Vlsi Test & Testability (Mel 626) Lecture - 1: Gavax Joshi

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 28

VLSI TEST & TESTABILITY

(MEL G626)
LECTURE - 1
GAVAX JOSHI
INTRODUCTION TO PHILOSOPHY OF
TESTING
If anything can go wrong it
will Murphys law
Testing a system comprises
subjecting it to inputs and
checking its outputs to verify
whether it behaves as per the
specifications targeted during
design.
3
VLSI REALIZATION PROCESS
Determine requirements
Write specifications
Design synthesis and Verification
Fabrication
Manufacturing test
Chips to customer
Customers need
Test development
DEFINITIONS
Design synthesis: Given an I/O function, develop a
procedure to manufacture a device using known materials
and processes.
Verification: Predictive analysis to ensure that the
synthesized design, when manufactured, will perform the
given I/O function.
Test: A manufacturing step that ensures that the physical
device, manufactured from the synthesized design, has no
manufacturing defect.
5
VERIFICATION VS. TEST
Verifies correctness of
design.
Performed by simulation,
hardware emulation, or
formal methods.
Performed once prior to
manufacturing.
Responsible for quality of
design.
Verifies correctness of manufactured
hardware.
Two-part process:
1. Test generation: software
process executed once during
design
2. Test application: electrical tests
applied to hardware
Test application performed on every
manufactured device.
Responsible for quality of devices.
PROBLEMS OF IDEAL TESTS
Ideal tests detect all defects produced in the
manufacturing process.
Ideal tests pass all functionally good devices.
Very large numbers and varieties of possible
defects need to be tested.
Difficult to generate tests for some real defects.
Defect-oriented testing is an open problem.
REAL TESTS
Based on analyzable fault models, which may not
map on real defects.
Incomplete coverage of modeled faults due to
high complexity.
Some good chips are rejected. The fraction (or
percentage) of such chips is called the yield loss.
Some bad chips pass tests. The fraction (or
percentage) of bad chips among all passing chips
is called the defect level.
EXAMPLE: ELECTRICAL IRON
Plug it in 220 AC and see if its heating.
funtional specification, that also partially.
Safety:
All exposed metals parts of the iron are grounded
Auto off on overheating
Detailed Funtionality
Heating when powered on
Glowing of LED to indicate power ON.
Temperature matching with specification for
different ranges that can be set using the regulator
(e.g., woolen, silk, cotton etc.)
EXAMPLE: ELECTRICAL IRON
Performance
Power consumption as per the specification
Time required to reach the desired temperature when
range is changed using the regulator
TEST FOR ONLY ELECTRICAL PARAMETERS
Test for mechanical parameters, like maximum
height from which there is resistance to breaking
of plastic parts if dropped on a tiled floor etc.
Number of tests performed depends on the time,
equipments etc. which in turn is decided by the
target price of the product.
EXAMPLE: NAND GATE
Check
functionality
Verify
input/output of
Table 1
EXAMPLE NAND GATE
Delay Test
0 to 1: time taken by the gate to rise from 0 to 1.
v1=1, v2=1 changed to v1=1, v2=0; After this change in input, time
taken by o
1
to change from 0 to 1.
v1=1, v2=1 changed to v1=0, v2=1; After this change in input,
time taken by o
1
to change from 0 to 1.
v1=1, v2=1 changed to v1=0, v2=0; After this change in input, time
taken by o
1
to change from 0 to 1.
1 to 0: time taken by the gate to fall from 1 to 0.
v1=0, v2=0 changed to v1=1, v2=1; After this change in input, time
taken by o
1
to change from 1 to 0.
v1=1, v2=0 changed to v1=1, v2=1; After this change in input, time
taken by o
1
to change from 1 to 0.
v1=0, v2=1 changed to v1=1, v2=1; After this change in input, time
taken by o
1
to change from 1 to 0.
Fan-out capability:
Number of gates connected at o
1
which can be driven by
the NAND gate.
EXAMPLE : NAND GATE
Power consumption of the gate
Static power: measurement of power when the
