This document is the drawing register for Part 3 - High Voltage Underground of the Distribution Construction Standards Handbook. It lists numerous drawings that have been deleted related to high voltage underground installations including single core XLPE cable joints, fuse switches, ringmain isolators, cable installation instructions, and transition joints for 3 core cables. The general notes specify that all equipment is to be installed according to manufacturer's instructions and require installer identification tags on joint and termination equipment. It also specifies the joint assemblies to be used for 11kV and 22kV rated cables requiring transition joints.
This document is the drawing register for Part 3 - High Voltage Underground of the Distribution Construction Standards Handbook. It lists numerous drawings that have been deleted related to high voltage underground installations including single core XLPE cable joints, fuse switches, ringmain isolators, cable installation instructions, and transition joints for 3 core cables. The general notes specify that all equipment is to be installed according to manufacturer's instructions and require installer identification tags on joint and termination equipment. It also specifies the joint assemblies to be used for 11kV and 22kV rated cables requiring transition joints.
This document is the drawing register for Part 3 - High Voltage Underground of the Distribution Construction Standards Handbook. It lists numerous drawings that have been deleted related to high voltage underground installations including single core XLPE cable joints, fuse switches, ringmain isolators, cable installation instructions, and transition joints for 3 core cables. The general notes specify that all equipment is to be installed according to manufacturer's instructions and require installer identification tags on joint and termination equipment. It also specifies the joint assemblies to be used for 11kV and 22kV rated cables requiring transition joints.
Di st r i but i on Const r uct i on St andar ds Handbook Techni cal Requi r ement s DMS #5114930 Par t 3 Hi gh Vol t age Under gr ound General Notes All equipment shall be installed in accordance with the manufacturers instructions supplied with the equipment kit to which they relate. Installer identification tags are required where provided as part of the equipment kit. The installer identification tags shall be labelled and fitted to the joint or termination equipment as per drawing R39.
All 11KV rated cable requiring transition joints shall use FJ0310 and FJ0405 joint assemblies. All 22KV rated cables requiring transition joints shall use FJ0403 joint assembly.
Di st r i but i on Const r uct i on St andar ds Handbook Techni cal Requi r ement s DMS #5114930