Biocide Injection Schematic + Recomendation

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 54

GX821 100% stroke = 1,270 l/h

GX822 100% stroke = 1,270 l/h


GX821-2A 100% stroke = 1.1 l/h
GX821-2B 100% stroke = 1.1 l/h
GX822B 100% stroke = 65 l/h
TA821
Bactirem 455
TA822
Bactirep 4018
GX821 GX822
GX821-2A GX821-2B
GX822B
WATER
INJECTION
WATER
INJECTION
DA-350
GX722 Suction
GX722
DS300 Water Outlet
DS301 Water Outlet
DS302 Water Outlet
DS300 Oil Inlet
DS301 Oil Inlet
GX721 Suction
Scale Inhibitor Lines
Foam Inhibitor Lines
22,443 sbopd
149 m3/h
324 sbwpd
2.1 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 500 0.44 5 2.2
U/S DS301 GX 822B 2.15 2,000 4.30 5 21.5
GX722 discharge
to DS-320
GX 822B 5.20 500 2.60 5 13.0
Oily water 8''
header
GX 822B 10 500 5.0 1 5.0
DA350 GX 821-2A 14.5 1,000 0.60 24 14.5
LOCATION PUMP
BIOCIDE
Considering the line length, better to inject slowly
but during long time. 1,000 ppm because of
bacteria detected
To be started first
2,000 ppm due to low water production rate
To be done after injection in DS301
1 hour is enough to replace 3 times the 8" line
volume, to be done after discharge to DS320
WATER
OIL
REMARK
30,574 sbopd
203 m3/h
361 sbwpd
2.4 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 500 0.44 5 2.2 2
U/S DS301 GX 822B 2.39 2,000 4.78 5 23.9 3
GX722 discharge
to DS-320
GX 822B 7.09 500 3.54 5 17.7 1
Oily water 8''
header
GX 822B 10 500 5.0 1 5.0 4
DA350 GX 821-2A 14.5 500 0.60 12 7.3 5
OIL
LOCATION PUMP
BIOCIDE
ORDER
WATER
Considering the line length, better to inject slowly but
during long time.
2,000 ppm due to low water production rate
1 hour is enough to replace 3 times the 8" line volume,
to be done after discharge to DS320
REMARK
30,849 sbopd
204 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 500 0.44 5 2.2 2
U/S DS301 GX 822B 6.63 1,000 6.63 5 33.1 3
GX722 discharge
to DS-320
GX 822B 7.15 500 3.58 5 17.9 1
Oily water 8''
header
GX 822B 10 500 5.0 1 5.0 4
DA350 GX 822B 14.5 1,000 2.90 5 14.5 5
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm due to bad DS-401 outlet
1,000 ppm due to low water production rate
1 hour is enough to replace 3 times the 8" line volume
WATER
OIL
REMARK
30,849 sbopd
204 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 1,000 0.89 5 4.4 2
U/S DS301 GX 822B 6.63 1,500 9.94 5 49.7 3
GX722 discharge
to DS-320
GX 822B 7.15 750 5.36 5 26.8 1
Oily water 8''
header
GX 822B 10 750 7.5 1 7.5 4
DA350 GX 822B 14.5 1,500 4.35 5 21.8 5
WATER
OIL
Increase injection rate to be sure to kill all bacteria in
case of TRB detection problem in Lab
REMARK LOCATION PUMP
BIOCIDE
ORDER
30,849 sbopd
204 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 1,000 0.89 5 4.4 2
U/S DS301 GX 822B 6.63 1,500 9.94 5 49.7 3
GX722 discharge
to DS-320
GX 822B 7.15 750 5.36 5 26.8 1
Oily water 8''
header
GX 822B 10 750 7.5 1 7.5 4
DA350 GX 822B 14.5 1,500 4.35 5 21.8 5
DS301 oil outlet
(PSV 3130 A/B
treatment)
GX 822B 2.00 2 4.0 7
TA 360 GX 822B 50 1 50 6
LOCATION PUMP
BIOCIDE
ORDER
WATER
OIL
Increase injection rate to be sure to kill all bacteria
REMARK
30,849 sbopd
204 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 500 0.44 5 2.2 2
U/S DS301 GX 822B 6.63 1,000 6.63 5 33.1 3
GX722 discharge
to DS-320 and oily
water header
GX 822B 17.50 500 8.75 5 43.8 1
DA350 GX 822B 14.5 1,000 2.90 5 14.5 4
DS301 oil outlet
(PSV 3130 A/B
treatment)
GX 822B 2.00 2 4.0 5
TA 360 GX 822B 50 1 50 6
dead legs careful to not inject more than 4 l in order to
protect PSV from local high concentration biocide
which can damage PSV gasket
WATER
1,000 ppm due to low water production rate
