Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 90

Renc

RAB

Gang way Dmg V Thp II


Gang way Dmg V Thp II

26,710,000,000.00
26,710,115,639.17
(115,639.17)

DAFTAR HARGA SATUAN UPAH

No

1
2
3
4
5
6
7
8
9
10
11
12

Bahan / Material

Pekerja
Tukang
Kepala Tukang
Mandor
Tukang Las
Operator
Mekanik
Juru Ukur
Juru Gambar
Surveyor
Pembantu Surveyor
Tukang Selam

Satuan

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

Harga Satuan
(Rp.)
46,200.00
60,500.00
66,000.00
66,000.00
66,000.00
93,500.00
77,000.00
66,000.00
66,000.00
77,000.00
55,000.00
110,000.00

42,000.00
55,000.00
60,000.00
60,000.00
60,000.00
85,000.00
70,000.00
60,000.00
60,000.00
70,000.00
50,000.00
100,000.00

DAFTAR HARGA SATUAN BAHAN


0
0

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
30
31
32
33
34
35
36
37
38
39
40
41

Bahan / Material

Semen PC 50 Kg/zak
Pasir Beton
Batu Pecah 2-3
Pasir Urug
Tanah Timbunan
Sirtu
Base Course
Batu Kali
Batu Belah 150 - 200 kg/unit
Batu Belah 300 - 500 kg/unit
Besi Beton
Kawat Beton
Pipa Baja 406.12 mm t = 12 mm
Pipa Baja 812.8 mm t = 14 mm
Pipa Baja 812.8 mm t = 16 mm
Pipa Baja 1400 mm t = 19 mm
Baja Profil dan Plat
Fender V500, L=2000 mm + angker (Hot dip Galvanized)
Electrode
Oxigen
Acetelyn
Pasir Kuarsa
Cat Anti Karat Untuk Baja
Kayu Kelas I
Kayu Kelas II
Kayu Perancah
Multipleks t = 12 mm
Geotextile
Olie
Solar
Paku
Air
Beton Readymix K-300
Beton Readymix K-250
Beton Readymix K-175
Beton Readymix K-Bo
Beton Material Grout
Karung
Air Kerja
Minyak Bekisting
Paving Block
Wiremesh D10

Satuan

zak
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg
kg
kg
kg
kg
Unit
kg
tabung
tabung
kg
kg
m3
m3
m3
lbr
m2
Liter
Liter
kg
m3
m3
m3
m3
m3
m3
lbr
m3
Liter
Liter
m2

Harga Satuan
(Rp.)
63,390.00
126,780.00
142,628.00
116,215.00
52,825.00
123,611.00
153,193.00
126,780.00
158,475.00
211,300.00
7,811.00
15,515.00
9,660.00
9,660.00
9,660.00
9,660.00
19,661.00
21,130,000.00
31,695.00
126,780.00
158,475.00
291.00
145,523.00
3,169,500.00
2,641,250.00
2,535,600.00
168,512.00
25,356.00
30,000.00
8,200.00
15,848.00
792.00
749,100.00
721,600.00
666,600.00
635,800.00
998,800.00
5,283.00
5,283.00
5,283.00
95,085.00
74,210.00

60,000.00
120,000.00
135,000.00
110,000.00
50,000.00
117,000.00
145,000.00
120,000.00
150,000.00
200,000.00
7,300.00
14,500.00
9,660.00
9,660.00
9,660.00
9,660.00
18,375.00
20,000,000.00
30,000.00
120,000.00
150,000.00
275.00
137,741.00
3,000,000.00
2,500,000.00
2,400,000.00
159,500.00
24,000.00
30,000.00
8,200.00
15,000.00
750.00
681,000.00
656,000.00
606,000.00
578,000.00
908,000.00
5,000.00
5,000.00
5,000.00
90,000.00
70,241.40

DAFTAR HARGA SATUAN PERALATAN


0
0

No

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Bahan / Material

Crane Kap. 25 Ton


Crane Kap. 35 Ton
Crane Kap. 40 Ton
Crane Kap. 90 Ton
Crane Kap. 100 Ton
Ponton Service
Hammer Diesel 4.5 Ton + Leader
Hammer Diesel 7.5 Ton + Leader
Dump Truck
Excavator
Motor Grader
Bulldozer
Mesin Gilas
Water Tank Truck
Genset
Mesin Las
Concrete Mixer
Air Compressor
Concrete Vibrator
Concrete Pump
Bar Bender/Bar Cutter

Satuan

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

Harga Satuan
(Rp.)
439,900.00
510,500.00
581,900.00
763,900.00
1,057,100.00
1,288,900.00
556,400.00
661,400.00
241,400.00
407,900.00
423,900.00
480,900.00
309,900.00
220,900.00
90,900.00
62,600.00
41,400.00
103,800.00
28,500.00
374,000.00
33,600.00

Sewa / Bln

50,000,000.00
60,000,000.00
70,000,000.00
100,000,000.00
150,000,000.00
200,000,000.00
80,000,000.00
100,000,000.00
20,000,000.00
40,000,000.00
45,000,000.00
50,000,000.00
35,000,000.00
20,000,000.00
10,000,000.00
9,000,000.00
3,000,000.00
10,000,000.00
2,500,000.00
40,000,000.00
2,500,000.00

Persiapan
Mobilisasi
Upah
Bahan Umum
Tiang Pancang
Besi beton
Beton
Peralatan
Sub Pancang (yg tdk pakai analisa)
Sub Pek Sipil
Sub Pek Gedung
Indeks INASA (diluar analisa)

1.0500
1.0500
1.1000
1.0565
1.0000
1.0700
1.1000
1.0500
1.0500
1.1250
1.1250
1.0300

1.05
1.05
1.11
1.10
1.12
1.11
1.13
1.06

NFA
747,000.00
717,000.00
667,000.00
614,000.00

Jayamix
Estimasi
Estimasi
Jayamix
6.75
187.5

FA
681,000.00
656,000.00
606,000.00
578,000.00

Sewa/Jam

262,500.00
315,000.00
367,500.00
525,000.00
787,500.00
1,050,000.00
420,000.00
525,000.00
105,000.00
210,000.00
236,250.00
262,500.00
183,750.00
105,000.00
52,500.00
47,250.00
15,750.00
52,500.00
13,125.00
210,000.00
13,125.00

HP

BBM/Jam
(liter)
160.00
180.00
200.00
220.00
250.00
220.00
120.00
120.00
120.00
180.00
170.00
200.00
110.00
100.00
37.50
15.00
25.00
50.00
15.00
160.00
20.00

20.00
22.50
25.00
27.50
31.25
27.50
15.00
15.00
15.00
22.50
21.25
25.00
13.75
12.50
4.69
1.88
3.13
6.25
1.88
20.00
2.50

BBM/Jam
(Rp.)
164,000.00
184,500.00
205,000.00
225,500.00
256,250.00
225,500.00
123,000.00
123,000.00
123,000.00
184,500.00
174,250.00
205,000.00
112,750.00
102,500.00
38,437.50
15,375.00
25,625.00
51,250.00
15,375.00
164,000.00
20,500.00

Operator

13,357.14
11,000.00
9,428.57
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
13,357.14
-

Total

439,857.14
510,500.00
581,928.57
763,857.14
1,057,107.14
1,288,857.14
556,357.14
661,357.14
241,357.14
407,857.14
423,857.14
480,857.14
309,857.14
220,857.14
90,937.50
62,625.00
41,375.00
103,750.00
28,500.00
374,000.00
33,625.00

Keterangan

Solar Umum
Solar Industri
Bensin

4500
8200
4500

DAFTAR HARGA SATUAN UPAH


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

No

1
2
3
4
5
6
7
8
9
10
11
12

Bahan / Material

Pekerja
Tukang
Kepala Tukang
Mandor
Tukang Las
Operator
Mekanik
Juru Ukur
Juru Gambar
Surveyor
Pembantu Surveyor
Tukang Selam

Satuan

Harga Satuan
(Rp.)

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

46,200.00
60,500.00
66,000.00
66,000.00
66,000.00
93,500.00
77,000.00
66,000.00
66,000.00
77,000.00
55,000.00
110,000.00

Jakarta, 9 Maret 2012


PT. WASKITA KARYA (Persero)
Divisi IV

Ir. Ridwan Darma, MM


Kepala

DAFTAR HARGA SATUAN BAHAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Bahan / Material

Semen PC 50 Kg/zak
Pasir Beton
Batu Pecah 2-3
Pasir Urug
Tanah Timbunan
Sirtu
Base Course
Batu Kali
Batu Belah 150 - 200 kg/unit
Batu Belah 300 - 500 kg/unit
Besi Beton
Kawat Beton
Baja Profil dan Plat
Electrode
Oxigen
Acetelyn
Kayu Perancah
Multipleks t = 12 mm
Olie
Solar
Paku
Air
Beton Readymix K-300
Beton Readymix K-Bo
Minyak Bekisting
Paving Block
Wiremesh D10

Satuan

Harga Satuan
(Rp.)

zak
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg
kg
tabung
tabung
m3
lbr
Liter
Liter
kg
m3
m3
m3
Liter
Liter
m2

63,390.00
126,780.00
142,628.00
116,215.00
52,825.00
123,611.00
153,193.00
126,780.00
158,475.00
211,300.00
7,811.00
15,515.00
19,661.00
31,695.00
126,780.00
158,475.00
2,535,600.00
168,512.00
30,000.00
8,200.00
15,848.00
792.00
749,100.00
635,800.00
5,283.00
95,085.00
74,210.00

Jakarta, 9 Maret 2012


PT. WASKITA KARYA (Persero)

Ir. Ridwan Darma, MM


Kepala

DAFTAR HARGA SATUAN PERALATAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Bahan / Material

Crane Kap. 35 Ton


Crane Kap. 40 Ton
Ponton Service
Hammer Diesel 4.5 Ton + Leader
Dump Truck
Excavator
Motor Grader
Bulldozer
Mesin Gilas
Water Tank Truck
Genset
Mesin Las
Concrete Mixer
Air Compressor
Concrete Vibrator
Concrete Pump
Bar Bender/Bar Cutter

Satuan

Harga Satuan
(Rp.)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

510,500.00
581,900.00
1,288,900.00
556,400.00
241,400.00
407,900.00
423,900.00
480,900.00
309,900.00
220,900.00
90,900.00
62,600.00
41,400.00
103,800.00
28,500.00
374,000.00
33,600.00

Jakarta, 9 Maret 2012


PT. WASKITA KARYA (Persero)

Ir. Ridwan Darma, MM


Kepala

Beton bertulang K-300 Pile Cap Tipe - 1 (7 m x 8 m x 1.6 m)


No.

Luar Atas

Luar Bawah

Luar Atas

Luar Bawah

Samping

Tengah

Vertikal di tengah pile cap)

Beton bertulang K-300 Pile Cap Tipe - 2 (7 m x 8 m x 1.6 m) ada takikan


No.

Luar Atas

Luar Bawah

Luar Atas

Luar Bawah

Samping

Tengah

Vertikal di tengah pile cap)

Beton bertulang K-300 Pile Cap Tipe - 3 (3.5 m x 3.5 m x 1.6 m)


No.

Luar Atas

Luar Bawah

Luar Atas

Luar Bawah

Samping

Tengah

Vertikal di tengah pile cap)

Beton bertulang K-300 Pile Cap Tipe - 4 (4 m x 8 m x 1.6 m)


No.

Luar Atas (x)

Luar Bawah (x)

Luar Atas (y)

Luar Bawah (y)

Samping

Tengah

Vertikal di tengah pile cap)

Beton bertulang K-300 Pile Cap Tipe - 5 (3.5 m x 8 m x 1.6 m)


No.

Luar Atas

Luar Bawah

Luar Atas

Luar Bawah

Samping

Tengah

Vertikal di tengah pile cap)

p Tipe - 1 (7 m x 8 m x 1.6 m)

1.00

Tulangan

BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

D22-150

2.984

11.20

54.00

604.80

1,804.72

D22-150

2.984

10.00

54.00

540.00

1,611.36

D22-150

2.984

10.20

48.00

489.60

1,460.97

D22-150

2.984

9.00

48.00

432.00

1,289.09

D22-150

2.984

30.00

12.00

360.00

1,074.24

D22-150

2.984

9.60

48.00

460.80

1,375.03

D22-150

2.984

2.40

96.00

230.40

687.51

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton
Rasio Besi/m3
1.05 Rasio Besi/m3

9,302.92
9,302.92
89.60
103.83
109.02

Bekisting
Volume Beton
Rasio Bekisting/m3

p Tipe - 2 (7 m x 8 m x 1.6 m) ada takikan


Tulangan

103.75
89.60
1.16

1.00
BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

D22-150

2.984

11.20

54.00

604.80

1,804.72

D22-150

2.984

10.00

54.00

540.00

1,611.36

D22-150

2.984

10.20

48.00

489.60

1,460.97

D22-150

2.984

9.00

48.00

432.00

1,289.09

D22-150

2.984

30.00

12.00

360.00

1,074.24

D22-150

2.984

9.60

48.00

460.80

1,375.03

D22-150

2.984

2.40

96.00

230.40

687.51

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton
Rasio Besi/m3
1.1 Rasio Besi/m3

9,302.92
9,302.92
89.60
103.83
114.21

Bekisting
Volume Beton
Rasio Bekisting/m3

p Tipe - 3 (3.5 m x 3.5 m x 1.6 m)


Tulangan

103.75
89.60
1.16

1.00
BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

D22-150

2.984

6.70

24.00

160.80

479.83

D22-150

2.984

5.50

24.00

132.00

393.89

D22-150

2.984

6.70

24.00

160.80

479.83

D22-150

2.984

5.50

24.00

132.00

393.89

D22-150

2.984

14.00

12.00

168.00

501.31

D22-150

2.984

5.10

24.00

122.40

365.24

D22-150

2.984

2.40

48.00

115.20

343.76

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton
Rasio Besi/m3
1.05 Rasio Besi/m3
Bekisting
Volume Beton
Rasio Bekisting/m3

2,957.74
2,957.74
19.60
150.91
158.45
103.75
19.60
5.29

p Tipe - 4 (4 m x 8 m x 1.6 m)
Tulangan

1.00
BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

D22-150

2.984

11.20

28.00

313.60

935.78

D22-150

2.984

10.00

28.00

280.00

835.52

D22-150

2.984

7.20

54.00

388.80

1,160.18

D22-150

2.984

6.00

54.00

324.00

966.82

D22-150

2.984

26.40

12.00

316.80

945.33

D22-150

2.984

9.60

28.00

268.80

802.10

D22-150

2.984

2.40

84.00

201.60

601.57

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton
Rasio Besi/m3
1.05 Rasio Besi/m3

6,247.30
6,247.30
51.20
122.02
128.12

Bekisting
Volume Beton
Rasio Bekisting/m3

p Tipe - 5 (3.5 m x 8 m x 1.6 m)


Tulangan

103.75
51.20
2.03

1.00
BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

D22-150

2.984

11.20

28.00

313.60

935.78

D22-150

2.984

10.00

28.00

280.00

835.52

D22-150

2.984

7.20

54.00

388.80

1,160.18

D22-150

2.984

6.00

54.00

324.00

966.82

D22-150

2.984

26.40

12.00

316.80

945.33

D22-150

2.984

9.60

28.00

268.80

802.10

D22-150

2.984

2.40

84.00

201.60

601.57

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton
Rasio Besi/m3
1.05 Rasio Besi/m3
Bekisting
Volume Beton
Rasio Bekisting/m3

6,247.30
6,247.30
51.20
122.02
128.12
103.75
51.20
2.03

kg
kg
m3
kg/m3
kg/m3
m2
m3
m2/m3

kg
kg
m3
kg/m3
kg/m3
m2
m3
m2/m3

kg
kg
m3
kg/m3
kg/m3
m2
m3
m2/m3

kg
kg
m3
kg/m3
kg/m3
m2
m3
m2/m3

kg
kg
m3
kg/m3
kg/m3
m2
m3
m2/m3

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=

Jenis Pekerjaan
Harga Satuan/Lump Sum
NO

URAIAN PEKERJAAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Crane Kap. 40 Ton


Crane Service 35 Ton
Diesel Hammer 4.5 Ton + Leader
Ponton 120 ft
Genset
Mesin las
Excavator
Tandem Roller
Air Compressor
Concrete Vibrator
Bar bender
Bar cutter
Concrete Pump
Theodolite
Waterpass

SATUAN

Mobilisasi dan Demobilisasi


Rp.
VOLUME

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

HARGA SATUAN (Rp.)


