Managing Item Lifecycle

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Terminology

• An Item Lifecycle is a sequence of Phases (e.g.


Concept, Design, Prototype, Production,
Obsolescence)
• Each phase represents a distinct stage in the
development lifecycle of the item.

Concept Design Prototype Pre- Production Retirement


Production

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-2 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management - I

Track Items through their Lifecycle

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
The Lifecycle Management Thought
Process
WHAT ARE THE VARIOUS STAGES
THROUGH WHICH OUR PRODUCTS
Concept Design Prototype Pre- Prod Prod Retire

EVOLVE/DEVELOP

DO DIFFERENT PRODUCTS/PRODUCT
GROUPS FOLLOW DIFFERENT
PRODUCT DEVELOPMENT CYCLES

DO WE NEED TO TRACK EVERY ITEM


THROUGH ITS PRODUCT
DEVELOPMENT CYCLE

ARE DIFFERENT CONTROLS REQUIRED


ON ITEMS AT DIFFERENT STAGES OF
THEIR DEVELOPMENT
Conce Design Prototype Pre- Prod Prod Retire
pt

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-4 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Scenario

Vision Engines has been flooded with customer


complaints on its new series of High Performance
Diesel Engines. Investigations have shown that the
Piston used in these engines has not undergone
prototype testing and pre-production validations.

To avoid recurrence of such problems, Vision Engines


has decided to track Engines and Engine Components
through all the phases of their product development
and establish correct item management policies in
each phase.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-5 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management – I
Demo

Track Items through their Lifecycle

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Item Lifecycle Tracking Flow

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-7 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create a new Diesel Engine Item

•Favorites > Create Production Items > Select the catalog category ‘ADS Diesel
Engines’ > Click on Continue button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-8 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Number/Description

•Provide Item Name and Description.


•Note – Current Status is Active

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-9 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Lifecycle details

•Select the Lifecycle ‘ADS Engine Lifecycle’ ;


Lifecycle phase defaults to ‘ADS Concept’
•Item Status is automatically assigned as
ADS Design
•Click on Continue

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-10 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Review Item Information

•Enter Attribute Information.


•Click on Finish

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-11 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe Item Lifecycle

•Open the item workbench with the


new item > Click on Lifecycle Tab
•Observe the Lifecycle Phases,
current phase and current Status for
new item

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-12 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe the Status control for current phase

•Click on the hypertext ‘Status Attributes’


•Observe that only ‘BOM Allowed’ is
enabled in the current phase

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-13 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Change Item Phase

•(N) Overview Region >


Click on the Change
Phase Button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-14 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Provide New Phase Information

•New Phase is automatically selected


•Select effective date as current date
•Update the time to be a minute ahead
of the current time
•Apply

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-15 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Review and Implement Pending Changes

•Pending Changes Tab > The


initiated phase change is
awaiting implementation
•Click on Implement button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-16 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe the Phase Change

•Item Phase is successfully


changed
•Similarly, the item can be
progressed through its lifecycle.
•We shall now progress the item to
the next phase which is prototype

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-17 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe the Status control for the New phase

•Hypertext ‘Status Attributes’


•Observe allowed actions in
the prototype phase

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-18 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management – I
Setups

Track Items through their Lifecycle

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Set Up Required

New Setups Required


• Lifecycle Phases • Link Phase and Status
– ADS Concept • Link Lifecycle with
– ADS Design
Item Catalog Category
– ADS Prototype • Setup Server Time-
zone Profile
Existing Data – ADS Pre-Production
• Time-zone Settings
• Item Catalog – ADS Production
Category – ADS Retire
– ADS Diesel • Lifecycle
Engine – ADS Engines Lifecycle
• Item Statuses
– ADS Design
– ADS Proto
– ADS Prod
– ADS Retire

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-20 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Setup Flow

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-21 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Define Lifecycle Phases

– (N) From the Project


Billing Super
Responsibility > Setup >
System > Statuses
– Status of Type Phase to
represent lifecycle
phases.
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-22 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create a New Lifecycle

