ENGLISH TASK

Created by :
GROUP 6
- Anggit Lestari Putri 11111!""
- Giusti A#i $a%uy& 11111!'(
- Nabi%a A)*+a,ra 11111!-'
- .a%ia .ana 11111!6'
/AN0UNG STATE O1 POL.TECHNIC
SCHOOL .EAR !11*!1
A!br0ken!! 0E1INITION
Flooring is the general term for a permanent covering of a floor, or for the work of
installing such a floor covering. Floor covering is a term to generically describe any
finish material applied over a floor structure to provide a walking surface. Both terms are
used interchangeably but floor covering refers more to loose-laid materials.
Setting tiles is a job that used tiles as its main material. This job main function is
to covered either wall or floor. This job is mainly use pasta cement as its main glue.
B!br0ken!!O/2ECTI3E4S5 O1 THIS 2O/ IS 4ARE5 TO:
; over the surface of the wall
; !rotect wall from weather
; "ake wall stronger
; #dding trasram properties the the wall $ waterproof%
C!br0ken!!THE TOOLS AN0 6ATERIALS ARE:
6ATERIALS:
; Tiles
; &ime $ in real case use cement%
; 'ater
TOOLS
; Spade
; Scrap spacy
; Bucket
; (ubber hammer
; 'aterpass
; Siku
; )ail
; Thread
D!br0ken!! 6ETHO0:
; First, preapare tools and materials and make the sketch on the wall using the nail and
thread
; )e*t, put all materials into bucket e*cept tiles
; Then, mi*s the materials until like pasta
; #t this stage, not only makiing the pasta cement but also we must prepare tiles. !ut
tiles into water for about + to ,- seconds untill the surface of the tiles become wet.
; Subse.uently, in case the wall is dry, we have to make the wall become abit moist,
ne*t we can put the pasta cement to thr wall using the scrap spacy, follow the
reference we have made from the previous step, and set the tiles, hit slowly with
rubber hammer.
; "eanwhile, we wait the tile become dry, put the nail above the tile to make space
between tiles.
; &ater, repeat the previous step, until cover the entire surface area in /-*+-cm
0
using
the waterpass.
; Then, if the space between tiles doesn1t filled well, fill again the space with the pasta
cement we had left, until all the space betweet each tiles covered well with the pasta
cement.
; 2uring this process, put off the nail that we used for reference, while we waited for
the tiles to dried up.
; #fterwards, put off the nail that we used to make the space between the tiles.
; 3ventually, clean up the surface of the tiles we had just made with 1kain bekas1
; Finally, the wall is clean.
; The result is that beautiful wall.
E!br0ken!! HO$ TO 6AKE THE RE1ERENCE7
1!br0ken!! !lace nails both at top and bottom side
2!br0ken!! "ake vertical line and hori4ontal line refers to the nail
Na
il
Threa
d
/I/LIOGRAPH.
http566www.ilmusipil.com6cara-pasang-keramik-dinding
http566en.wikipedia.org6wiki6Flooring