1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00

52,500,000.00
52,500,000.00
78,750,000.00
157,500,000.00
2,100,000.00
1,050,000.00
5,250,000.00
4,200,000.00
1,050,000.00
525,000.00
525,000.00
525,000.00
2,625,000.00
525,000.00
525,000.00

TOTAL

=
=

Jenis Pekerjaan
Harga Satuan/Bulan
NO
I

II

III

URAIAN PEKERJAAN

SATUAN

519,750,000.00
JUMLAH (Rp.)
52,500,000.00
52,500,000.00
78,750,000.00
315,000,000.00
2,100,000.00
2,100,000.00
5,250,000.00
4,200,000.00
1,050,000.00
1,575,000.00
525,000.00
525,000.00
2,625,000.00
525,000.00
525,000.00

519,750,000.00

Pengukuran & Positioning


Rp.
VOLUME

HARGA SATUAN (Rp.)

47,107,500.00
JUMLAH (Rp.)

PERALATAN
1 Theodolite
2 Waterpass
3 Alat bantu
Sub total

Bln
Bln
ls

8.00
8.00
1.00

1,050,000.00
787,500.00
157,500.00

8,400,000.00
6,300,000.00
157,500.00
14,857,500.00

TENAGA KERJA
1 Surveyor
2 Pembantu surveyor
Sub total

org
org

150.00
300.00

77,000.00
55,000.00

11,550,000.00
16,500,000.00
28,050,000.00

8.00
8.00

367,500.00
157,500.00

2,940,000.00
1,260,000.00
4,200,000.00

BAHAN BANGUNAN
1 Kayu dan bambu
2 Paku, Cat, Meni
Sub total

ls
ls

TOTAL

47,107,500.00

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=

Jenis Pekerjaan
Harga Satuan/Lump Sum
NO

URAIAN PEKERJAAN
1 Instalasi Listrik
2 Instalasi Air Kerja

SATUAN

Instalasi listrik dan air kerja


Rp.
VOLUME

Ls
Ls

HARGA SATUAN (Rp.)


1.00
1.00

5,250,000.00
3,150,000.00

Jumlah

=
=
URAIAN PEKERJAAN

1 Rekening listrik dan air kerja


2 Keselamatan Kerja

SATUAN

Biaya pemakaian listrik dan air kerja


Rp.
VOLUME

bln
bln

HARGA SATUAN (Rp.)


1.00
1.00

2,625,000.00
2,100,000.00

Jumlah

=
=
URAIAN PEKERJAAN

1 Peralatan Keselamatan Kerja


2 Petugas Keselamatan Kerja

SATUAN

Rp.
VOLUME

bln
bln

=
=
URAIAN PEKERJAAN

Jumlah

2,625,000.00
2,100,000.00

HARGA SATUAN (Rp.)


1.00
1.00

984,375.00
2,625,000.00

3,609,375.00
JUMLAH (Rp.)
984,375.00
2,625,000.00
3,609,375.00

Jenis Pekerjaan
Harga Satuan/Ls

1 Direksi Keet

4,725,000.00
JUMLAH (Rp.)

Keselamatan Kerja

Jumlah

NO

5,250,000.00
3,150,000.00

4,725,000.00

Jenis Pekerjaan
Harga Satuan/Bulan
NO

JUMLAH (Rp.)

8,400,000.00

Jenis Pekerjaan
Harga Satuan/Bulan
NO

8,400,000.00

SATUAN
m2

Direksi Keet
Rp.
VOLUME

HARGA SATUAN (Rp.)


1.00

787,500.00

787,500.00
JUMLAH (Rp.)
787,500.00

787,500.00

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

=
=

Jenis Pekerjaan
Harga Satuan/Lump Sum
NO

URAIAN PEKERJAAN
1 Administrasi
2 Asbuilt Drawing
3 Dokumentasi

SATUAN

Administrasi, As built drawing dan Dokumentasi


17,955,000.00
Rp.
VOLUME

Ls
Ls
Bln

HARGA SATUAN (Rp.)


1.00
1.00
8.00

8,400,000.00
7,875,000.00
210,000.00

Jumlah

=
=
URAIAN PEKERJAAN

BAHAN
1 Besi Beton
2 Kawat Beton

SATUAN

Pembesian
Rp.
VOLUME

kg
kg

UPAH
1 Pekerja
2 Mandor

Hari
Hari

HARGA SATUAN (Rp.)

ALAT
1 Bar Bender/Bar Cutter
2 Genset
3 Alat bantu

Jam
Jam
Ls

8,045.33
310.30
8,355.63

0.0143
0.0029

46,200.00
66,000.00

660.66
191.40

0.0020
0.0010
1.00

852.06

33,600.00
90,900.00
25.00

9,390.79

=
=

Jenis Pekerjaan
Harga Satuan/m3
URAIAN PEKERJAAN
BAHAN
1 Beton Readymix K-300

SATUAN

m3

Pengecoran Beton K-300


Rp.
VOLUME

HARGA SATUAN (Rp.)

1.03

749,100.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.9091
0.2273

46,200.00
66,000.00
Jumlah Upah

C
1
2
3
4

ALAT
Concrete Vibrator
Air Compressor
Concrete Pump
Alat bantu

Jam
Jam
Jam
Ls

0.1250
0.0500
0.0833
1.00

28,500.00
103,800.00
374,000.00
2,500.00
Jumlah Alat

Jumlah

67.20
90.90
25.00
183.10

Jumlah

JUMLAH (Rp.)

7,811.00
15,515.00
Jumlah Bahan

Jumlah Alat

NO

9,390.79

1.03
0.02

Jumlah Upah
C

8,400,000.00
7,875,000.00
1,680,000.00
17,955,000.00

Jenis Pekerjaan
Harga Satuan/Kg
NO

JUMLAH (Rp.)

870,981.92
JUMLAH (Rp.)

771,573.00

771,573.00

42,000.42
15,001.80
57,002.22

3,562.50
5,190.00
31,154.20
2,500.00
42,406.70

870,981.92

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
Jenis Pekerjaan
Harga Satuan/m2
NO

URAIAN PEKERJAAN

A
1
2
3
4
5
6

BAHAN
Kayu Perancah
Multipleks t = 12 mm
Paku
Minyak Bekisting
Klem Baja, Baut dll
Baja Profil dan Plat

1
2
3
4

UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

=
=

Bekisting Pile Cap

SATUAN

VOLUME

m3
lbr
kg
ltr
Ls
kg

0.0560
0.1910
0.3500
0.2000
1.0000
2.58

Rp.
HARGA SATUAN (Rp.)

2,535,600.00
168,512.00
15,848.00
5,283.00
25,000.00
19,661.00
Jumlah Bahan

Hari
Hari
Hari
Hari

0.8000
0.2667
0.2667
0.1333

ALAT
1 Perahu Kerja
2 Alat Bantu

Ls
Ls

46,200.00
60,500.00
66,000.00
66,000.00

1.0000
1.0000

10,000.00
5,000.00

=
=
URAIAN PEKERJAAN

1
2
3
4
5

BAHAN
Kayu Perancah
Multipleks t = 12 mm
Paku
Minyak Bekisting
Klem Baja, Baut dll

1
2
3
4

UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

SATUAN

m3
lbr
kg
ltr
Ls

Bekisting Plat Lantai


Rp.
VOLUME

0.0250
0.1910
0.6000
0.4000
1.0000

HARGA SATUAN (Rp.)

2,535,600.00
168,512.00
15,848.00
5,283.00
7,500.00

Jumlah Bahan

Hari
Hari
Hari
Hari

0.5000
0.1667
0.1667
0.0833

46,200.00
60,500.00
66,000.00
66,000.00
Jumlah Upah

ALAT
1 Alat Bantu
2 Scaffolding

Ls
m2

1.0000
1.0000

191,378.46
JUMLAH (Rp.)

63,390.00
32,181.11
9,508.80
2,113.20
7,500.00

114,693.11

23,100.00
10,085.35
11,002.20
5,497.80
49,685.35

2,000.00
25,000.00
Jumlah Alat

Jumlah

10,000.00
5,000.00

350,999.57

Jenis Pekerjaan
Harga Satuan/m2

36,960.00
16,135.35
17,602.20
8,797.80

15,000.00

Jumlah

141,990.17
32,181.11
5,546.80
1,056.60
25,000.00
50,729.54

79,495.35

Jumlah Alat

NO

JUMLAH (Rp.)

256,504.22

Jumlah Upah
C

350,999.57

2,000.00
25,000.00
27,000.00

191,378.46

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=
=

Jenis Pekerjaan
Harga Satuan/ton
Volume
NO

URAIAN PEKERJAAN

SATUAN

Pemancangan tiang pancang 406.4 mm


Rp.

VOLUME

HARGA SATUAN (Rp.)

211,623.21

JUMLAH (Rp.)

BAHAN
1
2
3

Jumlah Bahan

B
1
2
3
4

UPAH
Pekerja
Pembantu surveyor
Mandor
Operator

Hari
Hari
Hari
Hari

0.2000
0.2000
0.1000
0.2000

46,200.00
55,000.00
66,000.00
93,500.00

9,240.00
11,000.00
6,600.00
18,700.00
45,540.00

439,900.00
556,400.00

73,331.33
92,751.88

Jumlah Upah
C

ALAT
1 Crane Kap. 25 Ton
2 Hammer Diesel 4.5 Ton + Leader

Jam
Jam

0.1667
0.1667

Jumlah Alat

166,083.21

Jumlah

211,623.21

=
=
=

Jenis Pekerjaan
Harga Satuan/ton
Volume
NO

URAIAN PEKERJAAN

SATUAN

Pengukuran
Rp.

VOLUME

HARGA SATUAN (Rp.)

JUMLAH (Rp.)

BAHAN
1
2
3

Jumlah Bahan

B
1
2
3
4

UPAH
Pekerja
Pembantu surveyor
Mandor
Operator

Hari
Hari
Hari
Hari

0.2500
0.2500
0.1250
0.2500

ALAT
1 Crane Kap. 40 Ton
2 Hammer Diesel 4.5 Ton + Leader
3 Ponton Service

Jam
Jam
Jam

0.2000
0.2000
0.2000

11,550.00
13,750.00
8,250.00
23,375.00
56,925.00

581,900.00
556,400.00
1,288,900.00

116,380.00
111,280.00
257,780.00

Jumlah Alat

Jumlah

46,200.00
55,000.00
66,000.00
93,500.00
Jumlah Upah

542,365.00

485,440.00

542,365.00

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=

Jenis Pekerjaan
Harga Satuan/buah
NO
A

URAIAN PEKERJAAN
BAHAN
1 Oxigen
2 Acetelyn

SATUAN

tabung
tabung

Pemotongan tiang dia 40 cm di Darat


Rp.
VOLUME

HARGA SATUAN (Rp.)

0.2000
0.2000

126,780.00
158,475.00
Jumlah Bahan

UPAH
1 Pekerja
2 Mandor
3 Tukang

Hari
Hari
Hari

1.0000
0.2500
0.2500

1
2
3
4

ALAT
Mesin Las
Genset
Crane Kap. 35 Ton
Alat Bantu

Jam
Jam
Jam
Ls

0.2500
0.2500
0.0667
1.0000

46,200.00
16,500.00
15,125.00
77,825.00

62,600.00
90,900.00
510,500.00
5,000.00

15,650.00
22,725.00
34,033.33
5,000.00
77,408.33

Jumlah

212,284.33

Jenis Pekerjaan
Harga Satuan/buah

Pemotongan tiang pancang, setting dan penyambungan dia 812.3 mm

=
URAIAN PEKERJAAN

BAHAN
1 Oxigen
2 Acetelyn

SATUAN

tabung
tabung

Rp.
VOLUME

HARGA SATUAN (Rp.)

0.2000
0.2000

126,780.00
158,475.00
Jumlah Bahan

UPAH
1 Pekerja
2 Mandor
3 Tukang

Hari
Hari
Hari

1.0000
0.5000
0.5000

1
2
3
4
5

ALAT
Mesin Las
Genset
Crane Kap. 40 Ton
Ponton Service
Alat Bantu

Jam
Jam
Jam
Jam
Ls

0.2500
0.2500
0.0833
0.1667
1.0000

JUMLAH (Rp.)

25,356.00
31,695.00
57,051.00

46,200.00
33,000.00
30,250.00
109,450.00

62,600.00
90,900.00
581,900.00
1,288,900.00
5,000.00

15,650.00
22,725.00
48,472.27
214,816.67
5,000.00

Jumlah Alat

Jumlah

473,164.94

46,200.00
66,000.00
60,500.00
Jumlah Upah

25,356.00
31,695.00

46,200.00
66,000.00
60,500.00

Jumlah Alat

NO

JUMLAH (Rp.)

57,051.00

Jumlah Upah
C

212,284.33

306,663.94

473,164.94

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=

Jenis Pekerjaan

=
Harga Satuan/kg
NO
A

=
URAIAN PEKERJAAN

BAHAN
1 Baja Profil dan Plat
2 Pengecatan

SATUAN

Kg
Kg

Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi


gangway
Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi apron
ESR (100 m)
34,596.97
Rp.
VOLUME

HARGA SATUAN (Rp.)