– (N) From the Project Super


Responsibility > Projects:
Setup > Lifecycles
– (H) ‘Lifecycles’.
– Click on the Create Lifecycle
Button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-23 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Add Lifecycle Phases

– Provide Lifecycle Details (Name, Short Name and Description)


– Ensure that Enable for Projects and Enable for Items are
checked
– Enter the Lifecycle Phases sequentially
– Click on the Apply button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-24 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Item Status
Item Status denotes the state of the item and defines
the eligible activities that can be performed on the
Item.
Status Attributes set for each item status control the
actions that can be performed on the item.
Status Attributes are
• BOM Allowed
• Build In WIP
• Customer Orders Enabled
• Internal Orders Enabled
• Invoice Enabled
• Purchasable
• Stockable
• Transactable

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-25 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Define Item Status – ADS Design

– Setup Workbench > (T) Items > (ST)


Lifecycle Phases > (H) Create Item
Status
– Create a New Status ‘ADS Design’
– From Status Attributes Region, Check
‘BOM Allowed’
– Click on the Apply button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-26 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Define Item Status

BOM Allowed
BOM Allowed, Build in WIP Allowed
All Status control attributes enabled
BOM Allowed

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-27 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Link Lifecycle Phase and Item Statuses

Linking Item Statuses to a lifecycle phase enables


definition and control of the eligible activities that can
be performed on the item, in each phase of its lifecycle

Example -
In the design stage, I should be able to define bills for
the item, but should not be able to manufacture it.
In the Prototype stage, I should be able to make the
item but should not be able to order it.
In the production stage, all activities
should be permitted.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-28 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Assign Default Status to Design Phase

– Setup workbench > (T) Items > (ST) Lifecycle Phases


– Search by ‘Phase’, enter the string “ADS%”, Click on the Go Button
– Click on the hyperlink for each Phase and proceed to assign the default status
– Assign the Status ‘ADS Design’ to the ‘ADS Design’ Phase > Apply

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-29 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Assign Default Status to Phase
Phase Status

ADS Concept ADS Design

ADS Design ADS Design

ADS Proto ADS Proto

ADS Pre-Prod ADS Proto

ADS Prod ADS Prod

ADS Retire ADS Retire

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-30 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Associating Lifecycles to Item Catalog
Categories
Associating a lifecycle with an item catalog category
makes the lifecycle available for all items in the item
catalog category.

Lifecycles are inherited down through the item catalog


category hierarchy

Multiple Lifecycles could be linked to a catalog


category

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-31 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Assign Lifecycle to Item Catalog Category

– Query for the catalog category ‘ADS Diesel Engines’ from the setup workbench
– From the vertical Sidebar, click on the lifecycles link
– Click on Add
– Select the ADS Engine Lifecycle and apply

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-32 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Setup Site level Profile ‘Server Time Zone’

•Login as Profileoptions ; Password – sysadmin


•Set the profile ‘Server Time Zone’ to (GMT –06:00) Central Time
This is required since ADS Servers are at Austin (CT)
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-33 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Setup Time-zone Preferences

•Open any PLM page > Click on


hyperlink for preferences
•Set the timezone preference to the
time-zone of your location
•For the class, we shall set this to (GMT
–8:00) Pacific Time
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-34 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Verify Time-zone Settings on Desktop

•Open up the Date and Time Properties for your PC


•Verify that the time-zone matches with that set in the preferences and
matches the time zone of your location
•For the class, this has to be set to Pacific Daylight Time
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-35 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Exercise I
Track Items through their Lifecycle
Vision Engines builds New Diesel Engines by developing the
Engineering concept into detailed product designs. It then
tests the prototype in WIP, performs pre-production
validations and then releases the diesel engines to production.
Upon its end-of-life, the diesel engine model is retired.
Vision Engines wants to track the Diesel Engines through all
stages of their development and establish suitable controls
such that bills of material are allowed throughout the lifecycle,
WIP jobs can be created during prototyping and production
and engines are orderable once they are in production. Upon
retirement, no actions are permitted.
Using the PLM Solution, how can we start to solve this
business Problem.
Once you have built the solution progress the item through to
its prototype phase and demonstrate the lifecycle controls.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-36 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Recap Questions

