PIS NO DATE

REPLY
REQUIREMENT
CAT LOCATION
ISSUE
REMARKS
1
02.07.12 YES CIVIL
BOILER # 2
Issue of qulity inspection Defect of K3G5 foundation Short
column
2
3
10.07.12 YES MECH
BOILER # 1
Issue on MPH Steel structure hosting
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
06.10.12 YES MECH
BOILER # 1
Welding requirement
21
06.10.12 YES MECH BOILER Cleaning Requirements before pre parts assembley
22
06.10.12 NO MECH BOILER Welding Procedure For boiler celing grider
23
12.10.12 YES MECH BOILER Issue about Equipment Stacking and storage on Site
24
25
17.10.12 NO MECH BOILER Beam FB-64 Erection Proposal
26
19.10.12 NO MECH BOILER Roof Truss Inspection Before erection
27
23.10.12 NO MECH
BOILER # 1
Welding requirements for Boiler Pressure parts
28
29
06.11.12 NO MECH BOILER Issue about Waterwall NDT(RT)
30
31
08.11.12 NO CIVIL MPH Issue about Turbine & Genarator foundation
32
09.11.12 NO CIVIL MPH Issue about Turbine & Genarator RCC construction
33
14.11.12 NO CIVIL MPH Issue aabout the management construction drawings
34
17.11.12 NO MECH BOILER Pressure parts ball testing & Ground Cleannes inspection
35
20.11.12 NO MECH
BOILER # 2
Problems Found During steel structure inspection
36
37