1.0000
1.0000

19,661.00
3,380.80
Jumlah Bahan

UPAH
1 Pekerja
2 Mandor
3 Tukang

Hari
Hari
Hari

0.0640
0.0080
0.0320

1
2
3
4
5

ALAT
Mesin Las
Genset
Crane Kap. 35 Ton
Ponton Service
Alat Bantu

Jam
Jam
Jam
Jam
Ls

0.0150
0.0100
0.0029
0.0020
1.0000

46,200.00
66,000.00
60,500.00

2,956.80
528.00
1,936.00
5,420.80

62,600.00
90,900.00
510,500.00
1,288,900.00
250.00

939.00
909.00
1,458.57
2,577.80
250.00

Jumlah Alat

6,134.37

Jumlah

34,596.97

=
=

Jenis Pekerjaan
Harga Satuan/kg
NO

URAIAN PEKERJAAN

SATUAN

Pengecatan dan pemasangan konstruksi gangway


Rp.
VOLUME

HARGA SATUAN (Rp.)

8,755.79
JUMLAH (Rp.)

BAHAN
1 Pengecatan

Kg

1.0000

3,380.80
Jumlah Bahan

19,661.00
3,380.80
23,041.80

Jumlah Upah
C

JUMLAH (Rp.)

UPAH
1 Pekerja
2 Mandor
3 Tukang

Hari
Hari
Hari

0.0267
0.0033
0.0133

1
2
3
4

ALAT
Mesin Las
Genset
Crane Kap. 35 Ton
Alat Bantu

Jam
Jam
Jam
Ls

0.0150
0.0100
0.0020
1.0000

Jumlah Alat

Jumlah

3,380.80

46,200.00
66,000.00
60,500.00

1,233.54
217.80
804.65
2,255.99

62,600.00
90,900.00
510,500.00
250.00

939.00
909.00
1,021.00
250.00

Jumlah Upah
C

3,380.80

3,119.00

8,755.79

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

Jenis Pekerjaan
Harga Satuan/kg
NO
A

=
URAIAN PEKERJAAN

BAHAN
1 Baja Profil dan Plat
2 Pengecatan

Pengadaan, pabrikasi pengecatan dan pemasangan konstruksi kolom


penyangga

SATUAN

Kg
Kg

Rp.
VOLUME

HARGA SATUAN (Rp.)

1.0000
1.0000

19,661.00
3,500.00
Jumlah Bahan

UPAH
1 Pekerja
2 Mandor
3 Tukang

Hari
Hari
Hari

0.0640
0.0080
0.0320

1
2
3
4
5

ALAT
Mesin Las
Genset
Crane Kap. 35 Ton
Ponton Service
Alat Bantu

Jam
Jam
Jam
Jam
Ls

0.0150
0.0100
0.0040
0.0025
1.0000

19,661.00
3,500.00
23,161.00

2,956.80
528.00
1,936.00
5,420.80

62,600.00
90,900.00
510,500.00
1,288,900.00
250.00

939.00
909.00
2,042.00
3,222.25
250.00

Jumlah Alat

Jumlah

JUMLAH (Rp.)

46,200.00
66,000.00
60,500.00
Jumlah Upah

35,944.05

7,362.25

35,944.05

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

Jenis Pekerjaan

Harga Satuan/m3
Volume

=
=

NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

SATUAN

m3
m2
kg

Beton bertulang (K-300, U32) pondasi gangway 3000x1600x1600


Rp.
26.87
VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
103.0300

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
2.0000
103.0300

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

57,002.22
79,495.35
852.06

1.0000
2.0000
103.0300

42,406.70
15,000.00
183.10

Harga Satuan/m3
Volume

=
=
URAIAN PEKERJAAN

SATUAN

Beton bertulang (K-300, U32) pengisi tiang pancang dia.400mm


L=1000 mm
4,245,262.59
Rp.
3.01
VOLUME

HARGA SATUAN (Rp.)

JUMLAH (Rp.)

BAHAN
1 Beton K-300 (Bahan)

m3

1.0000

771,573.00

771,573.00

2 Pembesian (Bahan)
3 Plat Beton

kg
kg

285.3600
35.3250

8,355.63
19,661.00

2,384,362.58
694,524.83

Jumlah Bahan

3,850,460.41

UPAH
1 Beton K-300 (Upah)

m3

1.0000

57,002.22

57,002.22

2 Pembesian (Upah)

kg

285.3600

852.06

243,143.84

Jumlah Upah
C

42,406.70
30,000.00
18,864.79

2,540,514.15

Jenis Pekerjaan

57,002.22
158,990.70
87,787.74

91,271.49

Jumlah

771,573.00
513,008.44
860,880.56

303,780.66

Jumlah Alat

NO

JUMLAH (Rp.)

2,145,462.00

Jumlah Upah
C

2,540,514.15

m3

300,146.06

ALAT
1 Beton K-300 (Alat)

m3

1.0000

42,406.70

42,406.70

2 Pembesian (Alat)

kg

285.3600

183.10

52,249.42

Jumlah Alat

Jumlah

94,656.12

4,245,262.59

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=

Jenis Pekerjaan
Harga Satuan/m3
NO
A

Beton lantai kerja (K-100) t = 100 mm

=
URAIAN PEKERJAAN

BAHAN
1 Beton Readymix K-Bo

SATUAN

Rp.
VOLUME

m3

HARGA SATUAN (Rp.)

1.03

635,800.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.5000
0.1250

ALAT
1 Concrete Vibrator
2 Air Compressor
3 Alat bantu

Jam
Jam
Ls

46,200.00
66,000.00

0.1250
0.0333
1.00

28,500.00
103,800.00
1,000.00

Lapisan batu kali dipadatkan t = 600 mm

=
URAIAN PEKERJAAN

SATUAN

m3

Rp.
VOLUME

HARGA SATUAN (Rp.)

1.20

126,780.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

1.0000
0.2500

ALAT
1 Alat bantu

Ls

46,200.00
66,000.00

1.00

Jumlah

JUMLAH (Rp.)

152,136.00

46,200.00
16,500.00
62,700.00

5,000.00

Jumlah Alat

219,836.00

152,136.00

Jumlah Upah
C

3,562.50
3,456.54
1,000.00

694,243.04

Jenis Pekerjaan
Harga Satuan/m3

BAHAN
1 Batu Kali

23,100.00
8,250.00

8,019.04

Jumlah

654,874.00

31,350.00

Jumlah Alat

NO

JUMLAH (Rp.)

654,874.00

Jumlah Upah
C

694,243.04

5,000.00

5,000.00

219,836.00

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
Jenis Pekerjaan

Harga Satuan/m3
Volume

=
=

NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

SATUAN

m3
m2
kg

Beton bertulang (K-300, U32) pondasi gangway Type-1,


8000x7000x1600 (1 unit)
2,596,751.61
Rp.
89.60 m3
VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
109.0186

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
2.0000
109.0186

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
2.0000
109.0186

42,406.70
15,000.00
183.10

Harga Satuan/m3
Volume

=
=
URAIAN PEKERJAAN

BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

SATUAN

m3
m2
kg

VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
114.2099

771,573.00
256,504.22
8,355.63

m3
m2
kg

1.0000
2.0000
114.2099

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
2.0000
114.2099

JUMLAH (Rp.)

771,573.00
513,008.44
954,295.97
2,238,877.41

57,002.22
158,990.70
97,313.72
313,306.64

42,406.70
15,000.00
183.10
Jumlah Alat

Jumlah

42,406.70
30,000.00
19,961.30

Beton bertulang (K-300, U32) pondasi gangway Type-2,


8000x7000x1600 (1 unit)
2,645,502.59
Rp.
97.28 m3

Jumlah Bahan

57,002.22
158,990.70
92,890.37

2,596,751.61

Jenis Pekerjaan

2,195,500.32

92,368.00

Jumlah

771,573.00
513,008.44
910,918.88

308,883.29

Jumlah Alat

NO

JUMLAH (Rp.)

42,406.70
30,000.00
20,911.84
93,318.54

2,645,502.59

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

Jenis Pekerjaan

Harga Satuan/m3
Volume

=
=

NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

SATUAN

m3
m2
kg

Beton bertulang (K-300, U32) pondasi gangway Type-3,


3500x35000x1600 (3 unit)
3,060,955.50
Rp.
78.40 m3
VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
158.4504

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
2.0000
158.4504

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
2.0000
158.4504

42,406.70
15,000.00
183.10

Harga Satuan/m3
Volume

=
=
URAIAN PEKERJAAN

BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

SATUAN

m3
m2
kg

VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
128.1185

771,573.00
256,504.22
8,355.63

m3
m2
kg

1.0000
2.0000
128.1185

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
2.0000
128.1185

JUMLAH (Rp.)

771,573.00
513,008.44
1,070,510.83
2,355,092.27

57,002.22
158,990.70
109,164.65
325,157.57

42,406.70
15,000.00
183.10
Jumlah Alat

Jumlah

42,406.70
30,000.00
29,012.27

Beton bertulang (K-300, U32) pondasi gangway Type-4,


8000x4000x1600 (2 unit)
2,776,115.04
Rp.
102.40 m3

Jumlah Bahan

57,002.22
158,990.70
135,009.25

3,060,955.50

Jenis Pekerjaan

2,608,534.36

101,418.97

Jumlah

771,573.00
513,008.44
1,323,952.92

351,002.17

Jumlah Alat

NO

JUMLAH (Rp.)

42,406.70
30,000.00
23,458.50
95,865.20

2,776,115.04

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
Jenis Pekerjaan

Harga Satuan/m3
Volume

=
=

NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

SATUAN

m3
m2
kg

Beton bertulang (K-300, U32) pondasi gangway Type-5,


8000x3500x1600 (5 unit)
2,776,115.04
Rp.
224.00 m3
VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
128.1185

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
2.0000
128.1185

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
2.0000
128.1185

42,406.70
15,000.00
183.10

=
=
URAIAN PEKERJAAN

SATUAN

m3

Pengadaan material dan pemadatan lapisan sirtu


Rp.
VOLUME

HARGA SATUAN (Rp.)

1.20

123,611.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.1000
0.0250

46,200.00
66,000.00
Jumlah Upah

C
1
2
3
4

ALAT
Motor Grader
Mesin Gilas
Water Tank Truck
Alat bantu

Jam
Jam
Jam
Ls

0.0167
0.0250
0.0125
1.00

423,900.00
309,900.00
220,900.00
1,500.00
Jumlah Alat

Jumlah

57,002.22
158,990.70
109,164.65

42,406.70
30,000.00
23,458.50

2,776,115.04

Jenis Pekerjaan
Harga Satuan/m3

BAHAN
1 Sirtu

2,355,092.27

95,865.20

Jumlah

771,573.00
513,008.44
1,070,510.83

325,157.57

Jumlah Alat

NO

JUMLAH (Rp.)

173,691.08
JUMLAH (Rp.)

148,333.20

148,333.20

4,620.00
1,650.00
6,270.00

7,079.13
7,747.50
2,761.25
1,500.00
19,087.88

173,691.08

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=

Jenis Pekerjaan
Harga Satuan/m3
NO
A

URAIAN PEKERJAAN
BAHAN
1 Tanah Timbunan

SATUAN

Pengadaan material dan pemadatan lapisan/tanah urug


Rp.
VOLUME

m3

HARGA SATUAN (Rp.)

1.20

52,825.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.0800
0.0200

1
2
3
4

ALAT
Motor Grader
Mesin Gilas
Water Tank Truck
Alat bantu

Jam
Jam
Jam
Ls

46,200.00
66,000.00

0.0167
0.0125
0.0167
1.00

423,900.00
309,900.00
220,900.00
500.00

Pengadaan material dan pemadatan lapisan basecourse (CBR > 80%)

=
URAIAN PEKERJAAN

SATUAN

m3

Rp.
VOLUME

HARGA SATUAN (Rp.)

1.20

153,193.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.1000
0.0250

46,200.00
66,000.00
Jumlah Upah

C
1
2
3
4

ALAT
Motor Grader
Mesin Gilas
Water Tank Truck
Alat bantu

Jam
Jam
Jam
Ls

0.0167
0.0250
0.0125
1.00

423,900.00
309,900.00
220,900.00
1,500.00
Jumlah Alat

Jumlah

7,079.13
3,873.75
3,689.03
500.00

83,547.91

Jenis Pekerjaan
Harga Satuan/m3

BAHAN
1 Base Course

3,696.00
1,320.00

15,141.91

Jumlah

63,390.00

5,016.00

Jumlah Alat

NO

JUMLAH (Rp.)

63,390.00

Jumlah Upah
C

83,547.91

209,189.48
JUMLAH (Rp.)

183,831.60

183,831.60

4,620.00
1,650.00
6,270.00

7,079.13
7,747.50
2,761.25
1,500.00
19,087.88

209,189.48

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=

Jenis Pekerjaan
Harga Satuan/m3
NO
A

URAIAN PEKERJAAN
BAHAN
1 Pasir Urug

SATUAN

m3

Pengadaan lapisan pasir t = 50 mm di bawah paving blok


158,410.53
Rp.
VOLUME

HARGA SATUAN (Rp.)

1.20

116,215.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.0800
0.0200

46,200.00
66,000.00
Jumlah Upah

JUMLAH (Rp.)

139,458.00

139,458.00

3,696.00
1,320.00
5,016.00

ALAT
1 Mesin Gilas
2 Water Tank Truck
3 Alat bantu

Jam
Jam
Ls

0.0250
0.0167
1.00

309,900.00
220,900.00
2,500.00
Jumlah Alat

Jumlah

7,747.50
3,689.03
2,500.00
13,936.53

158,410.53

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=

Jenis Pekerjaan
Harga Satuan/m3
NO
A

URAIAN PEKERJAAN
BAHAN
1 Paving Block

SATUAN

m3

#REF!
Rp.
VOLUME

HARGA SATUAN (Rp.)

1.05

95,085.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.2667
0.0333

JUMLAH (Rp.)

99,839.25

99,839.25

46,200.00
66,000.00
Jumlah Upah

116,858.59

12,321.54
2,197.80
14,519.34

ALAT
1 Alat bantu

Ls

1.00

2,500.00

Jumlah Alat

Jumlah

2,500.00

2,500.00

116,858.59

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=

Jenis Pekerjaan
Harga Satuan/m3
NO
A

Pengadaan material dan pemasangan batu armour ukuran 150 - 200 Kg/unit

=
URAIAN PEKERJAAN

BAHAN
1 Batu Belah 150 - 200 kg/unit

SATUAN

m3

Rp.
VOLUME

HARGA SATUAN (Rp.)

