Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 47

ATTACHMENT 7.

1
Project Inspection and Test Plan-SITE
CIVIL AND STRUCTURE

(subcon
logo)

PROJECT INSPECTION & TEST PLAN


Discipline

Legend

STEEL STRUCTURE
Project Title
Job No
Description
Equipment Tag No.

: P&G PROJECT
:
: Project Inspection and Test Plan-Site
: -

Location

: -

No.

DESCRIPTION

STEEL STRUCTURE

8.1

Procedure

H
W
p

:
:
:

Hold Point
Witness
Perform

A
R
M

: Approval Required
: Review
: Monitoring

TPI : Third Party Inspection


JOB PMTS : JOB Pertamina-Medco E&P Tomori Sulawesi
TSC : Tripatra-Samsung Consortium

INSPECTION
METHOD

REFERENCE DOCUMENT

ACCEPTANCE CRITERIA

VERIFIED DOCUMENT

INSPECTION LEVEL
SSJ

a.

Welding Procedure Specification / Procedure


Qualification Record ( WPS/PQR )

Review

As applicable WPS/PQR

Comply with spec & proc.

Approved Procedure

P,R

b.

General Fabrication Work

Review

-SNO-S-TS-002 Specification Standard for


structural steel fabrication

Comply with spec & proc.

Approved Procedure

P,R

c.

General Structure Erection Work

Review

- SNO-X-PR-007 Steel Structure Erection


Procedure

Comply with spec & proc.

Approved Procedure

P,R

d.

Chipping and Padding Work

Review

- SNO-S-ES-002 Standard Specification for


Stuctural Steel Construction

Comply with spec & proc.

Approved Procedure

P,R

e.

Grouting Work

Review

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec & proc.

Approved Procedure

P,R

8.2

Material Inspection

Inspect

- SNO-S-TS-001 Specification for structural


steel material

Comply with spec.

SNO -Q-FM- 0002

P,R

8.3

Inspection During Fabrication


a.

WPS/PQR Qualification Test

Inspect

As applicable WPS/PQR

Comply with spec.

SNO -Q-FM- 0038

P,R

b.

Welder Performance test

Inspect

As applicable WPS/PQR

Comply with spec.

SNO -Q-FM- 0037

P,R

c.

Dimensional, Welding, NDT, and Coating Inspection

Inspect

As applicable WPS/PQR,NDT procedure


- SNO-S-ES-002 Standard Specification for
Stuctural Steel Construction

Comply with spec. & DWG.

SNO -Q-FM- 0019

P,R

(subcon
logo)

PROJECT INSPECTION & TEST PLAN


Discipline

Legend

STEEL STRUCTURE
Project Title
Job No
Description
Equipment Tag No.

: P&G PROJECT
:
: Project Inspection and Test Plan-Site
: -

Location

: -

No.

DESCRIPTION

8.4

8.5

H
W
p

:
:
:

Hold Point
Witness
Perform

A
R
M

: Approval Required
: Review
: Monitoring

TPI : Third Party Inspection


JOB PMTS : JOB Pertamina-Medco E&P Tomori Sulawesi
TSC : Tripatra-Samsung Consortium

INSPECTION LEVEL

INSPECTION
METHOD

REFERENCE DOCUMENT

ACCEPTANCE CRITERIA

VERIFIED DOCUMENT

- SNO-S-ES-002 Standard Specification for


Stuctural Steel Construction

Comply with spec. & DWG.

SNO -Q-FM- 0004

P,R

Comply with spec. & DWG.

SNO -Q-FM- 0021

P,R

SSJ

Installation
a.

Chipping and Padding check

Inspect

b.

Plumbness check

Inspect

c.

Welding and NDT Inspection

Inspect

As applicable WPS/PQR,NDT procedure


- SNO-S-ES-002 Standard Specification for
Stuctural Steel Construction

Comply with spec.

SNO -Q-FM- 0020

P,R

d.

Bolt Tightening

Inspect

- SNO-S-ES-002 Standard Specification for


Stuctural Steel Construction

Comply with spec.

SNO -Q-FM- 0023

P,R

e.

Grouting Work
1. Material Inspection

Inspect

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec.

SNO -Q-FM- 0002

P,R

2. Mixing proportion

Inspect

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec.

SNO -Q-FM- 0022

P,R

3. Form-work

Inspect

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec. & DWG.

