Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 19

PRO INENJERING D.O.O.

BELGRADE, SERBIA
DESIGN,RECONSTRUCTION AND REPAIR OF BRIDGES AND CULVERTS
ON RAILWAY AND ROADS




PRESENTATION OF PRO-INZENJERING COMPANY 2/19


ABOUT US

HISTORY
Pro-Inzenjering d.o.o. company specialized in designing, construction, reconstruction and
repairing bridges, culverts and other civil engineering structures. Company was founded on
January 18, 1990.
The company was founded by a group of experienced civil engineers who left reputed state
owned traffic institute and transfered the knowledge and experience to the private construction
enterprising, which was fighting its way on the market at the time.
Since the very beginning, the company has been developing through projects in the field of
designing, technical supervision, and expertise of steel bridges on railway.
Execution of work on building the new bridges and culverts, and reconstruction and repairing
existing bridges and culverts,is the second step in company development.
FIELD OF ACTIVITIES
At present time, Pro-Inzenjering d.o.o. offers services in inspection,design and execution of
works in field of railway and road bridges and culverts:
regular,detail,special and urgent inspections of road bridges and updating of the road bridge
database due to those inspections,
special and urgent inspections of railway bridges,
execution of work on reconstruction and repairing bridges and culverts on railway and roads,
execution of work on replacing existing ageing and damaged bridges and culverts with
special attention to maintain traffic during execution of works,
all stages in design of the new bridges and culverts - preliminary, main, detail and workshop
design,
all stages in rehabilitation design of the existing bridges and culverts - preliminary, main,
detail and workshop design,
technical supervision of all design stages (preliminary,main,detail and workshop design),
expertise,condition state reports etc

Fulfillment of legal terms in specified field of work is accomplished with:

adequate number of civil engineers with licences 310 and 410,issued by Serbian Chamber of
Engineers,
licence for structural design of road structures (bridges) P132G1 and licence for structural
design of railroad infrastructure P142G1 issued by the ministry competent for civil
engineering and building construction,
licence for execution of works on road structures (bridges) I132G1 and licence for execution
of works on railroad infrastructure I142G1 issued by the ministry competent for civil
engineering and building construction,
certificate SRPS ISO 9001:2008 for quality management system.

Except of civil engineers,in our company,we have other employees with following profiles:
high qualified certified welders,
high qualified locksmiths and steel erectors,
riveters.
PRESENTATION OF PRO-INZENJERING COMPANY 3/19


SPECIALTY
regular, detail, special and urgent inspections of road bridges,
special and urgent inspections of railway bridges,
updating of the road bridge database,
making of technical documentation,with all necessary investigation works on site,
for existing bridges on roads and railway, with unknown capacity and stability and without
technical documentation,
condition state reports with all necessary measures of urgent repair works,of existing
bridges and culverts on road and railway infrastructure,
categorization of bridges and culverts on road and railway infrastructure,due to their
capacity,
making of rehabilitation design for existing damaged bridges,
execution of works on reconstruction and repairing bridges with rivets for a long time,
our company is the only one in Serbia which has two operational riveting teams. These
teams are trained for work in all conditions (especially without traffic closure) with all
necessary equipment and tools

































PRESENTATION OF PRO-INZENJERING COMPANY 4/19


QUALITY MANAGEMENT SYSTEM

StandCert d.o.o. in accordance to their procedure,Certification Body certifies that
Pro-Inzenjering d.o.o. has established and applies a quality management system for Engineering
and Designing activities in compilance with standard:
SRPS ISO 9001:2008


PRESENTATION OF PRO-INZENJERING COMPANY 5/19


INVESTORS AND PARTNERS

During these twenty-two years, Pro-Inzenjering d.o.o. had successful cooperation with many
companies such as:


INVESTORS:

Public enterprise "Roads of Serbia"
Public enterprise "Serbian railways "
The Highway Institute Serbia A.D.
"Srbijaput" a.d.

