ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
1.0 SCOPE This specification establishes the technical requirements for the manufacture, inspection, testing and supply of Fitters, Sample Tube Headers, Sample Monitoring Tubes, Return Headers and Pipe-to-Tube Adaptors tor use in the Delayed Neutron Monitoring System of KAPP-3&4.
2.0 CONTENTS
DESCRIPTION SECTION APPLICABLE STANDARDS AND DRAWINGS 3
MATERIALS ANO WORKMANSHIP 4
GENERAL FUNCTTON ANO DESCRIPTION 5
REOUIREMENTS 6
INSPECTION, TESTS AND REPORTS 7
PACKING AND SHIPPING 8
DOCUMENTATION 9
GUARANTEE 10
CHECK LIST FOR THE BIDDER ANNEXURE-I
OUALITY ASSURANCE PLAN ANNEKURE-II
3.0 APPLICABLE STANDARDS & DRAWINGS
Latest issues of all the standards listed below constitute a part of this specification. In the event that certain requirements of these documents conflict with the requirements of this specification, the requirements of this specification shall govern.
3.1 Applicable Standards .
ASME-B S PV Code Section IIl Division 1, Subsection NB for class 1 nuclear components. Section V- Nondestructive Examination. Section IX - Welding & Brazing Qualifications
63132/PC-E-277 November 2008 NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 4 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
ASTM A106 Specification for seamless carbon steel pipe for high temperature service.
ASTM A-252 Standard practices for detecting susceptibility to intergranular attack in Austenitic Stainless Steels.
ASYM A-479 Specification for Stainless S Heat-Resisting Steel wires, bars and shapes tor use in boilers and other pressure vessels.
ANSI B1.20.4 Dryseal Pipe Threads.
ANSI B31.1 Code for pressure piping.
AWS A-5.4 Specification for Corrosion-Resisting Chromium and Chromium-Nickel Steel covered welding Electrodes.
AWS A-5.9 Specification for Corrosion-Resisting Chromium and Chromium-Nickel Steel covered welding Electrodes.
PC-M-267 NPC specification for seamless austenitic stainless steel tubing for 700 MWe PHWR.
PC-P-198 NPC specification for general cleaning and handling requirements for instruments and fittings for use in heavy water and helium service.
PB-E-182/pp-e-1209 NPC specification for Liquid Penetrant Examination.
PP-E-1212 NFC specification for Radiographic Examination of Metallic Products.
PP-E-1213 NFC specification for Ultrasonic inspection of Metallic Products.
NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 5 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
4. MATERIALS ANQ WORKMANSHIP
alternate materials are used shall be of good quality and in accordance with good practice pertinent to the manufacture of steel pressure vessels and piping, subject to approval of purchaser.
lass, high grade quality and in accordance with the best methods of manufacture to ensure satisfactory operation and service life in
5. GENERAL FUNCTION AND DESCRIPTION The Filters, Sample Tube Headers, Sample Monitoring Tubes, Return Headers and pipe-to- and are, therefore, designed for pressure & temperature of 126 kg/cm and 326C respectively. All the equipments are required for continuous duty.
6. REQUIREMENTS
6.1 General
All the equipments shall be constructed in accordance with ASME Boiler & Pressure Vessel Code, Section Ill, subsection NB tor Class 1 nuclear components and the requirements stated herein. The design and construction shall be appropriate for 40 years of trouble free power plant service for the conditions stipulated. The manufacturer shall prepare fabrication drawings, fabricate, inspect, test and ship completed Filters, Sample Tube Headers, Sample Monitoring Tubes, Return Headers and Pipe-to-Tube Adaptors. Manufacturers work shall be deemed to be complete only when the equipment has been delivered undamaged to the KAPP-3&4 Site.
6.2 Materials
All material rdance with ASTM standards shall be tested as required by those standards. Such tests shall be in addition to the requirements of section S of this spe s shall be free of dirt, grease, oil, rust, metal chips or shavings and loose or heavy scale. r S Return headers shall be fabricated from 5U NS double extra strong seamless carbon steel pipe conforming to ASTM A-1115 Grade B. Stainless steel material used in fabricating the sampl e monitoring tubes shall be conforming to ASTM standards.
63132/PC-E-277 November 2008
NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 6 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
6.3 Welding
All welding in accordance with ASME code for each equipment shall be electric and in accordance with section IX of the ASME B&PV conform to any further requirements stated herein. All welding procedures must be approved by NPCEL prior to their use.
Filler wire used for welds between SS St SS shall be of ER HUB L type as per AWE A- 5.9 and welding electrodes used for welds between S5 St CS shall be of type SUE} cb as per AWS A-5.4.
All surfaces to be joined shall be thoroughly cleaned to prevent weld contamination. In Multipass welding, any porosity, lack of penetration, inclusions or other defects and all slag, oil, penetrant or other foreign material shall be completely removed alter root pass, before subsequent passes are applied.