1.20

158,475.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.2667
0.0667

46,200.00
66,000.00
Jumlah Upah

ALAT
1 Dump Truck
2 Excavator
3 Alat bantu

Jam
Jam
Ls

0.2000
0.0400
1.00

241,400.00
407,900.00
5,000.00

Jumlah Alat

Jumlah

276,489.74
JUMLAH (Rp.)

190,170.00

190,170.00

12,321.54
4,402.20
16,723.74

48,280.00
16,316.00
5,000.00

69,596.00

276,489.74

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=

Jenis Pekerjaan
Harga Satuan/m3
NO
A

Pengadaan material dan pemasangan batu armour ukuran 300 - 500 Kg/unit

=
URAIAN PEKERJAAN

BAHAN
1 Batu Belah 300 - 500 kg/unit

SATUAN

m3

Rp.
VOLUME

HARGA SATUAN (Rp.)

1.20

211,300.00

Jumlah Bahan
B

UPAH
1 Pekerja
2 Mandor

Hari
Hari

0.2667
0.0667

46,200.00
66,000.00
Jumlah Upah

ALAT
1 Dump Truck
2 Excavator
3 Alat bantu

Jam
Jam
Ls

0.2000
0.0667
1.00

241,400.00
407,900.00
5,000.00

Jumlah Alat

Jumlah

350,770.67
JUMLAH (Rp.)

253,560.00

253,560.00

12,321.54
4,402.20
16,723.74

48,280.00
27,206.93
5,000.00

80,486.93

350,770.67

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=
=
=

Jenis Pekerjaan
Harga Satuan/m3
Volume
NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting (Bahan)
3 Pembesian (Bahan)

SATUAN

m3
m2
kg

Beton bertulang (K-300, U32) paravet/ dinding penahan


2,806,099.78
Rp.
#REF!
m3
VOLUME

HARGA SATUAN (Rp.)

1.0000
1.5000
150.0000

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
1.5000
150.0000

ALAT
1 Beton K-300 (Alat)
2 Bekisting (Alat)
3 Pembesian (Alat)

m3
m2
kg

57,002.22
79,495.35
852.06

1.0000
1.5000
150.0000

42,406.70
15,000.00
183.10

2,806,099.78

Jenis Pekerjaan
Harga Satuan/m3
Volume
URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting (Bahan)
3 Pembesian (Bahan)

Beton bertulang (K-300, U32) kepala tiang pancang/ pier dan


abutment

=
=

#REF!

SATUAN

VOLUME

m3
m2
kg

Rp.

UPAH
1 Beton K-300 (Upah)
2 Bekisting (Upah)
3 Pembesian (Upah)

m3
m2
kg

HARGA SATUAN (Rp.)

1.0000
1.5000
150.0000

771,573.00
256,504.22
8,355.63

1.0000
1.5000
150.0000

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
1.5000
150.0000

JUMLAH (Rp.)

771,573.00
384,756.33
1,253,344.50
2,409,673.83

57,002.22
119,243.03
127,809.00
304,054.25

42,406.70
15,000.00
183.10
Jumlah Alat

Jumlah

2,806,099.78

m3

Jumlah Bahan
B

42,406.70
22,500.00
27,465.00
92,371.70

Jumlah

57,002.22
119,243.03
127,809.00
304,054.25

Jumlah Alat

NO

771,573.00
384,756.33
1,253,344.50
2,409,673.83

Jumlah Upah
C

JUMLAH (Rp.)

42,406.70
22,500.00
27,465.00
92,371.70

2,806,099.78

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

Jenis Pekerjaan
Harga Satuan/m3
Volume
NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting (Bahan)
3 Pembesian (Bahan)

Beton bertulang retaining wall apron dan pelat lantai apron

=
=

#REF!

SATUAN

VOLUME

m3
m2
kg

Rp.

HARGA SATUAN (Rp.)

1.0000
1.5000
125.0000

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
1.5000
125.0000

57,002.22
79,495.35
852.06
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting (Alat)
3 Pembesian (Alat)

m3
m2
kg

1.0000
1.5000
125.0000

42,406.70
15,000.00
183.10

=
=
=
URAIAN PEKERJAAN

BAHAN
1 Beton K-300 (Bahan)
2 Bekisting (Bahan)
3 Wiremesh D10

SATUAN

m3
m2
m2

Beton bertulang (K-300, U32) lantai gangway


Rp.
#REF!
m3
VOLUME

HARGA SATUAN (Rp.)

1.0000
1.5000
7.0000

771,573.00
114,693.11
74,210.00
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting (Upah)
3 Pembesian (Upah)

m3
m2
m2

1.0000
1.5000
7.0000

57,002.22
49,685.35
2,128.53
Jumlah Upah

ALAT
1 Beton K-300 (Alat)
2 Bekisting (Alat)
3 Pembesian (Alat)

m3
m2
m2

1.0000
1.5000
7.0000

57,002.22
119,243.03
106,507.50

42,406.70
22,500.00
22,887.50

1,698,379.19

JUMLAH (Rp.)

771,573.00
172,039.67
519,470.00
1,463,082.67

57,002.22
74,528.03
14,899.69
146,429.94

42,406.70
27,000.00
851.41
Jumlah Alat

Jumlah

2,200,783.08

2,571,330.03

Jenis Pekerjaan
Harga Satuan/m3
Volume

771,573.00
384,756.33
1,044,453.75

87,794.20

Jumlah

JUMLAH (Rp.)

282,752.75

Jumlah Alat

NO

2,571,330.03

m3

42,406.70
40,500.00
5,959.88
88,866.58

1,698,379.19

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
=

Jenis Pekerjaan
Harga Satuan/m3
Volume
NO
A

=
=
URAIAN PEKERJAAN

BAHAN
1 Beton K-300 (Bahan)
2 Bekisting (Bahan)
3 Wiremesh D10

SATUAN

m3
m2
m2

Beton bertulang (K-300, wiremesh D10) lantai selter


Rp.
54.00
VOLUME

HARGA SATUAN (Rp.)

1.0000
1.5000
7.0000

771,573.00
114,693.11
74,210.00
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting (Upah)
3 Pembesian (Upah)

m3
m2
m2

1.0000
1.5000
7.0000

ALAT
1 Beton K-300 (Alat)
2 Bekisting (Alat)
3 Pembesian (Alat)

m3
m2
m2

57,002.22
49,685.35
2,128.53

1.0000
1.5000
7.0000

42,406.70
27,000.00
851.41

=
=
=
URAIAN PEKERJAAN

SATUAN

Konstruksi pasangan batu kali sebagai pondasi pagar precast beton


Rp.
82.00
VOLUME

480,375.73

m3
HARGA SATUAN (Rp.)

JUMLAH (Rp.)

BAHAN
1 Batu Kali
2 Semen PC 50 Kg/zak
3 Pasir Beton

m3
zak
m3

1.2000
3.0000
0.4900

126,780.00
63,390.00
126,780.00
Jumlah Bahan

UPAH
1 Pekerja
2 Tukang
3 Mandor

Hari
Hari
kg

0.6667
0.3333
0.2500

46,200.00
60,500.00
66,000.00
Jumlah Upah

42,406.70
40,500.00
5,959.88

1,698,379.19

Jenis Pekerjaan
Harga Satuan/m3
Volume

57,002.22
74,528.03
14,899.69

88,866.58

Jumlah

771,573.00
172,039.67
519,470.00

146,429.94

Jumlah Alat

NO

JUMLAH (Rp.)

1,463,082.67

Jumlah Upah
C

1,698,379.19

m3

ALAT
1 Concrete Mixer

Jam

0.2000

Jumlah

404,428.20

30,801.54
20,164.65
16,500.00
67,466.19

42,406.70

Jumlah Alat

152,136.00
190,170.00
62,122.20

8,481.34

8,481.34

480,375.73

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

Jenis Pekerjaan

Harga Satuan/m3
Volume

=
=

NO
A

URAIAN PEKERJAAN
BAHAN
1 Beton K-300 (Bahan)
2 Bekisting Pile Cap (Bahan)
3 Pembesian (Bahan)

SATUAN

m3
m2
kg

Beton bertulang (K-300, U32) pile cap dan sbg pondasi kolom
penyangga selter, 18 unit, dim.1600x1200x1200
2,887,691.66
Rp.
41.00 m3

VOLUME

HARGA SATUAN (Rp.)

1.0000
2.0000
140.0000

771,573.00
256,504.22
8,355.63
Jumlah Bahan

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

m3
m2
kg

1.0000
2.0000
140.0000

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

m3
m2
kg

57,002.22
79,495.35
852.06

1.0000
2.0000
140.0000

42,406.70
15,000.00
183.10

2,887,691.66

Jenis Pekerjaan

Harga Satuan/m3
Volume

=
=
URAIAN PEKERJAAN

1
2
3
4

BAHAN
Beton K-300 (Bahan)
Bekisting Pile Cap (Bahan)
Pembesian (Bahan)
Angkur

UPAH
1 Beton K-300 (Upah)
2 Bekisting Pile Cap (Upah)
3 Pembesian (Upah)

SATUAN

Beton bertulang (K-300, U32) pondasi tangga selter termasuk angkur


Rp.
2.00
VOLUME

ALAT
1 Beton K-300 (Alat)
2 Bekisting Pile Cap (Alat)
3 Pembesian (Alat)

HARGA SATUAN (Rp.)

JUMLAH (Rp.)

m3
m2
kg
Ls

1.0000
3.5000
128.7875
1.00

771,573.00
191,378.46
8,355.63
250,000.00
Jumlah Bahan

771,573.00
669,824.61
1,076,100.70
250,000.00
2,767,498.31

m3
m2
kg

1.0000
3.5000
128.7875

57,002.22
79,495.35
852.06

57,002.22
278,233.73
109,734.68

m3
m2
kg

1.0000
3.5000
128.7875

444,970.63

42,406.70
15,000.00
183.10
Jumlah Alat

Jumlah

3,330,956.63

m3

Jumlah Upah
C

42,406.70
30,000.00
25,634.00
98,040.70

Jumlah

57,002.22
158,990.70
119,288.40
335,281.32

Jumlah Alat

NO

771,573.00
513,008.44
1,169,788.20
2,454,369.64

Jumlah Upah
C

JUMLAH (Rp.)

42,406.70
52,500.00
23,580.99
118,487.69

3,330,956.63

ANALISA HARGA SATUAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

RENCANA ANGGARAN BIAYA (RAB)


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
No
A

URAIAN PEKERJAAN

UNIT

Pekerjaan Persiapan
Mobilisasi dan Demobilsasi
Pengukuran dan Positioning
Direksi Keet beserta kelengkapannya
Pagar Pengaman Proyek
Instalasi listrik, penerangan dan air kerja
a. Instalasi listrik dan air kerja
b. Biaya pemakaian listrik dan air kerja
6 Keselamatan Kerja
7 Administrasi, As built drawing dan Dokumentasi
1
2
3
4
5

VOLUME

HARGA SATUAN
(Rp.)

Ls
Ls
m2
m'

1.00
1.00
36.00
160.00

519,750,000.00
47,107,500.00
787,500.00
150,000.00

519,750,000.00
47,107,500.00
28,350,000.00
24,000,000.00

Ls
Bln
Bln
Ls

1.00
8.00
8.00
1.00

8,400,000.00
4,725,000.00
3,609,375.00
17,955,000.00

8,400,000.00
37,800,000.00
28,875,000.00
17,955,000.00
712,237,500.00

Kg
m
unit
unit
unit
unit
Kg

180.00
6.00
12.00
6.00
6.00
140.00

211,623.21
212,284.33
262,500.00
744,432.50
182,310.00
30,385.00

38,092,177.80
1,273,705.98
3,150,000.00
4,466,595.00
1,093,860.00
4,253,900.00
52,330,238.78

Kg
m
unit
unit
unit
unit
Kg
m2

1,650.00
55.00
110.00
55.00
55.00
18,800.00
580.00

542,365.00
473,164.94
567,000.00
1,792,715.00
717,086.00
30,385.00
846,443.58

894,902,250.00
26,024,071.70
62,370,000.00
98,599,325.00
39,439,730.00
571,238,000.00
490,937,275.00
2,183,510,651.70

m3
m3
m3
m3
m3
m3
unit
unit

26.87
3.01
3.62
27.47
41.20
80.71
28.00
3.00

2,540,514.15
4,245,262.59
694,243.04
219,836.00
45,000.00
56,250.00
1,931,250.00
31,981,500.00

68,263,615.21
12,778,240.40
2,513,159.80
6,038,894.92
1,854,000.00
4,539,937.50
54,075,000.00
95,944,500.00
246,007,347.83

m3
m3
m3
m3
m3
m3
unit
unit

89.60
97.28
78.40
102.40
224.00
55.26
9.00
8.00

2,596,751.61
2,645,502.59
3,060,955.50
2,776,115.04
2,776,115.04
4,245,262.59
31,981,500.00
18,726,945.00

232,668,944.26
257,354,491.96
239,978,911.20
284,274,180.10
621,849,768.96
234,593,210.72
287,833,500.00
149,815,560.00

unit

2.00

23,950,590.00

47,901,180.00

unit

2.00

20,859,045.00

41,718,090.00

unit

22.00

1,456,935.00

32,052,570.00
2,430,040,407.19

Sub Total
B
1
2
3
4
5
6
7

Tiang Pancang dan Assesoriesnya (Pondasi kolom penyangga gangway dan ESR, laut)
1 Pengadaan Tiang pancang 812,3 mm, t=14 mm ( w = 276 kg/m') (TA.2011)
2 Pemancangan tiang pancang dia. 812,3 mm
3 Pemotongan tiang pancang, setting dan penyambungan
Penyambungan tiang pancang setiap 12m
4 Ring pelat Dia=1200mm, t= 12 mm ( w = 59 kg/unit)
5 Pelat penutup tiang dia. 812,3 mm, t= 6mm ( w = 23,6 Kg/unit)
6 Bracing pengaku tiang pancang H 300 x 300 x 10/15 (w=94Kg/m')
7 Pengadaan dan Pemasangan Selimut Tiang Pancang (Pelindung Karat, PE Cover)
Sub Total

D
1
2
3
4
5
6
7
8

Tiang Pancang dan Assesoriesnya (Pondasi kolom penyangga gangway, darat)


Pengadaan Tiang pancang 406.4 mm, t=12 mm ( w = 117 kg/m') (TA. 2011)
Pemancangan tiang pancang dia. 400 mm
Pemotongan tiang pancang
Penyambungan tiang pancang setiap 12m
Ring pelat Dia=700mm, t= 12 mm ( w = 24.5 kg/unit)
Pelat penutup tiang dia. 400 mm, t= 6mm ( w = 6 Kg/unit)
Bracing pengaku tiang pancang H 300 x 200 x 8/12 (w=57Kg/m')
Sub Total

Pekerjaan beton dan pelengkapnya (Pondasi kolom penyangga gangway, darat)


Beton bertulang (K-300, U32) pondasi gangway 3000x1600x1600
Beton bertulang (K-300, U32) pengisi tiang pancang dia.400mm L=1000 mm
Beton lantai kerja (K-100) t = 100 mm
Lapisan batu kali dipadatkan t = 600 mm
Pembongkaran dan galian tanah untuk pondasi
Urug kembali dan pemadatan tanah termasuk pemasangan eksisting paving blok
Pilar pelindung kolom gangway, besi dia.150 mm, t= 10mm, L = 1300 mm digalvanis
Angkur kolom penyangga konstruksi gangway ( w = 900 Kg/unit)
Sub Total

Pekerjaan beton dan pelengkapnya (Pondasi kolom penyangga gangway, laut)


Beton bertulang (K-300, U32) pondasi gangway Type-1, 8000x7000x1600 (1 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-2, 8000x7000x1600 (1 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-3, 3500x35000x1600 (3 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-4, 8000x4000x1600 (2 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-5, 8000x3500x1600 (5 unit)
Beton bertulang (K-300, U32) beton pengisi tiang pancang dia. 800 mm, L=2000 mm
Angkur dan baseplate kolom penyangga konstruksi gangway ( w = 900 Kg/unit)
Angkur dan baseplate kolom penyangga konstruksi Akses Bridge ( w = 527 Kg/unit)
Angkur dan baseplate konstruksi Kolom Penggantung Hidraulik ESR, Tipe -1 ( w = 674
9
Kg/unit)
Angkur dan baseplate konstruksi Kolom Penggantung Hidraulik ESR, Tipe -2 ( w = 587
10
Kg/unit)
11 Angkur dan baseplate konstruksi Apron ESR ( w = 41 Kg/unit)
Sub Total
1
2
3
4
5
6
7
8

JUMLAH HARGA
(Rp.)