SNO -Q-FM- 0022

P,R

4. Anchor bolts and embedded items

Inspect

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec. & DWG.

SNO -Q-FM- 0022

P,R

5. Cleaning prior to placing

Inspect

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec.

SNO -Q-FM- 0022

P,R

6. Grout test (compressive strength)

Inspect

- SNO-C-ES-015 Standard Specification for


Grouting of stuctural and equipment

Comply with spec.

SNO -Q-FM- 0017

P,R

f.

Steel Structure Installation Acceptance

Inspect

- SNO-S-ES-002 Standard Specification for


Stuctural Steel Construction

Comply with spec.

SNO -Q-FM- 0024

P,R

f.

Fire Proofing

Inspect

- SNO-S-ES-002 Standard Specification for


Stuctural Steel Construction

Comply with spec.

SNO -Q-FM- 0030

P,R

Steel erection work

(subcon
logo)

PROJECT INSPECTION & TEST PLAN


Discipline

Legend

STEEL STRUCTURE
Project Title
Job No
Description
Equipment Tag No.

: P&G PROJECT
:
: Project Inspection and Test Plan-Site
: -

Location

: -

No.

DESCRIPTION

H
W
p

INSPECTION
METHOD

:
:
:

Hold Point
Witness
Perform

REFERENCE DOCUMENT

A
R
M

: Approval Required
: Review
: Monitoring

TPI : Third Party Inspection


JOB PMTS : JOB Pertamina-Medco E&P Tomori Sulawesi
TSC : Tripatra-Samsung Consortium

INSPECTION LEVEL

ACCEPTANCE CRITERIA

VERIFIED DOCUMENT

Approved to JSEA

SNO -Q-FM- 0004

P,R

SSJ

a.

Prepare JSEA

Inspect

b.

Inspect all steel work ( Handling Material Process)

Inspect

Comply with spec

SNO -Q-FM- 0021

P,R

1. Hard Stamping

Inspect

Comply with spec.

SNO -Q-FM- 0020

P,R

2. Damage

Inspect

Comply with spec.

SNO -Q-FM- 0023

P,R

3. Paint touch up later concealed areas

Inspect

Comply with spec.

Inspect all steel work after Modules Ground


Assembly, Including:

Inspect

Comply with spec.

SNO -Q-FM- 0002

P,R

1. Tension of Bolts

Inspect

Comply with spec.

SNO -Q-FM- 0022

P,R

2. Touch up paint & Cleaning

Inspect

Comply with spec.

SNO -Q-FM- 0022

P,R

3. Complete to marking plan

Inspect

Comply with spec.

SNO -Q-FM- 0022

P,R

Inspect All Steel work After erection,including:

Inspect

Comply with spec.

SNO -Q-FM- 0022

P,R

1. Aligment of Structure

Inspect

Comply with spec.

SNO -Q-FM- 0017

P,R

2. Tension of Bolts

Inspect

Comply with spec.

SNO -Q-FM- 0024

P,R

3. Touch up paint & Cleaning


4. Complete to marking plan
Inspect all Roofing/Walling work for:
1. hard Stamping
2. Quantity
3. Damage
Inspect all Roofing/Walling & accessories after
installation, Including:
1. Visual (cleaning)
2. Connection metal Sheet ( Sheet to Sheet)
3. Overlap joint sheet
4. Joint plashing, Silent, Gutter
5. Complete to marking plan

Inspect
Inspect
Inspect
Inspect
Inspect

Comply with spec.


Comply with spec.
Comply with spec.
Comply with spec.
Comply with spec.

SNO -Q-FM- 0030


SNO -Q-FM- 0004
SNO -Q-FM- 0021
SNO -Q-FM- 0020
SNO -Q-FM- 0023

P,R
P,R
P,R
P,R
P,R

Inspect

Comply with spec.

SNO -Q-FM- 0002

P,R

Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect

Comply with spec.


Comply with spec.
Comply with spec.
Comply with spec.
Comply with spec.
Comply with spec.
Comply with spec.

SNO -Q-FM- 0022


SNO -Q-FM- 0022
SNO -Q-FM- 0022
SNO -Q-FM- 0022
SNO -Q-FM- 0017
SNO -Q-FM- 0024
SNO -Q-FM- 0030

P,R
P,R
P,R
P,R
P,R
P,R
P,R

c.

d.

e.

f.