Vision Engines develops Diesel Engines through various stages such as Design,
Prototype and Production, and wants to track the items through all these stages.
How would Vision Engines configure the system to enable this tracking?
Vision Engines wants to ensure that the Diesel Engines cannot be ordered
during the Prototype Phase. How will it establish this control?
The product manager has updated the lifecycle phase for a Diesel Engine from
Design to Prototype. He now tries to implement the phase change, but finds that
the record is not getting updated and the phase change is not happening. What
would he need to check before implementing the phase change?

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-37 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management - II

Establish Lifecycle Policies for Item Information

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Scenario

Vision Engines is observing an increasing occurrence


of engineers making ad-hoc changes to item
specifications, even after design freeze.
Vision Engines wants to build tight controls to
eliminate this practice?

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-39 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Establish Lifecycle Policies for Item Information
Thought Process
Examples of Item
Information
Attributes
WHAT ELEMENTS OF ITEM Attachments
INFORMATION HAVE TO BE BROUGHT
UNDER CONTROL Associations
Structures

Concept Design Prototype Pre- Prod Prod Retire

WHAT CONTROLS ARE REQUIRED BY


LIFECYCLE PHASE

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-40 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-41 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management – II
Demo

Establish Lifecycle Policies for Item Information

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Demo Flow

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-43 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create a new Diesel Engine Item

Favorites > Create Production Items > Select the catalog category
‘ADS Diesel Engines’ > Click on Continue button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-44 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Number/Description

Provide Item Name and


Description.
Note – Current Status is Active

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-45 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Lifecycle

•Select the Lifecycle ‘ADS Engine Lifecycle’


Lifecycle phase defaults to ‘ADS Concept’
•Item Status is automatically assigned as
ADS Design
•Click on Continue

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-46 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Item Information details

Enter Attribute Information.


Click on Finish

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-47 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe Item Lifecycle

•Observe the Lifecycle Phases, current phase and current Status for the new item

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-48 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe Change Order Policy

•From Lifecycle Tab, select the Change Order Policy Sub-tab


•Observe the established attribute controls in different lifecycle phases

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-49 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Diesel Engine Specs

•From Item Specifications tab > Click on the hypertext ‘ADS Diesel
Engine’
•Note how update button is available in this phase to directly update
any attribute value
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-50 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Change Item Phase to Prototype

•From Lifecycle Tab > Click on the


Change Phase Button
•Proceed to change the phase, first
to Design and then to Prototype.
•From pending changes region,
Implement the phase change each
time, to progress the item to
Prototype phase
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-51 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Observe the Phase Change

•Item Phase is successfully changed


•Item Status also automatically changes to the default status of the new
phase

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-52 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Diesel Engine Specs

•From Item Specifications tab > Click on the hypertext ‘ADS Diesel Engine
•Update button has disappeared. Attribute changes can be effected only through a
change order and has to pass through its approval process.
•Click on the Create Change Order button to create a new change order for modifying
attribute values

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-53 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create New Change Order for Attribute Change

•Select the Change Order Type


•Click on the continue button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-54 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Change Order header details

•Enter Description
•Click on Save and Continue
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-55 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Open Change Order details

•Click on the hypertext ‘Item Attribute Changes’


•Click on the update button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-56 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Attribute Values

•Modify Torque rating to 250


•Click on the Apply button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-57 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Submit the Change Order

•(T) Change Order > (ST) Overview


•From Actions Lov, select Submit > Click on Go
•Click on the hypertext on the Item Number to return to the item workbench
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-58 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Review Item Attribute Values

•(T) Item > (ST)


Specifications
•Click on Hypertext ‘Diesel
Engine Specs’
•System suggests that the
attribute ‘Torque Rating’
has pending changes
•From view lov, select the change order number
created for attribute change and click on Go
•Observe how current and new values are displayed
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-59 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Promote Item Phase