38
39
22.11.12 NO MECH ESP # 2 Suggestions For upcoming Work of steel Structure
40
22.11.12 NO MECH ESP # 1 Suggestions For erection of ladder platform
41
23.11.12 NO CIVIL MPH Suggestions on CEP Foundation pouring
42
43
24.11.12 NO CIVIL MPH Issue on turbine foundation construction joint of MPH
44
26.11.12 YES CIVIL MPH Issue on bottom base plate can be revised.
45
26.11.12 NO CIVIL MPH Issue on unit 1 MPH Foundation Construction
46
27.11.12 BOILER MECH STORE YARD Issue on equipment and material storage
47
29.11.12 YES CIVIL MPH Issue about Turbine & Genarator Column construction joint
48
29.11.12 NO ELECT STORE YARD Storage of frequency conversion control cabinet
49
01.12.12 NO MECH
BOILER # 1
Spped up erection of boiler steel structure K51
PIS DETAILS
50
01.12.12 NO MECH
BOILER # 2
steel structure alignment prolem
51
01.12.12 NO MECH BOILER On hanger damage and timely reorder
52
03.12.12 NO CIVIL MPH # 1 issue on adding foundation construction joint
53
03.12.12 NO MECH ESP # 1 Proposal on erection
54
04.12.12 NO MECH BOILER Advise for boiler pressure parts, pipes & heders welding
55
06.12.12 NO MECH
BOILER # 1
Problems Found During steel structure inspection
56
07.12.12 NO MECH MPH Transfer and storage requirements for TG set and auxiliaries
57
11.12.12 NO CIVIL MPH # 1 Issue on excavation backfill.
58
11.12.12 NO MECH STORE YARD On equipment storage
59
12.12.12 NO MECH MPH On unloaded turbine press equipment placement at port
60
13.12.12 NO MECH BOILER Endscope for heders inside cleanness inspection
61
13.12.12 NO MECH BOILER Welding proposal on FQP - C of boiler press erection
62
13.12.12 NO MECH ESP # 2 Proposal on erection
63
13.12.12 NO MECH BOILER Welding requirement
64
14.12.12 NO MECH MPH Proposal onEOT crane equipment box storage
65
15.12.12 NO CIVIL MPH # 1 Turbine foundation construction
66
15.12.12 NO MECH BOILER Waterwall welding deformation and prevetive measure
67
17.12.12 NO MECH MPH # 1 Issue on embedded parts erection of super structure
68
18.12.12 NO MECH
BOILER # 1
Proposal on measures taken to working points safety
69
20.12.12 NO MECH ESP # 2 Suggestions on erection sequence
70
20.12.12 YES MECH MPH # 1 Issue on embedded parts erection of super structure
71
21.12.12 NO MECH BOILER Suggestions on NDT
72
22.12.12 NO CIVIL MPH # 1 On design modifications of foundation embedded parts.
73
22.12.12 YES MECH STORE YARD Request BGR to furnish and improve storage conditions at site
74
24.12.12 NO MECH BOILER
RUWW weldintg deformanation and control procedure for
deformanation
75
26.12.12 NO CIVIL MPH # 1 Issue on handover inspection of MPH foundation
76
26.12.12 NO MECH BOILER RUWW weldintg deformanation and welding problem
77
28.12.12 NO MECH MPH # 1 Issue on cleaning of construction joint for superstructre
78
28.12.12 NO MECH BOILER
Serial number compilation for drawings and components of
krishnapa tnam,india mill bunker bay from MCC5
79
01.01.13 NO MECH BOILER Welding Joint qulity problem of left side water wall
80
04.01.13 NO MECH MPH On EOT crane rail erection
81
08.01.13 NO MECH MPH # 1&2 Requirements for tie-in weld coonection ofcrane rails
82
08.01.13 NO MECH MPH Electrical equipment erection for EOT crane
83
08.01.13 NO MECH STORE YARD Turbine storage at site
84
85
11.01.13 NO MECH BOILER Precautions before platen superheater lifting
86
15.01.13 NO MECH BOILER
Cleaning Requirements and control methods for boiler pressure
parts inside
87
15.01.13 NO MECH STORE YARD Rectification on material and equipment storage
88
89
17.01.13 NO MECH BOILER Anti-erosion cover welding for superheater
90
19.01.13 NO MECH STORE YARD On equipment trasportation and storage
91
19.01.13 NO MECH MPH Turbine equipment package opening and checking
92
21.01.13 NO MECH BOILER Proposal on boiler proper assembly and erection
93
21.01.13 NO MECH BOILER Problems Found During pressure parts header inspection
94
22.01.13 NO MECH BOILER On EOT crane erection
95
23.01.13 NO MECH STORE YARD Problems of equipment storage
96
25.01.13 NO MECH BOILER Preparation before ID Fan erection
97
25.01.13 NO MECH BOILER
Fit-up bending of rear water wall screen tubes and front
enclosure wall lower header assembly
98
99
28.01.13 NO MECH MPH Issue on beam & column bolting of MPH steel structure
100
28.01.13 NO MECH BOILER Foregin matters removing inside heders
SL NO PIS NO DATE
REPLY
REQUIREMENT
CAT LOCATION ISSUE REMARKS
1
1 02.07.12 YES CIVIL BOILER # 2
Issue of qulity inspection Defect of K3G5 foundation Short
column
2 3
10.07.12 YES
MECH
BOILER # 1
Issue on MPH Steel structure hosting
3 20
06.10.12 YES
MECH
BOILER # 1
Welding requirement
4 21
06.10.12 YES
MECH BOILER Cleaning Requirements before pre parts assembley
5 22
06.10.12 NO
MECH BOILER Welding Procedure For boiler celing grider
6 23
12.10.12 YES
MECH BOILER Issue about Equipment Stacking and storage on Site
7 25
17.10.12 NO
MECH BOILER Beam FB-64 Erection Proposal
8 26
19.10.12 NO
MECH BOILER Roof Truss Inspection Before erection
9 27
23.10.12 NO
MECH
BOILER # 1
Welding requirements for Boiler Pressure parts
10 29
06.11.12 NO
MECH BOILER Issue about Waterwall NDT(RT)
11 31
08.11.12 NO
CIVIL
MPH
Issue about Turbine & Genarator foundation
12 32
09.11.12 NO
CIVIL
MPH
Issue about Turbine & Genarator RCC construction
13 33
14.11.12 NO
CIVIL
MPH
Issue aabout the management construction drawings
14 34
17.11.12 NO
MECH BOILER Pressure parts ball testing & Ground Cleannes inspection
15 35
20.11.12 NO
MECH
BOILER # 2
Problems Found During steel structure inspection
16 39
22.11.12 NO
MECH
ESP # 2
Suggestions For upcoming Work of steel Structure
17 40
22.11.12 NO
MECH
ESP # 1
Suggestions For erection of ladder platform
18 41
23.11.12 NO
CIVIL
MPH
Suggestions on CEP Foundation pouring
19 43
24.11.12 NO
CIVIL
MPH
Issue on turbine foundation construction joint of MPH
20 44
26.11.12 YES
CIVIL
MPH
Issue on bottom base plate can be revised.
21 45
26.11.12 NO
CIVIL
MPH
Issue on unit 1 MPH Foundation Construction
22 46
27.11.12 NO
MECH
STORE YARD
Issue on equipment and material storage
23 47
29.11.12 YES
CIVIL
MPH
Issue about Turbine & Genarator Column construction joint
24 48
29.11.12 NO
ELECT
STORE YARD
Storage of frequency conversion control cabinet
25 49
01.12.12 NO
MECH
BOILER # 1
Spped up erection of boiler steel structure K51
26 50
01.12.12 NO
MECH
BOILER # 2
steel structure alignment prolem
27 51
01.12.12 NO
MECH BOILER On hanger damage and timely reorder
28 52
03.12.12 NO
CIVIL MPH # 1 issue on adding foundation construction joint
29 53
03.12.12 NO
MECH
ESP # 1
Proposal on erection
30 54
04.12.12 NO
MECH BOILER Advise for boiler pressure parts, pipes & heders welding
31 55
06.12.12 NO
MECH
BOILER # 1
Problems Found During steel structure inspection
32 56
07.12.12 NO
MECH
MPH
Transfer and storage requirements for TG set and auxiliaries
33 57
11.12.12 NO
CIVIL MPH # 1 Issue on excavation backfill.
