Assignment
completed
7 Feasibility Report for Kepjog Mini
Hydel Scheme, near Gerusoppa
village, Honnavar Taluk, North Canara
district, Karnataka, India
M/s Trident Power
Systems Limited, 4th
Floor, Bhaskar Plaza,
Road No.1, Banjara
Hills, Hyderabad
10MW -- 3.00 No.224 dated
4/5.12.2008
Assignment
completed
8 Pre-feasibility Report for Talthare MHS
in Coorg District - Reg
M/s. GM Property Dev
elopers Pvt. Ltd., # 4/5,
1, 2 nd Cross, Crescent
Road, High Grounds,
Bangalore - 560 001.
-- -- 5.612 DG/GMPDPL/TM
HS/01/2007 Dtd:-
30.03.2007
Assignment
completed
9 Feasibility Report for Hosakambi
MHS, Ankola Taluk, Uttara Kannada
District, Karnataka
M/s. Mysore
Mercantile Co., Ltd.,
Bangalore.
2x2.5=5MW 2000 4.00 No.
MMCL/MAR/043/0
6-07, Dated
16.03.2007
Assignment
completed
10 Feasibility Report for Panasuguli at
Yellapur Taluk, Uttarakannada
District, Karnataka
M/s. Mysore
Mercantile Co., Ltd.,
Bangalore.
2x2.5=5MW 2000 4.00 No.
MMCL/MAR/043/0
6-07, Dated
16.03.2007
Assignment
completed

11

Feasibility Report for MHS
Dugganabail at Yellapur Taluk,
Uttarakannada District, Karnataka

M/s. Mysore
Mercantile Co., Ltd.,
Bangalore.

2x2.50=5.00MW

2000

4.00

No.
MMCL/MAR/043/0
6-07, Dated
16.03.2007

Assignment
completed
Feasibility Report
87


12 Feasibility Report for MHS
Bairekoppa at Ankola Taluk,
Uttarakannada District, Karnataka
M/s. Mysore
Mercantile Co., Ltd.,
Bangalore.
2x2.50=5.00MW 2000 4.00 No.
MMCL/MAR/043/0
6-07, Dated
16.03.2007
Assignment
completed
13 Feasibility Report for Kelasi MHS
across river Bedthi in Karnataka
M/s. Abletech Electro
Engineers (P) Ltd.,
Bangalore
2x2.50=5.00MW 2000 4.00 No.AEEPL/DG/121
3/2006-07 Dated
06.03.2007
Assignment
completed
14 Detailed Project Report for
Nanniruhalla Mini Hydel Scheme,
near Geripal village, Honnavar Taluk,
North Canara district, Karnataka, India
M/s Trident Power
Systems Limited, 4th
Floor, Bhaskar Plaza,
Road No.1, Banjara
Hills, Hyderabad
10MW -- 6.00 No.10 dated
25.05.2007
Preparation of
Feasibility report
completed.
15 Feasibility report of Chapparahalla
Mini Hydel Scheme Phase 1 & 2
M/s. Akasha Ganga
Energy Pvt. Ltd., F
103, No.148, Akshay
Mansion, 4th Main,
Govindarajanagar,
Bangalore - 560 040.
14MW, 3MW -- 1.102 DG/AGEPL/01/05,
dtd: 04.01.2005
Assignment
completed
16 Feasibility Report for Identification of
Site Providing Study of Hydrology,
Potential at Site Rough Cost estmate
and financial analysis Estimate &
Financial Analysis
M/s. Aster
Infrastructure Pvt Ltd,
Secunderabad
-- -- 4.00 No.
AIPL/HYDAL/DG/
001/04-05
Assignment
completed

17

Feasibility Report for Abilbiru MHS,
Chikkamagalur District, Karnataka.

M/s.South-West
Hydro Power Pvt Ltd.,
Bangalore

2x2.25=4.50MW

18000

3.00

Dated 01.12.2003

Assignment
completed

Feasibility Report
88


16. MISCELLANEOUS ASSIGNMENTS COMPLETED

Sl.
No.
Assignment Client
Installed
Capacity in
MW
Cost of
project
Rs. In lakhs
Cost of
assignment
Rs. In
lakhs
Work Order No. and Date Remarks


1

Local Load Analysis of 12
nos. Nozzles ranging from 1"
ND to 30"NB, Moracco,
Africa


M/s. Tenova-
Delkor Pvt.Ltd.,
Bangalore


--

--

2.81

DTIPL/ADI/12.1210/29382
dt15.01.2013

Assignment
completed
2 Calibration of Caverns by
Volume computation for
ISPRL, Vizag Project, -Phase
Ii, Andhra Pradesh

M/s.IOT
Infrastructure &
Energy Services
Limited
-- -- 5.06 PO No.120 00061-1/201202241 dt
6.2.2013
Assignment
completed
3 Discharge measurements and
estimation of conveyance
efficiency of NLBC system,
Karnataka,India
Through
M/s.WAPCOS,
New Delhi
-- -- 80.90 WAP/Bang/WRD/KBJNL/NLBC/ER
M/WO/ConvEff/130 dt 22.03.2013
Assignment
completed
4 Investigation of water
leakages-unit-No. 2 in the
existing Chunchanakatte
Mini Hydel Project, Mandya
district, Karnataka

M/s.Graphite India
Limited, Bangalore
-- -- 0.20 DOM/4500133228 dt 25.3.2013 Assignment
completed

5
Pre-tender services for
Design, drawings and
estimation of quantities for
Taksang Chhu River
Diversion for trench weir
M/s.AFCONS
Infrastructure
Limited, Mumbai
-- -- 0.50 No.Hydro/SGP/343 dt 23.04.2012 Assignment
completed
Miscellaneous Assignment
89


construction, Arunachal
Pradesh

6 Providing Pre-Tender Service
for NJC Hydro Project,
Arunachal Pradesh

M/s.Simplex
Projects Limited,
New Delhi
-- -- 1.00 No.SPL/DG/NJC/001 dt 28.05.2013 Assignment
completed
7 Calibration of Petroleum
Storage Caverns by Volume
computation for ISPRL, Vizag
Project-Phase I, Andhra
Pradesh

M/s.Centre of Plant
Engineering
Services,
Hyderabad
-- -- 3.68 COPES/PES/603 dt.20.07.2013 Assignment
completed

8
Pre-tender services for
Detailed Engineering for civil
works for intake well, jack
well cum Pump House, RCC
foot bridge, 19MLD WTP and
pure water pump house
under improvement to water
supply scheme to Gangavathi
Town with Tunga Bhadra
River as source project,
Bellary, Karnataka
M/s.SEW
Infrastructure Ltd.,
Hyderabad
19MLD
WTP
-- 5.39 SEW/IWSS/Gangavathi/2012/WO/13d
t 21.09.2013
Assignment
completed

9

Pre-tender consultancy
sercvices for various work of
960 MW Indira Sagar
Polavaram project on EPC
basis, Polavaram, Andhra
Pradesh, India


Through
M/s.IL&FS
Engineering
Services, Gurgaon

960

--

2.53

No.IECC/POLVR/002 dated
16.05.2012

Assignment
completed
Miscellaneous Assignment
90


10 Pre-tender services for
Preparation and submission,
Hydraulic design and
Civil/Electronic Mechanical
works and BOQ in respect of
74 MLD WTP along with
associated civil works.
M/s.Gammon India
Limited, Mumbai
74MLD
WTP
-- 4.80 WO/WIV/EDMS/410 dated 21.05.2012 Assignment
completed

11

Consultancy services for
preparing extra claims for
river water intake system for
2x270MW Goindwal Sahib
Thermal Power Plant, Punjab.


M/s.Punj Lloyd
Limited, Gurgaon

--

--

2.25

PJNo1/365652 dt 15.11.2012 F1(B)-
1110107-po(2012)-116 DT 27.07.2012

Assignment
completed
12 Preparation of Technical
Report of Power Evacuation
System of Kudathini Plant,
Bellary district, Karnataka.

M/s.Sathavahana
Ispat Limited,
Bellary
-- -- 0.50 SIL/BLY/RM&ADMN/2012-13/257
DT 6.11.2012
Assignment
completed
13 Pre-bid consultancy services
for Pernai Hydro Electric
Project, J&K
Through
M/s.WAPCOS,
New Delhi
-- -- 6.00 WAP/HYDRO/DG/12 Assignment
completed
14 Pre tender services for Rewa
Canal project, Himachala
Pradesh
Associated
Engineering
Consultanats &
Analysts Pvt.Ltd.,
Mumbai

-- -- 2.50 A-191/92/D-72/STR/2 dt 23.2.2011 Assignment
completed

15
Pre-tender services for
Dagmnara HEP, Supaul
District, Bihar
Through WAPCOS,
New Delhi
25X5=
125MW
-- 12.57 WAP/DG/Dagmara HEP/Tender
Doc/2011/848 dated 4.3.2011
Assignment
completed
Miscellaneous Assignment
91


16 Pre-tender services for 3 no.
of Small Hydro Electric
Project ie Balgad, Khutani,
Seraghat in Uttarakhand

Simplex
Infrastructure
Limited, Mumbai
-- -- 2.21 021/VP/TENDER/VOL.1750102 DT
17.03.2011
Assignment
completed
17 Preparation of design
drawings and Draft Tender
Papers(DTP)for construction
of Diversion weir across
Varada River near Halsur
village in Savanur Taluk,
Karnataka

Karnataka
Neeravari Nigama
Limite, Bangalore
-- -- 4.41 Kaninini:mabada-4:dibi:Tendara:10-
11/3381 dt 18.2.2011
Assignment
completed
18 Consultancy services for
updating of financials of DPR
for Magundi Mini Hydro
Scheme, Chikkamagalur
District

Continental Energy
Services Private
Limited,
Hyderabad
2 x 3=6MW -- 0.69 CESPL/DG/MHS/D.No.1/2011 Dt
25.03.2011
Assignment
completed
19 Pre-tender services for
Electro-Mechanical
Equipment for Dumajarhi
Small Hydro Electric Project,
Orissa, India

Megawin
Switchcgear-P-
Limited, Chennai
2x7.5=15MW -- 1.10 Proj/SEPL/DG/2010-11 dated
26.03.2011
Assignment
completed
20 Pre-tender services for the
proposed Agra Water Supply
Project in Agra.