INVESTORS AND PARTNERS:

Traffic institute CIP,
Mostogradnja etc

BUSINESS ASSOCIATES:
Asmec consultants,
Filos inzenjering,
IMS Institute etc






















PRESENTATION OF PRO-INZENJERING COMPANY 6/19


CONTACT

Headquarters office: Nikolaja Gogolja 36, 11030 Belgrade, Serbia

Management: Bulevar Zorana inia 50/3, 11070 Belgrade, Serbia

WAT: 101202065

Bank acc.: 205-1439-39

Activity Code: 4213

Tel/fax. +381 11 21-44-651

Tel. +381 11 311-82-12
e-mails: office@pro-inzenjering.com, proinzenjering@yahoo.com
































PRESENTATION OF PRO-INZENJERING COMPANY 7/19


REFERENCES

A) ACTIVITIES IN LAST YEARS:
A.1) DESIGNING:
Project analysis of repair of the road bridge over the Brestova river on state road IB-22
Year: 2013

Established of segment "bridge capacity" for 10 bridges
Year: 2013

Main designs of 2 railway culverts at km 318+600 and 318+730 railroad Belgrade-Nis-
Preevo,
Year: 2013

Project analysis of repair of the 2 culverts on state road IB-25 at km 0+768 and 1+975
Year: 2013

Project analysis of repair of the road bridge over the Boleica river on state road R-251
Year: 2012

Project analysis of repair of the road bridge over the Groica river on state road R-100
Year: 2012

Main design of rehabilitation of the 24 railway culverts on the railway line Nis-
Dimitrovgrad,chainages from 19+863 to 50+602;
Year: 2011

Main design of the 26 reinforced and pre-stressed concrete bridges on the highway E-763
section Obrenovac-Ub;
Year: 2010

Structural analysis, formwork and reinforcement plans for six pre-stressed bridges on the
highway-Coridor X on the section Gornje Polje-Cariina dolina;
Year: 2010

Structural analysis, formwork, details and reinforcement plans for reinforced concrete
bridges on the highway-Coridor X over the South Morava in the loop Predejane.
Year: 2010

Main design of rehabilitation of the steel road composite bridge Grza V over the Grza
river,on highway M-5,section Paracin-Zajecar;
Year: 2010

Main design of rehabilitation of the bridge over Tamis river on the regional road R-110,
section Perlez-Kovacica.
Year: 2010



PRESENTATION OF PRO-INZENJERING COMPANY 8/19



Main design of rehabilitation of the steel truss road bridge over Jasenica river,on the
regional road R-126,near Jarmenovci;
Year: 2009

Main design of rehabilitation of the steel truss road bridge over Kolubara river,on the
regional road R-271,near the city of Lajkovac;
Year: 2009

Main design of rehabilitation of the steel truss road bridge over Tamnava river,on the
regional road R-101b,section Kalinovac-Novaci;
Year: 2010

Main design of rehabilitation of the steel truss road bridge over Jadar river,on the highway
M-4;
Year: 2010

Main design of rehabilitation of the steel road composite bridge over Ribnica river in the city
of Kraljevo;
Year: 2009

Main designs of rehabilitation of five bridges on the regional road R-116,section Braduljice-
Zivicka,one bridge on section Zivicka-Usce and one more bridge on highway M-22,section
Brvenik-Raska;
Year: 2010
Main design of new culvert on the deviation of railway line Belgrade-Nis-State
border,chainage 0+525,74;
Year: 2011

Main design of new culvert on the deviation of railway line Belgrade-Nis-State
border,chainage 0+955,09;
Year: 2011

Main design of concrete bridge on the deviation of railway line Belgrade-Nis-State
border,chainage 1+322,48;
Year: 2011

Structural analysis of Form Traveler System (FT) in accordance to Serbian standards for
the construction of the new bridge Beka over the Danube river near Beska;
Year: 2010

Structural analysis of Movable Scaffolding System (MSS) in accordance to Serbian
standards for the construction of the new bridge Beka over the Danube river near Beska;
Year: 2009