34 58
11.12.12 NO
MECH
STORE YARD
On equipment storage
35 59
12.12.12 NO
MECH
MPH
On unloaded turbine press equipment placement at port
36 60
13.12.12 NO
MECH
BOILER # 1
Endscope for heders inside cleanness inspection
37 61
13.12.12 NO
MECH BOILER Welding proposal on FQP - C of boiler press erection
38 62
13.12.12 NO
MECH
ESP # 2
Proposal on erection
39 63
13.12.12 NO
MECH BOILER Welding requirement
40 64
14.12.12 NO
MECH
MPH
Proposal onEOT crane equipment box storage
41 65
15.12.12 NO
CIVIL MPH # 1 Turbine foundation construction
42 66
15.12.12 NO
MECH BOILER Waterwall welding deformation and prevetive measure
43 67
17.12.12 NO
MECH MPH # 1 Issue on embedded parts erection of super structure
44 68
18.12.12 NO
MECH
BOILER # 1
Proposal on measures taken to working points safety
45 69
20.12.12 NO
MECH
ESP # 2
Suggestions on erection sequence
46 70
20.12.12 YES
MECH MPH # 1 Issue on embedded parts erection of super structure
47 71
21.12.12 NO
MECH BOILER Suggestions on NDT
48 72
22.12.12 NO
CIVIL MPH # 1 On design modifications of foundation embedded parts.
49 73
22.12.12 YES
MECH
STORE YARD
Request BGR to furnish and improve storage conditions at site
PIS DETAILS
50 74
24.12.12 NO
MECH BOILER
RUWW weldintg deformation and control procedure for
deformation
51 75
26.12.12 NO
CIVIL MPH # 1 Issue on handover inspection of MPH foundation
52 76
26.12.12 NO
MECH BOILER RUWW weldintg deformanation and welding problem
53
77
28.12.12 NO MECH MPH # 1 Issue on cleaning of construction joint for superstructre
54
78
28.12.12 NO MECH BOILER
Serial number compilation for drawings and components of
krishnapa tnam,india mill bunker bay from MCC5
55
79
01.01.13 NO MECH BOILER Welding Joint qulity problem of left side water wall
56
80
04.01.13 NO MECH MPH On EOT crane rail erection
57
81
08.01.13 NO MECH MPH # 1&2 Requirements for tie-in weld coonection ofcrane rails
58
82
08.01.13 NO MECH MPH Electrical equipment erection for EOT crane
59
83
08.01.13 NO MECH STORE YARD Turbine storage at site
61
85
11.01.13 NO MECH BOILER Precautions before platen superheater lifting
62
86
15.01.13 NO MECH BOILER
Cleaning Requirements and control methods for boiler pressure
parts inside
63
87
15.01.13 NO MECH STORE YARD Rectification on material and equipment storage
65
89
17.01.13 NO MECH BOILER Anti-erosion cover welding for superheater
66
90
19.01.13 NO MECH STORE YARD On equipment trasportation and storage
67
91
19.01.13 NO MECH MPH Turbine equipment package opening and checking
68
92
21.01.13 NO MECH BOILER Proposal on boiler proper assembly and erection
69
93
21.01.13 NO MECH BOILER Problems Found During pressure parts header inspection
70
94
22.01.13 NO MECH BOILER On EOT crane erection
71
95
23.01.13 NO MECH STORE YARD Problems of equipment storage
72
96
25.01.13 NO MECH BOILER Preparation before ID Fan erection
73
97
25.01.13 NO MECH BOILER
Fit-up bending of rear water wall screen tubes and front
enclosure wall lower header assembly
75
99
28.01.13 NO MECH MPH Issue on beam & column bolting of MPH steel structure
76
100
28.01.13 NO MECH BOILER Foregin matters removing inside heders
GRID 1 2 3 4 1/4 5 6 7 8 8-Jan 9 10 11 12 13 13a REMARKS
A0
A
0.1/A
1/A
1.1/A
1.2/A
2/A
2.1/A
2.2A
3/A
3.1/A
B
C
MPH COLUMN TIER - I ALIGNMENT STATUS