Gammon India
Limited, Mumbai
-- -- 2.85 TMS/WIV/428 DT 15.06.2011 Assignment
completed
21 Preparation of Technical
apprisal of 6 number of Mini
Hydel Schemes in Western
Ghats, Karnataka
Greenko Energies
Pvt.Ltd.,
Hyderabad
-- -- -- -- Assignment
completed
Miscellaneous Assignment
92


a) Venkatswara Swamy MHS -do- 6MW 2600 0.50 GEPL/WO/2011/12/014 DATED
7.7.2011
Assignment
completed
b) Shiragola MHS -do- 6MW 1455 0.50 GEPL/WO/2011/12/014 DATED
7.7.2011
Assignment
completed
c)Jaladurga MHS -do- 3MW 1255 0.50 GEPL/WO/2011/12/014 DATED
7.7.2011
Assignment
completed
d)Kanthamangala MHS -do- 2MW 1670 0.50 GEPL/WO/2011/12/014 DATED
7.7.2011
Assignment
completed
e)Narasimhaswamy -do- 5MW 1700 0.50 GEPL/WO/2011/12/014 DATED
7.7.2011
Assignment
completed
f)Ranganathaswamy MHS -do- 10MW 3459 0.50 GEPL/WO/2011/12/014 DATED
7.7.2011
Assignment
completed
22 Pre-tender services for Upper
Narmada Irrigation Project in
Madhya Pradesh

Gammon India
Limited, Mumbai
-- -- 6.50 EDMS/WIV/636 dated 14.10.2011 Assignment
completed
23 Review Services Stage I upto
DPR preparation(Review of
DPRs for Umjaut(69MW) and
Umduna-Mawphu Stage
I(90MW) Hydro Electric
Project, Meghalaya

M/s.ETA Star
Infrastructure Ltd.,
Mumbai
Umjaut-
69MW ,
Umduna-
Mawphu
Stage I-
90MW
127200 25.00 ESIL/OB/2011 dated 14.11.2011 Under
execution
Miscellaneous Assignment
93


24 Vishnugad Piaplkoti HEP in
Uttarkhand State - Civil &
Hydro Mechanical Works
including Penstock steel
Liners - Report on
Construction Methodology
M/s. Rithwik
Projects Private
Ltd., Plot No. 37 &
39, Navodaya
Colony, Road No.
2, Banjara Hills,
Hyderabad - 500
034.
-- -- 0.75 RPPL/DG/2010-11/02 dtd: 20,01.2010 Assignment
completed

25

Pre Tender Services for EPC
Bids at Ghataprabha Dam
Site floated by KPCl , near
Gokak, Belgaum district,
Karnatak, India

M/s. Megawin
Switchgear Pvt
Ltd., Sai Kiran, II
Floor 2B, No.4, 1
Main Road,
Kasturibai Nagar,
Adyar, Chennai -
600 020.


2 x 10 MW

220600

--

Proj/KPCL/Ghataprabha/DG/2010-11,
dtd: 23/07/2010

Assignment
completed
26 Pre-tender services for the
proposed circulating cooling
water system for EMCO
Thermal Power Plant,
Warora, Maharastra

Gammon India
Ltd., Mumbai
2x300=
600MW
-- 3.58 TNS/WIV/129 dt 02.03.2010 Assignment
completed
27 Pre-Tender Servicces for Sea
Water Intake for
Krishnapatnam UMPP.AP

Gammon India
Ltd., Mumbai
6x660=
3960MW
-- 3.03 TNS/WIV/570 dt 14.09.2010 Assignment
completed

28

Pre-tender services for
UJVNL Projects in the state of
Uttaranchala, India

M/s. R.R.
Constructions &
Infrastructure India
Pvt Ltd.,
Hyderabad.


--

--

1.43

Dated 07.02.2009

Assignment
completed
Miscellaneous Assignment
94


29 Preparation of Pre-tender
Design & Engineering
Services, Kalisindh Dam
Project, Rajasthan

M/s. Simplex
Infrastructures Lim
ited, Mumbai

--

--

3.50

No.021/BD/DesignGroup/Kalisindh/0
01/Vol-1/50288 DATED 22.09.2009.

Assignment
completed
30 Pretender Service for Tender
Rammam Stage-III HEP
M/s. Gammon
India Ltd., Mumbai
3 X 40=
120 MW
-- 5.00 No.MKTG/G/Tender/Rammam
Dated 30.01.2008
Assignment
completed
31 Preparation of Pre-tender
Services for Water Supply
Scheme to JSW Ltd.,
Torangallu, Bellary district,
Karnataka, India

M/s. Gammon
India Ltd., Mumbai
-- -- 3.37 No.GIL/ENVIRONMENT/1629 Dated
15.11.2007
Assignment
completed
32 Identification & Obtaining
Survey & Generation
Licenses for Arkhet Bazar,
Uiya, Philim, Jaleswar &
Amras HEPs in Nepal

M/s. Maytas Infra
Limited,
Hyderabad
-- -- 665.45 No.MIL/07-08/DG/HEP-NEPAL/002
Dated 04.12.2007
Assignment
completed
33 Pre-tender Services for
Package-II Upper Bhadra LIS
Project, Karnataka

M/s. Gammon
India Ltd., Mumbai
-- -- 2.25 No.MKTG Dated 4.8.2007 Assignment
completed
34 Marking of Enabling Works
on Survey Drawings for
Dodda Betta MHS

M/s.Sanjivini
Power Private Ltd.,
Bangalore
-- 2x10=20MW 0.50 No.SPPL/DG/2007-08 Assignment
completed
35 Studies of Techno Economic
Viability for Bajoli Holi HEP

M/s.Simplex
Infrastructures
Ltd., Mumbai
180 MW -- 2.00 No.021/BD/HEP/001/VOL-I/51833
Dated 31.05.2006.
Assignment
completed
Miscellaneous Assignment
95



36

Preparation of Report on
hydrology and power studies
for Handihalla MHS in
Karnataka

M/s. Penna Cement
Industries td.,
Hyderabad
3x8.25=
24.75MW
-- 2.00 No.PCIL/DG/001 Dated 27.10.2006 Assignment
completed

37

Consultancy for Water
Proofing, Chunchanakatte
MHS, Mandya district,
Karnataka.

M/s. Graphite India
Ltd., Visveswaraya
Indl Area,
Whitefield Road,
Bangalore - 560 048.


--

--

--

DOM/4500044759, dtd: 30-04-2008

Assignment
completed
38 Project Appraisal for
Biomass Based Power Plant
in Andhra Pradesh
M/s. Alpha Energy
Systems Ltd.,
Chennai


40 MW 1200 2.16 No.ALPHA/DG/PROJ/APPRSL/ORD
ER/2004 Dated 05.04.2004
Assignment
completed
39 Pre tender Services for
Pulichintala Project,
Balance Reservoir Head
Works.
M/s. Gammon
India Ltd.,
Gammon House,
Veer Savarkar
Marg, Post Box No.
9129, Prabhadevi,
Mumbai - 400 025.
-- -- 1.25 DG/GIL./24/04, dtd: 11.05.2004 Assignment
completed
40 Pre tender services for
Bheema Lift Irrigation Proejct
Lift 1 - Stage 1 & 2 And Lift -
II stage 1 & 2,. Pebbain
Mandal, Mehabubnagar
dist5rict, Andhra Pradesh
M/s. Gammon
India Ltd.,
Gammon House,
Veer Savarkar
Marg, Post Box No.
9129, Prabhadevi,
Mumbai - 400 025.
-- -- 0.025 MKTG:G:623/23.09.2004 Assignment
completed
Miscellaneous Assignment
96


41 Tender Preparation for Make-
up Water System for Tripura
Gas Based Power Project
M/s. Johnson
Eastern Power
Industries,
Zuangtui Indl
Estate, P.O. Box
No. 40 (AIZAWL),
Zuangtul
-- -- 1 JEP/04-05/627,dtd: 12.01.2005 Assignment
completed
42 Pre tender Services for
Koilsagar Lift Irrigation
Scheme Stage 1 & 2 Package
22 & 23 in Mahaboobnagar
District of A.P
M/s. Nagarjuna
Construction
Company Ltd.,
Uma Enclave, Ivth
Floor, Road No. 9,
Banjarahilla,
Hyderabad - 500
034.