PRESENTATION OF PRO-INZENJERING COMPANY 9/19

A.2) EXECUTION OF WORKS:
Rehabilitation of the steel truss bridge over the Juzna Morava river in the city of Vranje,with
spans of 30.8+30.8=61.6m;
Year: 2011

Rehabilitation of the steel truss road bridge over the Kolubara river in Lajkovac city,on the
regional road R-271,with span of 51.52m;
Year: 2010

Rehabilitation of the steel truss road bridge over the Jasenica river in Jarmenovac,on the
regional road R-126,with span of 22.0m.
Year: 2010

Rehabilitation of the steel truss road bridge over the Toplica river in Doljevac,with span of
41.25m;
Year: 2010

Rehabilitation of the steel bridge on railway line Belgrade-Nis,chainage 194+194,with span
of 20.6m;
Year: 2009

Rehabilitation of the steel truss bridge over the Banjstica river in Vranjska Banja,with span
of 30.8m;
Year: 2009


Mounting the new construction for carrying power cables on the old Sava Bridge in
Belgrade over the Sava river;
Year: 2009

B) PREVIOUS ACTIVITIES (EXCERPT):
B.1) DESIGNING
Test load inspection plan and supervision of the test load inspections on site for 4 railway
bridges in Republic of Slovenia on railway line Celje-Velenje;
Year: 1992
Test load inspection plan and supervision of the test load inspections on site for 3 railway
bridges in Republic of Slovenia on railway line Pragersko-Sredisce.
Year: 1990
Test load inspection plan and supervision of the test load inspections on site for 4 railway
bridges in Republic of Slovenia on railway line Celje-Maribor.
Year: 1992
Test load inspection plan and supervision of the test load inspection on site for the railway
bridge in Republic of Slovenia on railway line Zabok-Stranje.
Year: 1992
Main design of the rehabilitation of the bridge over Tacevic stream on highway M-25.1;
Year: 2011
Main design of existing state and main design of the rehabilitation of the steel railway bridge
on railway line Belgrade-Nis,chainage 185+341;
Year: 2006
PRESENTATION OF PRO-INZENJERING COMPANY 10/19


Main design of existing state and main design of the rehabilitation of the steel railway bridge
on railway line Belgrade-Nis,chainages 186+228;
Year: 2006
Statical analysis and rehabilitation design of permanent way on steel railway bridge on
railway line Belgrade-Nis,chainage 86+623;
Year: 2007
Main design of the existing state of the steel railway bridge on railway line Sargan Vitasi
Mokra Gora,chainage 212+110;
Year: 2000
Main design of rehabilitation of the railway bridge on railway line Belgrade-Bar,chainage
32+082;
Year: 1992
Main design of the new railway bridge on the railway line Markovac-Resavica,chainage
31+470;
Year: 2000
Main design of the steel temporary bridge with span of 9,3m;
Year: 2001
Main design of the steel temporary bridge with span of 12,3m.
Year: 2001
Main design of rehabilitation of the railway culvert on the railway line Belgrade-Nis-Presevo-
State Border,chainage 368+747;
Year: 2011


B.2) EXECUTION OF WORKS
B.2-1)STEEL BRIDGES
Cast and erect of the new steel bridge, with span of 6.60 m, on railway line Beograd-
Nis,chainage 172+068;
Year: 1999
Cast and erect of the new steel bridge, with spans of 18.80+12.80=31.6m,on railway line
Beograd-Vrac-State border;
Year: 2000
Rehabilitation of the steel truss bridges Pivnica (span 80.0m) and Lucica 2 (span
100.0m) on the railway line Lapovo-Kosovo Polje chainages 103+431 and
135+400,respectively;
Year: 2000
Reconstruction of the steel truss railway bridge on railway line Lapovo-Kosovo Polje,
chainage 202+510;
Year: 2003

Cast and erect of the new steel bridge, with span of 16.0m, on railway line Ruma-abac-
Zvornik, chainage 52+200;
Year: 2000
PRESENTATION OF PRO-INZENJERING COMPANY 11/19