No

URAIAN PEKERJAAN

F
1
2
3
4
5
6
7
8
9
10
11
12
13
14

UNIT

Pekerjaan reklamasi dan revetment


Pengadaan material dan pemadatan lapisan sirtu
Pengadaan material dan pemadatan lapisan/tanah urug
Pengadaan material dan pemadatan lapisan basecourse (CBR > 80%)
Pengadaan lapisan pasir t = 50 mm di bawah paving blok
Pengadaan material dan pemasangan paving blok t =80 mm ( K-400)
Pengadaan material dan pemasangan lapisan geotekstil
Beton bertulang (K-300, U32) paravet/ dinding penahan
Pengadaan material dan pemasangan batu armour ukuran 150 - 200 Kg/unit
Pengadaan material dan pemasangan batu armour ukuran 300 - 500 Kg/unit
Pengadaan material dan pemasangan Pipa PVC (AW) dia. 100 mm pada paravet
Konstruksi pasangan batu kali sebagai pondasi pagar precast beton
Pengadaan material dan pemasangan kolom pagar precast 200x200x3000 mm int. 2,5 m
Pengadaan material dan pemasangan pagar pelat beton precast 2400x500x t = 50 mm
Pembongkaran existing pagar beton precast

m3
m3
m3
m3
m2
m2
m3
m3
m3
m
m3
unit
unit
m

VOLUME

5,756.00
1,279.00
1,066.00
127.50
2,050.00
525.00
87.75
1,409.89
600.00
10.00
82.00
30.00
120.00
75.00

HARGA SATUAN
(Rp.)

173,691.08
83,547.91
209,189.48
158,410.53
116,858.59
16,102.13
2,806,099.78
276,489.74
350,770.67
45,000.00
480,375.73
225,000.00
309,375.00
84,375.00

Sub Total
G
1
2
3
4
5
6
7
8

Tiang Pancang dan Assesoriesnya (Abutment ESR dan Kolom Penyangga Gangway)
Pengadaan Tiang pancang 812,8 mm, t=14 mm ( w = 276 kg/m') (TA. 2011)
Pemancangan tiang pancang dia. 812.8 mm
Pemotongan tiang, setting
Penyambungan tiang pancang setiap 12m
Ring pelat Dia=1200mm, t= 12 mm ( w = 59 kg/unit)
Pelat penutup tiang dia. 812.3 mm, t= 6mm ( w = 24 Kg/unit)
Bracing pengaku tiang pancang H 300 x 300 x 10/15 (w=94 Kg/m')
Base plate dan angkur untuk post guard rail ( w= 12Kg/unit )

1
2
3
4
5
6
7
8
9
10

Pekerjaan beton dan pelengkapnya (Abutment dan Appron ESR)


Beton bertulang (K-300, U32) kepala tiang pancang/ pier dan abutment
Beton bertulang (K-300, U32) pengisi tiang pancang dia.812.3 mm L=2000 mm
Angkur dan base plate kolom penyangga konstruksi gangway ( w = 900 Kg/unit)
Angkur base plate appron ESR (w = 45 Kg/unit)
Pelat sudut di abutment termasuk angkurnya , digalvanis ( w = 20 Kg/m')
Pengadaan dan pemasangan guard rail , post dan assesoriesnya (digalvanis)
Beton bertulang retaining wall apron dan pelat lantai apron
Beton lantai kerja (K-100) t = 100 mm
Lapisan basecorse termasuk pekerjaan pemadatan
Lapisan sirtu termasuk pekerjaan pemadatan

Kg
m
unit
unit
unit
unit
Kg
unit

60.00
2.00
4.00
2.00
2.00
348.00
12.00

542,365.00
473,164.94
567,000.00
1,792,715.00
729,240.00
30,385.00
364,620.00

32,541,900.00
946,329.88
2,268,000.00
3,585,430.00
1,458,480.00
10,573,980.00
4,375,440.00
55,749,559.88

m3
m3
unit
unit
m
Kg
m3
m3
m3
m3

27.00
2.00
1.00
2.00
15.00
750.00
20.00
5.00
20.00
15.00

2,806,099.78
4,245,262.59
31,981,500.00
1,367,325.00
607,700.00
35,535.00
2,571,330.03
694,243.04
209,189.48
173,691.08

Sub Total
I

999,765,856.48
106,857,776.89
222,995,985.68
20,197,342.58
239,560,109.50
8,453,615.63
246,235,255.70
389,820,119.53
210,462,402.00
450,000.00
39,390,809.86
6,750,000.00
37,125,000.00
6,328,125.00
2,534,392,398.83

Sub Total
H

JUMLAH HARGA
(Rp.)

75,764,694.06
8,490,525.18
31,981,500.00
2,734,650.00
9,115,500.00
26,651,250.00
51,426,600.60
3,471,215.20
4,183,789.60
2,605,366.20
216,425,090.84

Konstruksi Gangway dan Kolom Penyangga ( 267 m, bagian darat )


1 Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi gangway (TA. 2011)

Kg

2 Pengadaan, pabrikasi pengecatan dan pemasangan konstruksi kolom penyangga (TA. 2011)

Kg

3 Pengadaan, pabrikasi konstruksi gangway (tanpa pengecatan dan pemancangan) (TA. 2011)

Kg

Pengadaan, pabrikasi kontruksi kolom penyangga (tanpa pengecatan dan pemasangan) (TA.
4 2011)

Kg

5
6
7
8
9

Pengecatan dan pemasangan konstruksi gangway


Pengecatan dan pemasangan konstruksi kolom penyangga
Beton bertulang (K-300, U32) lantai gangway
Pengadaan dan pemasangan pelat bondek
Pengadaan dan pemasangan atap asbes dan assesoriesnya
10 Pengadaan, fabrikasi dan pemasangan fiber sheet t = 5 mm (handrail) dan asesories.

Kg
Kg
m3
m2
m2

120,739.000
26,638.000
38.00
363.00
727.00

8,755.79
8,755.79
1,698,379.19
178,190.00
87,550.00

1,057,165,328.81
233,236,734.02
64,538,409.22
64,682,970.00
63,648,850.00

m2

220.00

unit

53.00

918,760.00
393,750.00

202,127,200.00

11 Elektrikal (titk lampu @ 5 m dan jaringannya)


Sub Total

20,868,750.00
1,706,268,242.05

No

URAIAN PEKERJAAN

J
1
2
3
4
5
6
7
8
9

UNIT

Konstruksi Gangway dan Kolom Penyangga ( 200 m, bagian laut )


Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi gangway
Pengadaan, pabrikasi (tanpa pengecatan dan pemasangan) (TA. 2011)
Pengecatan dan pemasangan baja
Pengadaan, pabrikasi pengecatan dan pemasangan konstruksi kolom penyangga
Beton bertulang (K-300, U32) lantai gangway
Pengadaan dan pemasangan pelat bondek
Pengadaan dan pemasangan atap asbes dan assesoriesnya
Pengadaan, fabrikasi dan pemasangan fiber sheet t = 5 mm (handrail) dan asesories
Elektrikal (titk lampu @ 5 m dan jaringannya)

Kg
Kg
Kg
Kg
m3
m2
m2
m2
unit

VOLUME

37,302.00
146,823.00
43,800.00
88.00
735.00
1,593.00
245.00
50.00

HARGA SATUAN
(Rp.)

34,596.97
8,755.79
35,944.05
1,698,379.19
178,190.00
87,550.00
918,760.00
393,750.00

Sub Total
K

Konstruksi Baja Apron ESR


1 Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi apron ESR (100 m)
Sub Total
Movable Gangway
1 Konstruksi Movable Gangway ( 1set, 2unit)
a. Fixed Flatform
b. Turning Flatform
c. Rear Bridge
d. Movable Frame
e. Tilting Bridge
f. Base Frame
2 Mekanikal dan Elektrikal ( 1 set, 2 unit )
a. Hidraulik Silinder ( 1 @ 4 unit)
b. Power Pack Hidraulik Unit
c. Elektrikal dan Piping

Kg

150,000.00

34,596.97

5,189,545,500.00
5,189,545,500.00

Kg
Kg
Kg
Kg
Kg
Kg

3,600.00
1,169.00
3,600.00

36,050.00
56,135.00

129,780,000.00
65,621,815.00
129,780,000.00

unit
unit
set

Elevated Side Ramp


1 Konstruksi Baja Side Ramp
a.
Approach Bridge
b. Moving Bridge
c. Ramp Bridge
d. Rangka Kolom , Operating Room dan Walkway
e. Base Plate , Plate 300x300xt=20, Angkur Dia.40mm, L = 500mm
f. Bearing Plate 300 x 300 x t = 50 mm
2 Mekanikal dan Elektrikal
a. Hidraulik Silinder Moving Bridge ( 2 unit)
b. Hidraulik Silinder Ramp Bridge ( 2 unit)
c. Power Pack Hidraulik Unit
Elektrikal, Control Desk, panel dan Oil Piping (sus 304, sch 160) termasuk assesories dan
d. rubber hose Unit 0.00
Pengadaan dan pemasangan lampu red flash, kabel dan assesoriesnya (1 set@ 2 unit)
e.
Pengadaan dan pemasangan kabel listrik (power supply) termasul konduit dan
assesoriesnya
f.
g. Pengadaan dan pemasangan tiang lampu, lampu dan kabel jaringannya
3 Pekerjaan Sipil Lainnya
a. Pelat Lantai kendaraan t = 250 mm (beton bertulang, K500)
b. Rumah mesin (4 m x 4 m)
Sub Total

1,290,536,174.94
1,285,551,355.17
1,574,349,390.00
149,457,368.72
130,969,650.00
139,467,150.00
225,096,200.00
19,687,500.00
4,815,114,788.83

36,050.00

325,181,815.00

Sub Total
M

JUMLAH HARGA
(Rp.)

Kg
Kg
Kg
Kg
Kg
Kg

22,000.00
5,500.00
25,000.00
610.00
1,130.00

56,135.00
45,835.00
34,505.00
29,458.00
34,505.00

1,234,970,000.00
252,092,500.00
862,625,000.00
17,969,380.00
38,990,650.00

unit
unit
unit

unit

set

titik

m3
m2

2,406,647,530.00

No
N

URAIAN PEKERJAAN

UNIT

Shelter
Pengadaan dan pemasangan konstruksi baja termasuk pengecatan
Pemancangan tiang pancang dia. 400 mm pondasi selter, 18 titik @ 30 m
Pemotongan tiang pancang
Penyambungan tiang pancang
Ring pelat Dia=700mm, t= 12 mm ( w = 24.5 kg/unit)
Pelat penutup tiang dia. 400 mm, t= 6mm ( w = 6 Kg/unit)
Bracing pengaku tiang pancang H 300 x 200 x 8/12 (w=57Kg/m')
Beton bertulang (K-300, U32) pile cap dan sbg pondasi kolom penyangga selter, 18 unit,
5 dim.1600x1200x1200
1
2
3
4

VOLUME

HARGA SATUAN
(Rp.)

JUMLAH HARGA
(Rp.)

Kg
m
Unit
Unit
Unit
Unit
Kg

540.00
18.00
36.00
18.00
18.00
897.75

125,000.00
150,000.00
250,000.00
744,432.50
182,310.00
30,385.00

67,500,000.00
2,700,000.00
9,000,000.00
13,399,785.00
3,281,580.00
27,278,133.75

m3

41.00

2,887,691.66

118,395,358.06

m3
unit
m3
m2
m2

2.00
18.00
54.00
419.00
450.00

3,330,956.63
618,750.00
1,698,379.19
85,000.00
178,190.00

6,661,913.26
11,137,500.00
91,712,476.26
35,615,000.00
80,185,500.00

unit

11.00

9,290,250.00

102,192,750.00

Pengadaan dan pemasangan jendela Tipe-2 dim. 2800x2200mm (rangka alumunium + Kaca dan
12 assesoriesnyuan)

unit

9.00

9,290,250.00

83,612,250.00

Pengadaan dan pemasangan jendela Tipe-3 dim. 2800x1500mm(rangka alumunium + Kaca dan
13 assesoriesnyau)

unit

10.00

6,423,750.00

64,237,500.00

Pengadaan dan pemasangan jendela Tipe-4 dim.2200x900mm (rangka alumunium + Kaca dan
14 assesoriesnya)

unit

2.00

3,177,000.00

6,354,000.00

Pengadaan dan pemasangan jendela Tipe-5 dim.1625x900mm (rangka alumunium + Kaca dan
15 assesoriesnya)

unit

2.00

2,420,156.25

4,840,312.50

Pengadaan dan pemasangan jendela Tipe-6 dim. 1100x500mm (rangka alumunium + Kaca dan
16 assesoriesnya)

unit

2.00

1,085,625.00

2,171,250.00

Pengadaan dan pemasangan pintu double dim.3100x2100 (rangka alumunium + Kaca dan
17 assesoriesnya)

unit

2.00

9,802,125.00

19,604,250.00

m2

500.00

618,750.00

309,375,000.00

m2
m2
unit
m2
m2
set
set

500.00
540.00
6.00
132.00
122.00
1.00
1.00

120,937.50
163,928.57
393,750.00
106,875.00
106,875.00
1,968,750.00
151,875,000.00

60,468,750.00
88,521,428.57
2,362,500.00
14,107,500.00
13,038,750.00
1,968,750.00
151,875,000.00

unit

1.00

16,875,000.00

16,875,000.00

6
7
8
9
10

Beton bertulang (K-300, U32) pondasi tangga selter termasuk angkur


Angkur dan baseplate kolom penyangga bangunan selter
Beton bertulang (K-300, wiremesh D10) lantai selter
Pengadaan dan pemasangan lantai keramik 60x60 cm
Pengadaan dan pemasangan bondek
Pengadaan dan pemasangan jendela Tipe-1 dim.2800x2200mm (rangka alumunium + Kaca dan
11 assesoriesnyau)

18
19
20
21
22
23
24
25
26

Pengadaan dan pemasangan Aluminium Komposit Panel PVDF (tebal 4 mm, Al.koil 0,3 mm )
termasuk rangkam dan sealant
Pengadaan dan pemasangan kalsiboard termasuk finishing dan pengecatan
Pengadaan dan pemasangan atap corrugated metal roof termasuk perlengkapannya
Pengadaan dan pemasangan pintu PVC untuk toilet termasuk perlengkapannya
Pekerjaan dinding pasangan bata merah termasuk plesteran, acian dan pengecatan
Pengadaan dan pemasangan dinding keramik 20X20 cm di toilet
Pekerjaan plumbing dan sanitari, termasuk kloset duduk, keran dan perelngkapan lainnya
Pekerjaan elektrikal termasuk jaringan listrik, lampu dan perlengkapan lainnya
Pekerjaan bangunan septic tank (beton bertulang) dim. 2000x2000x3000mm termasuk
kelengkapannya

Sub Total

1,408,472,237.40

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
TA. 2012
No
A
B
C
D
E
F
G
H
I
J
K
L
M
N

URAIAN PEKERJAAN

BIAYA (Rp.)