output of the gate is not switching. This power is
consumed because of leakage current
Dynamic power: measurement of power when the
output of the gate switches from 0 to 1 and from 1 to
0.
Threshold Level
Minimum voltage at input considered at logic 1
Maximum voltage at input considered at logic 0
Voltage at output for logic 1
Voltage at output for logic 0
Switching noise
Noise generated when the NAND gate switches from
0 to 1 and from 1 to 0
Test at extreme conditions
Performing the tests at temperatures (Low and High
Extremes) as claimed in the specification document.
EXAMPLE: NAND GATE
EXAMPLE: NAND GATE
Output Characteristics
a set of I
DS
vs V
DS
curves for different
constant values of the gate-source
voltage V
GS
Transfer characteristics
a set of I
DS
vs V
GS
curves for different
values of the substrate-source voltage
V
BS
, at constant V
DS
Threshold Voltage Test
Threshold Voltage obtained in test,
matches the specifications
EXAMPLE: NAND GATE
OPTIMAL QUALITY OF TEST
Given a digital logic gate, what tests are to be performed
to assure an acceptable quality of product at reasonable
price
Test for the NAND gate should be such that results are
accurate (say 99% above) yet time for testing is low (less
than a millisecond)
DIGITAL TESTING is not testing digital circuits (comprised
of logic gates)
DIGITAL TESTING is defined as testing a
digital circuit to verify that it performs the
specified logic functions and in proper time.
VLSI CIRCUIT TESTING VERSUS CLASSICAL
SYSTEM TESTING
VLSI testing Classical Systems
Technology matures and faults
tend to decrease, a new technology
based on lower sub-micron devices
evolves
Basic technology is matured and
well testted
Binned as defective and scrapped
(i.e. not repaired)
Diagnosed and repaired
Yield is low Yield is almost 100%
Expensive equipments and
Specialized Manpower
Simple test setups and Technicians
All samples to be tested Random sample testing
Test arrangements in design Rarely required
Reference:
http://newsroom.intel.com/community/intel_newsroom/blog/2014/08/11/
intel-discloses-newest-microarchitecture-and-14-nanometer-
manufacturing-process-technical-details
DIGITAL VLSI TEST PROCESS
AUTOMATIC TEST EQUIPMENT
These test patters
are generally
applied and
analyzed using
automatic test
equipment (ATE).
Figure 7 shows the
picture of an ATE
from Teradyne.
TAXONOMY OF DIGITAL TESTING
TAXONOMY OF DIGITAL TESTING
TAXONOMY OF DIGITAL TESTING
TEST ECONOMICS
The basic essence of economics of a product is
minimum investments and maximum returns. To
under test economics the investments (price paid)
and returns (gains) for a VLSI testing process are to
be enumerated.
Investments
1. Man hours for test plan development:
Expert test engineers are required to make elaborate test
plans.
2. CAD tools for Automatic Test Pattern
Generation
Given a circuit, binary input patters required for testing is
automatically generated by commercial CAD tools.
TEST ECONOMICS
3. Cost of ATE
ATE is a multimillion dollar instrument. So cost of
testing a chip in an ATE is dependent on
time a chip is tested,
the number of inputs/outputs pins
frequency the test patters are to be applied
At- speed testing by ATE is extremely expensive
(TRADEOFF)
4. DFT or BIST circuitry
RETURNS
Proper binning of Chips:
In case of VLSI testing, it is not of much concern
as how many chips are binned as faulty, rather
important is how many faulty chips are binned as
normal
WHAT WE WILL STUDY?
Functional and Structural Testing
Fault Equivalence
Fault Simulation and Testability Measures
Fault Simulation
Testability Measures (SCOAP)
Combinational Circuit Test Pattern
Generation
Introduction to Automatic Test Pattern
Generation (ATPG) and ATPG
Algebras
D-Algorithm
WHAT WE WILL STUDY?
Sequential Circuit Testing and Scan Chains
ATPG for Synchronous Sequential Circuits
Scan Chain based Sequential Circuit Testing
Built in Self test (BIST)
Built in Self Test
Memory Testing
Delay test
Design for Testability (DFT)
System-on-a-Chip (SoC) test
Fault diagnosis
Analog/RF test
Test issues in nano-technology
THANK YOU