Form Code : SNO-Q-FM-0039 Rev.0

(subcon
logo)

REQUEST FOR INSPECTION


Project Title
Job No
Client
Main Contractor
(Client Name) :

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
Tripatra-Samsung Consortium
Attn.

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

Mr.
Project Manager

Gentlemen,
We would like to have your presence for inspection according to the following schedules.

Date and time

Place/Area

Inspection Item

Piping

Civil

Instrument

Pipeline

Structural

Electrical

Remarks

Mechanical

COMMENT :

Involvement Party

Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0

Performed By
Sub-Contractor

Approved By
TSC

Reviewed By
JOB PMTS

TPI (If applicable)

EQUIPMENT /MATERIAL RECEIVING INSPECTION


REPORT
Project Title

Senoro Gas Development Project

Sub-Contractor

Job No

9608/SU2573

Report No.

Client

JOB Pertamina Medco E & P Tomori Sulawesi

Date

Main Contractor

Tripatra-Samsung Consortium

Page

Material Arrival Date

PO.No. / Packing List No

NO.

RESULT2)
ACCEPTED REJECTED

INSPECTION ITEM

(subcon
logo)

DD/MM/YY
of

Remarks

Surface Condition
1

Visual
Dimension

Mill Certificate
Conform to
- Chemical Composition
2
- Mechanical Properties

3 Manufacturer Data Sheet1)

4 Other

Note:
1) If Necessary
2) Put check mark () on the selected result.
Involvement Party

Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0002 Rev.0

Performed By
Sub-Contractor

Approved By
TSC

Reviewed By
JOB PMTS

TPI (If applicable)

(subcon
logo)

INSPECTION REPORT
Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

1. Type Inspection Item

Sub-Contractor
Report No.
Date
Page
Location :

DD/MM/YY
of

:
Inspection / Test /Examination / Check

2. Inspection Report

3. Remarks

Supporting document attached


YES
NO

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0003 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

SURVEY REPORT
Project Title
Job No
Client
Main Contractor
REFERENCES
Item Name
Drawing No.
Revision
Sheet
No.

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
:
:
:
:
:

(subcon
logo)

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

Location :

Of

DESCRIPTION

Plan

Coordinate
Actual
Difference

Plan

Elevation
Actual

Difference

Remarks

E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E = East
N = North

Involvement
Party

Performed By
Sub-Contractor

Signature

Signature
Sign Date
Job Title
Form Code : SNO-Q-FM-0004 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

CLEARING AND GRUBBING INSPECTION REPORT


Project Title
Job No
Client
Main Contractor
REFERENCES
Drawing No.
Revision
Sheet

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Sub-Contractor
Report No.
Date
Page

:
:
:
:

Location

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

DD/MM/YY
of
:

Reviewed
JOB PMTS

Remarks

EXISTING AREA / LOW SWAMPY


Cut off flush of selected trees without
removing its roots
STABLE EXISTING AREA FOR SUPPORT THE WEIGHT OF HAULING EQUIPMENT
Trees, brush, stump and resting
vegetation removal and disposal.
Organic soil material removal and
disposal
Other unsatisfactory soil material
removal
Demolition, relocation, elevation and
protection of existing facilities.
Quality of Cleaning.
COMMENT :

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0005 Rev.0

Approved By
TSC

Reviewed by
JOB PMTS

TPI
(If applicable)

(subcon
logo)

EXCAVATION INSPECTION REPORT


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

From KP ... To KP
REFERENCES
Drawing No.
Revision
Sheet

:
:
:
:

Location

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

Demolition or Protection of Existing Facility


Investigation of Existing under-ground
Facilities
Setout location, based on shop drawing and
endorsed Benchmark
Line, Slope and Grades according to
approved drawing
Depth of Excavation, confirmed
Safety regarding excavation works,
confirmed and Protection of Slope
Dewatering
Quality Cleaning of Bottom Surface
COMMENT

Involvement
Party

Performed By
Sub-Contractor

Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0006 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

BACKFILL MATERIAL INSPECTION REPORT


Project Title
Job No
Client
Main Contractor
REFERENCES
Drawing No.
Revision
Sheet

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
:
:
:
:

NO

INSPECTION ITEMS

Sub-Contractor
Report No.
Date
Page
Location

APPROVED
(Sub-Con)
TSC

DD/MM/YY
of
:

REVIEWED
JOB PMTS

REMARKS

1 QUALITY OF MATERIAL USED


a. LS / CLY / SCLY
b. LS / CLY / SCLY
c. LS / CLY / SCLY
2 DISTRIBUTION QUALITY OF MATERIAL
3 VISUAL SOIL MATERIAL GRADATION
4 VISUAL SOIL MATERIAL PLASTICITY
5 COHESIVENESS OF SOIL MATERIAL
a. Cohesive / Little Cohesive / Loose
b. Cohesive / Little Cohesive / Loose
c. Cohesive / Little Cohesive / Loose
6 CLEANING ( REMOFAL OF TRASH, DEBRIS )
7 SLOPE PROTECTION
Legend
LS
CLY
SCLY

Supporting document attached


: Lime Stone
: Clay Silt
: Sandy Clay

YES

NO

COMMENT

Involvement
Party

Performed by
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0007 Rev.0

Approved by
TSC

Reviewed By
JOB PMTS

TPI

(subcon
logo)

COMPACTION INSPECTION REPORT


Project Title
Job No
Client
Main Contractor
REFERENCES
Drawing No.
Revision
Sheet
NO

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Sub-Contractor
Report No.
Date
Page

:
:
:
:

Location

RESULT

INSPECTION ITEMS

Accepted

Fill material quality

Area location marking for layer


thickness

Soil spreading methods

Thickness of loose soil

Water spreading methods

Optimum water content

Compactor trip number

Compaction test number for


covered area

Rejected

APPROVED
(Sub-Con)

REVIEWED
TSC

JOB PMTS

DD/MM/YY
of
:

REMARKS

EQUIPMENT
Total Unit
Sheep Foot Compactors

Vibratory Compactors

pc(s)

Running Unit :

pc(s)

Stand Unit

pc(s)

Total Unit

pc(s)

Running Unit :

pc(s)

Stand Unit

pc(s)

Water Source Check


Accepted

Rejected

Accepted

Rejected

Water Quantity Due to Wet


Compaction Check

COMMENT

Involvement
Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0008 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

FIELD DENSITY TEST (SAND CONE METHOD)


Project Title
Job No
Client
Main Contractor
Date Of Test
TestMax.
No. Dry Density
TypeOpt.
of Layer
Moist. Content

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

DD/MM/YY
of
REMARK

Location Of Test

VOLUME DETERMINATION
1
2
3
4
5

Weight of Sand + Cone + Jar ( before )


Weight of Sand + Cone + Jar ( after )
Weight of Sand in Hole + Cone
Weight of Sand in Cone
Weight of Sand in Hole

Unit Weight of Sand

Volume Of Hole

UNIT

FORMULA

gram
gram
gram
gram
gram

a
b
c
d
e=c-d
3

g=e/f

UNIT

FORMULA

Weight of Wet Soil + Container


Weight of Dry Soil + Container
Weight of Water
Weight of Container
Weight of Dry Soil
Moisture Content

gram
gram
gram
gram
gram
%

i
j
k=i-j
l
m=j-l
n=(k/m)x100

DENSITY DETERMENATION

UNIT

FORMULA

gram
gram
gram

o
p
q=o-p
r=q/g

7
8
9
10

Weight of Soil from Hole + Container


Weight of Container
Weight of Soil from Hole
WET DENSITY

11

DRY DENSITY

12
13
14

Maximum LAB DENSITY


Optimum Moisture Content
Present Compaction

gram/cm3

Sheep foot = .X 2 passing

Sheep foot = ..X 2 passing

Vibro smooth drum = ..X 2 passing

Vibro smooth drum = ..X 2 passing

Container No.

Container No.

gram/cm
cm3

MOISTURE CONTENT DETERMENATION


1
2
3
4
5
6

Sub-Contractor
Report No.
Date
Page

Container No.

Container No.

gram/cm3 s=r/(1+(n/100))
t
gram/cm3
%
u
%
v=(s/t)x100

Remarks :

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0009-1 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If Applicable)

(subcon
logo)

SUMMARY SAND CONE TEST REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Min soil Density
Compactor Trip
Compactor Trip

No.