-- -- 1.049 NCC/Koilsagar/I & CAD/2005, dtd:
02/02/2005
Assignment
completed
43 Consultancy Services for
Survey, Investigation, design
preparation of estimates, DTP
etc for FIC works in
Ghataprabha RightBank
Canal under Ghataprabha
Project- Reg
M/s. Karnataka
Neeravari Nigama
Niyamitha, 4th
Floor, Coffee Board
Bldg, No.1, Dr. BR
Ambedkar Veedhi,
Bangalore - 560 001.
-- -- -- KNN/244/FIC/GRBC/2003/5350, dtd:
29.03.2005
Assignment
completed
44 Owners Engineer Services for
Alakananda Hydro Electric
Projects in Uttaranchal
M/s. GMR Energy
Ltd., Skip House,
25/1, Museum
Road, Bangalore -
560025.
140 MW 1.5 GEL/Alaknanda/DG/329/05-
16.08.2005
Assignment
completed
45 Preparation of Canal Gauging
& Computation of discharges
in various Power Channels of
Shiva HEP at
Shivasamudram, Karnataka,
M/s. Visvesvaraya
Vidyuth Nigama
Ltd., Bangalore
-- -- 2.70 No.VVNL/EE/Shiva-Works/2259-
12/2004-05 Dated 14.07.2004
Assignment
completed
Miscellaneous Assignment
97


India
46 Velocity measurement in
Link Canal at various
Locations by Current Meter,
Srirangapattana Taluk,
Mandya district, Karnataka,
India
M/s. Graphite India
Ltd., Visveswaraya
Indl. Area,
Whitefield Road,
Bangalore - 560 048.
-- -- 0.025 BBU004, dtd: 11/10/2004 Assignment
completed
47 Review and Preparation of
DPR for Mannapitlu MHP
across Gurupur River in
Dakshina Kannada District.

M/s. Bobba Power
Projects, Bangalore
3x5.00=
15.00MW
6503 24.00 Dated 06.02.2003 Assignment
completed
48 Construction of Bridge over
Spillway of Upper Tunga
Dam Across River Tunga
near Gajanur Village,
Shimoga district, Karnataka.

M/s. The Mysore
Construction Co.,
Bangalore
-- -- 0.30 No.MCC/1428/2003 Dated 09.06.2003 Assignment
completed
49 Preparation & Submission of
GA drawings for 110Kv
transmission line at
Varahi Tail Race MHS,
Hosangadi, Udupi District,
Karnataka

M/s.VA Tech
Escher Wyss Flovel
Ltd., Faridabad,
Haryana (India)
-- -- 0.25 PO.NO. 4500004619 Dated 14.08.2003 Assignment
completed
50 Pre-tendering work for
Karimasuti Lift IIIrd Stage
Under Halyal Lift Irrigation
Scheme, Dharwad district,
Karnataka
M/s. The Mysore
Construction Co.,
Bangalore
-- -- 0.30 No.MCC/B/899/2003 Dated
01.12.2003
Assignment
completed
Miscellaneous Assignment
98



51 Preparation of Equipment
Layout, verifying Submittals
etc. at GE power controls,
Bangalore
M/s. GE Power
Controls, Bangalore
-- -- 3.50 No.40870/SED/03 Dated 31.05.2002 Assignment
completed

52

Development of a
Spreadsheet for Computation
of Load Coming on the
Saddle Supports & Anchor
Blocks of a Penstock steel
pipeline for birkapalli HEP in
Turkey


M/s. Quality
Engineering &
Software
Technologies Pvt
Ltd., Bangalore

-

--

0.86

PO.No. Q-I/VM/040/02-03 Dated
08.07.2002

Assignment
completed
53 Preparation of as built DPR
as per actual site condition,
including hydrulic study, etc.,
M/s. Graphite India
Ltd., Bangalore
-- -- 2.40 PO.No. BBL-022 Dated 17.09.2002 Assignment
completed
54 Design Service for 132 kV
Switchyard, Capacitor Bank
& Transformer Feeder,
Hindalco, Renukoot,
Rajasthan

M/s. Bharat Heavy
Electricals Ltd.,
New Delhi
-- -- 0.99 No.IS-1-02-2002-DG-36 Dated
03.10.2002
Assignment
completed
55 Submission of Drawing for
Auxiliary Trash Rack
Arrangement for Hydro
Electric Project,

M/s. Graphite India
Ltd., Bangalore
-- -- 2.00 PO.No. BBL-043 Dated 31.12.2002 Assignment
completed
Miscellaneous Assignment
99


56 Quality Control and Third
Party Inspection
M/s. Visveswaraya
Vidyuth Nigama
Limited, Office of
the Director
(Technical), VVNL,
No.16, 1st Main
Road, Jayamahal
Extension,
Bangalore - 560046.
-- -- -- VVNL/D
(T)/DGM(T)/Coun))/310/2001-02,
dtd: 11-05-2001
Assignment
completed

57

Providing Expoxy Timer
Resin Surface Lining to scroll
case for Generators 1, 2, & 3,
at Munirabad.

M/s. Visveswaraya
Vidyuth Nigama
Limited, Office of
the Director
(Technical), VVNL,
No.16, 1st Main
Road, Jayamahal
Extension,
Bangalore - 560046.


--

--

--

VVNL/D (T)/DGM(T)/307/2001-02,
dtd: 10-05-2001

Assignment
completed
58 i) Pre-bid services for projects
at Sanna, Taiz, Hydhadhe
and Aden (ii)Design
engineering services for BOP
of all the four power plants to
incoude architectural,
structural, electrical,
mechanical works, etc.,
including external servics
within the battery limits,
Yemen

at Sanna 4x5 MW,
at Taiz 2x5MW,
at Hydhadhe
2x5MW and
at Aden 2x5MW
M/s.
National
Trading Co.,
Ltd., Sanna,
Yemen Arab
Republic
US$
750Million
US $ 12000 DG/NTCL/01/01dated 4.7.2001 Assignment
completed
Miscellaneous Assignment
100


59 Remodeling of Shiva Power
Channel at
Shivanasamudram, Mandya
District, Karnataka
M/s. Karnataka
Power
Transmission
Corporation Ltd.,
Bangalore.

Power
Project
1000 1998 Assignment
completed
60 Design and preparation of
Vaccum Chamber for the
Robotic & Manual TIG
Welding System
&7mx5mx3.05m)
M/s Hind High
Vaccum Company
Pvt.Ltd.,, Penya,
Bangalore
-- - 8.00 No.HPL/5/SL/4434dated 6.2.2010 Assignment
completed
61





Review Report on DPR of
Kallur-B MHS, Hirekallur
village, Jeevargi taluk,
Gulbarga district, Karnatka,
India.
M/s. Jasper Energy
Pvt Ltd, Bangalore.
4x4=16MW 6250 5.33 -- Assignment
completed
62 Nozzle Load Analysis as per
ASME SEC VIII Code &
Equipment Drawings & input
Loads.
M/s.Tenova Delkor
India, Bangalore
1.57 WO.DTIPL/ADI/13.1481/33780 Dated
4.2.14
Under
execution
63 Pretender Service for Hydro-
mechanical works, for
Kopasingha, District
Sundargarh

M/s.IL&FS
Engineering
Services,
Hyderabad
5.00 WO.IECCL/ORISSA/BARRAGE/KOP
ISINGA/01 Dated 26.02.2014
Under
Execution
64 Pretender Service for Hydro-
mechanical works, for
Deogaon District Jharsuguda
M/s.IL&FS
Engineering
Services,
Hyderabad
5.00 WO.IECCL/ORISSA/BARRAGE/DEO
GAON/01 Dated 26.02.2014
Under
Execution


Miscellaneous Assignment
101


17. ORGANISATION STRUCTURE
PANEL OF ADVISORS




Sl. No. Name & Qualification Designation
1.

Sri C.S. Hebli
Director Technical (Retd),
Karnataka Power Corporation Ltd.
Bangalore.
Chairman &
Chief Consultant.
2. Sri H.V. Eswaraiah
Director Technical (Retd),
Karnataka Power Corporation Ltd.,
Bangalore.
Consultant Hydro Civil
Designs.
3. Sri G.N. Yoganarasimhan,
Director (Retd),
WRTD, Rourke,
Bangalore.
Advisor-Hydrology.
4. Sri. P.R. Balasubramanian,
CMD (Retd), FACT,
Triavancore, Kerala.
Bangalore.
Advisor- Gas Based Power
Plant.
5. Dr. D.N. Seshagiri, PhD Harvard, USA.
Director (Retd),
Engineering Geology,
Geological Survey of India.
Advisor Engineering Geology.
6. Sri.Vishwanath Balachandran,
Director General, GIS (Retd).
Chennai.
Advisor- Engineering
Geology.
7. Sri. Shankar Nesargi
Managing Director (Retd.)
VVNL, Bangalore.
Advisor -Wind Energy
8. Sri. C. R. Venkatesh
Executive Director (Retd.)
NHPC Ltd., New Delhi,
Bangalore.
Advisor -Hydro Power
Projects.
9. Sri. M.C. Rangarajan, B.Sc, B.E.
Executive Director(Retd),
KPCL, Bangalore.
Advisor / Consultant Hydro-
electrical Components of Projects
& electrical Systems.
Panel of Advisors
102




Sl. No. Name & Qualification Designation
10. Sri B.V. Ramakrishnaiah,
Bangalore.
Advisor Gates.
11. Sri Srinath Anekal, ME (Civil), MS (Environment)
USA.
Advisor-Environment.
12. Sri. M. M. Kamath,
Chief Engineer (Retd),
NMPT, Mangalore.
Advisor Marine Engineering.
13. Sanker Prasad, M.Tech (Roorkee),
New Delhi.
Consultant- Geology.
14. Sri. Thippeswamy
Chief Engineer (Retd.)
BWSSB, Bangalore.
Advisor Water and Waste Water
System.
15. Sri. V. Suresh Kumar, M.Tech (Khargpur),
Bangalore.
Advisor GIS

16. Sri V. Narayanan,
General Manager, SAE (I) Ltd (Retd),
Bangalore.
Advisor Transmission
Lines.
17. Dr. Y. Lingaraju. Advisor - Ground Water
18. Sri. Umashankara , B.E. (Civil)
Ex-Mecon.