Following the earlier steps, try to promote item to next phase > System
will not permit phase/status changes when there are pending changes

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-60 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Review Change Order Policy

•From Lifecycle Tab, select the Change Order Policy Sub-tab


•Observe the established attribute controls in different lifecycle phases

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-61 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management – II
Setups

Establish Lifecycle Policies for Item Information

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Set Up Required

Existing Data New Set up Required


• Item Catalog • Establish Lifecycle change
Category Policies
– ADS Diesel – Establish Attribute Control
Engines Policies
• Lifecycle
– ADS Engines
Lifecycle

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-63 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Setup Flow

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-64 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Establish Lifecycle Change Policy

– Setup Workbench > Query the ADS Diesel Engines catalog


category
– Hypertext Lifecycles > Opens the Lifecycle page
– In the Change Policy region, proceed to update Policy for
Attributes.
– Update > ADS Concept > Go > Add Another row

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-65 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Establish Lifecycle Change Policy

– In the Attribute Group Field, select ‘ADS


Diesel Engine Specifications’

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-66 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Establish Lifecycle Change Policy

– Set the Change Policy to Allowed for the ADS Concept and ADS
Design Phase
– Set the Change Policy to ‘Change Order Required’ for ADS Proto and
ADS Pre-Prod Phases
– Set the Change Policy to ‘Not Allowed’ for ADS Prod
– Set the Change Policy to ‘Change Order Required’ ADS Retire phase
– Click on Apply Button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-67 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Establish Lifecycle Change Policy

– Attribute controls have thus been


established by lifecycle phase

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-68 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Exercise II
Establish Lifecycle Policies for Item
Information

Engineer’s develop the Engine Specifications for the Diesel


Engines through the concept and design phases.
Once design freeze is completed, the Engines are moved to
prototype testing and pre-production validations. The
Engine Specs can still be changed, but this requires
approval from the Product Manager. Once the Engines are
released to Production, the Engine Specifications cannot be
changed.
Using the PLM Solution, how can we start to solve this
business Problem.
Once you have built the solution, progress the item to
prototyping and demonstrate the lifecycle controls.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-69 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Recap Questions

The Product Manager wants to progress a diesel engine which is under a


pending change, from concept to design phase. What would happen if he tries to
update the item phase? What would he need to do to update the item phase?
How can Vision Engines ensure that design documents for Diesel Engines are
not modified without authorization beyond the design phase?
What are the various types of item information, on which Vision Engines can
configure lifecycle change policies?
Vision Engines has established change policies for the Diesel Engine
Specifications such that a change order would be required to modify the
specifications beyond the prototype phase. Vision Engines now wants to change
the policy and permit direct updates for the diesel engine specifications in the
prototype phase. How will Vision Engines accomplish this?

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-70 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management - III
Managing Product Lifecycle with Lifecycle
Tracking Project

Execute
Plan Oracle
Project
Management

Control

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-71 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Scenario

Vision Engines develops high performance and


specialized electric engines, to custom designs. The
product development typically involves executing a
large number of activities over long lead-times.
Vision Engines is faced with frequent cost and time
over-runs while developing the custom engines. It
needs to establish tight monitoring and control
systems to remain competitive in this segment.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-72 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Managing Product Lifecycle with Projects
Thought Process

WHAT ITEMS NEED TO BE TRACKED IS THE PROJECT CREATED FIRST OR


USING PROJECTS THE ITEM

DO WE HAVE STANDARD TEMPLATE HAVE WE EXECUTED SIMILAR PROJECT


FOR CREATING THE PROJECT BEFORE

HOW DO WE QUALIFY RESOURCES FOR


HOW DO WE REPORT PROJECT PROGRESS THE PROJECT

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-73 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management – III
Demo

Managing Product Lifecycle with


Lifecycle Tracking Project

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Demo Flow

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-75 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create a new Electric Engine