Rehabilitation of the steel truss bridge over Morava river,with spans of 3x81.34m=244.02m,
on railway line Belgrade-Nis,chainage 146+612;
Year: 2004
Reconstruction of the steel truss combined railway/road bridge over the Tamis river in
Tomasevac,with spans of 3x39.84m=119.52m;
Year: 2004
Reconstruction of the steel bridge,with span of 21.0m,on the narrow gauge railway line
Mokra Gora State border,chainage 275+119;
Year: 2004
Reconstruction of the steel truss bridge over the Kutin river,with span of 20.74m,on the
railway line Nis-Dimitrovgrad,chainage 8+641;
Year: 2005
Reconstruction of the steel truss bridge over the Nisava river,with span of 51.20m,on the
railway line Nis-Dimitrovgrad,chainage 13+056;
Year: 2005
Reconstruction of the steel truss bridge over the Nisava river,with span of 62.0m,on the
railway line Nis-Dimitrovgrad,chainage 23+509;
Year: 2005
Reconstruction of the steel bridge over the highway,with span of 17.78m,on the railway line
Nis-Dimitrovgrad,chainage 30+908;
Year: 2005
Reconstruction of the steel truss bridge in Crvena Reka,with span of 21.25m,on railway line
Nis-Dimitrovgrad,chainage 35+652;
Year: 2005
Reconstruction of the steel bridge over the Mokranjska river,with span of 18.36m,on the
railway line Nis-Dimitrovgrad,chainage 44+392;
Year: 2005
Reconstruction of the steel truss bridge over the Nisava river,with span of 61.20m,on the
railway line Nis-Dimitrovgrad,chainage 56+431;
Year: 2005
Reconstruction of the steel truss bridge over the Temska river,with span of 51.80m,on the
railway line Nis-Dimitrovgrad,chainage 64+201;
Year: 2005
Reconstruction of the steel truss bridge over the Nisava river,with span of 55.90m,on the
railway line Nis-Dimitrovgrad,chainage 66+237;
Year: 2005
Reconstruction of the steel truss road bridge over the Velika Morava river near the city of
Jagodina,with total length of 200.0m;
Year: 2006
Rehabilitation of the steel road bridge over the Osaonica river,in the city of Trstenik,with
span of 17.32m;
Year: 2006
Reconstruction of the combined tramway/road steel arch bridge over Sava river in the city of
Belgrade,total length of 400.0m with main span 106.0m steel arch;
Year: 2007

PRESENTATION OF PRO-INZENJERING COMPANY 12/19


B.2-2) REINFORCED OR PRE-STRESSED CONCRETE BRIDGES
Reconstruction of the reinforced concrete bridge on railway line Beograd-Panevo,chainage
18+136;
Year: 1992
Reconstruction of the reinforced concrete bridge on the railway line Markovac-Resavica,
chainage 31+470;
Year: 2001
Reconstruction of the reinforced concrete bridge on the railway line Belgrade-Bar,chainage
66+330;
Year: 2003
Reconstruction of the reinforced concrete bridge on the railway line Belgrade-Bar,chainage
69+369;
Year: 2003
Reconstruction of the reinforced concrete bridge on the railway line Belgrade-Bar,chainage
75+996;
Year: 2003
Cast and erect of the new reinforced concrete bridge on railway line Belgrade-Novi
Sad,chainage 68+530,with span of 7.0m;
Year: 2005
Cast and erect of the new pre-stressed concrete bridge on railway line Belgrade-Novi
Sad,chainage 64+249,with span of 12.20m;
Year: 2005
Cast and erect of the new reinforced concrete bridge on railway line Belgrade-Novi
Sad,chainage 61+858,with span of 7.0m;
Year: 2005
Reconstruction of the reinforced concrete road bridge over the Tamis river in Centa;
Year: 2005

