THERMAL POWERTECH CORPORATION OF INDIA LIMITED

2X660MW STPP, KRISHNAPATNAM SITE.



FIELD INSPECTION REPORT
Dt of Inspection : 28.05.2011
PERSONS PRESENT : R. GOPAL (HEAD/QA&I/TPCIL SITE)
PVN VARMA (SM/QA&I/TPCIL)
ANISH REDDY(EXECUTION ENGINEER/TPCIL)
SRINIVASA REDDY (SAI RAM AGENCIES)
CONTRACTOR : SRI SAIRAM HARDWARE & CONSTRUCTION, VINJAMUR.
CONT. REFERENCE : TPCIL/INFRA-10/Dt: 28.01.2011
DESC OF WORK : 12.5m SPUN POLES FIXING & CONCRETING OF 33KV LINE
(Bhramadevam to TPCIL)
QUANTITY : 49 Nos (Z1 to Z12, T1 to T18 & M1 to M19 )
CONCRETE SIZE : 0.9mx 0.9m X2.1m(PCC, C.C Ratio - 1:4:8)

OBSERVATIONS :
1) Concreting of poles physically checked at different stages and 43 Nos found
satisfactory.
2) Balance six numbers of poles (Z7, T1,T2,T10, M4,M15) found filled by sand, since these
spun poles may need re-fixing/alteration during line stringing & tie up. (Clearance hold
for these poles until the concreting.)
3) Pit size & depth for poles checked at random during different stages and found
satisfactory.
4) Curing of concretes witnessed at random on various days.


Place : Nellore.
THERMAL POWERTECH CORPORATION OF INDIA LIMITED
2X660MW STPP, KRISHNAPATNAM SITE.

FIELD INSPECTION REPORT

Dt of Inspection : 21.05.2011
PERSONS PRESENT : R. GOPAL (HEAD/QA&I/TPCIL SITE)
ANISH REDDY(EXECUTION ENGINEER/TPCIL)
SRINIVASA REDDY (SAI RAM AGENCIES)
CONTRACTOR : SRI SAIRAM HARDWARE & CONSTRUCTION, VINJAMUR
CONT. REFERENCE : TPCIL/INFRA-10/Dt: 28.01.2011
DESC OF WORK : 12.5m SPUN POLES FIXING & CONCRETING OF 33KV LINE
(Bhramadevam to TPCIL)
QUANTITY : 11 Nos
CONCRETE SIZE : 0.9mx 0.9m X2.1m(PCC, C.C Ratio - 1:4:8)

OBSERVATIONS :
1) Concreting of five poles physically checked and found satisfactory.
2) One pole found filled by sand, since the spun pole may require re-fixing/alteration
during line stringing & tie up.
3) Pit size & depth for three poles checked and found satisfactory.
4) Curing of concretes witnessed at random.


Place : Nellore.


THERMAL POWERTECH CORPORATION OF INDIA LIMITED
2X660MW STPP, KRISHNAPATNAM SITE.

FIELD INSPECTION REPORT

Dt of Inspection : 12.05.2011
PERSONS PRESENT : R. GOPAL (DGM/QA&I/TPCIL SITE)
RADHA KRISHNAN (EXECUTION ENGINEER/TPCIL)
ANISH REDDY(EXECUTION ENGINEER/TPCIL)
SRINIVASA REDDY (SAI RAM AGENCIES)
CONTRACTOR : SRI SAIRAM HARDWARE & CONSTRUCTION, VINJAMUR
CONT. REFERENCE : TPCIL/INFRA-10/Dt: 28.01.2011
DESC OF WORK : 12.5m SPUN POLES FIXING & CONCRETING OF 33KV LINE
(Bhramadevam to TPCIL)
QUANTITY : 10Nos
CONCRETE SIZE : 0.9mx 0.9m X2.1m(PCC, C.C Ratio - 1:4:8)
OBSERVATIONS :
1) Concreting of six poles physically checked and found satisfactory.
2) Two poles found filled by sand, since the spun poles may require re-fixing/alteration
during line stringing & tie up.
3) Pit size & depth of four poles checked and found satisfactory.


Place : Nellore.