Advisor -Steel Structures.
19. Sri. G. Rajagopalan,
Director (Retd),
Engineering Geology,
Geological Survey of India, Chennai.
Consultant Engineering
Geology
20. Sri. Krishnappa,
Financial Controller(Retd),
KPCL, Bangalore.
Advisor Finance.

21. Sri. Sridhar Prabhu Legal Adviser Advisor PPA
22. Sri. Venkateshwar Rao
New Delhi.
Consultant (Liaison)
23. Sri T.S. Somanathan, B.E. (Mech).
Foremerly NLPC Ltd.,
Advisor Welding.
24. Sri. C. Chennakeshava Computer Aided Mathematical
Moddling
Panel of Advisors
103




Brief Profile of Advisors

Dr. G. N. Yoganarasimha, Hydrology & Irrigation
Dr. G.N. Yoganarasimhan after a brilliant Academical qualification, joined as Assistant
Professor in BITS Pilani, the renowned Technical Education Institution in India. He has
worked as a Professor in LukE University, after obtaining Ph.D. degree in Hydrology.
Subsequently, he was elevated for the post of Director WRTDC Roorkee Institute, India
run under UNDP funds, teaching on hand training in Water Resources subjects to
participants, drawn from all over the world.

He was a visiting faculty at Asian Institute of Technology, Bangkok and visiting faculty
MIT, USA. He was Full Bright fellow at East West Centre Honolulu, Hawaai. Member
of various professional Institutions around the world. He has to his credit more than
two dozen technical papers published in International Journals. After his retirement, he
had a brief stint at M/s. Synotech Engineers, Consultants, and PT, Wiratman &
Associates, Jakarta, Indonesia, and Consultant to CES / WAPCOS, New Delhi. He was
consultant to World Bank, on various assignments.

Presently, he is a Freelance Advisor and acknowledged expert in Hydrology and Water
Resources projects .

Advisor
104




Mr. H.V. Eswaraiah, Advisors Hydro Projects

Mr. H.V. Eswaraiah, after retiring from Karnataka Power Corporation Limited as
Director Technical, is working as freelance Consultant for large Hydro Power Projects.
Design Group is availing of his technical expertise in implementation of Hydro Power
Projects as related to contracts, QAC, PMC etc.

Mr. H.V. Eswaraiah, after his Masters degree in Engineering from the renowned Indian
Institute of Science, Bangalore had brief stint as lecturer in engineering college and
worked in Karnataka State Public Works Department, before joining Karnataka Power
Corporation Limited, as Assistant Executive Engineer in the year 1971, and retiring as
Technical Director in the year 1997. He has extensively dealt with all aspects of
implementation of Hydro Power Projects, starting from field investigation, preparation
of PFR, DPRs, Bid preparation, technical evaluation, award of work, as Executive
Engineer. He was in charge of construction of a 100m high Supa Concrete gravity Dam
of Kalinadi Hydro Electrric Project, and managed to achieve production level of 1000
cumecs per day of concrete production and laying in the body of the dam. Working at
corporate level, he was in charge of long term Power Project Planning, advising
Managing Director, KPCL, on settlements of dispute and claims of contracts,
Implementation monitoring of all Projects under construction, procurement and
movement of Coal, Cement and Steel. In his tenure with KPC Ltd he has handled
implementation of 15 Hydro Power Projects, a Thermal and Wind Projects. He has wide
experience in dealing with implementation of World Bank Funded Projects.

After his retirement, he was appointed by NTPC as an Advisor for implementation of
KOL dam (800 MW) HEP. He is also assisting various Commercial Banks as Lenders
Engineer monitoring various Mini Hydel Scheme funded by these Commercial Banks.
Advisor
105


Mr. Shankar V. Nesargi Advisor Wind Energy Projects.

Mr. Shankar V. Nesargi, B.E. (Mech), ME (WR), joined Karnataka Power Corporation
Limited, as an Engineer in the year 1973 and retired in the year 2005 as Managing
Director of VVNL, a subsidiary Company of KPCL. As an Assistant Engineer he
handled detailed investigation works of Kali Hydro Electric Project (6 x 135 MW)
including putting in drifts for investigation of foundation rock of Supa Dam. From being
an Executive Engineer in-charge for construction of various components, O&M of 4 x
210 MW Raichur Thermal Power Plant, he had extensive exposure to construction of
Coal Handling Plant, Railway siding, WTP, Boilers, Turbines etc. During this period, he
was elevated to posts of, as Superintending / Chief Engineer to handle these areas of coal
based thermal power plant. In the year 2003, he was appointed as Executive Director to
be totally incharge of Planning Infrastructure works of the proposed 4 x 350 MW, Bidadi
Gas Based Power Plant, near Bidadi, Bangalore. Subsequently, he was appointed, as
Managing Director, Vishveswaraiah Vidyuth Nigama Ltd., to be incharge of O&M, of 6
Hydro Power Projects including - R & M works and O&M of a Diesel based Thermal
Power Project. During his tenure in KPCL, he has attended several National and
International Seminars and has travelled worldwide.

After retirement he was a freelance consultant to various foreign Companies in Uganda,
Spain etc., and has traveled extensively in these countries as technical consultant on
many hydro and thermal power projects.

Presently, he works as the Managing Director of DB Global Energy Limited, a Company
dedicated to Wind Power Generation as an IPP and executing the 100 MW of Windfarm
near Chikodi in Belgaum district of Karnataka.


Advisor
106


Mr. P.R. Balasubramanian Advisor Gas based Power Plant.

Mr. P.R. Balasubramanian, after obtaining a Bachelors degree in Mechanical
Engineering, had one year training in Nuclear and Allied subjects at Bhabha Automic
Research Centre, Bombay. Thereafter, he was absorbed in the Atomic Energy
Department and worked for a decade in various departments of BARC, before joining
Engineers India Limited, New Delhi in the year 1978. Thereafter he joined Gas
Authority of India Limited and worked there till 1990. He was selected, as Director of
Neyveli Lignite Corporation Ltd, in 1997. He was Chairman / Managing Director of
Fertiliser and chemicals, Travancore from the year 2000 up to his retirement in the year
2002.

He is a freelance consultant and presently is an independent Director of REC India, and
Rare Earth Ltd., (Department of Atomic Energy).

His areas of expertise are Overall Corporate Management of Large Organisations,
Development of Engineering Expertise in the Organisation, Conceptualising of Turn
Around strategies, over view of the implementation of the Projects from Concept to
Commissioning, preparation of quality Project Reports, Proper appraising of the Project
Reports, Resolving Arbitration Issues etc., by applying his expertise and experience in
managing various projects in Nuclear Chemicals, Fine Chemicals, Petrochemicals,
Hydrocarbons, Gas Processing Plants, Cross Country Pipelines, Thermal power plants,
Fertilizer Complexes etc.
Advisor
107


Mr. B.V. Ramakrishnaiah Advisor Hydraulic Gates & Structures

Sri. B.V. Ramakrishnaiah was ranked 4
th
in his Bachelor of Engineering Degree
Examination, and passed M.E. in distinction from Indias premier Institution namely
Indian Institute of Science, Bangalore, in the year 1964. He joined CW& PC, New Delhi
and worked mainly on design and drawing of Hydraulic Gates for Irrigation and Hydro
Power Projects. In the year 1966 he joined M/s. Triveni Structurals Ltd., Naini,
Allahabad, and served for over 13 years in the organization, as Gates and Penstock
design specialist. During his tenure, he has designed Cylinderical Gates for
Ramanaganga Project, which is only one of its kind in the country, and which are
operated by 70 tonnes capacity Hydraulic hoists. High Pressure slide gates operated by
650 tonnes capacity Hydraulic hoist is designed, for Baggi control works of Beas-Sutlej
Link HEP Sundernagar, Himachal Pradesh. High Pressure fixed wheel Penstock
emergency gate was designed for Beas Project, Punjab for a clear vent size of 10 feet x 21
feet, for a design head of 110m. This gate carries a total load of 2160 tonnes which is
transferred to concrete through 12 fixed wheels. 150 tonnes capacity hydraulic hoist
operates the gate. Radial crest gates for Itezhitezhi Dam, Zambia, has been designed by
him and was vetted by SWECC Swedan. Similarly, Batten outlet radial gates have been
designed for Great Reeha Power Project Tanzania.

After leaving M/s. Triveni Structurals Ltd., in the year 1979, he started his own
consultancy firm, and has designed over 100 gates of various shapes and sizes. To name
a few, he has designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro
Electric Project in Andhra Pradesh. In this case for the first time spherical plain bearings
were used for the Trunion instead of normal bronze bushes. He has designed one of the
tallest Penstock gate of size 6.75m x 15.75m in the country, for Lower Mettur Hydel
Project at Mettur dam in Tamil Nadu.