Open 2 hours the by pass to oily water header
1000 ppm because we often detect bacteria in DA 350
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
30,849 sbopd
204 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 500 0.44 5 2.2 2
U/S DS301 GX 822B 6.63 1,000 6.63 5 33.1 3
GX722 discharge
to DS-320 (wash
water)
GX 822B 7.15 500 3.58 5 17.9 1
DA350 GX 822B 14.5 1,000 2.90 5 14.5 4
DS301 oil outlet
(PSV 3130 A/B
treatment)
GX 822B 2.00 2 4.0 5
TA 360 GX 822B 50 1 50 6
OIL
REMARK LOCATION PUMP
BIOCIDE
ORDER
dead legs careful to not inject more than 4 l in order to
protect PSV from local high concentration biocide
which can damage PSV gasket
WATER
1,000 ppm due to low water production rate
1000 ppm because we often detect bacteria in DA 350
30,849 sbopd
204 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 0.89 500 0.44 5 2.2 2
U/S DS301 GX 822B 6.63 1,000 6.63 5 33.1 3
GX722 discharge
to DS-320 (wash
water)
GX 822B 25.00 500 12.50 5 62.5 1
DA350 GX 822B 14.5 1,000 2.90 5 14.5 4
TA 360 GX 822B 50 1 50 5
WATER
1,000 ppm due to low water production rate
1000 ppm because we often detect bacteria in DA 350
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
21,404 sbopd
142 m3/h
633 sbwpd
4.2 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 821-2A 1.96 500 0.98 5 4.9 2
U/S DS301 GX 822B 4.19 1,000 4.19 5 21.0 3
GX722 discharge
to DS-320 (wash
water)
GX 822B 25.00 500 12.50 5 62.5 1
DA350 GX 822B 14.5 1,000 2.90 5 14.5 4
TA 360 GX 822B 50 1 50 5
TRAITEMENT
455
OIL
REMARK LOCATION PUMP
BIOCIDE
ORDER
WATER
1,000 ppm due to low water production rate
1000 ppm because we often detect bacteria in DA 350
32,085 sbopd
164 m3/h OIL 7294 SBOPD
1,000 sbwpd WATER 4 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 2.61 500 1.31 5 6.5 2
U/S DS301 GX 822B 6.63 1,000 6.63 5 33.1 3
GX722 discharge to
DS-320 (wash water)
GX 822B 25 500 12.50 5 62.5 1
Flushing of Oily water
8'' header
GX 822B 20 500 10.0 1 10.0 4
DA350 GX 822B 14.5 1,000 2.90 5 14.5 5
TA 360 50 6
TRAITEMENT
4018
To use a bucket to tranfer the biocide directly in the
open drain
WATER
1,000 ppm due to low water production rate
To inject at the outlet of GX722
1000 ppm because we often detect bacteria in DA 350
To inject at the outlet of GX722
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
From D1 + D2
43,902 sbopd
158 m3/h OIL 20000 SBOPD
1,500 sbwpd WATER 500 SBWPD
9.9 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 500 0.50 5 2.5 2
U/S DS301 GX 822B 9.94 1,000 9.9 5 49.7 3
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
Flushing of Oily water
8'' header
GX 822B 20 500 10.0 1 10.0 4
DA350 GX 822B 14.5 1,000 2.90 5 14.5 5
TA 360 GX 822B 50 1 50 6
TRAITEMENT 455
OIL
REMARK
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
WATER
1,000 ppm due to low water production rate
To inject at the outlet of GX722
1000 ppm because we often detect bacteria in DA 350
To inject at the outlet of GX722
78,138 sbopd
521 m3/h OIL 48000 SBOPD
3,300 sbwpd WATER 2300 SBWPD
21.9 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.00 5 5.0 2
U/S DS301 GX 822B 21.86 1,000 21.9 5 109.3 3
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
Flushing of Oily water
8'' header
GX 822B 20 500 10.0 1 10.0 4
DA350 GX 822B 14.5 500 1.45 5 7.3 5
TA 360 GX 822B 50 1 50 6
TRAITEMENT
4018
WATER
To inject at the outlet of GX722
To inject at the outlet of GX722
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
From D1 + D2
30,138 sbopd
201 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.00 5 5.0 2
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 3
GX722 discharge to