Pekerjaan Persiapan
Tiang Pancang dan Assesoriesnya (Pondasi kolom penyangga gangway, darat)
Tiang Pancang dan Assesoriesnya (Pondasi kolom penyangga gangway dan ESR, laut)
Pekerjaan beton dan pelengkapnya (Pondasi kolom penyangga gangway, darat)
Pekerjaan beton dan pelengkapnya (Pondasi kolom penyangga gangway, laut)
Pekerjaan reklamasi dan revetmen
Tiang Pancang dan Assesoriesnya (Abutment ESR dan Kolom Penyangga Gangway)
Pekerjaan beton dan pelengkapnya (Abutment dan Appron ESR)
Konstruksi Gangway dan Kolom Penyangga ( 267 m, bagian darat )
Konstruksi Gangway dan Kolom Penyangga ( 200 m, bagian laut )
Konstruksi Baja Apron ESR (Elevated Side Ramp)
Movable Gangway
Elevated Side Ramp
Shelter

712,237,500.00
52,330,238.78
2,183,510,651.70
246,007,347.83
2,430,040,407.19
2,534,392,398.83
55,749,559.88
216,425,090.84
1,706,268,242.05
4,815,114,788.83
5,189,545,500.00
325,181,815.00
2,406,647,530.00
1,408,472,237.40

Sub Total I
PPN 10%
TOTAL
PEMBULATAN

24,281,923,308.34
2,428,192,330.83
26,710,115,639.17
26,710,115,639.00

Terbilang :

Dua Puluh Enam Milyar Tujuh Ratus Sepuluh Juta Seratus Lima Belas Ribu Enam Ratus Tiga Puluh Sembilan Rupiah

Jakarta, 9 Maret 2012

Kepala

BAGIAN PEKERJAAN YANG DISUBKONTRAKKAN


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II

No

Bab B
2
3
4

PROSENTASE DARI
HARGA TOTAL
PENAWARAN
(%)

URAIAN PEKERJAAN

Pemancangan tiang pancang dia. 400 mm


Pemotongan tiang pancang
Penyambungan tiang pancang setiap 12m

0.16%
0.01%
0.01%

Pemancangan tiang pancang dia. 812,3 mm


Pemotongan tiang pancang, setting dan penyambungan
Penyambungan tiang pancang setiap 12m

3.69%
0.11%
0.26%

Bab D
3

Beton lantai kerja (K-100) t = 100 mm

0.01%

Bab H
8

Beton lantai kerja (K-100) t = 100 mm

0.01%

Bab C
2
3

4.25%

Jakarta, 9 Maret 2012

Kepala

FORMULIR REKAPITULASI PERHITUNGAN


TINGKAT KOMPONEN DALAM NEGERI (TKDN) GABUNGAN BARANG DAN JASA
PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
URAIAN PEKERJAAN
(01)

DN
(2)

Nilai Gabungan Barang / Jasa (Rp.)


LN
TOTAL
Rp
(3)
(4)

TKDN
% KDN
(5)

Barang / Jasa Rp

Gabungan %

(7)

(8)

Barang
I
II

Material Langsung (Bahan Baku)


Peralatan (Barang Jadi)

A. Sub Total Barang

22,703,598,293.29
-

22,703,598,293.29
-

100.00%
#DIV/0!

22,703,598,293.29
-

85.00%
0.00%

22,703,598,293.29

22,703,598,293.29

100.00%

22,703,598,293.29

85.00%

667,752,890.98

667,752,890.98

100.00%

667,752,890.98

2.50%

934,854,047.37
1,736,157,516.55
667,752,890.98

934,854,047.37
1,736,157,516.55
667,752,890.98

100.00%
100.00%
100.00%

934,854,047.37
1,736,157,516.55
667,752,890.98

3.50%
6.50%
2.50%

4,006,517,345.88

4,006,517,345.88

100.00%

4,006,517,345.88

15.00%

26,710,115,639.17

26,710,115,639.17

100.00%

26,710,115,639.17

100.00%

Jasa
III
IV
V
VI

Manajemen Proyek dan


Prekayasaan
Alat Kerja / Fasilitas Kerja
Konstruksi dan Fabrikasi
Jasa Umum

B. Sub Total Jasa


C. Total Biaya (A+B)

Jakarta, 9 Maret 2012

Kepala

Terbilang : RUPIAH rupiah

0
0
0
0
0
0
0
0
0
0
0

5.12051E+11

RUPIAH
26,710,115,639
26,710,115,639
26,710,115
26,710
26
710
115
639

0
26
7
10
1
15
6
39

Dua Puluh Enam


Milyar
Tujuh Ratus
Sepuluh
Juta

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Satu
Dua
Tiga
Empat
Lima
Enam
Tujuh
Delapan
Sembilan
Sepuluh
Sebelas
Dua Belas
Tiga Belas
Empat Belas
Lima Belas
Enam Belas
Tujuh Belas
Delapan Belas
Sembilan Belas
Dua Puluh
Dua Puluh Satu
Dua Puluh Dua
Dua Puluh Tiga
Dua Puluh Empat
Dua Puluh Lima
Dua Puluh Enam
Dua Puluh Tujuh
Dua Puluh Delapan
Dua Puluh Sembilan
Tiga Puluh
Tiga Puluh Satu
Tiga Puluh Dua
Tiga Puluh Tiga
Tiga Puluh Empat
Tiga Puluh Lima
Tiga Puluh Enam
Tiga Puluh Tujuh
Tiga Puluh Delapan
Tiga Puluh Sembilan
Empat Puluh
Empat Puluh Satu
Empat Puluh Dua
Empat Puluh Tiga
Empat Puluh Empat
Empat Puluh Lima
Empat Puluh Enam
Empat Puluh Tujuh
Empat Puluh Delapan
Empat Puluh Sembilan

Seratus
Lima Belas
Ribu
Enam Ratus
Tiga Puluh Sembilan
Rupiah

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

Lima Puluh
Lima Puluh Satu
Lima Puluh Dua
Lima Puluh Tiga
Lima Puluh Empat
Lima Puluh Lima
Lima Puluh Enam
Lima Puluh Tujuh
Lima Puluh Delapan
Lima Puluh Sembilan
Enam Puluh
Enam Puluh Satu
Enam Puluh Dua
Enam Puluh Tiga
Enam Puluh Empat
Enam Puluh Lima
Enam Puluh Enam
Enam Puluh Tujuh
Enam Puluh Delapan
Enam Puluh Sembilan
Tujuh Puluh
Tujuh Puluh Satu
Tujuh Puluh Dua
Tujuh Puluh Tiga
Tujuh Puluh Empat
Tujuh Puluh Lima
Tujuh Puluh Enam
Tujuh Puluh Tujuh
Tujuh Puluh Delapan
Tujuh Puluh Sembilan
Delapan Puluh
Delapan Puluh Satu
Delapan Puluh Dua
Delapan Puluh Tiga
Delapan Puluh Empat
Delapan Puluh Lima
Delapan Puluh Enam
Delapan Puluh Tujuh
Delapan Puluh Delapan
Delapan Puluh Sembilan
Sembilan Puluh
Sembilan Puluh Satu
Sembilan Puluh Dua
Sembilan Puluh Tiga
Sembilan Puluh Empat
Sembilan Puluh Lima
Sembilan Puluh Enam
Sembilan Puluh Tujuh
Sembilan Puluh Delapan
Sembilan Puluh Sembilan

1
2

26,710,115,639.00
26,710,115,639
Dua Puluh Enam Milyar Tujuh Ratus Sepuluh Juta Seratus Lima Belas Ribu Enam Ratus Tiga Puluh Sembilan Rupiah

uluh Sembilan Rupiah

2.67E+10

RENCANA ANGGARAN BIAYA (RAB)


PEMBANGUNAN GANGWAY DAN ELEVATED SIDE RAMP DI DERMAGA V
PELABUHAN PENYEBERANGAN MERAK - TAHAP II
No
A

URAIAN PEKERJAAN

UNIT

Pekerjaan Persiapan
Mobilisasi dan Demobilsasi
Pengukuran dan Positioning
Direksi Keet beserta kelengkapannya
Pagar Pengaman Proyek
Instalasi listrik, penerangan dan air kerja
a. Instalasi listrik dan air kerja
b. Biaya pemakaian listrik dan air kerja
6 Keselamatan Kerja
7 Administrasi, As built drawing dan Dokumentasi
1
2
3
4
5

ESTIMASI
KUANTITAS

HARGA SATUAN
(Rp.)

Ls
Ls
m2
m'

1.00
1.00
36.00
160.00

519,750,000.00
47,107,500.00
787,500.00
150,000.00

Ls
Bln
Bln
Ls

1.00
8.00
8.00
1.00

8,400,000.00
4,725,000.00
3,609,375.00
17,955,000.00

Sub Total
B
1
2
3
4
5
6
7

Tiang Pancang dan Assesoriesnya (Pondasi kolom penyangga gangway dan ESR, laut)
1 Pengadaan Tiang pancang 812,3 mm, t=14 mm ( w = 276 kg/m') (TA.2011)
2 Pemancangan tiang pancang dia. 812,3 mm
3 Pemotongan tiang pancang, setting dan penyambungan
Penyambungan tiang pancang setiap 12m
4 Ring pelat Dia=1200mm, t= 12 mm ( w = 59 kg/unit)
5 Pelat penutup tiang dia. 812,3 mm, t= 6mm ( w = 23,6 Kg/unit)
6 Bracing pengaku tiang pancang H 300 x 300 x 10/15 (w=94Kg/m')
7 Pengadaan dan Pemasangan Selimut Tiang Pancang (Pelindung Karat, PE Cover)
Sub Total

D
1
2
3
4
5
6
7
8

Tiang Pancang dan Assesoriesnya (Pondasi kolom penyangga gangway, darat)


Pengadaan Tiang pancang 406.4 mm, t=12 mm ( w = 117 kg/m') (TA. 2011)
Pemancangan tiang pancang dia. 400 mm
Pemotongan tiang pancang
Penyambungan tiang pancang setiap 12m
Ring pelat Dia=700mm, t= 12 mm ( w = 24.5 kg/unit)
Pelat penutup tiang dia. 400 mm, t= 6mm ( w = 6 Kg/unit)
Bracing pengaku tiang pancang H 300 x 200 x 8/12 (w=57Kg/m')
Sub Total

Pekerjaan beton dan pelengkapnya (Pondasi kolom penyangga gangway, darat)


Beton bertulang (K-300, U32) pondasi gangway 3000x1600x1600
Beton bertulang (K-300, U32) pengisi tiang pancang dia.400mm L=1000 mm
Beton lantai kerja (K-100) t = 100 mm
Lapisan batu kali dipadatkan t = 600 mm
Pembongkaran dan galian tanah untuk pondasi
Urug kembali dan pemadatan tanah termasuk pemasangan eksisting paving blok
Pilar pelindung kolom gangway, besi dia.150 mm, t= 10mm, L = 1300 mm digalvanis
Angkur kolom penyangga konstruksi gangway ( w = 900 Kg/unit)
Sub Total

Pekerjaan beton dan pelengkapnya (Pondasi kolom penyangga gangway, laut)


Beton bertulang (K-300, U32) pondasi gangway Type-1, 8000x7000x1600 (1 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-2, 8000x7000x1600 (1 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-3, 3500x35000x1600 (3 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-4, 8000x4000x1600 (2 unit)
Beton bertulang (K-300, U32) pondasi gangway Type-5, 8000x3500x1600 (5 unit)
Beton bertulang (K-300, U32) beton pengisi tiang pancang dia. 800 mm, L=2000 mm
Angkur dan baseplate kolom penyangga konstruksi gangway ( w = 900 Kg/unit)
Angkur dan baseplate kolom penyangga konstruksi Akses Bridge ( w = 527 Kg/unit)
Angkur dan baseplate konstruksi Kolom Penggantung Hidraulik ESR, Tipe -1 ( w = 674
9
Kg/unit)
10 Angkur dan baseplate konstruksi Kolom Penggantung Hidraulik ESR, Tipe -2 ( w = 587
Kg/unit)
11 Angkur dan baseplate konstruksi Apron ESR ( w = 41 Kg/unit)
Sub Total
1
2
3
4
5
6
7
8

JUMLAH HARGA
(Rp.)

