Region V Physical Facilities Unit: Department of Education Division of Camarines Sur

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

Findings:

Pre-Inspected by: Noted:


Findings:
Inspected by: Noted:
SBRMS Committee Chairman
REYNALDO B. ALBINO, JR.
PRE REPAIR INSPECTION
School Head/Principal
Freedom Sports Complex, San Jose, Pili, Camarines Sur
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region V
DIVISION OF CAMARINES SUR
Physical Facilities Unit
Date
Division Technical Property Inspector
Date
SBRMS Committee Chairman
Date Date
POST REPAIR FINDINGS
Repair of Roofing and installation of Ceiling of Roco Building
Item
No.
% Total Quantity Unit Cost Remarks
I 100% 1 Lot I 32,165.00 Repair as
program
9,649.50
41,814.50
Prepared by: Checked & Reviewed:
Approved: Concurred:
Labor
Total
Description
(Scope of Work)
PROGRAM OF WORKS
Repair of Roofing and
installation of ceiling
of Roco Building
PHYSICAL TARGET:
Freedom Sports Complex, San Jose, Pili, Camarines Sur
Grades III nd VII Classrooms
PONONG INTEGRATED SCHOOL
PONONG, MAGARAO, CAMARINES SUR
P 41,814.50
School :
Address :
MOOE 2014
BY ADMINISTRATION
PROJECT TITLE:
ALLOCATION:
SOURCE OF FUND:
MODE OF IMPLEMENTATION:
OCTOBER-DECEMBER 2014
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region V
DIVISION OF CAMARINES SUR
Physical Facilities Unit
PROJECT DURATION:
NICOLAS L. REBELLION, JR.
In-Charge of Division Congressional District
WILLIAM A. VILLARE, Ed. D
Division Physical Facilities Coordinator
CRYSTAL ROSE D. CASTRO
School Physical Facilities Coordinator
REYNALDO B. ALBINO, JR.
School Head
Date: 9/25/2014
REPLACEMENT OF HIGH SCHOOL CLASSROOMS' FLASHDOORS
Scope of works
I. QTY UNIT UNIT PRICE TOTAL
10 pcs 600 6000
2 pcs 180 360
3 pcs 160 480
120 pcs 120 14400
20 pcs 420 8400
1 liter 120 120
2 kls 120 240
3 kls 100 300
1 kl 100 100
2 gal 600 1200
2 pcs 60 120
1 pc 45 45
4 pcs 50 200
4 pcs 50 200
32,165.00
9,649.50
41,814.50
Prepared by: Checked & Reviewed:
Approved: Concurred:
TOTAL PROJECT COST
sand paper #100
MATERIALS COST
LABOR COST
REYNALDO B. ALBINO, JR.
School Head
CRYSTAL ROSE D. CASTRO
School Physical Facilities Coordinator
NICOLAS L. REBELLION, JR.
In-Charge of Congressional District
WILLIAM A. VILLARE, Ed. D
Division Physical Facilities Coordinator
PHYSICAL TARGET:
SUBJECT:
roller
DESCRIPTION (Scope of Work)
2x2x12 good lumber
Grades 8-10 Classrooms and Computer Laboratory
BILL OF QUANTITIES
G.I. Sheets #12
3x2x12 good lumber
1.5 x 2 x 12
Marine plywood
Patching compound
Concrete Nail #3
CW Nail # 2
CW Nail # 1
Flatwall enamel (white)
Address:
P 27,220.05
MOOE 2014
By Administration
October to December 2014
brush (1.5)
sand paper #120
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region V
DIVISION OF CAMARINES SUR
Physical Facilities Unit
Freedom Sports Complex, San Jose, Pili, Camarines Sur
ALLOCATION:
SOURCE OF FUND:
MODE OF IMPLEMENTATION:
PROJECT DURATION:
PROJECT TITLE:
PONONG, MAGARAO, CAMARINES SUR
PONONG INTEGRATED SCHOOL School :
REPLACEMENT OF HIGH SCHOOL CLASSROOMS' FLASHDOORS
*Repair *New Construction
Approved: Reviewed: Concurred:
School
Project Title School Head Division Technical Inspector Div. Physical Facilities Coordinator
Php CY
Amount
PROJECT LOCATOR MAP
PONONG INTEGRATED
Magarao
WILLIAM A. VILLARE, Ed. D. Replacement of HS Flashdoors REYNALDO B. ALBINO, JR. NICOLAS L. REBELLION, JR.
Municipality/District
*SBRMS *MOOE Date Date Date
Municipality/District
*Repair *New Con. Approved: Reviewed: Concurred:
School
Project Title School Head
In-Charge in Congressional
District
Div. Physical Facilities
Coordinator
Php CY
Amount
*SBRMS *MOOE Date Date Date
Municipality/District
PERSPECTIVE PLANS & SPECS
WILLIAM A. VILLARE, Ed. D.

You might also like