B.2-3) REINFORCED CONCRETE CULVERTS

Cast and erect of the new reinforced concrete culvert on railway line Belgrade-Nis,chainage
17+149,box type;
Year: 1997
Cast and erect of the new reinforced concrete culvert on railway line Belgrade-Bar,chainage
123+041;
Year: 1996
Reconstruction of the seven existing culverts on railway line Lapovo-Kosovo Polje;
Year: 1996
Cast and erect of the new ones and reconstruction of the existing culverts on railway line
Kovacevac-Kusadak (reconstruction of four and building of two new culverts);
Year: 1993
Reconstruction of the four culverts on railway line Belgrade-Pancevo.
Year: 1996
Cast and erect of the new 28 reinforced concrete culverts on railway line Cortanovci-
Petrovaradin,box type,with no traffic closure during the execution of works;
Year: 2004
PRESENTATION OF PRO-INZENJERING COMPANY 13/19


B.2-4) PEDESTRIAN TRAILS

Main design and mounting the new pedestrial trail on the bridge Uvac,with spans of
52.8+3x66.0+52.8m=303.6m,on railway line Belgrade-Bar;
Year: 1998
Main design and reconstruction of the pedestrian trail on the bridge Lozno on railway line
Lapovo-Kosovo Polje,chainage 133+129;
Year: 2002
Main design and mounting the new pedestrial trail on the bridge Rudnica ,on railway line
Lapovo-Kosovo Polje,chainage 163+644;
Year: 2002
Main design and mounting the new pedestrial trail on the bridge over Danube river in
Belgrade,with spans of 161.30+3x162.14+161.30m=809.02m,on railway line Pancevo
glavna-Zrenjanin-State Border,chainage 5+721;
Year: 2005
Main design and mounting the new pedestrial trail on the steel bridge,on railway line
Belgrade-Nis,chainage 186+228,with span of 6.0m;
Year: 2006
Main design and mounting the new pedestrial trail on the bridge Krivelj,with span of
435.6m,on railway line Belgrade-Bor-Zajecar,chainage 208+238;
Year: 2007
Main design and reconstruction of the pedestrial trail on the steel truss bridge over Sava
river in the city of Sabac,on the railway line Ruma-Sabac-Zvornik.
Year: 2007

B.2-5) OTHER CONSTRUCTIONS

riveting all connections (10.000 rivets) on bucket-wheel excavator SRs1300 in Zeoke for
Public Enterprise Electric Power Industry of Serbia EPS.
Year: 2006
PRESENTATION OF PRO-INZENJERING COMPANY 14/19

PICTURE GALERY













RECONSTRUCTION OF THE RAILWAY BRIDGE BANJSKA NEW CULVERT ON THE RAILWAY LINE
BELGRADE NOVI SAD






BRIDGE PIVNICA ON RAILWAY LINE KRALJEVO-SKOPJE
ERECTION OF THE FALLEN BRIDGE WEIGHT 480 TONS ON THE EXISTING PIER 14,5 METERS
HIGH WITHOUT HEAVY MECHANIZATION ONLY WITH HAND TOOLS


PRESENTATION OF PRO-INZENJERING COMPANY 15/19










RECONSTRUCTION OF THE PEDESTRIAL TRAIL ON THE STEEL TRUSS BRIDGE KRIVELJ















REPLACEMENT OF THE DAMAGED RIVETS ON THE STEEL TRUSS BRIDGE








RECONSTRUCTION OF THE COMBINED TRAMWAY/ROAD BRIDGE OVER SAVA RIVER IN
BELGRADE

PRESENTATION OF PRO-INZENJERING COMPANY 16/19




























REHABILITATION OF THE STEEL TRUSS BRIDGE IN CITY OF VRANJE

PRESENTATION OF PRO-INZENJERING COMPANY 17/19




























REHABILITATION OF THE STEEL TRUSS BRIDGE IN CITY OF VRANJE
PRESENTATION OF PRO-INZENJERING COMPANY 18/19


























CAPACITY CHECK OF THE EXISTING BRIDGE CONSTRUCTION
PRESENTATION OF PRO-INZENJERING COMPANY 19/19














MAIN DESIGN OF A NEW BRIDGE ON HIGHWAY E-763, BELGRADE-SOUTH JADRAN

You might also like