The root passes of welds accessible from one side only shall be made by the inert Gas Tungsten Arc Welding (GTAW) process. The welds shall be purged on both sided with inert gas. Fillet welds shall be continuous and shall completely seal off crevices. For pipe and tube welding, the initial volume of air in the pipe and/or tubing shall be purged with at least 6 times the air volume of inert gas before any welding is performed. The purge gas shall continue to flow throughout the welding operation. The inert gas shall be vented so as to prevent blow through when root passes are made. All welds shall
cuttings.
Electrode coating and core wire shall be free from undesirable elements that might combine with deposited welded metal and alter its composition. To avoid moisture pick- up, electrodes shall be kept in dry heated storage oven.
All welds shall be examined during and on completion of the process in accordance with section 7.2.2, 7.2.3 and 7.2.4 and as required in the drawings and by Quality Surveyor.
Weld defects shall be removed fully by grinding or chipping to ensure good weld Preparation for rewelding.
6.4 Surface Finish and Cleanliness All weld surfaces shall be smooth and merge smoothly into the parent material. All scale, oxide, weld splatter, oil, chips and other foreign material shall be completely removed from the inside and outside of ail components. All surfaces, which will not permit internal cleaning after complete fabrication and assembly, shall be cleaned of all
63132/PC-E-277 November 2008 NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 7 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
foreign material visible to the naked eye prior to assembly. Adequate precautions such temporary covers shall be taken to ensure that this state of cleanliness is maintained throughout upto the completion of alt work. Particular care should be taken to ensure that ail tubing is kept clean and free of any m
Degreasing agents or other chemicals shall not be used without prior approval of the purchaser. Chemicals containing chlorine or fluorine will not be approved.
Cleaning procedure shall be submitted to the purchaser by the manufacture: and shall be approved by the purchaser.
6.5 ldenti on Each equipment shall be tagged with the following information:
1)Manufacturer's name and identity 2} Unit name and identity of the project
Filters 63132-FR-1 through 63132-FR-392 & 40 spares. Sample Tube Headers 63132-STH-1 through 63132-STH-28 & 6 spares. Sample Monitoring Tube type A 63132-SMT-t through 63132-SMT-14 & 3 spares. Sample Monitoring Tube type B 63132-SMT-15 through 63132-SMT-28 & 3 spares.
7. INSPECTION, TESTS AND REPORTS
7.1 Inspection
The manufacturer shall be responsible tor conducting all the tests as per the NPCIL al QA plan and detailed test procedure covering all the tests stipulated vide the QA plan attached as Annexure-I as well as any other test deemed necessary to meet the requirements. Three copies of these documents shall be submitted to NPCIL by the manufacturer tor approval before commencement of fabrication.
The manufacturer's works shall be accessible to the authorized NPCIL representatives for conducting/witnessing the inspection/testing at all the reasonable time. Any deviation in_ the inspection/test results shall be subject to review by NPCIL and it found acceptable shall be covered by a Design Concession Request to be submitted by the manufacturer in a prescribed format and duly approved by NPCIL.
The manufacturer shall submit 3 sets of Test Reports based on approved test procedure of the equipment.
63132/PC-E-277 November 2008 NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 8 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
7.2 TESTS
7.2.1 Material Tests
All materials designated in accordance with ASTM standards shall be tested as required by such standards, Proof that the required tests have been conducted at the source of supply will tests shall be preformed by the manufacturer at his expense. All bars shall be subjected -E-12t3. All tubes shall be tested as per -M-267.
7.2.2 Visual Examination
All welds shall be examined visually to ensure that they are ot good quality. Should the purchasers inspector be dissatisfied with the quality of such welds, the contractor shall conduct the necessary repairs at his own expense.
7.2.3 Liquid Penetrant Examination
Root and final passes of all seal welds, socket welds & butt weld shall be liquid penetrant checked in accordance with PB-E-182/PP-E-1209 Penetrate and deyetoper shall be removed completely on completion of inspection. The penetrant, developer and cleaning agent shall be approved by the purchaser and shall not contain halogens and sulphur in excess of 25 ppm each.
7.2.4 Radiographic Examination
All butt welds in the sample monitoring tube shall be radiographically examined in accordance with PF-E-1212. Records of radiographic inspection shall be submitted to NPCIL and shall remain as the property of NPGIL.
7.2.5 Hydrostatic Test
headers and pipe-to-tube adaptors shall be subjected to cold hydrostatic test as given in respective drawings.
7.2.6 Helium Leak Test All sample shall be pressurized to 1 kg/cm with a gas containing at least 50% helium. Leakage to atmosphere shall not exceed 10 6 cc/s of helium at a point and 10 5 cc/s overall as determined by mass spectrometer. In lieu of helium leak test, a bubble test shall be accepted under the following conditions. The devices shall be immersed in water and
63132/PC-E-277 November 2008
NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 9 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
pressurized to pressure of 110 kg/cmg with helium. visual observations shall be made for bubble formation. The rate of bubble formation shall not exceed 9 bubbles/hr. of approx. 2 mm diameter.