DS-320 (wash water)
GX 822B 20 500 10.00 5 50.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TA 360 GX 822B 50 1 50 5
TRAITEMENT
455
OIL
REMARK LOCATION PUMP
BIOCIDE
ORDER
WATER
Open 2 hours the by pass to oily water header for
Flushing of Oily water 8'' header
23,664 sbopd
158 m3/h
1,000 sbwpd
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.00 5 5.0 2
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 3
GX722 discharge to
DS-320 (wash water)
GX 822B 20 500 10.00 5 50.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TA 360 GX 822B 50 1 50 5
TRAITEMENT
4018
WATER
Open 2 hours the by pass to oily water header for
Flushing of Oily water 8'' header
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
53,664 sbopd
358 m3/h OIL 30000 SBOPD
2,500 sbwpd WATER 1500 SBWPD
16.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.00 5 5.0 2
U/S DS301 GX 822B 16.56 1,000 16.6 5 82.8 3
GX722 discharge to
DS-320 (wash water)
GX 822B 40 500 20.00 5 100.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
455
OIL
REMARK
WATER
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
DO NOT CLOSE 2'' FLUSHING LINE
73,664 sbopd
491 m3/h OIL 50000 SBOPD
3,500 sbwpd WATER 2500 SBWPD
23.2 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS301 GX 822B 23.19 1,000 23.2 5 115.9 2
GX722 discharge to
DS-320 (wash water)
GX 822B 20 500 10.00 5 50.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 3
TRAITEMENT
4018
OIL
REMARK
WATER
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
65,875 sbopd
439 m3/h OIL 40000 SBOPD
2,600 sbwpd WATER 1600 SBWPD
17.2 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS301 GX 822B 17.23 1,000 17.2 5 86.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 20 500 10.00 5 50.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 3
TRAITEMENT
455
OIL
REMARK
WATER
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
68,168 sbopd
454 m3/h OIL 38000 SBOPD
2,520 sbwpd WATER 1520 SBWPD
16.7 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.20 1,000 1.2 5 6.0 3
U/S DS301 GX 822B 16.70 1,000 16.7 5 83.5 2
GX722 discharge to
DS-320 (wash water)
GX 822B 20 500 10.00 5 50.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
4018
OIL
REMARK
WATER
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
23,476 sbopd
157 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 10 500 5.00 5 25.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
455
OIL
REMARK
WATER
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
23,122 sbopd
154 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 10 500 5.00 5 25.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
23,122 sbopd
154 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 10 500 5.00 5 25.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
4018
OIL
REMARK
WATER
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
23,122 sbopd
154 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
25,753 sbopd
172 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
4018
OIL
REMARK
WATER
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
20,291 sbopd
135 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS301 GX 822B 6.63 2,000 13.3 5 66.3 2
GX722 discharge to
DS-320 (wash water)
GX 822B 15 1,000 15.00 5 75.0 1
DA350 GX 822B 14.5 1,000 2.90 5 14.5 3
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
20,563 sbopd
137 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
4018
OIL
REMARK
WATER
Double concentration because was not done last week
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
Double concentration because of low water cut