Kg
m
unit
unit
unit
unit
Kg

180.00
6.00
12.00
6.00
6.00
140.00

100,000.00
100,000.00
250,000.00
669,989.25
164,079.00
27,346.50

Kg
m
unit
unit
unit
unit
Kg
m2

1,650.00
55.00
110.00
55.00
55.00
18,800.00
580.00

350,000.00
100,000.00
275,000.00
1,613,443.50
645,377.40
27,346.50
550,000.00

4,019,935.50
984,474.00
3,828,510.00
8,832,919.50

88,739,392.50
35,495,757.00
514,114,200.00
638,349,349.50

m3
m3
m3
m3
m3
m3
unit
unit

26.87
3.01
3.62
27.47
41.20
80.71
28.00
3.00

2,540,514.15
4,245,262.59
694,243.04
219,836.00
40,000.00
35,000.00
1,738,125.00
28,783,350.00

m3
m3
m3
m3
m3
m3
unit
unit

89.60
97.28
78.40
102.40
224.00
55.26
9.00
8.00

2,596,751.61
2,645,502.59
3,060,955.50
2,776,115.04
2,776,115.04
4,245,262.59
28,783,350.00
16,854,250.50

259,050,150.00
134,834,004.00

unit

2.00

21,555,531.00

43,111,062.00

unit

2.00

18,773,140.50

37,546,281.00

unit

22.00

1,311,241.50

28,847,313.00
503,388,810.00

48,667,500.00
86,350,050.00
135,017,550.00

No

URAIAN PEKERJAAN

F
1
2
3
4
5
6
7
8
9
10
11
12
13
14

UNIT

Pekerjaan reklamasi dan revetment


Pengadaan material dan pemadatan lapisan sirtu
Pengadaan material dan pemadatan lapisan/tanah urug
Pengadaan material dan pemadatan lapisan basecourse (CBR > 80%)
Pengadaan lapisan pasir t = 50 mm di bawah paving blok
Pengadaan material dan pemasangan paving blok t =80 mm ( K-400)
Pengadaan material dan pemasangan lapisan geotekstil
Beton bertulang (K-300, U32) paravet/ dinding penahan
Pengadaan material dan pemasangan batu armour ukuran 150 - 200 Kg/unit
Pengadaan material dan pemasangan batu armour ukuran 300 - 500 Kg/unit
Pengadaan material dan pemasangan Pipa PVC (AW) dia. 100 mm pada paravet
Konstruksi pasangan batu kali sebagai pondasi pagar precast beton
Pengadaan material dan pemasangan kolom pagar precast 200x200x3000 mm int. 2,5 m
Pengadaan material dan pemasangan pagar pelat beton precast 2400x500x t = 50 mm
Pembongkaran existing pagar beton precast

m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m3
unit
unit
m

ESTIMASI
KUANTITAS

5,756.00
1,279.00
1,066.00
127.50
2,050.00
525.00
87.75
1,409.89
600.00
10.00
82.00
30.00
120.00
75.00

HARGA SATUAN
(Rp.)

173,691.08
83,547.91
209,189.48
158,410.53
116,858.59
12,500.00
2,806,099.78
276,489.74
350,770.67
40,000.00
450,000.00
200,000.00
275,000.00
75,000.00

Sub Total
G
1
2
3
4
5
6
7
8

Tiang Pancang dan Assesoriesnya (Abutment ESR dan Kolom Penyangga Gangway)
Pengadaan Tiang pancang 812,8 mm, t=14 mm ( w = 276 kg/m') (TA. 2011)
Pemancangan tiang pancang dia. 812.8 mm
Pemotongan tiang, setting
Penyambungan tiang pancang setiap 12m
Ring pelat Dia=1200mm, t= 12 mm ( w = 59 kg/unit)
Pelat penutup tiang dia. 812.3 mm, t= 6mm ( w = 24 Kg/unit)
Bracing pengaku tiang pancang H 300 x 300 x 10/15 (w=94 Kg/m')
Base plate dan angkur untuk post guard rail ( w= 12Kg/unit )

Kg
m
unit
unit
unit
unit
Kg
unit

60.00
2.00
4.00
2.00
2.00
348.00
12.00

150,000.00
100,000.00
250,000.00
1,613,443.50
656,316.00
27,346.50
328,158.00

Sub Total
H
1
2
3
4
5
6
7
8
9
10

Pekerjaan beton dan pelengkapnya (Abutment dan Appron ESR)


Beton bertulang (K-300, U32) kepala tiang pancang/ pier dan abutment
Beton bertulang (K-300, U32) pengisi tiang pancang dia.812.3 mm L=2000 mm
Angkur dan base plate kolom penyangga konstruksi gangway ( w = 900 Kg/unit)
Angkur base plate appron ESR (w = 45 Kg/unit)
Pelat sudut di abutment termasuk angkurnya , digalvanis ( w = 20 Kg/m')
Pengadaan dan pemasangan guard rail , post dan assesoriesnya (digalvanis)
Beton bertulang retaining wall apron dan pelat lantai apron
Beton lantai kerja (K-100) t = 100 mm
Lapisan basecorse termasuk pekerjaan pemadatan
Lapisan sirtu termasuk pekerjaan pemadatan

1
2
3

Konstruksi Gangway dan Kolom Penyangga ( 267 m, bagian darat )


Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi gangway (TA. 2011)
Pengadaan, pabrikasi pengecatan dan pemasangan konstruksi kolom penyangga (TA. 2011)
Pengadaan, pabrikasi konstruksi gangway (tanpa pengecatan dan pemancangan) (TA. 2011)

3,226,887.00
1,312,632.00
9,516,582.00
3,937,896.00
17,993,997.00

m3
m3
unit
unit
m
Kg
m3
m3
m3
m3

27.00
2.00
1.00
2.00
15.00
750.00
20.00
5.00
20.00
15.00

2,806,099.78
4,245,262.59
28,783,350.00
1,230,592.50
546,930.00
31,981.50
2,571,330.03
694,243.04
209,189.48
173,691.08

Sub Total
I

JUMLAH HARGA
(Rp.)

28,783,350.00
2,461,185.00
8,203,950.00
23,986,125.00

63,434,610.00

Kg

Kg

Kg

Pengadaan, pabrikasi kontruksi kolom penyangga (tanpa pengecatan dan pemasangan) (TA.
4 2011)

Kg

5
6
7
8
9

Pengecatan dan pemasangan konstruksi gangway


Pengecatan dan pemasangan konstruksi kolom penyangga
Beton bertulang (K-300, U32) lantai gangway
Pengadaan dan pemasangan pelat bondek
Pengadaan dan pemasangan atap asbes dan assesoriesnya
10 Pengadaan, fabrikasi dan pemasangan fiber sheet t = 5 mm (handrail) dan asesories.

Kg
Kg
m3
m2
m2

120,739.000
26,638.000
38.00
363.00
727.00

8,806.50
8,806.50
1,698,379.19
160,371.00
78,795.00

1,063,288,003.50
234,587,547.00

m2

220.00

unit

53.00

826,884.00
350,000.00

181,914,480.00

11 Elektrikal (titk lampu @ 5 m dan jaringannya)


Sub Total

58,214,673.00
57,283,965.00

1,595,288,668.50

No

URAIAN PEKERJAAN

J
1
2
3
4
5
6
7
8
9

UNIT

Konstruksi Gangway dan Kolom Penyangga ( 200 m, bagian laut )


Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi gangway
Pengadaan, pabrikasi (tanpa pengecatan dan pemasangan) (TA. 2011)
Pengecatan dan pemasangan baja
Pengadaan, pabrikasi pengecatan dan pemasangan konstruksi kolom penyangga
Beton bertulang (K-300, U32) lantai gangway
Pengadaan dan pemasangan pelat bondek
Pengadaan dan pemasangan atap asbes dan assesoriesnya
Pengadaan, fabrikasi dan pemasangan fiber sheet t = 5 mm (handrail) dan asesories
Elektrikal (titk lampu @ 5 m dan jaringannya)

Kg
Kg
Kg
Kg
m3
m2
m2
m2
unit

ESTIMASI
KUANTITAS

37,302.00
146,823.00
43,800.00
88.00
735.00
1,593.00
245.00
50.00

HARGA SATUAN
(Rp.)

29,200.50
8,806.50
29,200.50
3,000,000.00
160,371.00
78,795.00
826,884.00
350,000.00

Sub Total
K

Konstruksi Baja Apron ESR


1 Pengadaan, pabrikasi,pengecatan dan pemasangan konstruksi apron ESR (100 m)
Sub Total
Movable Gangway
1 Konstruksi Movable Gangway ( 1set, 2unit)
a. Fixed Flatform Kg 3,600.00
b. Turning Flatform Kg 3,600.00
c. Rear Bridge Kg 1,680.00
d. Movable Frame Kg 10,800.00
e. Tilting Bridge Kg 6,000.00
f. Base Frame Kg 3,600.00
2 Mekanikal dan Elektrikal ( 1 set, 2 unit )
a. Hidraulik Silinder ( 1 @ 4 unit)
b. Power Pack Hidraulik Unit
c. Elektrikal dan Piping

Pengadaan dan pemasangan lampu red flash, kabel dan assesoriesnya (1 set@ 2 unit)
e.
Pengadaan dan pemasangan kabel listrik (power supply) termasul konduit dan
f. assesoriesnya
g. Pengadaan dan pemasangan tiang lampu, lampu dan kabel jaringannya
3 Pekerjaan Sipil Lainnya
a. Pelat Lantai kendaraan t = 250 mm (beton bertulang, K500)
b. Rumah mesin (4 m x 4 m)
Sub Total

117,872,685.00
125,520,435.00
202,586,580.00

Kg

150,000.00

29,200.50

4,380,075,000.00
4,380,075,000.00

Kg
Kg
Kg
Kg
Kg
Kg

3,600.00
1,169.00
3,600.00

32,445.00
50,521.50

116,802,000.00
59,059,633.50
116,802,000.00

unit
unit
set

Elevated Side Ramp


1 Konstruksi Baja Side Ramp
a.
Approach Bridge
b. Moving Bridge
c. Ramp Bridge
d. Rangka Kolom , Operating Room dan Walkway
e. Base Plate , Plate 300x300xt=20, Angkur Dia.40mm, L = 500mm
f. Bearing Plate 300 x 300 x t = 50 mm
2 Mekanikal dan Elektrikal
a. Hidraulik Silinder Moving Bridge ( 2 unit)
b. Hidraulik Silinder Ramp Bridge ( 2 unit)
c. Power Pack Hidraulik Unit
Elektrikal, Control Desk, panel dan Oil Piping (sus 304, sch 160) termasuk assesories dan
d. rubber hose Unit 0.00

1,089,237,051.00
1,292,996,749.50
1,278,981,900.00

4,107,195,400.50

32,445.00

292,663,633.50

Sub Total
M

JUMLAH HARGA
(Rp.)

Kg
Kg
Kg
Kg
Kg
Kg

22,000.00
5,500.00
25,000.00
610.00
1,130.00

50,521.50
41,251.50
31,054.50
26,512.20
31,054.50

1,111,473,000.00
226,883,250.00
776,362,500.00
16,172,442.00
35,091,585.00

unit
unit
unit

unit

set

titik

m3
m2

2,165,982,777.00

No
N

URAIAN PEKERJAAN

UNIT

Shelter
Pengadaan dan pemasangan konstruksi baja termasuk pengecatan
Pemancangan tiang pancang dia. 400 mm pondasi selter, 18 titik @ 30 m
Pemotongan tiang pancang
Penyambungan tiang pancang
Ring pelat Dia=700mm, t= 12 mm ( w = 24.5 kg/unit)
Pelat penutup tiang dia. 400 mm, t= 6mm ( w = 6 Kg/unit)
Bracing pengaku tiang pancang H 300 x 200 x 8/12 (w=57Kg/m')
Beton bertulang (K-300, U32) pile cap dan sbg pondasi kolom penyangga selter, 18 unit,
5 dim.1600x1200x1200
1
2
3
4

ESTIMASI
KUANTITAS

HARGA SATUAN
(Rp.)

Kg
m
Unit
Unit
Unit
Unit
Kg

540.00
18.00
36.00
18.00
18.00
897.75

475,000.00
100,000.00
250,000.00
669,989.25
164,079.00
27,346.50

m3

41.00

2,500,000.00

m3
unit
m3
m2
m2

2.00
18.00
54.00
419.00
450.00

2,500,000.00
550,000.00
3,500,000.00
85,000.00
160,371.00

unit

11.00

3,388,000.00

Pengadaan dan pemasangan jendela Tipe-2 dim. 2800x2200mm (rangka alumunium + Kaca
12 dan assesoriesnyuan)

unit

9.00

3,388,000.00

Pengadaan dan pemasangan jendela Tipe-3 dim. 2800x1500mm(rangka alumunium + Kaca


13 dan assesoriesnyau)

unit

10.00

2,310,000.00

Pengadaan dan pemasangan jendela Tipe-4 dim.2200x900mm (rangka alumunium + Kaca dan
14 assesoriesnya)

unit

2.00

1,089,000.00

Pengadaan dan pemasangan jendela Tipe-5 dim.1625x900mm (rangka alumunium + Kaca dan
15 assesoriesnya)

unit

2.00

804,375.00

Pengadaan dan pemasangan jendela Tipe-6 dim. 1100x500mm (rangka alumunium + Kaca dan
16 assesoriesnya)

unit

2.00

302,500.00

Pengadaan dan pemasangan pintu double dim.3100x2100 (rangka alumunium + Kaca dan
17 assesoriesnya)

unit

2.00

3,580,500.00

18

m2

500.00

350,000.00

19
20
21
22
23
24
25

m2
m2
unit
m2
m2
set
set

500.00
540.00
6.00
132.00
122.00
1.00
1.00

150,000.00
175,000.00
350,000.00
95,000.00
95,000.00
1,750,000.00
35,000,000.00

unit

1.00

15,000,000.00

6
7
8
9
10

Beton bertulang (K-300, U32) pondasi tangga selter termasuk angkur


Angkur dan baseplate kolom penyangga bangunan selter
Beton bertulang (K-300, wiremesh D10) lantai selter
Pengadaan dan pemasangan lantai keramik 60x60 cm
Pengadaan dan pemasangan bondek
Pengadaan dan pemasangan jendela Tipe-1 dim.2800x2200mm (rangka alumunium + Kaca
11 dan assesoriesnyau)

Pengadaan dan pemasangan Aluminium Komposit Panel PVDF (tebal 4 mm, Al.koil 0,3 mm )
termasuk rangkam dan sealant
Pengadaan dan pemasangan kalsiboard termasuk finishing dan pengecatan
Pengadaan dan pemasangan atap corrugated metal roof termasuk perlengkapannya
Pengadaan dan pemasangan pintu PVC untuk toilet termasuk perlengkapannya
Pekerjaan dinding pasangan bata merah termasuk plesteran, acian dan pengecatan
Pengadaan dan pemasangan dinding keramik 20X20 cm di toilet
Pekerjaan plumbing dan sanitari, termasuk kloset duduk, keran dan perelngkapan lainnya
Pekerjaan elektrikal termasuk jaringan listrik, lampu dan perlengkapan lainnya
Pekerjaan bangunan septic tank (beton bertulang) dim. 2000x2000x3000mm termasuk
26 kelengkapannya

Sub Total

JUMLAH HARGA
(Rp.)

