JOB SUMMARY OVERVIEW

PROJECT No. : WORK PACKAGE No. : WORK PACKAGE GENERATED DATE


PACKAGE No. : 4333-EI-001
WORK PACKAGE TITLE:
SHEET
13.8Kv Cable installation 1 of 1
WORK PACKAGE GENERATED BY:
AREA(S) WHERE WORK IS TO BE PERFORMED:
APPROVED BY SCHEDULE
CONSTRUCTION PROJECT ACTIVITY ID:
NAME:
DATE:
SCHEDULED DURATION:
SAFETY ACTUAL DURATION:
NAME:
DATE: SCHEDULED START DATE:
ACTUAL START DATE:
PLANT
NAME: SCHEDULED FINISH DATE:
DATE: ACTUAL FINISH DATE:
PLANT
NAME:
DATE:
I. OBJECTIVE

The objective of this package is to detail the safe installation of the new 13.8Kv cables serving the
new #9 Autoclave switchgear. This package will not "Electrically" connect the new cables to the
existing switch. The Termination of the cables to the existing switch will not be performed until all
downstream work has been completed. A separate work package will be issued prior to terminating
the cables to the existing 13.8Kv switch

II. SAFETY


A. When working in substation the adjacent #7 gear will be DEENERGIZED.

B. Testing for absence of voltage shall be performed each time prior to the commencement of work. This
means that each time you leave the work area upon returning to perform work you MUST re-verify that the
equipment is deenergized.

C. During absence of voltage only parties involved directly in the exercise, with Proper PPE, will be allowed
within 15' of task.







Per Project
Schedule
249739995.xls.ms_office
DETAILED JOB PLAN
( work package # 4333-EI-001 )
STEP ACTION TIME
PLANT MK
1
Plant / Construction: Supervision to review work package
and demonstrate concurrence with plan by signing cover
sheet.
Date
2
Construction: Verify that all equipment and miscellaneous
materials are on-site and identified for use in this package.
Date
3
Construction: Erect barricades around New transformer on
roof of the #9 Autoclave finishing building
4
Construction: Erect barricades around existing 13.8Kv
switchgear. (subs 6,7 & 8 )
5
Plant: Install Danger signs on the following Compartments:
1. Incoming feeder #7
2. Substation #6 Upper compartment
3. Substation #8 Upper compartment (switching side)
4. Substation #8 Lower compartment (switching side)
5. Substation #8 Lower compartment (outgoing side)
6. Substation #7 Upper compartment (switching side)
7. Substation #7 Lower compartment (switching side)
8. Substation #7 Lower compartment (outgoing side)
6 Plant: Close #7 feeder switches on sub-stations #7 & #8.
7
Plant: Open #8 feeder switches to sub-stations #7 & #8.
Apply locks on switches to maintain them in the open position.
8 Construction: Place locks on locked #8 feeder Switches.
9
Plant: Open feeder #8 Breakers A & B at Building 50. Rack
breakers out and apply locks to breakers or rack-in rails.
10 Construction: Place locks on locked #8 feeder Breaker.
INITIALS
Page2 of 6
DETAILED JOB PLAN
( work package # 4333-EI-001 )
STEP ACTION TIME
PLANT MK
INITIALS
11
Construction: Test for absence of voltage in Substation #6
outgoing compartment and feeder #8 buss located above
substation #6 outgoing compartment.
USE PROPER PPE!
Beehive Hood
Nomex
Voltage Rated Gloves
12
Construction: Verify that grounds are properly installed in
substation #6 outgoing compartment.
13
Construction: Verify that grounds are properly installed in
feeder #8 incoming compartment.
14 Construction: Install termination kits.
15
Construction: Clean-up and remove all materials from
compartment.
16
Construction: Remove locks on #8 Feeder breaker and #8
feeder switches.
17 Construction: Inform plant that work is completed.
Installation of Cable term kits complete
Page3 of 6
SKETCH SHEET #5
PROJECT No. : 4333 WORK PACKAGE No. : WORK PACKAGE GENERATED DATE
PACKAGE No. : EI-3 1/10/2000
SHEET 1 of 1
AREA(S) WHERE WORK IS TO BE PERFORMED:
4333-EI-001
Existing 13.8Kv Switchgear On roof of 162 Building
WORK PACKAGE TITLE: 13.8 Kv CABLE Installation
Jerry Hamilton
WORK PACKAGE GENERATED BY:
12
11
12
11
12
11
12
11
12
11
7
8
7
8
12
11
7
8
SUB-STATION
#5
INCOMING
FEEDER #7
SUB-STATION
#6
SUB-STATION
#8
SUB-STATION
#7
SWITCH ORIENTATION FOR SUB #6 Cable Term Kit INSTALLATION
SKETCH SHEET #5
PROJECT No. : 4333 WORK PACKAGE No. : WORK PACKAGE GENERATED DATE
PACKAGE No. : EI-3 1/10/2000
SHEET 1 of 1
AREA(S) WHERE WORK IS TO BE PERFORMED:
4333-EI-001
Existing 13.8Kv Switchgear On roof of 162 Building
WORK PACKAGE TITLE: 13.8 Kv CABLE Installation
Jerry Hamilton
WORK PACKAGE GENERATED BY:
12
11
12
11
12
11
12
11
12
11
7
8
7
8
12
11
7
8
INCOMING
FEEDER #7
SUB-STATION
#6
SUB-STATION
#8
SUB-STATION
#7
DANGER SIGNS FOR SUB #6 Cable Term Kit INSTALLATION
DANGER
HIGH VOLTAGE
DANGER
HIGH
VOLTAGE
DANGER
HIGH
DANGER
HIGH
DANGER
HIGH
VOLTAGE
DANGER
HIGH VOLTAGE
SKETCH SHEET #5
PROJECT No. : 4333 WORK PACKAGE No. : WORK PACKAGE GENERATED DATE
PACKAGE No. : EI-3 1/10/2000
SHEET 1 of 1
AREA(S) WHERE WORK IS TO BE PERFORMED:
4333-EI-001
Existing 13.8Kv Switchgear On roof of 162 Building
WORK PACKAGE TITLE: 13.8 Kv CABLE Installation
Jerry Hamilton
WORK PACKAGE GENERATED BY:
12
11
12
11
12
11
12
11
SUB-STATION
#7
SUB-STATION
#8
SUB-STATION
#6
INCOMING
FEEDER #8
DANGER SIGNS FOR SUB #6 Cable Term Kit INSTALLATION
DANGER
HIGH VOLTAGE
DANGER
HIGH
VOLTAGE
DANGER
HIGH
VOLTAGE
DANGER
HIGH VOLTAGE
DANGER
HIGH
DANGER
HIGH VOLTAGE
DANGER
HIGH VOLTAGE