Date of
Test

Involvement Party

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

:
:
:

TEST NO / LAYER / ELEVATION

Performed by
Sub-Contractor

Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0009-2 Rev.0

LOOSE SOIL
THICKNESS (mm)

Approved by
TSC

WATER
CONTENT
3
(gr/cm )

WET
DENSITY
3
(gr/cm )

DRY
DENSITY
3
(gr/cm )

Reviewed By
JOB PMTS

RESULT (%)

REMARK

TPI
(If Applicable)

PILE DRIVING ANALYZER (PDA) TEST REPORT


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Sub-Contractor
Report No.
Date
Page

Drawing No

Hammer Type

Point No

Weight of RAM :

Total Length of Pile

Type of Pile

Location

Date / Time

Test
Load

Point
No

Static Load
Capacity

Pile
Stress

Reading
Pile Energy
Transfer

(subcon
logo)

DD/MM/YY
of

Pile
Integrity

Pile Statement

JUDGEMENT
The piles under tested are
ACCEPTED

REJECTED

according to selected standards, code and specification.

Attachment
1)
2)
3)

Involvement Party

Perform By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code: SNO-Q-FM-0010 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

PILE DRIVING RECORD


Project Title
Job No
Client
Main Contractor
PILE SPECIFICATION
Number
:
Diameter
:
Length
:
Weight
:
DRIVING
Start/ End
Delay
Splicing Joint I
Joint II
Joint III

Senoro Gas Development Project


Sub-Contractor
9608/SU2573
Report No.
JOB Pertamina Medco E & P Tomori Sulawesi
Date
DD/MM/YY
TRIPATRA-SAMSUNG CONSORTIUM
Page
of
ITEM NO.
:
LOCATION
:
PILE DRIVING TYPE
:
HAMMER SPECIFICATION
Type
:
Weight
:
Drop Height :
CUSHION
Material Type :
Thickness
:
Final Set
:
cm /
Settlement
:
cm/blow

:
:
:
:
:

blow

DRIVING RECORD
PENETRATION
m
cm

BLOW
COUNT

PENETRATION
m
cm
13

50

PENETRATION
m
cm
26

50

14
50
50
16
50
50

50

18
50

50

19
50

50

20
50

50

21
50

50

22
50

50

23
50

50

24
50

50

25
50

50

Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0011-1 Rev.0

50
50

50
38

50
Performed By
Sub-Contractor

50
49

37
50

12

50
48

36
50

11

50
47

35
50

10

50
46

34
50

50
45

33
50

50
44

32
50

50
43

31
50

50
42

30
50

50
41

29

17

50

50

50

50
51

50
Approved By
TSC

BLOW COUNT

40

28
50

PENETRATION
m
cm
39

27

15

BLOW
COUNT

50

50

Involvement Party

BLOW
COUNT

50
Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

PILE DRIVING RECORD


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Form Code : SNO-Q-FM-0011-2 Rev.0

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

(subcon
logo)

WELDING INSPECTION REPORT (PILE)


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

WELDING INSPECTION
POINT NO.

JOINT
NO

PILE NUMBER
1
2
2
3
3
4
4
5

DATE1)

START /
FINISH 2)

WEATHER
CONDITION

RESULT
APPROVED
Accepted Rejected SUB-CON TSC

REVIEWED
JOB PMTS

:
:
:
:
:
:
:
:

NOTES :
1) FORMAT MM/DD/YY
2) FORMAT HH:SS

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0012 Rev.0

Performed By
Sub-Contractor

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If appalicable)

REMARKS

FINE AGGREGATE
Project Title
Job No
Client
Main Contractor
STD REFERENCE :
MATERIAL
:
SOURCE
:
SUPPLIER
:

Sieve No.

mm

(subcon
logo)

Senoro Gas Development Project


Sub-Contractor
9608/SU2573
Report No.
JOB Pertamina Medco E & P Tomori Sulawesi
Date
TRIPATRA-SAMSUNG CONSORTIUM
Page
TESTING DATE
:
SAMPLING DATE :
PIC
:
TESTING DATE
:

Weight
Retain

Total
% Retain Passing
Weight

ASTM C33
min
max

DD/MM/YY
1
of

Additional Test
Parameter
Spec.
Specific Gravity
Absorption
Silt Content
Washing Loss
Sedimentation
Clay Lumps & Friable
Organic Impurities
Visual Test (Color)
Sand Equivalent

Total

Form Code : SNO-Q-FM-0013-1 Rev.0

Result

FINE AGGREGATE

(subcon
logo)

(subcon
logo)

COARSE AGGREGATE
Project Title
Job No
Client
Main Contractor
STD REFERENCE :
MATERIAL
:
SOURCE
:
SUPPLIER
:

Sieve No.

mm

Senoro Gas Development Project


Sub-Contractor
9608/SU2573
Report No.
JOB Pertamina Medco E & P Tomori Sulawesi
Date
TRIPATRA-SAMSUNG CONSORTIUM
Page
TESTING DATE
:
SAMPLING DATE :
PIC
:
TESTING DATE
:

Weight
Retain

Total
Weight

%.
Retain

Passing

ASTM C33
min
max

DD/MM/YY
2
of

Additional Test
Parameter
Spec.
Specific Gravity
Absorption
Silt Content
Washing Loss
Sedimentation
Clay Lumps & Friable
Organic Impurities
Visual Test (Color)
Sand Equivalent

max 3%
max 12%
max 3%
<80%

Total
Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0013-2 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

Result

(subcon
logo)

MIX DESIGN CONCRETE


Project Title
Job No
Client
Main Contractor
DESIGN MIX
Slump
W/C Ratio
Cement
Fly Ash
Silica Fume
Fine Aggregates

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
:
:
:
:
:
:
:

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

mm
3

Kg/m
3
Kg/m
Kg/m3
%

COMPOSITION FOR 1 CuM (SSD CONDITION)


Water
:
L
Cement
Type
:
Kg
Fly Ash
:
Kg
Silica Fume
:
Kg
Admixture
:
L
Retarder
:
L
Superplasticiser:
L
Other
:
L
AGGREGATES VOLUME
Aggregates
:
Sand 1
:
Sand 2
:
Gravel - 01
:
Gravel - 02
:
Gravel - 03
:
Total
Density

Kg
Kg
Kg
Kg
Kg
Kg

:
:

Involvement Party

Ton
T/CuM

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0014 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

FOUNDATION CHECK LIST

Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Equipment / Location

Drawing no
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

:
:

NO

RESULT
Accepted Rejected

DESCRIPTION

Surveying

Rebar

Form Work

Concrete

Anchor Bolt or Box Embbedded Steel, Water


Stop

Misc, Opening, Sleeve,


etc

REMARK

Location
Elevation
Plumbness
Diameter Bending
Footing/Pedestal
Lap Length
Surface Cleaning of Rebar
Rigidity
Dimension Alignment
Footing/Pedestal
Form Oil Coating
Stability
Top Elevation
Chamfer Spacer
Cleaning Pouring Place
Footing/Pedestal
Slump Test
Using Vibrator
Removal Laitance
Curing
Appearance of Surface
Size Type Number
Location Orientation Level
Stability
Protection of Anchor Bolt Screw
Dimension, Location, Orientation, Material

COMMENT

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0015 Rev.0

Approved By
TSC

Reviewed by
JOB PMTS

TPI
(If applicable)

(subcon
logo)

CONCRETE POUR PERMIT


Project Title
Job No
Client
Main Contractor

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Drawing No.
Revision
Sheet

:
:
:

Design Mix

:
:

Slump
Quantity

:
:

Equipment / Location

A(fc' = 35 Mpa)
C(fc' = 20.7 Mpa)

DD/MM/YY
of

B (fc' = 28 Mpa)
D (fc' = 10.3 Mpa)

Cm
3

APPROVED BY :
TSC Signatures
(Print name)

Discipline

Sub-Contractor
Report No.
Date
Page

Date

REVIEWED BY
JOB Signatures
(Print name)

Date

Civil
Piping
Mechanical
Electrical / Instrument
Survey
Engineering
WEATHER

Sunny

Cloudy

Placement Start Date


:
Placement Completed Date:
Number of Cube
:
Concrete Tested by
:

Rainy

Time :
Time :
QTY :

(Nos)

REMARKS:

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0016 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

CONCRETE COMPRESSIVE STRENGTH TEST REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Testing Laboratory

Sub-Contractor
Report No.
Date
Page

POURING DATA AND DELIVERY


ITEM
NO

DD/MM/YY
of

SAMPLE NO.