He has designed Penstock, Pipes, of 2.743m dia for a static head of 405m for Kaufe
Gorge HEP in Zambia Africa, and has designed penstock pipe of 4.88m dia to withstand
static head of 51.2m for Bowatena Power Project in Sri Lanka. He has the distinction of
designing very large size gates and penstocks of large diameter in India. He is rated as a
top class designer in India for various type of gates for water resources projects.
Advisor
108



Mr. V. Balachandran - Geology
Mr. V. Balachandran, is a retired, Deputy Director General and HOD GSI, Southern
Region. He is presently a freelance consulting Geologist advising Design Group on
various aspects of Engineering Geology for Large Hydro and Irrigation Projects in India
and Abroad. Presently he is also pursuing his doctoral thesis in Osmania University.

Mr. V. Balachandran, after a Masters degree in Geology, joined the Geology Survey of
India in the year 1971, as Junior Geologist and retired, as the Deputy Director General
and HOD, GIS, Southern Region. Out of the total 36 years of experience in the field of
Geology, 30 years he has spent in Engineering Geology, and was involved in conducting
Preliminary Investigation and construction stage activities. His services spreads to many
projects all over India, including Supervision and guidance to Project Authorities during
execution . A few Projects where he was directly involved are: Chibro-Khodri Hydro
Power Project which has a tunnel across two regional thrusts. Facilitated smooth
negotiation of twin tunnels of Khan Hydel Scheme, upto upper Siwalik incoherent sand
rock with plethora of problems such as seepage, collapse and daylighting of the tunnel;
Selection of Dam site for 230m high rockfill dam project on upper reaches of Yamuna
river which was under investigation for a protracted period (40 years). Identifying the
source of seepage at Kadampari Pumped storage scheme and its stoppage so that, the
energy generation was substantially enhanced; Adopted hydraulic jacking of upper
Kodayan tunnel and suggested other remedial measure; Extensive Geological
investigation at MAPS Kalpakkam and Kundankulam for Nuclear Power Corporation
Ltd; Extensive field investigations were carried out with special reference to
Seismological studies which led to clearance for Kundankulam Atomic Power Plant;
Initiated studies on Korada Atomic Power Plant; studies on Plutonium Fast Breeder
Reactor Project under Madras Nuclear Power Plant leading to clearance to the Project;
Carried out Mega thrust Tsunami Hazard studies in South India; Attended several
National and International seminars, and presented several technical papers; Travelled
World Wide, including undergoing training in Harza Engineering, USA and National
Resources (Canada) and Geological Survey of Canada at Vancouver Calgary and
Ottawa, Canada.
Advisor
109

Mr. C.R. Venkatesh B.E. (Civil), M.E. (Str), Advisor Hydel Projects

Mr. C.R. Venkatesh obtained a first class with distinction at the Masters degree exam ,
from the renowned Indian Institute of Science, Bangalore. He worked, as a lecturer in
Engineering Colleges, as an Assistant Residential Officer, CWPRS, Poona and as a
Scientist, Cement Research Institute of India, New Delhi, before joining National Hydro
Power Corporation Ltd., in the year 1981 as Manager and working there till his
retirement in the year 2004. During his tenure in NHPC Ltd., he rose from the post of
Manager upto that of Executive Director. As a Chief Engineer, he was in charge of
implementation of Dulhasti Hydro Power Project (3 x 130 MW). As an Executive
Director, Contract Division, he managed all procurement activities and managing Civil
E & M Works Contracts. Under R & D wing, he has evolved cost analysis of complicated
works, suggested various means for cost cutting. He was trained in Canada in detailed
structural analysis of Chamera Concrete Dam; In Sweden, he underwent training at the
Advanced International Hydro Power Develop Project; In Germany / Netherland he
attended Advanced Management Development Training.

In India, he has undergone specialized technical training in Reflection Photo elasticity
and strain gauge technique, Dam Safety, Geotechnical instrumentation etc. He has
visited a number of Foreign Countries; was deputed to Pakistan, to participate in
technical discussions, on Indus Water Treaty issues. Had interaction with Arbitrators in
connection with Internal Arbitration Tribunal on Chamera HEP Contract disputes. He
has 44 technical papers to his credit. His research paper on De-silting basin, won a
special Certificate of merit by the Central Board of Irrigation and Power, New Delhi.

Since, his retirement, his services, as freelance consultant is being used by major Civil
Contract agencies for dispute redressal and Arbitration.
Advisor
110


Mr. M.C. Rangarajan Electrical Engineering Projects

Mr. M.C. Rangarajan, is presently a free lance Electrical Engineering Consultant for
various organisation including M/s. Design Group Project Consultants Pvt Ltd.

Mr. M.C. Rangarajan, after obtaining a Bachelor of Engineering degree from the Indian
Institute of Science, in the year 1969, joined Karnataka Power Corporation as an
Electrical Engineer, and retired as Executive Director in the year 2005, after acquiring 36
years of rich experience in Hydro Power generation. Important assignments during his
tenure were Design and Layout of Hydro and Thermal Projects sizing of units, firming
up of technical specification, bid documents, bid processing, contract management,
project monitoring, inspection of components at Vendors Plant. He was involved in
construction of the following Hydro Projects, Nagjhani (6 x 135 MW) Supa Dam Power
House (2 x 50 MW), Gerusoppa Dam Power House (4 x 60 MW), Kadra Dam Power
House (3 x 50 MW), and Kodasalli Dam Power House (3 x 40 MW). In addition he has
looked after O & M of Sharavathy HEP (1035 MW), Varahi underground Power House
(230 MW), R & M works etc.

As a senior executive Chairman of the Core group for Q & AC of EPC Contract for
implementation of the 500 MW Bellary Thermal Power Plant, he handled the Power
Purchase agreement with State level distribution Companies. He has presented several
technical papers in National and International Conferences; Visited different types of
Power Houses and manufacturer units in India and Abroad.
Advisor
111

Mr. Umashankar

Mr. Umashankar has large experience on design and drawings for large span roof
trusses used in Power Plants, and complicated heavily loaded structural steel works.
Presently he is an advisor to Design Group.

Mr. Umashankar joined MECON Ltd., in the year 1973, as structural engineer and
retired in the year 2009, as Deputy General Manager. As a steel structural designer, he
was actively involved in design of Steel Plants of large capacity in India, such as Bokaro
Steel Plant (expansion) Bhilai steel plant (expansion, Titanium Dioxide pigment plant
in Kerala, Defence Project NSTL at Vizag A.P., Kudremukh Iron Ore Project, Essar
Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external
Coal handling system for TNEB at Chennai, Birla Copper expansion phase II. HGPL
Expansion at Vizag A.P. Defence Project Sea bird project at Karwar on the West Coast
of Karnataka, Essar Integrated Steel Plant at Hazira. More than half million tones of
Structural Steel design and fabrication work has been done under his guidance. He has
been deputed to foreign countries by MECON for inspection and fabrication works in
Countries like China, Germany, Korea, He has also attended several workshops in the
structural steel field conducted in India and Abroad.
Advisor
112


Mr. V. Narayanan Advisor Transmission line Projects

Mr. V. Narayanan, is an expert in transmission line design and construction and is an
Advisor to Design Group as and when required on assignments pertaining to planning
and implementation of transmission line projects.

After his Bachelor degree in Civil Engineering, he obtained the Masters degree in Civil
and Hydraulic Engineering from the Indian Institute of Science, Bangalore, in the year
1963. Soon after, he joined M/s. SAE (India) Ltd., as Design Engineer for transmission
line tower, Civil Foundation and other allied works. He has been involved in the designs
and fabrication drawings of Transmission lines for various voltages from 66 kV to 220
kV for many Electricity Boards in India.

From year 1973 onwards, he assumed the charge of Production Manager at the M/s. SAE
Factory at Jabalpur. He was deputed to M/s. SAE, Milano, for being trained in their
works at Lecco, on production engineering, design and drawings, Testing Stations. In
the year 1978 he was sent to Australia to acquaint himself with the working of a Testing
Station. At Jabalpur Plant, he was responsible for the commercially viable Testing
Station on par with International Testing Station. He was responsible for increasing the
production capacity of the plant to 30,000 MT per annum from the original 8000 MT. As
the General Manager he was responsible for design and testing of many 400 kV and 500
kV DC lines. After his retirement he has worked in several International Companies,
such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc. He has vast technical
knowledge in implementing Transmission line projects from concept to commissioning.
Advisor
113

Mr. C. Channakeshava Advisor Development of Design Software

Mr. C. Channakeshava, Ph.D, is an advisor to Design Group on Computer aided
Mathematical modeling for 3D complicated structures for carrying out precision
analysis and design of Dams etc.

Mr. C. Channakeshava, after his post graduation in M.E., from Indian Institute of
Science, Bangalore, obtain his Ph.D in the same Institution in the year 1988. He was Post
Doctral Research Associate in University of Cincinnati Ohio, USA, Louisiana State
University, USA, and has extensively worked on Finite Element Method applied to Civil
Engineering works. He has an illustrious academic background, being a topper in
Universities in India and Abroad.

In Bangalore, he joined a reputed EMRC Software Company (USA) team to develop
world class NISA Software tool used extensively for Non-linear analysis. His field of
interests are computational mechanics, Finite Element Analysis, Boundary Element
Analysis, Analysis and Design of RCC & Steel Structurals, Roads and Bridges, Computer
Aided Design.

Advisor
114


Mr. Shridhar Prabhu

Mr. Shridhar Prabhu, is a freelance Solicitor who specializes in Energy Law Audit and
Regulatory Affairs and Compliance. Design Group is availing his services for handling
issues in PPA related matters.

