www.fmctechnologies.com/SubseaSystems
FMC Technologies
1777 Gears Road
Houston TX 77067
USA
Phone: +1 281 591 4000
FMC Technologies
PO Box 440
NO-1373 Asker
Norway
Phone: +47 6675 3600
Project Region Customer Systems Insulated Max Water
Depth, ft (m)
Year
Zaro Southern Africa ExxonMobil Tree Flow Loops 2,500 (770) 2002
Thunder Horse GoM BP Trees, Jumpers 6,300 (1,940) 20022003
Princess GoM Shell Trees, Jumpers 3,700 (1,140) 2003
Llano GoM Shell Trees, Jumpers 2,600 (800) 2003
GC 518 GoM Anadarko Trees, Jumpers, Manifolds, PLET 4,200 (1,300) 2004
J. Bellis GoM LLOG Trees, Jumpers, PLET 2,700 (830) 2004
EB-157 & GC-298 GoM ENI Sleds, Jumpers 3,300 (1,000) 2005
Various GoM Ker McGee Trees, Manifolds 5,200 (1,600) 2005-2008
Agbami Africa ChevronTexaco Trees, Jumpers, Manifolds 6,500 (2,000) 2007
Devils Island GoM Helix Trees 2,300 (700) 2007
Cottonwood GoM Petrobras PLET, Jumpers 2,200 (670) 2007
Na Kika GoM BP Trees, Manifolds, Jumpers 6,900 (2,120) 2007
Penn State GoM Amerada Hess Trees 1,440 (440) 2007
WEL Angel,
Chinguetti II,
Pluto
Various Woodside Trees, Flowbase 5,000 (1,520) 2007
Blind Faith GoM ChevronTexaco Trees, Manifolds, PLET 7,000 (2,130) 2007
FRADE Brazil ChevronTexaco Trees, Manifolds 4,000 (1,250) 2008
Mexilho Brazil Petrobras Trees, Manifolds 8,500 (2,600) 2008
Cascade GoM Petrobras Trees, Manifolds, Pump Jumpers 8,800 (2,700) 2008
Perdido GoM Shell Trees, Manifolds, Caisson 10,000 (3,050) 2008
Gumusuit Asia Shell Trees, Manifolds 4,000 (1,250) 2008
Azurite Africa Murphy Trees, Manifolds 4,470 (1,360) 2008
BC-10 Brazil Shell Trees, Manifolds 6,560 (2,000) 2008-2009
Pazor Africa Total Trees, Manifolds 3,900 (1,200) 2009
Atlantis GoM BP Trees, Manifolds 7,074 (2,156) 2009-2011
Isabella GoM BP Trees, Jumpers, PLETs 6,500 (1,980) 2010-2011
Kizomba Africa Saipem Riser Assemblies, FLETs, Field Joints 4,500 (1,500) 2011
CLOV Africa Total Trees, Manifolds 4,500 (1,500) 2011-2012
Novolastic
tm
Other materials
XT System 6 9 Days 10 15 Days
Manifold (8 Slots) 12 Days 26 Days
PLET 5 Days 9 Days
Jumper 4 Days 8 Days
Field track record
Insulation Application Duration (from Start to Final Inspection)