Favorites > Create Engineering Items > Select the catalog category
‘ADS Electric Engines’ > Click on Continue button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-76 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create Item : Enter Number/Description

•Provide Item Name and Description; Note Item Status is Active

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-77 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Lifecycle details

•Select Lifecycle
•Lifecycle phase defaults
•Item Status Changes
•Click on Continue
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-78 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Review Item Information

•Define Attribute Values


•Click on Finish

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-79 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Review New Electric Engine’s Lifecycle

From Lifecycle tab,


observe the associated
lifecycle phases, current
phase and status of the
new item.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-80 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Associate Lifecycle Tracking Project

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-81 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Associate New Lifecycle Tracking Project

Click on Associate New Project


Button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-82 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Select Template

•Select the Template ‘ADS Electric Engine Lifecycle Template'


•Note - The Lov only displays the template with the same lifecycle as linked to
the item catalog category under which the item has been created
•Click on the Continue button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-83 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Lifecycle Tracking Project Details

•Enter Project Number, Name, Project


Manager, Project Start and Project
Finish Dates
•Click on Finish Button > Wait till the
project is created
•Click on Home to return to the Portal
Page

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-84 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Examine Item – Project Association

•Perform a Simple Search for the new item > Open the Item workbench
•From the lifecycle page, observe that the new project created has now been linked as the
lifecycle tracking project
•There is a one-to-one relationship between the item and its lifecycle tracking project
•Observe that the Change Phase button is no longer available on this PLM page
•Click on the Project link to examine the Project Details

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-85 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Examine Workplan Details

•From workplan tab, Click on Show workplan details


•Notice the Lifecycle and current phase of the project are same as that of the item.
•The phase controls for the item now reside with this tracking project

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-86 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress

•Scroll down to display the Work


Breakdown Structure
•Click on Update Progress Icon against
‘Concept’ Task

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-87 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress – Preview Progress
Summary

•Summary page shows up current


progress status for the top task
•Estimated and Actual dates are rolled
up from the lower tasks

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-88 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress for Sub-Task

•Hypertext ‘Subtasks’ > Subtasks are


displayed
•Click on Update Progress Icon for one
of the sub-tasks

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-89 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress – Enter Actual Dates

Enter the Task Progress details –


Update actual Start and Finish dates
for this task. The progress reported
will roll up to the top task

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-90 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress – Enter Task and
Progress Status for Sub-Task

•Click on the Progress Report Link


•Enter task status as completed
•Click on Recalculate and Continue Updating Button
•System confirms that changes are saved
•Click on hyperlink on Task 1 (Concept) to return to the
concept task.
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-91 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress – Enter Task and
Progress Status for Concept Task

•Click on the Progress Report Link


•Enter task status as completed

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-92 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress – Enter Percent
Complete for Concept Task

•Click on the Summary Link


•Enter physical Percent Complete as 100
•Click on Recalculate and Continue Updating Button
•System confirms that changes are saved
•Click on hyperlink on Task 2 (Design) to update progress for design task

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-93 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Update Project Progress for Design Task

•Click on the Progress Report Link


•Enter task status as ‘In Progress’
•Click on Submit
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-94 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Promote Lifecycle Phase to Design

•From current phase lov, select the current


phase as ADS Design’
•Click on Update Current Phase > Click on Yes
in the confirmation page
•Current phase now stands updated
•Click on Home link to return to the portal page

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-95 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Monitor Project Updates from PLM

•Perform a Simple Search for the new item >


Open the Item workbench
•From the lifecycle page, observe the lifecycle
and project details

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-96 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Lifecycle Management – III
Setups

Managing Product Lifecycle with Lifecycle Tracking


Project

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Set Up Required

Existing Data New Set up Required


• Item Catalog Category • Create new Project
• Lifecycle Template
• Link Lifecycle to Item
Catalog Category

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-98 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
New Concepts

Lifecycle Tracking Project


• Standardizes product development process
• Provides visibility
• Centralized resource management
• Reduce product risk by tracking schedule slippage and
budget over-runs