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
20,870 sbopd
139 m3/h OIL 0 SBOPD
1,200 sbwpd WATER 0 SBWPD
8.0 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 7.95 1,000 8.0 5 39.8 2
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
455
Double concentration because of low water cut
OIL
REMARK
WATER
Double concentration because of low water cut
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
21,310 sbopd
142 m3/h OIL 0 SBOPD
1,200 sbwpd WATER 0 SBWPD
8.0 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 7.95 1,000 8.0 5 39.8 2
GX722 discharge to
DS-320 (wash water)
GX 822B 15 500 7.50 5 37.5 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
4018
OIL
REMARK
WATER
Double concentration because of low water cut
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
Double concentration because of low water cut
Open 2 hours the 2'' flushing line to 8'' inch oily water
header
21,310 sbopd
142 m3/h OIL 0 SBOPD
1,200 sbwpd WATER 0 SBWPD
8.0 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 7.95 1,000 8.0 5 39.8 2
GX722 discharge to
DS-320 (wash water)
GX 822B 40 500 20.00 5 100.0 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
455
Double concentration because of low water cut
OIL
REMARK
WATER
Double concentration because of low water cut
From D1 + D2
LOCATION PUMP
BIOCIDE
ORDER
2'' flushing line open all the time
21,310 sbopd
142 m3/h OIL 0 SBOPD
1,200 sbwpd WATER 0 SBWPD
8.0 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 7.95 1,000 8.0 5 39.8 2
GX722 discharge to
DS-320 (wash water)
GX 822B 35 700 24.50 5 122.5 1
DA350 GX 822B 14.5 500 1.45 5 7.3 4
TRAITEMENT
4018
OIL
REMARK
WATER
Double concentration because of low water cut
LOCATION PUMP
BIOCIDE
ORDER
From D1 + D2
Double concentration because of low water cut
2'' flushing line open all the time
21,310 sbopd
142 m3/h OIL 0 SBOPD
1,200 sbwpd WATER 0 SBWPD
8.0 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 7.95 1,000 8.0 5 39.8 2
DA350 GX 822B 14.5 500 1.45 5 7.3 4
U/S Sand filter GX822B 800 600 480.00 5 2400.0 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
Double concentration because of low water cut
It will allow to treat water injection system as well as oily
water package ( via GX722)
LOCATION PUMP
BIOCIDE
ORDER
Double concentration because of low water cut
21,429 sbopd
143 m3/h OIL 0 SBOPD
1,200 sbwpd WATER 0 SBWPD
8.0 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 3
U/S DS301 GX 822B 7.95 1,000 8.0 5 39.8 2
DA350 GX 822B 14.5 500 1.45 5 7.3 4
U/S Sand filter GX822B 800 700 560.00 5 2800.0 1
TRAITEMENT
4018
It will allow to treat water injection system as well as oily
water package ( via GX722). Please open 2'' flushing
line in order to reach 30 m3/h (15 m3/h wash water+15
m3/h flushing line)
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
WATER
From D1 + D2
21,629 sbopd
144 m3/h OIL 0 SBOPD
1,000 sbwpd WATER 0 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.05 1,000 1.1 5 5.3 1
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
DA350 GX 822B 14.5 500 1.45 5 7.3 3
TRAITEMENT
4018 AND 455
1,000 ppm dur to low water flowrate
1,000 ppm dur to low water flowrate
LOCATION PUMP
BIOCIDE
ORDER
OIL
REMARK
WATER
From D1 + D2
25,024 sbopd
167 m3/h OIL 2000 SBOPD
1,000 sbwpd WATER 80 SBWPD
6.6 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS301 GX 822B 6.63 1,000 6.6 5 33.1 2
DA350 GX 822B 14.5 500 7.25 1 7.25 3
U/S Sand filter GX822B 800 500 400 5 2000 1
TRAITEMENT
4018
Open 2'' flushing line discharge of GX722 in order to
reach 30 m3/h (15 m3/h wash water+15 m3/h flushing
line) + run continuously GX721 and GX600.