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0017 Rev.0

POURING LOCATION

Performed By
Sub-Contractor

INSPECTION DATE AND REPORT OF TESTING SPECIMEN


Actual
Slump
(cm)

DATE
CAST

TEST

AGE
(days)

Approved By
TSC

Cylinder
Size
(dxh)

Cube Size
(pxlxt)

Weight
( kg )

Concrete
Design

Reviewed By
JOB PMTS

BREAKING
LOAD

COMPRESSIVE
STRENGTH

TPI

RESULT

(subcon
logo)

RELEASE OF FOUNDATION
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

Reference Document

Equipment / Location
Drawing No
Revision
Sheet

:
:
:

THE ABOVE FOUNDATION HAS BEEN COMPLETED, AND COMPLIES WITH THE DRAWING REQUIREMENT,
ALL SURVEY'S HAVE BEEN COMPLETED WITHNESSED AND APPROVED

Attachment Document Hand Over


No

Document Description

Related Inspection Reports

Final Survey after pouring concrete

Punch List report

Acc

Rej

Status Attachment
Remark

COMMENT :

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0018 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

DIMENSIONAL, WELDING, NDT & PAINTING


INSPECTION RECORD
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
SKETCH

(subcon
logo)

Sub-Contractor
Report No.
Date
Page
Drawing No
Revision
Sheet

DD/MM/YY
of
:
:
:

DIMENSIONAL INSPECTION RECORD


DIMENSION (mm)
Mark

RESULT

Actual

Design Tol

DIMENSION (mm)

Accepted Rejected

Mark

Actual

Design Tol

RESULT
Accepted Rejected

Approved By
(Sub-Con)

TSC

Reviewed By

JOB PMTS

WELDING & NDT INSPECTION RECORDS


WPS/PQR Check

Visual Check

Process

Dimension Check

Electrode

NDT

Parameter

Welder ID

Approved By
(Sub-Con)

TSC

Reviewed By

JOB PMTS

COATING / PAINTING INSPECTION RECORD


Painting System
Painting Brand

DFT (micron)

SAMPLE

Surface Preparation :

Primer / DFT

Intermediate / DFT :

Top/ DFT

TOTAL DFT

Std

Tol

Actual
(micron)

RESULT
Accepted Rejected

Approved By
(Sub-Con)

TSC

Reviewed By

JOB PMTS

6
7
8
9
average

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0019 Rev.0

Approved By
TSC

#DIV/0!

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

NON DESTRUCTIVE EXAMINATION REQUEST


Project Title
Job No
Client
Main Contractor
Discipline
Request No.
Request Date
Area / Unit
NO.

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Sub-Contractor
Report No.
Date
Page

:
:
:
:

Drawing Number

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0020 Rev.0

RT
UT
MT
PT
Revision

Sheet

Performed By
Sub-Contractor

Member

Section No.

:
:
:
:

Profile

Approved By
TSC

Attachment

Material

Welding
Process

Welder
Stamp

Reviewed By
JOB PMTS

Shoot Date

Result

DD/MM/YY
of

: 1)
2)

Shop Drawing
Sketch of location

Report No.

TPI
(If applicable)

Remarks

(subcon
logo)

PLUMBNESS INSPECTION REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor

Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

DD/MM/YY
of
:

:
:
PLUMBNESS

STRUCTURE
NAME

LOCATION

POSITION
TOP

N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E
N
E

BOT

ELEVATION BASE PLATE


PLAN

ACTUAL

TOLERANCE

REMARK

DIFFERENCE

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0021 Rev.0

Performed By
Sub-Contractor

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

GROUTING INSPECTION REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No
Revision
Sheet

NO

:
:
:

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

Equipment / Location :

CHECKING ITEM

RESULT
Accepted Rejected

APPROVED
(Sub-Con)
TSC

REVIEWED
JOB PMTS

REMARKS

SURFACE ROUGHNESS
MIXING PROPORTION
CLEANING
CURING
DIMENSION, ALIGNMENT &
STABILITY OF FORM WORK
TOP ELEVATION OF FORM
WORK
CHAMFER
LOCATION
BASE PLATE
SURFACE FINISHING
NOTE :

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0022 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

BOLT TIGHTENING CHECK


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No
Revision
Sheet

:
:
:

DD/MM/YY
of

Equipment / Location :

STRUCTURE NAME

Involvement Party

Sub-Contractor
Report No.
Date
Page

BOLT SPEC./SIZE

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0023 Rev.0

TENSION STD.
(NM)

Approved by
TSC

BOLT CHECK LOCATION

Reviewed by
JOB PMTS

RESULT
ACCEPTED REJECTED

TPI
(If applicable)

(subcon
logo)

RELEASE OF STEEL STRUCTURE INSTALLATION


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
of

Reference Document

Equipment / Location
Drawing No
Revision
Sheet

:
:
:

THE ABOVE STEEL STRUCTURE INSTALLATION HAS BEEN COMPLETED, AND COMPLIES WITH THE DRAWING
REQUIREMENT, ALL SURVEY'S HAVE BEEN COMPLETED WITHNESSED AND APPROVED

Attachment Document Hand Over


No
1

Document Description

Related Inspection Reports


Final Survey (Plumbness)

Punch List report

Acc

Rej

Status Attachment
Remark

COMMENT :

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0024 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

AGGREGATE GRADATION REPORT


( SIEVE TEST )
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Sample No.