12,059,806.50
2,953,422.00
24,550,320.38

72,166,950.00

111,730,498.88

PERHITUNGAN PEMBESIAN

Beton Pengisi Ujung Tiang Pancang Baja K.300


Beton bertulang (K-300) pengisi tiang pancang (panjang 2.0 m / pile)
No.
Tulangan

18 buah tiap pile


Spiral

1
2
3

18-D 25
D13 - 75
Plat t = 9 mm

Beton bertulang selimut tiang pancang


Beton bertulang (K-300) pengisi tiang pancang (panjang 2.5 m / pile)
No.
Tulangan

18 buah tiap pile


Spiral

II.2

1
2

16- 13
10 - 100

PILE CAP
SEGMEN I
No.

Tulangan

Luar

D19-200

Dalam

D19-200

Samping

D19-200

Begel tengah

D19-200

Penahan Fender
Trapesium

D19-200

Horizontal (mengelilingi)

D19-200

Horizontal Atas

D19-200

SEGMEN I'
SEGMEN II
No.

Tulangan

Luar

D19-200

Dalam Atas

D19-200

Samping depan & belakang

D19-200

Bawah

D19-200

Begel tengah

D19-200

SEGMEN II'

SEGMEN III
No.

Tulangan

Luar

D19-200

Dalam

D19-200

Samping

D19-200

Begel tengah

D19-200

Penahan Fender
Trapesium

D19-200

Horizontal (mengelilingi)

D19-200

Horizontal Atas

D19-200

Samping
Fender
Bawah

Multipleks
V=
V=
V=

(17.5+3.5+3.5+2+4.5+2+1.5+2+4.5+2+3.5+3.5)*1.5
((1.5*1.5)+(1.1*1.5*2)+(1.5*2))*3
(3.5*3.5)*2+(1.5*4.5*2)+(1.5*3.5)

Kayu Bekisting 5/7 , 6/12


No Kayu
1
2
3
4
5
6
7
8
9
10
Total Volume Kayu Pile Cap

1.00

panjang 2.0 m / pile)


BJ

Panjang

3.980
1.042

3.05
2.24

Jumlah

18.00
29.33

Total
Panjang

Total
Berat

54.90
65.61

218.50
68.37
terpisah

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton Isi Tiang
Rasio Besi/m3
1 Rasio Besi/m3

286.87
286.87
1.01
285.36
285.36

kg
kg
m3
kg/m3
kg/m3

1.00

panjang 2.5 m / pile)


BJ

Panjang

1.578
0.617

Dibulatkan

3.00
2.71

Jumlah

16.00
25.00

Total
Panjang

Total
Berat

48.00
67.70

75.74
41.77

Total Pembesian
Jumlah Pile = 1
Volume Beton Selimut Tiang
Rasio Besi/m3
1.05 Rasio Besi/m3

117.52
117.52
0.72
164.06
172.27

Bekisting
Volume Beton Selimut Tiang
Rasio Bekisting/m3

7.95 m2
0.72 m3
11.10 m2/m3

BJ

Panjang

Jumlah

Total
Panjang

kg
kg
m3
kg/m3
kg/m3

Total
Berat

2.250

10.00

19.00

190.00

427.50

2.250

10.00

19.00

190.00

427.50

2.250

14.00

9.00

126.00

283.50

2.250

1.90

57.00

108.30

243.68

2.250

7.40

9.00

66.60

149.85

2.250

5.20

9.00

46.80

105.30

2.250

4.50

3.00

13.50

30.38

BJ

Panjang

Total Pembesian

1,667.70 kg

Total Pembesian

1,667.70 kg

Jumlah

Total
Panjang

Total
Berat

2.250

6.00

24.00

144.00

324.00

2.250

10.00

9.00

90.00

202.50

2.250

4.50

18.00

81.00

182.25

2.250

4.50

9.00

40.50

91.13

2.250

1.90

24.00

45.60

102.60

BJ

Panjang

Total Pembesian

902.48 kg

Total Pembesian

902.48 kg

Jumlah

Total
Panjang

Total
Berat

2.250

10.00

9.00

90.00

202.50

2.250

6.00

19.00

114.00

256.50

2.250

10.00

9.00

90.00

202.50

2.250

1.90

19.00

36.10

81.23

2.250

7.40

9.00

66.60

149.85

2.250

5.20

9.00

46.80

105.30

2.250

4.50

3.00

13.50

30.38

Total Pembesian

1,028.25 kg

TOTAL BESI + Wise


Volume I

6,168.60 Kg
39.38 m3

Pengurang

Dibulatkan

Volume II
Volume III
Volume IV
Volume V
Volume Beton Pile Cap
Rasio Besi/m3
1.15 Rasio Besi/m3

21.00
4.50
7.09
(3.11)
68.86
89.59
103.03

3.5+3.5+2+4.5+2+1.5+2+4.5+2+3.5+3.5)*1.5
5)+(1.1*1.5*2)+(1.5*2))*3
5)*2+(1.5*4.5*2)+(1.5*3.5)

5/7
5/7
5/7
5/7
5/7
5/7
5/10
6/12
5/7
5/7
5/7
6/12

Jumlah
20.00
16.00
16.00
12.00
20.00
4.00
6.00
2.00
8.00
4.00
4.00
2.00

75.00
25.65
43.25
=
Rasio Multipleks/m3

Type

m3
m3
m3
m3
m3
kg/m3
kg/m3

Luas
Pot
0.0035
0.0035
0.0035
0.0035
0.0035
0.0035
0.0050
0.0072
0.0035
0.0035
0.0035
0.0072

143.90 m2
2.09 m2/m3

Panjang
1.40
1.00
1.10
0.80
0.70
1.20
1.80
1.80
0.90
0.75
1.10
0.75

olume Kayu Pile Cap

Volume
(m3)
0.10
Kayu dalam utk precast
0.06
Kayu dalam utk precast
0.05
0.02
0.05
0.03
0.03
0.01
0.02
0.01
7.712

Rasio Kayu Bekisting/m3

sudah termasuk bekisting dalam

0.112 m3/m3

dah termasuk bekisting dalam

yu dalam utk precast

yu dalam utk precast

PERHITUNGAN PEMBESIAN

Beton Pengisi Ujung Tiang Pancang Baja K.300


Beton bertulang (K-300) pengisi tiang pancang (panjang 2.0 m / pile)
No.
Tulangan

328 buah tiap pile


Spiral

1
2
3

32-D 25
D12 - 200
Plat t = 9 mm

Beton bertulang K-300 precast (2 m x 2 m x 0.15 m)


No.

Tulangan

Luar

D13-200

Vertikal

D16-200

Samping

D16-200

Vertikal (pada 1 m atas)

D16-200

Beton bertulang K-300 pengisi beton precast


No.

Tulangan

Luar

D13-200

Vertikal

12-D25

Luar

D13-200

Vertikal

12-D25

#REF!
SEGMEN I
No.

Tulangan

Luar

D16-150

Atas

10-D25

Samping

D16-150

Bawah

10-D25

Begel Horizontal

D13-400

Begel Vertical

D13-25

Samping
Bawah

Multipleks
V=
V=

(1.5+1.5)*6.2
2.8*6.2

Kayu Bekisting 5/7 , 6/12


No Kayu
1
2

3
4
5
6
7
8
9
10
Total Volume Kayu Pile Cap

#REF!

No.

Tulangan

Luar

D13-100

Atas

10-D25

Samping

D16-150

Bawah

10-D25

Tulanagn Penguat Tengah

8-D25

Begel Horizontal

D13-250

Begel Vertical

D13-25

WF dudukan bekisting
Plat Klem

1
2

WF 200x100x5,5x8 mm
Plat Clamp Cincin t = 12 mm
lebar 25 cm

Samping
Bawah

Multipleks
V=
V=

(2*2.8)+(3*2)+(2.8*2)+(3*2)
2.8*5.8

Kayu Bekisting 5/7 , 6/12


No Kayu
1
2
3
4
5
6
7
8
9
10
Total Volume Kayu Pile Cap

#REF!
No.

Besi Plat

1
2

Plat Clamp Cincin t = 12 mm


lebar 25 cm
Plat Dudukan

Pengurang Lingkaran

1.00

BJ

Panjang

3.980
0.888

4.05
4.24

Jumlah

32.00
14.75

Total
Panjang

Total
Berat

129.60
62.56

515.81
55.55
terpisah

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton Isi Tiang
Rasio Besi/m3
1.05 Rasio Besi/m3

571.36
571.36
4.54
125.82
132.11

kg
kg
m3
kg/m3
kg/m3

1.00
BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

1.042

9.80

32.00

313.60

326.77

1.560

7.45

41.00

305.45

476.50

1.560

7.45

4.00

29.80

46.49

1.560

2.50

15.00

37.50

58.50

Dibulatkan

Total Pembesian
Jumlah Pile = 1
Volume Beton Precast
Rasio Besi/m3
1.05 Rasio Besi/m3

908.26
908.26
8.03
113.09
118.75

Bekisting
Volume Beton Precast
Rasio Bekisting/m3

103.75 m2
8.03 m3
12.92 m2/m3

1.00
BJ

Panjang

Jumlah

kg
kg
m3
kg/m3
kg/m3

Total
Panjang

Total
Berat

1.042

2.60

32.00

83.20

86.69

3.980

8.05

12.00

96.60

384.47

1.042

2.60

32.00

83.20

86.69

3.980

Dibulatkan

8.05

12.00

96.60

Total Pembesian
Jumlah Pile = 1
Volume Beton Pengisi Precast
Rasio Besi/m3
1.05 Rasio Besi/m3

384.47

942.32
942.32
8.44
111.63
117.21

Bekisting
Volume Beton Pengisi Precast
Rasio Bekisting/m3

kg
kg
m3
kg/m3
kg/m3

4.00 m2
8.44 m3
0.47 m2/m3

BJ

Panjang

Jumlah

Total
Panjang

Total
Berat

1.578

9.00

42.00

378.00

596.48

3.980

6.82

10.00

68.20

271.44

1.578

6.82

20.00

136.40

215.24

3.980

6.82

10.00

68.20

271.44

1.042

3.20

32.00

102.40

106.70

1.042

1.80

32.00

57.60

60.02

Total Pembesian

Dibulatkan

1,521.32 kg

TOTAL BESI + Wise


Volume Beton Cap Beam
Rasio Besi/m3
1.15 Rasio Besi/m3

1,521.32
26.04
58.42
67.19

Kg
m3
kg/m3
kg/m3

18.60
17.36

Dibulatkan

Type
5/7
5/7
5/7
5/7

=
Rasio Multipleks/m3
2.5 Rasio Multipleks/m3

Jumlah
20.00
16.00
16.00
12.00

Luas
Pot
0.0035
0.0035
0.0035
0.0035

35.96 m2
1.38 m2/m3
3.45 m2/m3

Panjang
1.40
1.00
1.10
0.80

sudah termasuk bekisting dalam

Volume
(m3)
0.10
Kayu dalam utk precast
0.06
Kayu dalam utk precast

5/7
5/7
5/10
6/12
5/7
5/7
5/7
6/12

20.00
4.00
6.00
2.00
8.00
4.00
4.00
2.00

0.0035
0.0035
0.0050
0.0072
0.0035
0.0035
0.0035
0.0072

0.70
1.20
1.80
1.80
0.90
0.75
1.10
0.75

0.05
0.02
0.05
0.03
0.03
0.01
0.02
0.01
3.213

Rasio Kayu Bekisting/m3

BJ

Panjang

Jumlah

Total
Panjang

0.123 m3/m3

Total
Berat

1.042

10.10

59.00

595.90

620.93

3.980

8.80

10.00

88.00

350.24

1.578

17.60

28.00

492.80

777.64

3.980

8.80

10.00

88.00

350.24

3.980

6.95

8.00

55.60

221.29

1.042

3.20

24.00

76.80

80.03

1.042

2.30

45.00

103.50

107.85

Total Pembesian

Dibulatkan

21.33
7,850.00

Dibulatkan
Pemakaian

2,508.21 kg

TOTAL BESI + Wise


Volume Beton Pile cap
Rasio Besi/m3
1.2 Rasio Besi/m3

6
5.60

2
0.10

Volume Beton Pile cap


Rasio WF & Plat/m3
1.1 Rasio WF & Plat/m3
2.00 Rasio WF & Plat/m3

12
0.01

2,508.21
31.50
79.63
95.55

Kg
m3
kg/m3
kg/m3

256.00
39.55
295.55
31.50
9.38
10.32
5.16

kg
kg
kg
m3
kg/m3
kg/m3
kg/m3

23.2
16.24
=
Rasio Multipleks/m3

39.44 m2
1.25 m2/m3

sudah termasuk bekisting dalam

Dibulatkan

Type
5/7
5/7
5/7
5/7
5/7
5/7
5/10
6/12
5/7
5/7
5/7
6/12

2.5 Rasio Multipleks/m3

Jumlah
20.00
16.00
16.00
12.00
20.00
4.00
6.00
2.00
8.00
4.00
4.00
2.00

Luas
Pot
0.0035
0.0035
0.0035
0.0035
0.0035
0.0035
0.0050
0.0072
0.0035
0.0035
0.0035
0.0072

3.13 m2/m3

Panjang

Volume
(m3)

1.40
1.00
1.10
0.80
0.70
1.20
1.80
1.80
0.90
0.75
1.10
0.75

0.10
Kayu dalam utk precast
0.06
Kayu dalam utk precast
0.05
0.02
0.05
0.03
0.03
0.01
0.02
0.01
3.213

Rasio Kayu Bekisting/m3

0.102 m3/m3

1.00
BJ

Panjang

Lebar
m

Volume
m3

Total
Berat

7,850.00

5.60

0.25

0.02

131.84

7,850.00

2.00

2.00

0.05

376.80

(0.02)

(145.01)

7,850.00

Total Pembesian

363.63 kg

4,545,358.45

dah termasuk bekisting dalam

yu dalam utk precast

yu dalam utk precast

dah termasuk bekisting dalam

yu dalam utk precast

yu dalam utk precast

Rasio Bekisting
Selimut Tiang 609 mm

Keliling Luar
Panjang (coba)
Luas

2.542 m'
1.000 m'
2.542 m2

Volume
Luas Luar
Luas Dalam
Selisih
Panjang (coba)

0.514
0.291
0.223
1.000

Volume / 1 m'

0.223 m3

Rasio Bekisting

Selimut Tiang 809 mm

m2
m2
m2
m'

11.410 m2/m3

Misal P = 1.5 m
Klem
Rasio Klem

3.812 m2
2.000 Buah
0.525 Buah / m2

Keliling Luar
Panjang (coba)
Luas

3.170 m'
1.000 m'
3.170 m2

Volume
Luas Luar
Luas Dalam
Selisih
Panjang (coba)

0.800
0.514
0.286
1.000

Volume / 1 m'

0.286 m3

Rasio Bekisting

m2
m2
m2
m'

11.100 m2/m3