Mr. Shridhar Prabhu, after obtaining a degree in law, started practicing in the High
Court of Karnataka, enrolled himself in Delhi Bar Council. As a specialist in Regulatory
Appraisals related to Energy, he was nominated, as Vice Chairman, Energy Committee
of the Federation of Karnataka Chamber of Commerce and Industries, He is an Advisor
to India Wind Turbine Manufacturers Association. An Advisor to Renewable Energy
Developer Association, Karnataka (REDAK) and was a Former State Council Member
IWPA. In addition during his practice, he has represented Indias Wind Energy Sector,
before the Supreme Court; was the only representative of the Wind Energy Sector to
represent before the Central Electricity Regulatory Commission (CERC), New Delhi.
Represented, on several occasions, on behalf of IPPs, and has argued before RECS on
fixation of Tariff, standardization of PPAs, Renewable Power Purchase obligations for
Wind Project.

Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services
Company with a market capitalization of over US$ 30 Billion for Green Power
procurements in Southern States. Engaged for advisory and tariff filing by first ever
electric cooperative society and distribution license in Karnataka.
Advisor
115


Mr. Srinath N. Anekal Advisor Environment

Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPPs developers
on environmental and sustainable Development Areas including climate change and
CDM aspects etc., Design Group seeks his advice on specific fields like Environmental
impact assessment of projects, CDM due diligence of Environmental Protection aspects
Report.

Mr. Srinath N. Anekal after obtaining Bachelor / Master degrees in Civil Engineering
from Bangalore University pursued higher studies in University of Florida, Gainsville,
USA, and was awarded Master degrees in Environmental Engineering Science in the
year 1993. Has under gone, short term course in Finance for Non-finance Managers at
IIM Bangalore, ISO 14000 Environmental Management System CII India, hazardous
waste management operational practice, USA. He has traveled widely in USA, Inida,
Banglaesh, Maruitius and Mozambique, where he has worked extensively in the field of
Environment, Energy and Water. He was demonstrated vast experience in
conceptualizing, design, promoting and implementing innovative projects in the area of
waste minimization, clean Technologies, Environmental protection, Urban Water Supply
and sanitation, Renewable Energy and clean Development Mechanism. He was with
executing Agencies for implementing reform oriented projects funded by World Bank,
DflD, KfW, European Commission and Danida. He has contributed to the development
of country level strategies; especially on mainstream new development concepts,
through conduct and participation in seminars and workshops and effective interaction
with all stake holders in Government, Non-Governmental Organization and Private
Sectors.
Advisor
116

CONSULTANTS

Mr. C.S. Hebli, B.E. (Hons),

After obtaining the Bachelor degree in Civil Engineering with
distinction, joined Bombay Public Works Department, in the year
1954, worked as Junior Engineer, Planning Minor Irrigation Projects
and Community Development Projects. After formation of Karnataka
state, his services were lent to Hydro Electrical Projects Department
in the year 1959. As Assistant Executive Engineer, he was involved in the investigation
and preparation of DPRs for Bedthi, Aghanashini, Mahadayi, and Kalinadi (910 MW)
Projects. When the dedicated power generation company namely Karnataka Power
Corporation Limited, a public sector undertaking, fully owned by Government of
Karnataka was formed in year 1970 to execute the Kalinadi HEP, his services were
transferred and absorbed in the KPC Ltd. In this Organisation he rose from the ranks of
Assistant Executive Engineer to that of the Technical Director of the Company. He
retired in the year 1990 with 30 years of rich experience in investigation, design,
implementation and administration of power projects. During his service, he was
actively involved in planning and implementation of Kalinadi HEP (910 mw),
Sharavathi HEP (835 MW), Varahi HEP (239 MW). Raichur TPS (6 X 210 MW) from
concept to completion. He was involved in long term planning of Power Projects for
Karnataka and the Hydro policy in the State etc. After retirement has worked with
Thapar Hydro Consult, as a consultant and dealt with several Hydro and Gas based
Power Plants aggregating over to 2000 MW. He joined as Chairman, Design Group
Project Consultants Pvt Ltd., Company in 1998, technically guiding the staff strength of
52 technocrats and has been effectively involved in technical advice to all Projects.
Policy decisions, Company affairs etc. undertaken by Design Group Project Consultants
Private Ltd.,
Consultant
117


Mr. B.L. Lakshminarasimha, B.Sc., B.E., M.E., M.I.E., F.I.V., M.A.S.C.E.,
After obtaining Master degree in Civil Engineering from Birla Institute
of Technology and Science, Pilani, a premier technical educational
Institution of India (collaboration with MIT., USA,) and after a short
stint with M/s. Gerame and Binny Limited, joined the Karnataka Power
Corporation Limited, as a Civil Engineer in the year 1975. Took Voluntary retirement
after 20 years of service, acquiring technical knowledge in drafting of bid documents
for large Hydro Power Projects, interpretation of Contract Clauses, resolving disputes,
formulating schedule of rates, design of Surface Power Houses, framed structure
through 3 D modeling etc. He was involved in Designing and construction of KPCL
Corporate office building, Assisted Companys legal advisors in Arbitration
proceeding/Contract disputes, in the Court of Law etc. He is the Founder member of
Design Group Project Consultants Private Ltd, established in 1979. A company started to
be one man show in 1979 has grown into a large consultancy firm of repute in India and
Abroad. Over its 3 decades of existence, he was responsible for pooling together and
developing an exclusive team of dedicated consultants having years of experience in
implementation of Power and Irrigation Projects from concept to completion and
implementation of other infrastructure projects.

Recently he is responsible for developing a dedicated team of engineers to extend design
engineering services in Water and Waste Water Treatment Plants. He has successfully
steered the company in obtaining KEMA ISO Certification, He has managed the
company and has maintained consistent profitability over the decades. He is responsible
for the company executing a number of Joint Venture Partnership in India and Abroad,
such as CPRI, WAPCOS, ILF, for implementation of Large Projects successfully he , has
been responsible for obtaining few design engineering assignment contract in
neighbouring countries such as, Saudi Arabia, Dubai, Muscat, Ghana, Nepal, Sri Lanka.
Consultant
118


Mr. P.R. Mallikarjuna

After obtaining M.E., degree from the prestigious Indian Institute of
Science in the year 1969, he worked in various capacities in a Public
Sector / Private Companies, before joining Karnataka Power
Corporation in the year 1971, as a Group Engineer (AEE), and retired in
the year 2000 as the Technical Director, with an illustrious career spanning 30 years in
various cadres. After his retirement, he was a member of the Board of Directors of KPC
Limited, for over 7 years. During his tenure in the KPCL, he was the head of the Design
wing and handled all major Hydel Projects, Thermal Power Plants from concept to
commissioning. Over 1200 MW of Power Projects has been investigated under his
guidance and about 2000 MW of Power Projects has been designed and implemented.
Further, 900 MW of Power Projects have been implemented under his direct guidance.
He has attended several National and International seminars, and contributed dozens of
technical papers. After his retirement, he was involved in the preparation of revised
DPR for 12 X 80 MW Indira Sagar Polavaram Hydro Electric Project in Andhra Pradesh,
on behalf of Andhra Pradesh Irrigation Department, including obtaining clearances
from Central Electricity Authority, New Delhi. He was involved in detailed design
engineering of Nagarjuna Sagar Tail Pond dam Power House (2 x 25 MW) and Varahi
underground Power house Stage II (2 x 115 MW).

From the year 2008 onwards, he heads the Civil Design wing of DGPCPL and is
responsible for all consultancy assignments of planning and design of Hydro Electric
Projects and Large Irrigation Projects.
Consultant
119




Mr. P.K. Rupangudi, M.E
After obtaining M.E., degree from the prestigious University College
of Engineering, Bangalore in the year 1971 worked in Karnataka State
Government Public Works Department, before joining Karnataka
Power Corporation in the year 1972 as an Engineer and retired in the
year 2004 as a Chief Engineer with an illustrateous carrer spanning 32
years in various cadres. During his tenure in the KPCL, he was head
of Design wing consisting of engineers of all disciplines and, handled all major Hydro,
Thermal Power Plants from concept to completion. Attended several National and
International seminars, and contributed several technical papers. He is member since
year 1996 of Gate Committee formed by the Government of Karnataka for design,
fabrication erection & commissioning of spillway Gates and hoists of the prestigious
Almatti Dam of Upper Krishna Irrigation Project. Even to date, he is in the panel for
inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty
member on the continuing education to the Engineers of the State, organized by The
Director, KERS Mysore. He is the main author for compilation of the History of
Lingamakki & Talalakalale dams, of Sharavati Hydel Scheme assigned to him by the
Karnataka Power Corporation Limited. After his retirement, he was involved in detailed
engineering of Nagarjuna Sagar Tail Pond Dam on Krishna River and Varahi
underground Power House Stage II (2 x 115 MW) and a major weir for Lower Jurala
H.E.P on Krishna river of Andhra Pradesh Power Generation Company.

From the year 2010 onwards he is associated with DG and is responsible for
implementation of planning and design of assignments of Hydro Electric and Irrigation
Projects.
Consultant
120




Mr. Chikkaguddappa (C.G. Appa), joined Design Group Project
Consultants Pvt Ltd., in 2005, as a Director Hydro Power Project
Planning and river basin study. He has travelled to neighbouring
countries of Nepal & Srilanka, to advice IPPs on Planning of Hydro
Power Projects.

Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the
year 1973, as an Engineer, rose to higher levels and retired in the year 2005, after 32
years of long service. From the initial stages of service in KPCL, he was involved in
river basin development for power, identifying and Planning Hydro Power Projects for
all rivers of Karnataka state. Mostly dealt with Investigation of HEPs like Shivana
Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti Stage I HEP. As a
Assistant Executive Engineer, he was involved in field data collection for Hydrology,
surface and sub-surface details for preparation of DPR for major HEPs like MahadayI
(318 MW), Cauvery Scheme (270 MW), Tamankal (800 MW), Almati Dam Power House
(280 MW), (Mekedatu HEP (1400 MW), Kali stage III (1200 MW) Bedti stage II (400
MW), Aghanashini (600 MW), Gundiya High head scheme (400 MW) conceived as a run
of the river scheme, study proposed for Pumped storage scheme at the existing
Sharavathy complex (1000 MW) and Kali Complex (1200 MW). He was one of the
Authors of river basin studies for Power Development in Karnataka. In addition, he has
identified and prepared DPRs for many Mini Hydel Schemes of individual capacities of
less than 25 MW.

He joined Design Group Project Consultants Pvt Ltd., in the year 2005, and is
responsible for identifying and preparation of Desk Study Reports for Hydro Power
Projects in neighbouring Country Nepal aggregating to a total projected installed
capacities totaling to nearly 12000 MW.
Consultant
121


Mr. Raghavendra Rao H

After obtaining BE degree in Electrical Engineering from National
Institute of Engineering, Mysore in the year 1972, worked in Medium
Voltage Switch Gear industry as development and production
Engineer till 1977 before joining Karnataka Power Corporation Ltd,
which has the responsibility for carrying out design, construction, operation and
maintenance of power plants in the state of Karnataka,. He retired as Superintending
Engineer (Electrical) KPCL in the year 2006. During his tenure in KPCL he has worked in
the areas of design, construction, testing and commissioning and maintenance of Hydro
and Thermal power plants mainly in the areas of Electrical equipments and systems of
power plants. His tenure included working at both power plants and the corporate design
office.

His specialized areas of expertise are control and protection. He was a member of
Protection committee formed by Southern Regional Electricity Board.

After joining DG in 2008 he is in charge of assignments of Engineering of Electro
Mechanical systems of Hydro and thermal power plants. He is an accredited energy
auditor, certified by Bureau of Energy Efficiency, India.




Consultant
122


Mr. M.M. Reddy

Mr. M.M. Reddy is an expert in substation Layouts and Electrical systems
designs from 33 kV upto 400 kV. His services are being used by Design
Group in substation design segment of Electrical Engineering of Power
Project Consultancy assignments.

Mr. M.M. Reddy after obtaining Bachelors degree in Electrical Engineering from
Bangalore University, in the year 1968, worked in various capacities in various
organizations. He has worked in NGEF from 1968 to 1997 for 29 years and took
voluntary retirement in the year 1997, as Divisional Manager. During his tenure in
NGEF, he was head of Sub-station group and handled switchyard systems from 33 kV to
220 kV, from designing to commissioning of sub-stations on EPC basis. Under his
guidance, about 600 MW of aggregate total capacity, outdoor Switchyards from 33 kV to
220 kV have been designed and commissioned. He has undergone training in high
voltage outdoor yard sub-stations in AEG Telefunken, Germany for 6 months.

In May 1997, he joined M/s. Design Group Project consultant Pvt Ltd., Since then he is
responsible for designing of out door yard substation and transmission lines for various
projects. He has designed and commissioned various switchyards and transmission line
for Hydro Power Projects, to name a few major Projects:

i) Varahi Tail Race HEP (37 MW 110 kV ODY)
ii) Narayanpur Right Bank Canal HE Project Phase I and II (18 MW - 66 kV ODY)
iii) Singatallur Hulligudda HEP(18 MW 110 kV ODY)

He has designed and commissioned balance of equipment for a 15 MW capacity
Windmill Project.
Consultant
123




Mr. S. Ramanan, B.E. (Civil), initially worked in Karnataka Power
Corporation Limited between year 1975 to year 1984. After a brief stinct,
as lecture in NIE Mysore. Joined NHPC, in the year 1985, and retired in
the year 2009, as General Manager.

He had exposure to various aspects of implementation of Hydro Power Project, from
Survey, Investigation, Preparation of PFRs and DPRs, bid documents, to detail civil
designs, and construction works. He was posted as GM Consulting and Bussiness
Development Division, where he dealt with Tidal Power Project, Infrastructure
development in Andaman and Nicobar Island, Varzab Power Plant in Tajikistan and
raising of the Dhankari dam in Port Blair, Andaman and Nicobar Island. Till his
retirement, he had handled works relating to project of over 5000 MW of Hydro Power
development in various capacities spread over 10 HEPS across the length and breadth of
India. He had a short stint in design and engineering of Power transmission line in
North East State. He is also freelance consultant advising various IPPs in
implementation of small Hydro Projects.
Consultant
124


Mr R. Vasudevan
Mr R. Vasudevan is a water utility management specialist with over 40
years of experience in Design Construction & Operation of Water
utility services from the source to the consumer. He is presently full
time consultant of Design Group for similar Project assignments.

He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining
Bangalore Water Supply and Sewerage Board in the same year, he worked in various
capacities and retired as the Chief Engineer during the year 2010. He was involved in all
the major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million
residents of Bangalore in 1971, and has now become a giant utility supplying over 900
MLD water to over 8 Million residents.

He was associated in Cauvery water supply Scheme stage I to supply 135 MLD water
from River Cauvery, in establishing pipe fabrication and laying activities; Later was
involved in the stage II of the scheme supplying another 135 MLD. He was in charge of
Electrical system Design and Construction; In the III stage of Cauvery water supply
project which was a larger 270 MLD Project, he was in charge of complete Electrical and
Hydro-Mechanical components of the project from tendering to completion. In the
subsequent Stage IV-Phase I Project which was with external funding, He was
responsible for total cross-country steel pipeline of 1950mm Diameter and 90 Kilometers
long, and later in the installation of Sewerage pumping stations and the electrical Design
and Construction of Seven Sewage treatment plants. In the last 5 years of his service he
was responsible for Securing ODA loan of INR 34000 Million from JICA for Stage IV
Phase II project with a capacity to supply 500 MLD, selection of project consultants,
tendering selection and award of contracts for all water supply components.

In the course of his long service he has participated in various workshops and seminars
on pumps , cavitation, cross-country pipeline design, water-hammer studies and control,
Consultant
125


water treatment, wastewater treatment and sludge disposal, project management,
international contracts, leakage reduction and distribution improvement of water
supply system , flow measurement, tariff structuring, urban planning , reuse and
conservation of water supply, etc.

He led the Technical team which presented Innovative Practices in Revenue
Management initiative by BWSSB to the Department of Urban Development and
Secured the First Prize in National Urban Water Awards, 2009, presented by the Honble
President of India, in August 2009.

Vasudevan has designed pumping systems for several lift irrigation pumping systems,
electrical substations and surge protection to pipeline for the Consultancy Centre of
BWSSB from 1995 to 2007. Many such projects have been commissioned in the last 10
years and are in operation.

He also handled an assignment on alternative methods of infrastructure finance by
Private Sector, Infrastructure Bonds, and developing Public-Private Partnerships in
2009.

He also secured an MBA from ICFAI Dehradun with Finance as optional subject. On
retirement from Service he joined Design Group as Water Supply Consultant in
September 2010.

Consultant
126


Mr. U.R. Raghotham

Mr. U.R. Raghotham after obtaining M.Tech from Mysore University in
the year 1974 worked as design engineer with the architects, M/s Karekar
and Sundaram for one year and then joined Karnataka Power
Corporation Ltd., in the year 1975.

During his service in KPC Ltd., he has worked in the design team for Supa Dam for 5
years and then worked as AEE (Construction) in Supa Dam for 7 years right from the
stages of foundation level of the spillway and power blocks to the stage of completion of
the Dam.

Thereafter he was in charge of construction of Ghataprabha Dam Power House. From
year 1989 onwards he worked in the design office of KPC Ltd., and handling the
planning and design of various Hydro Electric projects including Kadra dam of Kalinadi
HEP and Sharavathi Tailrace Project. Since year 2003, he is working as a independent
consultant and was involved in the design of Nagarjuna Sagar Tail Pond Dam Project,
Gandikota dam project, Lower Jurala hydel project of Andhra Pradesh, Varahi
Underground Power House (2x115MW) and many other projects. He was involved in
the preparation of DPR for Indira Sagar Polavaram Hydro Electric Project (960MW) and
in obtaining clearance from CWC and CEA. He is with DG since year 2010.

Consultant
127



Mr. G. Penchalaiah
Mr. G. Penchalaiah, after retirement from CWC/CEA works as a free
lance Consultants, for various investigation agencies in flow
monitoring of river regime, pre-construction Investigation works in
large Irrigation Projects. Design Group is utilizing his services for
overseeing, Fielding investigation works in large Irrigation and
Hydro Electric Projects in India and Abroad.

