Sub: - Turn down of compound wall due to rainfall of BO campus at Raisinghnagar As per the information received, the left side compound of BO campus of Raisinghnagar Branch has been turn down due to excessive load of earth filling during the rainfall on 4-9- 2014 evening. I have visited the site on 6-9-2014 as per the instructions of the competent authorities and observed the position of compound wall.
Total area of plot is 38.130m X 45.745m with frontage 38.130m. The plot of Branch Office is approx. 8 ft in depression from existing road from front side and 6-6ft from left side road. The compound wall was constructed along with Branch office building in Jan 2001 with stilt parking on entire floor. The full length RCC Retaining wall was constructed in front side in (38.130m of height 7 ft with 300 mm thick from inner formation level). The RCC retaining wall had also constructed partially on left side up to 10m in length with 230mm thickness and in Right side 28.00 m in length with 300 mm thickness and both side has 7ft height from inner formation level. Total height of front-side has 13-3 ft from inner level and right side also has the same height up to 28.00m with 2ft of MS grill and remaining 6 ft height in balance length.
The left side wall is 45.745 m in length and having 230mm thickness with 345 mm thick columns 3.00m C/C and having 10-3 including 2ft height of MS grill from inner formation level. The RCC Retaining wall was partially constructed in left side up to 10.00 m from front corner in 230 mm thick up to 7ft height from inner formation level and reaming height has match with 1ft height of brick work of 230 mm thick and 2 ft height of MS grill. Earlier the retaining wall was taking the pressure of 4 to 2-6 filling on outer side but now the Road work is in progress and filling has been done up to 6-6 at outer side. The excessive filling has been done on outer side of compound wall, therefore the wall up to 50ft has turn sour due to excessive earth pressure during heavy rainfall.
The remaining portion of Brick wall is also not in good condition and neither it is safe. The entire left side brick compound wall should be replaced with retaining wall. The above wall should be redesign as a retaining wall before construction is taken up. If competent authority accord principal approval for above works thereafter we may arrange to get work done though the Engg. Depptt. , Jaipur.
Engg.Asstt.
Proposal of Reconstruction of Ramp and Entrance Steps in BO Raisinghnagar
We have received notice dated 28-3-2014 from Municipality Office, Raisinghnagar regarding removal of approach road and Entrance steps of BO. The Plot of Branch Office is having 10ft in depression and Branch Office was contracted with stilt parking. During construction of BO, the ramp was provided with an approach road in front side of compound wall for using of stilt parking area and steps was also provided for approach of Office.
Now, The Municipal Board is providing a road in font of our Office. Therefore The Municipal Board is removing the approach road and steps. We have required to reconstruct the approach road and Entrance steps with small gradient.
In view of the facts stated above the competent authority is requested to accord the approval for carry out the above work.