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
50,808 sbopd
339 m3/h OIL 25000 SBOPD
1,500 sbwpd WATER 1000 SBWPD
9.9 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 2
U/S DS301 GX 822B 9.94 1,000 9.9 5 49.7 3
DA350 GX 822B 14.5 500 7.25 1 7.25 4
U/S Sand filter GX822B 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 30 m3/h (15 m3/h wash water+15 m3/h flushing
line) + run continuously GX721 and GX600.
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
50,808 sbopd
339 m3/h OIL 25000 SBOPD
2,400 sbwpd WATER 1250 SBWPD
15.9 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.90 1,000 15.9 5 79.5 4
DA350 GX 822B 14.5 500 7.25 1 7.25 5
GX722 discharge to
DS-320 (wash
water)
GX 822B 30 800 24.00 5 120.0 2
U/S Sand filter GX822B 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed)
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 30 m3/h (15 m3/h wash water+15 m3/h flushing
line) +
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
52,312 sbopd
349 m3/h OIL 25000 SBOPD
2,400 sbwpd WATER 1250 SBWPD
15.9 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.90 1,000 15.9 5 79.5 4
DA350 GX 822B 14.5 500 7.25 1 7.25 5
GX722 discharge to
DS-320 (wash
water)
GX 822B 35 800 28.00 5 140.0 2
U/S Sand filter GX822B 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed)
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 35 m3/h (24 m3/h wash water+11 m3/h flushing
line) +
27,312 sbopd
182 m3/h OIL 0 SBOPD
1,500 sbwpd WATER 0 SBWPD
9.9 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 9.94 1,000 9.9 5 49.7 4
DA350 GX 822B 14.5 500 7.25 1 7.25 5
GX722 discharge to
DS-320 (wash
water)
GX 822B 30 700 21.00 5 105.0 2
U/S Sand filter GX822B 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed)
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 30 m3/h (24 m3/h wash water+6 m3/h flushing
line) +
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
46,091 sbopd
307 m3/h OIL 20000 SBOPD
2,495 sbwpd WATER 1000 SBWPD
16.5 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 16.53 1,000 16.5 5 82.7 4
DA350 GX 822B 14.5 500 7.25 1 7.25 5
GX722 discharge to
DS-320 (wash
water)
GX 822B 30 800 24.00 5 120.0 2
U/S Sand filter GX822B 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed)
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 30 m3/h (24 m3/h wash water+6 m3/h flushing
line) +
48,181 sbopd
321 m3/h OIL 20000 SBOPD
2,586 sbwpd WATER 1000 SBWPD
17.1 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 17.13 1,000 17.1 5 85.7 4
DA350 GX 822B 14.5 500 7.25 1 7.25 5
GX722 discharge to
DS-320 (wash water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX822 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed)
LOCATION PUMP
BIOCIDE
ORDER
1 hour to treat the DA-350 is enough as there is no flow
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 25 m3/h (18 m3/h wash water+7 m3/h flushing
line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
48,261 sbopd
322 m3/h OIL 20000 SBOPD
2,575 sbwpd WATER 1000 SBWPD
17.1 m3/h
To be treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 17.06 1,000 17.1 5 85.3 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722 discharge to
DS-320 (wash water)
GX 822B 25 500 12.50 5 62.5 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed)
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hour for the dead leg of GX-200
discharg
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to
reach 25 m3/h (18 m3/h wash water+7 m3/h flushing
line)
45,280 sbopd
302 m3/h OIL 16000 SBOPD
2,196 sbwpd 4.6% WATER 640 SBWPD
14.6 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 14.55 1,000 14.6 5 72.8 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 500 12.50 5 62.5 2
U/S Sand filter GX822 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30.