Mr. G. Penchalaiah after his graduation in Civil Engineering from Sri. Venkateshwara
University in 1970, joined Central Water Commission, Government of India as Civil
Engineer and retired in the year 2007, as Director. He has vast experience in Water
Resources Project Planning, especially large Irrigation Projects including investigation,
Hydrology, Computation of yield, Development of Irrigation dam and associated
Irrigation Networks, preparation of Detailed Project Report. He was posted to various
States in India, and is familiar with available yield in various river basins for Irrigation
utilization to improve the Agricultural Sector and Water Management. He was deputed
to CEA, New Delhi, and was responsible for design of structures and cost estimates for
Thermal Power Project. He had made topo map studies, interlinking river, water
balance study, etc. As a Senior Engineer worked on Indo-Nepal Joint Projects, namely
Pancheshwar Multipurpose Project and, head quartered at Kathmandu, Nepal and was
involved in preparation of DPR, cost estimates, preparation of Infrastructure Planning
for major Power / Multipurpose Projects, such as Poornagiri, Rupaligad etc.





Consultant
128




Mr. Suryanarayana, after his retirement as Deputy General Manager -
Geology from Karnataka Power Corporation Limited, works as
freelance Consultant on Geology. He is with Design Group and has
extensively lent his expertise in Engineering Geology aspects of in
various assignments undertaken, on job to job basis.

My. Suryanarayana, after obtaining Masters degree in Geological Science, joined
Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007,
as Deputy General Manager Geology. During his tenure, he was involved in most of
the Hydro Power Projects implemented by Karnataka Power Corporation Limited, to
name a few 80 meter high Chakra Rock-fill Dam: Varahi HEP (460 MW). Involved in
preparation of DPR for Gundiya Hydel Scheme (400 MW), Shivasamundram Seasonal
Scheme (270 MW), Mekedatu Multipurpose Project (360 MW). He is also involved in
ongoing Himagiri HEP (280 MW), Upper Tunga Irrigation Project involving 4 km of
tunneling etc. Apart from this, he has wide experience in advising developers / IPPs in
implementation of Mini Hydel Scheme of 25 MW and below all over India to name a
few, Ramman HEP 120 MW, Roleup HEP (60 MW), and Chakung cha HEP (60MW) all
in Sikkim State.

Consultant
129


Mr. K.T. Sreedhara
Mr. K.T. Sreedhara, after obtaining B.E (Civil), degree from Vikram
University, Ujjain, in the year 1970. worked as design Engineer with
M/s. P.V. Raj & Co. Consulting Engineers Hyderabad from January 1971
to November 1973. The works dealt in this period are Designs of Bridges
and Industrial Structures and Buildings.

Then he joined Karnataka Power Corporation Ltd., a public sector undertaking of
Government of Karnataka, in year 1973 and worked upto the year 2006 i.e. for a period of
32 years, in various capacities and finally retired as I/C Chief Engineer. During his is
tenure in KPCL he has worked in the civil designs wing on the design of Gravity dam
(concrete), Earthen dams, water conducting System. In the construction wing he worked in
Precision survey works at Under Ground Power House at Varahi Schemes and in
Sharavathi Schemes as AEE. As Executive Engineer worked in the investigation of Power
Projects especially High Head Scheme and Mini Hydel Schemes. He has also worked in
designs wing in the designs of Sarpady Barrage Hydro Electric Project and consultancy
assignment of structures of Markandeya Dam Project, Kalasa & Bandurnala Projects for
KNNL.

Further, in construction wing of KPC he has worked as Executive Engineer (Safety) at
Raichur Thermal Power Station Shakthinagar He has worked with KPCL civil designs wing
and involved in the investigation work of Bridge cum Barrage Project across River Krishna
near Gugal. for KBJNL As Superintending Engineer and further I/C chief Engineer (civil) of
Raichur Thermal Power Station (7X210 MW Installed Capacity as on 2006) involved in the
civil maintenance works of the Thermal Power Generation Station. After retirement in the
year 2006 from KPCL after serving 32 years, he joined as an Consultant with M/s Subhadra
Consulting Engineers who were Associate Consultants to M/s STUP consultants Pvt Ltd.,
Bangalore and was involved in the Detailed Engineering of Nagarjunasagar Tail Pond dam
Consultant
130


, Gandikota Dam and Lower Jurala Hydro Electric Project which are under construction, He
was also involved in Preparation of revised DPR for Polavaram Hydro Electric Project with
12X80MW(960MW) Installed Capacity .

Currently he is working with Design Group Project Consultant Pvt Ltd., as Deputy Director
(designs) in the planning, design of Hydro Power Projects and Irrigation Project and other
Structure since year 2010.

He is an Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer
(India) 2) Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics
Consultant
131


Mr. Achutha Narayana
Mr. Achutha Narayana, after obtaining M.Tech degree from the
Prestigious Indian Institute of Technology Kanpur in the year 1996, has
15 years of exclusive experience in design of various components of
hydroelectric Projects. He started his early career in Design Group
Project Consultants Pvt. Ltd., Bangalore as Design Engineer (Civil) and
was involved in design of Harangi HEP (2x4.5MW) in Karnataka. He later joined NHPC
ltd., A Govt. of India Enterprise in year the 1998 and was involved in Planning and
Construction stage Design of Dhauliganga HEP (4x70MW), Uttaranchal state and Chamera-
III HEP (3x77MW), Himachal Pradesh State. He was associated with the preparation of
DPR of Siyom HEP (1000MW), Arunachal Pradesh, Dhauliganga Intermediate HEP,
Uttaranchal, Tender stage Design Activities for Chamera-III HEP, Kishanganga HEP
(3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was also involved in Pre-
feasibility reports of 7 projects in Arunachal Pradesh totaling to 2581 MW under Prime
Ministers 50000MW Initiative. He was also associated with the consultancy project of
Katra Laole KRCL Stretch of Prestigious Jammu-Kashmir Rail Link Project. He has also
presented few technical papers in various National Seminars. He is a member of Indian
Society of Rock Mechanics and Tunneling Technology (ISMRTT) and International Society
for Rock Mechanics (ISRM) and Indian Hydropower Association (INHA).

He joined Tata Consultancy Engineers, Bangalore in 2007-2008 and was associated with
projects of Augmentation of Bhira Power station and Gokak SHEP totaling to an aggregate
of 100 MW.

Since 2008, he is working as Deputy Director (Designs) in Design Group Project Consultants
Pvt. Ltd. and has been responsible for various construction stage design engineering of
Hydel Projects, DPRs and Pre-tendering Services for various projects.


Consultant
132


Mr. T.S. Srinivasa
Mr. T.S. Srinivasa, after obtaining B.E. degree from National Institute of
Engineering College, Mysore, Karnataka in the year 1984 and M.E.,
degree from one of the noted Technical Institution PSG College of
Technology, Coimbatore, Tamilnadu in the year 1987 worked in various
capacities in Public Sector/Private companies. He has worked In the
Public sector Organisation Karnataka Urban Water Supply & Drainage Board (KUWS&DB)
from year 1986 to year 2006 for a period of 21 years. He took voluntary retirement from
KUWS & DB and worked in private organizations such as M/s. Secon as Manager and
M/s.Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).

He was head of Design Wing while working with KUWS&DB, and was involved in
preparation of many DPRs comprising of Planning, Design, Estimating, implementation of
number of water supply and sewerage schemes including Water treatment plants(WTPs)
and Sewage Treatment Plants(STPs)in urban areas of Karnataka State. He was involved
with water supply & sewerage scheme proposals for the second major city in the state vof
Karnataka viz., Hubli-Dharwar city under the World Bank Project. He was also involved
with National River Conservation Projects for prevention of river pollution in the State of
Karnataka.

While working with M/s. Secon, he was involved with water supply and sewerage projects
for different towns of the Country of Libya. While working with M/s. Jurong Infrastructure
Ltd., he was involved with Design and implementation of Infrastructure facilities such as
roads, water supply, sewerage, storm water drainage, Electrical & Communication facilities
to a number of town ship development projects including some of the SEZs.

From 2009 onwards he heads the Water Division of DGPCL and is responsible for
implementing water supply and sewerage projects assignments. Presently he is involved
Consultant
133


with detail Civil Engineering Design of component of Rafha gas based Power Plant Project
in Saudi Arabia and has handled of the assignment.
Consultant
134


Mr. P Sudarshan Rao

Mr. P Sudarshan Rao, after obtaining B.E. (E&E) degree from Malnad College
of Engineering, Hassan (Mysore University) in 1987 worked in the same college
and Regional College of Education, Mysore as a Lecturer for a brief period
before joining KPCL in 1989.

He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power
Corporation Limited, a State owned Public Sector Undertaking with dedication for Power
Generation to the State with ISO 9001 and ISO 14001 certification. He has experience in
Operation, Maintenance and Design wings of 210/250 MW coal based Thermal Power Plant.
He also has experience across domains like Inventory Management, Tendering, Tender
Evaluation, Study of various Control System drawings, Planning of Preventive and
Breakdown Maintenance of 210 MW Generator & Auxiliaries, Erection & Commissioning of
Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear,
220kV & 400kV Outdoor Switchyard, and Station Battery System. He was also involved in
preparation of cable schedules, interconnection schedules and commissioning of 210 MW &
250MW coal fired thermal Units.

After joining DG in February 2011, he is the group leader of Electrical Design team carrying out
detail Engineering for gas based generating plants and hydro electric plants.

Consultant
135



19. Some of the Certificates for Completed Projects
Certificate
136




Certificate
137






Certificate
138








Certificate
139





Certificate
140








Certificate
141








Certificate
142








Certificate
143







Certificate
144







Certificate
145






Certificate
146







Certificate
147







Certificate
148







Certificate
149







Certificate
150








Certificate
151






Certificate
152
Certificate
153
Certificate
154