Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Agenda:
BOG Reliquefaction plant
Low Pressure Gas to Engine(e.g. DFDE, 2-Stroke DFE) and BOG
Reliquefaction System
High Pressure Gas to Engine(Gas Diesel Engine) and BOG
Reliquefaction System
Future concepts
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Regasification
(FSRU/JRU)
LNG receiving
terminal
LNG liquefaction
& terminal
Re-liquefaction of
Boil
Off Gas,
LNG
fuelled
vessels
LNG carrier
Small scale
liquefaction plants
LNG/LBG
FPSO
Flare recovery
Oil separation
Exploration &
Drilling
LNG fuel gas
systems for OSVs
Gensets
Wrtsil
Production &
liquefaction
On- & Offshore small
scale liquefaction
Antiflaring/VOC
Oil separation
Gas FPSO
12 November 2013
LNG bunkering
& barges
Oil tanker
with VOC
Production
Exploration &
development
Power generation
Transport &
storage
Receiving
terminals &
regasification
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Distribution &
transport to the
users
Gas/LNG
distribution/logistics
Feed gas to Power
plants
35 LNG BOG
Reliquefaction systems
Al Gattara (Hyundai) BOG Reliquefaction
System (58,000 tpy )
Wrtsil
12 November 2013
Kollsnes II LNG
2 x capacity of
existing Linde plant
(Kollsnes I).
Hamworthy EPCIC
contract with
GASNOR.
Full production
August 2007.
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Pattern for ships using BOG & LNG as fuel for propulsion
Maximum
(Laden
voyage)
Minimum
(Ballast
voyage)
Ballast
6
Wrtsil
12 November 2013
Laden
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Ballast
Forced
LNG
Excess
BOG
Available BOG
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Available BOG
BOG consumed
in the engine
Balance between
Vessel speed and
BOG flow
Boil-off gas
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Cold box
LNG pump
skid
N2
reservior
N2 supply
skid
N2
companders
Pre-heater
N2
companders
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
BOG
compressors
Boil-off gas
LP-compressor
11
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
12
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
14
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
STEAM/HOT WATER
HEATER
BRINE PUMP
HP PUMP
15
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Pulse
damper (1)
LNG vaporizer
(1)
Suction
drum (1)
Brine
circulation
pump (2)
HP LNG
pump (2)
Brine
heater (1)
Typical dimensions: 7 x 3 x 2 m (L x W x H)
Equipment weights: Ca 25 ton
16
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
HP LNG
pump (2)
17
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Typical dimensions:
30 x 22,5 x 7 m (L x W x H)
18
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
FUTURE CONCEPTS
NEW MR
TWO REFERENCES:
NEW MR DEMONSTRATION PLANT 2,5 TON/DAY
NEWMR EGE PLANT 11 TON/DAY
20
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
21
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
22
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
Liquefaction process
Pretreatment
H2O & CO2
removal
Raw gas
inlet
Gas
precooling
H2O
&
CO2
Storage
system
Cold Box
Pre Cooling
system
MR
refrigeration
unit
Expansion
To flare gas
system
Gas return
from trucks
LNG tank
LBG Truck
Filling station
Flare gas
Export LNG pump
23
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
24
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
25
Wrtsil
12 November 2013
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
EIRIK MELAAEN