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hour for the dead leg of GX-200 discharg
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
53,430 sbopd
356 m3/h OIL 20000 SBOPD
2,375 sbwpd 4.3% WATER 800 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.73 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 500 12.50 5 62.5 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hour for the dead leg of GX-200 discharg
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
53,430 sbopd
356 m3/h OIL 20000 SBOPD
2,375 sbwpd 4.3% WATER 800 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.73 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX822 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
53,430 sbopd
356 m3/h OIL 20000 SBOPD
2,375 sbwpd 4.3% WATER 800 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.73 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
53,430 sbopd
356 m3/h OIL 20000 SBOPD
2,375 sbwpd 4.3% WATER 800 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.73 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX822 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
53,430 sbopd
356 m3/h OIL 20000 SBOPD
2,375 sbwpd 4.3% WATER 800 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.73 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200
discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
50,143 sbopd
334 m3/h OIL 17000 SBOPD
2,193 sbwpd 4.2% WATER 680 SBWPD
14.5 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 14.53 1,000 14.5 5 72.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX822 800 500 400 5 2000 1
TRAITEMENT
4018
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + Flush during one
hours the PSV collector of the deareation tower (new
purged line installed) + the 7 sand filters to be treated at leat
1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
54,463 sbopd
363 m3/h OIL 22000 SBOPD
2,324 sbwpd 4.1% WATER 660 SBWPD
15.4 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.40 1,000 15.4 5 77.0 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 500 12.50 5 62.5 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
run continuously GX721 and GX600 + the 7 sand filters to
be treated at leat 1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
59,647 sbopd
398 m3/h OIL 24000 SBOPD
2,377 sbwpd 3.8% WATER 720 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.75 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 500 12.50 5 62.5 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
4018
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + the 7 sand filters to
be treated at leat 1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
59,776 sbopd
399 m3/h OIL 23000 SBOPD
2,481 sbwpd 4.0% WATER 690 SBWPD
16.4 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 16.44 1,000 16.4 5 82.2 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 500 12.50 5 62.5 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
run continuously GX721 and GX600 + the 7 sand filters to
be treated at leat 1h30. On line Analyser to be isolated
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
59,647 sbopd
398 m3/h OIL 24000 SBOPD
2,377 sbwpd 3.8% WATER 720 SBWPD
15.7 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 15.75 1,000 15.7 5 78.7 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX822 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + the 7 sand filters to
be treated at leat 1h30. On line Analyser to be isolated+
CA712 dead legs to be performed
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (20 m3/h wash water+5 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2
36,876 sbopd
246 m3/h OIL 0 SBOPD
1,792 sbwpd 4.6% WATER 0 SBWPD
11.9 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 11.87 1,000 11.9 5 59.4 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
455
OIL
REMARK
WATER
From D1 + D2
1,000 ppm due to low water flowrate
run continuously GX721 and GX600 + the 7 sand filters to
be treated at leat 1h30. On line Analyser to be isolated+
CA712 dead legs to be performed
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
37,483 sbopd
250 m3/h OIL 0 SBOPD
1,597 sbwpd 4.1% WATER 0 SBWPD
10.6 m3/h
To be
treated
m3/h ppm l/h hours l/batch
U/S DS300 GX 822B 1.00 1,000 1.0 5 5.0 3
U/S DS301 GX 822B 10.58 1,000 10.6 5 52.9 4
DA350 GX 822B 14.5 1,000 7.25 2 14.50 5
GX722
discharge to
DS-320 (wash
water)
GX 822B 25 800 20.00 5 100.0 2
U/S Sand filter GX821 800 500 400 5 2000 1
TRAITEMENT
4018
run continuously GX721 and GX600 + the 7 sand filters to
be treated at leat 1h30. On line Analyser to be isolated+
CA712 dead legs to be performed
LOCATION PUMP
BIOCIDE
ORDER
1,000 ppm in 2 hours for the dead leg of GX-200 discharge
1,000 ppm due to low water flowrate
Open 2'' flushing line discharge of GX722 in order to reach
25 m3/h (18 m3/h wash water+7 m3/h flushing line)
1,000 ppm due to low water flowrate
OIL
REMARK
WATER
From D1 + D2

You might also like