TECHNICAL EVALUATION REPORT

as of August 12, 2014

: NORZAGARAY HEIGHTS RESETTLEMENT PROJECT


: Brgy. Bitungol, Norzagaray, Bulacan
: Mever Construction

PROJECT
LOCATION
DEVELOPER

250 HOUSING UNITS


Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

Rfng

Door

Wdws.

rough finish (frontage)

rough finish (frontage)

rough finish (frontage)

rough finish (frontage)

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

PVC
Vent

Catch
Basin

WC

Tiles

10

rough finish (frontage)

12

w/ hairline cracks (frontage)

14

16

18

rough finish (frontage)

10

20

11

22

rough finish (frontage)

12

24

rough finish (frontage)

rough finish (frontage)

13

26

14

28

15

30

rough finish (frontage)

16

32

17

34

rough finish (frontage)

18

36

19

38

20

40

21

42

22

44

23

45

24

46

25

47

Page 1 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

26

48

Rfng

Door

Wdws.

rough finish (frontage)

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

PVC
Vent

Catch
Basin

WC

Tiles

27

49

28

50

29

51

w/ hairline cracks (frontage)

30

52

31

53

32

54

33

55

34

56

35

57

36

58

37

59

38

60

39

61

40

62

41

63

42

64

43

65

44

66

45

67

46

68

47

69

48

70

49

71

50

72

51

73

52

74

53

54

55

Page 2 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

56

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

57

58

59

60

61

62

10

63

11

64

12

65

13

66

14

67

15

68

16

69

17

70

18

71

19

72

20

73

21

74

22

75

23

76

24

77

25

78

26

79

27

80

28

81

29

82

30

83

31

84

32

33

85

Page 3 of 21

Remarks

provide water stopper (backdoor)

provide water stopper (backdoor)

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

86

34

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

87

35

88

36

89

37

rough finish (frontage)

90

38

91

39

92

40

rough finish (frontage)

93

41

94

42

rough finish (frontage)

95

43

96

44

97

45

rough finish (frontage)

98

46

99

47

100

48

101

49

102

50

103

51

104

52

105

53

106

54

107

55

108

56

109

57

110

58

111

60

112

61

113

114

115

Page 4 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

116

10

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

117

12

118

14

119

16

120

18

121

122

123

124

125

126

127

128

129

130

10

131

11

132

12

133

134

135

136

137

138

139

140

141

142

10

143

11

144

12

13

145

Page 5 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

146

14

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

147

16

148

149

150

151

152

153

154

155

156

157

10

158

11

159

12

160

13

161

14

162

15

163

16

164

17

165

18

166

20

167

10

168

10

169

10

170

10

171

10

172

10

10

173

10

11

174

10

12

13

175

10

Page 6 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

176

10

14

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

177

10

15

178

10

16

179

10

17

180

10

18

181

10

19

182

10

20

183

10

21

184

10

22

185

10

23

186

10

24

187

10

25

188

10

26

189

10

27

190

10

28

191

10

29

192

10

30

193

10

31

194

10

32

195

10

33

196

10

34

197

10

35

198

10

37

199

11

200

11

201

11

202

11

203

11

13

204

11

14

15

205

11

Page 7 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

206

11

16

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

207

11

17

208

11

18

209

11

19

210

11

20

211

13

212

13

213

13

214

13

215

13

216

13

217

13

218

13

219

13

220

13

10

221

13

11

222

13

12

223

13

13

224

13

14

225

13

15

226

13

16

227

13

17

228

13

18

229

13

19

230

13

20

231

13

21

232

13

22

233

13

23

234

13

24

25

235

13

Page 8 of 21

Remarks

Ctrl.
No.

Blk.

Lot

Floor

Wall

No.

No.

Slab

CHB

Plastering

236

13

26

Rfng

Door

Wdws.

C. R.

Service
Safety
Entrance
Switch
/RSC

Elect'l
Wire

Kitche
C.R. n Sink
Jalousi and
e Wdw counte
r

WC

Tiles

PVC
Vent

Catch
Basin

237

13

27

238

13

28

239

13

29

240

13

30

241

13

31

242

13

32

243

13

33

244

13

34

245

13

35

246

13

36

247

13

37

248

13

38

249

13

39

250

13

40

RECONMMENDATION:

LEGEND:

- Provide slope protection at the back of the housing units in Block 3


-The noted defects/damaged portion of housing units shall be covered by Deed of Undertaking and withholding the release of 5% Retention Money

Prepared by:

Checked by:

Noted by:

FORTUNATO JESUS G. DAIGAN


NHA - Senior Engineer

CESAR A. JONOS
Project Engineer
Region III-A

RAMON S. PARAGAS
District Manager
Region III-A

MARK CALVIN A. CABULISAN


NHA - Senior Engineer

Page 9 of 21

Completed
Not Com

Remarks

TECHNICAL EVALUATION REPORT - LAND DEVELOPMENT


as of MAY 2014
: NORZAGARAY HEIGHTS RESETTLEMENT PROJECT
: Brgy. Bitungol, Norzagaray, Bulacan
: Mever Construction

PROJECT
LOCATION
DEVELOPER

165 HOUSING UNITS


Ctrl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

Blk. No. Lot No.


2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

LAYOUT

SEPTIC
ROADWAY
STORM CONCRETE FINISH
AREA
TCT COMPLETED
GROUND ELEV
TANK DRAINAGE LINE
WATER LINE DRAIN PAVEMENT
(SQ.M)

67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
7
7
7
7
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9

43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250

9
9
9
9
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

16
17
18
20
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Prepared by:

Checked by:

LEAN ALEJANDRO J. SERVIDAD


NHA - Senior Engineer

CESAR A. JONOS
Project Engineer
Region III-A

FORTUNATO JESUS G. DAIGAN


NHA - Senior Engineer

TECHNICAL EVALUATION REPORT - LAND DEVELOPMENT


as of MAY 8, 2014
: NORZAGARAY HEIGHTS RESETTLEMENT PROJECT
: Brgy. Bitungol, Norzagaray, Bulacan
: Mever Construction

PROJECT
LOCATION
DEVELOPER

250 DEVELOPED LOTS


Ctrl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

Blk. No. Lot No.


2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3

2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
1
2
3
4
5
6
7
8
9
10
11
12
13

LAYOUT

SEPTIC
ROADWAY
STORM CONCRETE FINISH
TCT COMPLETED
TANK DRAINAGE LINEWATER LINE DRAIN PAVEMENTGROUND ELEV

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
Page 14 of 21

Ctrl.
No.
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

Blk. No. Lot No.


3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
7
7
7
7
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
8

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
60
61
4
6
8
10
12
14
16
18
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8

LAYOUT

SEPTIC
ROADWAY
STORM CONCRETE FINISH
TCT COMPLETED
TANK DRAINAGE LINEWATER LINE DRAIN PAVEMENTGROUND ELEV

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
Page 15 of 21

Ctrl.
No.
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215

Blk. No. Lot No.


8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
11
11
11
11
11
11
11
11
11
11
11
11
13
13
13
13
13

9
10
11
12
13
14
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
37
2
3
5
6
13
14
15
16
17
18
19
20
1
2
3
4
5

LAYOUT

SEPTIC
ROADWAY
STORM CONCRETE FINISH
TCT COMPLETED
TANK DRAINAGE LINEWATER LINE DRAIN PAVEMENTGROUND ELEV

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
Page 16 of 21

Ctrl.
No.
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250

Blk. No. Lot No.


13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

LAYOUT

SEPTIC
ROADWAY
STORM CONCRETE FINISH
TCT COMPLETED
TANK DRAINAGE LINEWATER LINE DRAIN PAVEMENTGROUND ELEV

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

Recommendation:

Legend:

- Provide slope protection at the back of the housing units in Block 3


- The noted defects/damaged portion of Land Development shall be covered by
Deed of Undertaking and withholding the release of 10% Retention Money.

Completed
Not Completed

Prepared by:

Checked by:

Noted by:

FORTUNATO JESUS G. DAIGAN


NHA - Senior Engineer

CESAR A. JONOS
Project Engineer
Region III-A

RAMON S. PARAGAS
District Manager
Region III-A

MARK CALVIN A. CABULISAN


NHA - Senior Engineer

Page 17 of 21

AREA
(SQ.M)
63
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
42
42
40
40
73
67
40
40
40
40
40
40
40
40
40
40
40
Page 18 of 21

AREA
(SQ.M)
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
54
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
Page 19 of 21

AREA
(SQ.M)
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
48
53
40
40
40

Page 20 of 21

AREA
(SQ.M)
40
40
40
40
40
40
40
40
40
40
40
40
40
40
41
41
42
41
40
41
40
43
40
50
53
40
40
43
40
40
40
40
40
40
40

Completed
Not Completed

RAMON S. PARAGAS
District Manager

Page 21 of 21