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-99 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Setup Flow

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-100 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Create New Project Template

• Project Super User > Projects: Setup > Project Templates > Select
‘Comp Component Lifecycle Templ (T, Computer Com Lifecycle) >
Click on the Duplicate button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-101 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Enter Template Information

• Enter Template Number, Template Name


• Add the Product Manager as the Project Manager
• Click on Finish button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-102 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Quick entry
information

• Scroll down the template definition page to the Quick Entry Region
• Add Quick Entry fields for Project Start Date and Project Finish Date

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-103 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Add Team Members

• Setup Options Region > Setup > Project > Team


Members
• Click on Update Icon
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-104 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Add Team Members

• Click on Add Team


Members Link

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-105 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Add Team Members
and Assign Project Role

• Add the Design Engineer and provide


him with the the ‘Project’ Role –
Engineer
• Enter a Start Date
• Click on Apply
• Click on Project Template Setup
breadcrumb link

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-106 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Lifecycle

• Setup Options Region > Workplan > Workplan Information


• Click on Update Icon

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-107 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Lifecycle and
Current Phase

• Enter Structure Name as ‘ADS Engine Lifecycle’


• Change the Lifecycle to ‘ADS Engines Lifecycle’
• Select Current Phase as ‘ADS Concept’
• Accept remaining defaults and click on Apply
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-108 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Work
Breakdown Structure

• Setup Options Region > Workplan > Work Breakdown Structure


• Click on Update Icon

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-109 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Task

• For the Concept Task, click on the Update Icon

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-110 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Task - Add
Phase and Task Manager

• Add Task Manager


• Link Phase
• Click on Save
• From Vertical side bar, proceed to update remaining tasks

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-111 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Tasks

• From Actions Lov, Select Update Tasks


• Click on Go

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-112 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Modify Template – Update Task Dates

• Click on Expand All link


• Update the Scheduled Start and Finish Dates for lowest node tasks
• After all dates are entered, select the Apply and Continue Updating Option and
click on Go
• Will get a message that ‘Your changes have been saved’
• Template updates are now complete
• Click on the Home link to return to the portal page
This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-113 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Assign Lifecycle to Item Catalog Category

– Query for the catalog category ‘ADS Electric Engines’ from the setup
workbench

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-114 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Assign Lifecycle to Item Catalog Category

– From the vertical Sidebar, click on the Hypertext Lifecycles


– Click on Add Button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-115 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Assign Lifecycle to Item Catalog Category

– Select the ADS Engine Lifecycle


– Click on the Apply button

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-116 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Exercise 3
Managing Product Lifecycle with Lifecycle
Tracking Project

Vision Engines receives a contract from the Rail Road


company to supply 6000 KW Electric Engines, and desires
to manage the product development lifecycle.
They would like to define and track all the activities involved
in the product development through Design, Prototype,
Production and Service Phases
They would like to establish tight controls over cost, effort
and resources involved in the product development.
Using the PLM Solution, how can we start to solve this
business Problem.
Once you have built the solution process the item through
its lifecycle and promote it from the Design to Prototype
Phase.

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-117 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.
Recap Questions

What are the some of the benefits, that Vision Engines would derive by using
Oracle Projects to manage item lifecycle?
When trying to create a lifecycle tracking project for a new electric engine, the
product manager did not find any suitable templates available for copying the
project from? What could have possibly gone wrong?
The Product manager wants to progress the Electric engine from Design to
Prototype phase, but finds that the Update Phase button is not available on the
ltem Lifecycle page? How will the Product Manager progress the item?
The Product Manager was trying to link an existing project to manage the
lifecycle of the Diesel Engine? He could not find any project for association?
What could have gone wrong?
The Product Manager wants to manage the Product lifecycle for a new Electric
Engine and a new Diesel Engine, using a single lifecycle tracking project? Is this
possible?
When updating progress, the task manager found that he could not enter actual
start and actual finish dates for the concept task? What is he doing wrong?

This presentation is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
1-118 any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making a purchasing decision.

You might also like