7.3 Reports
The manufacturer shall submit 5 sets of Inspection Reports and Test Reports based on approved test procedures.
8. DOCUMENTATION
3 sets of detailed fabrication drawings giving all the major dimensions shall be submitted by the manufacturer to NPCIL for approval before commencement of fabrication. 5 sets of As built drawings St Inspection History Docket and 1 set-.of reproducible tracings shall be submitted by the manufacturer to NPCIL after fabrication before shipping.
9. PAGHENG AND SHIPPING
Procedure proposed for the preparation of equipments for shipment shalt be submitted to the purchaser for approval and shall meet the following requirements: 1. All shipment shall be tropically packed, suitably boxed, crated and protected from damage in transit to site. . 2. Equipments shall be prepared for a storage period exceeding six months. 3. Suitable rust inhibitor approved by purchaser shall be applied to carbon steel surfaces. 4. the interior of equipments shall be cleaned dry and ail openings shall be blanked, plugged, capped or otherwise suitably sealed to prevent the ingress of moisture. " 5. All packages shall be suitable for rail/road transport and shall have adequate cushioning, blocking, bracing, skidding, hoisting and tie down provisions. 5. All packages shall be clearly and legibly marked in a suitable, permanent manner with the following information: Purchase Order No............ USI No: 63132 No. of equipments in each package.......... ..
9. GUARANTEE The equipments shall be guaranteed against defects arising out of faulty design, materials and workmanship at least tor a period of one year after commissioning or eighteen months from the date or despatch whichever is earlier.
63132/PC-E-277 November 2008 NUCLEAR POWER CORPORATION OF INDIA LIMITED KAHRAPAR ATOMIC POWER PROJECT-3&4 Page 10 of 12 ENGINEERING SPECIFICATION ON Rev. No.0 PROCESS EOUIPMENTS FOR DELAYED NEUTRON MONITORING SYSTEM
ANNEXURE-1 CHECK LIST FOR THE BIDDER (To be submitted along with the Quotation)
1. Complete technical details of seal plates are being submitted Yes/No along with the Quotation.
2. AIE fabrication drawings including bill of material shall be submitted Yes/No to NPC for approval within one month of receipt of purchase order.
3. Fabrication procedure and Inspection Er Testing procedure shall be Yes/No Submitted to NFC within two months after receipt of purchase order.
4. 5 sets of As built drawings 8. Inspection history Docket shall be Yes/No (Submitted to NFC after completion of the order.
5. All the raw material sha Yes/No Q5 Engineer before taking up fabrication work to ensure that alt the relevant tests such as chemical composition, physical tests. IGC test, ultrasonic tests etc., as applicable, are carried out.
6. Aii the machined components shall be inspected and cleared by NFC Yes/No
and tolerances.
7. All welding Yes/No welder.
B. All tests detailed below shail be carried out as per this specification.
NUCLEAR POWER CORPORATION OF INDIA LIMITED ENGINEERING SPECIFICATION ON PROCESS EOUIPMENTS FOR DELAYE Page 11 of 12 NEUTRON MONITORING SYSTEM Rev. No.0
ANNEXURE-II QUALITY ASURANCE PLAN SL NO. Components Characteristic Type of check Classifi cation of test Quantum of check Reference Document Acceptance Norms Format of Record Agency
P W V Remarks 1 Raw Material Chemical Composition
Analysis/ Test Major 1 sample Per heat Relevant ASTM std. Relevant ASTM std. Product Analysis Report 3 2 1 To be Done in NPCIL Approved Lab Physical Properties (tensile, Yield, %elongation & %reduction in Area , hardness) Inter Granular Mechanical Testing
-do-
1 sample Per heat
-do-
-do-
Test certificate
3 1 1 -do- -do- Corrosion (IGC) Test
IGC Test -do- 1 sample Per heat ASTM A-262 Prac-E ASTM A-262 Prac-E Test certificate 3 1 1 Physical Defect
63132/PC-E-277 November 2008 NUCLEAR POWER CORPORATION OF INDIA LIMITED ENGINEERING SPECIFICATION ON PROCESS EOUIPMENTS FOR DELAYE Page 12 of 12 NEUTRON MONITORING SYSTEM Rev. No.0
SL NO. Components Characteristic Type of check Quantum of check Reference Document Acceptance Norms Format of Record Agency
P W V Remarks 3 FINISHED PRODUCTS Weld Joints Visual Examination 100% NPC Spec. NPC Spec. Test Reports 2 1 1 4 -do- Liquid Penetrant Examination 100% -do- -do- -do- 2 1 1 5 -do- Radiograpic Examination of Butt Welds 100% -do- -do- -do- 3 1 1 To be done By NPC Approved Test House. 6 -do- Leakage Hydrostalic Test 100% -do- -do- -do- 2 1 1 7 -do- Helium Leak Test 100% -do- -do- -do- 2 1 1 8 -do- Final Packing Final Packing Check 100% -do- -do- -do- 2 1 1