Source of Aggregate

Sieve Size
Inch

mm

Individual
Wt.Ret ( gr )

Wt.Ret
( gr )

SAMPLE I
% Ret

% Pass

Sub-Contractor
Report No.
Date
Page

Spec %
Pass

(subcon
logo)

DD/MM/YY
of

REMARK

TOTAL
NOTE :

Involvement Party

Performed By
Sub-Contrcator

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0025 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

GRAVEL INSPECTION REPORT


Project Title
Job No
Client
Main Contractor
REFERENCES
Drawing No.
Revision
Sheet

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
:
:
:
:

Sub-Contractor
Report No.
Date
Page
Location

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

DD/MM/YY
of
:

Reviewed
JOB PMTS

Remarks

Quality of Cleaning before Spreading


Condition of Compaction
Quality of Cleaning after Spreading
Check Thickness and Width of Gravelling
COMMENT

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0026 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

CALIFORNIA BEARING RATIO (CBR) INSITU


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Location
Test Date

(subcon
logo)

Sub-Contractor
Report No.
Date
Page

DD/MM/YY
1 of

:
:

Time second

Penetration
x 10-2

Inc

Reading x 10 -2

0
50
100
150
200
250
300
350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500

Load (lbs)

Remarks
Cf=
Ap=
Load= Reading x CF

CBR 0.1"
Corrected load

x 100%

Ap x 1000 Psi

CBR 0.2"
Corrected load

x 100%

Ap x 1500 Psi

Remarks
Cf = Calibration Factor
Ap = Area of Plunger

Note :

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0027-1 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

CALIFORNIA BEARING RATIO ( CBR )REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
:

Test Date

DD/MM/YY
2 of

Load (lbs)

Location

Sub-Contractor
Report No.
Date
Page

(subcon
logo)

Penetration of Plunger ( inch )

CBR 0.1" =

Remarks :

CBR 0.2" =

Involvement
Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0027-2 Rev.0

Approved By
TSC

Reviewed by
JOB PMTS

TPI
(If applicable)

SEWER PIPING AND DRAINAGE INSPECTION


REPORT
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

(subcon
logo)

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

Check Installation of Pipes


Check Dimensional ( Location, Elevation &
Slope )
Check Connection of pipe and manhole
Concrete
Surface Finishing
Water Flow / Service test

COMMENT

Involvement
Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0028 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

BRICK INSPECTION REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

BRICK WORK
Location, wall centre, vertical board
Location of door and windows
Proportioning and Mixing Mortar
Reinforcement and installation of accessories
(Horizontal Dowels, Veltical Dowels, etc)
Installation of Column Practice
Finish of surface
COMMENT

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0029 Rev.0

Approved by
TSC

Reviewed By
JOB PMTS

TPI (If applicable)

(subcon
logo)

WATER PROOFING INSPECTION REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

Surface Preparation
Condition & Application of Material
Overlap Joint
Leakage Test
COMMENT

Involvement Party

Performed by
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0030 Rev.0

Approved by
TSC

Reviewed by
JOB PMTS

TPI
(If applicable)

(subcon
logo)

DOORS & WINDOWS INSPECTION REPORT

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

Installation of Frames and doors & windows


Installation of Hardware
Fixed condition of glass
Condition of Cleaning
Functional Test
COMMENT

Involvement
Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0031 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

WALL , CEILING AND FLOOR INSPECTION REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

I. WALL FINISHING (Brick, Concrete, Gypsum or Partition)


Surface
Flatness
Painting or Wall Paper
Condition of Joint
Condition of Cleaning
II. CEILING (Acoustic Board or Gypsum Board)
Setting Frame
Layout and Pattern
Condition of Joint
Painting
Condition Cleaning and Protection
III. FLOOR WORK
Pattern and Layout of Installation
Surface
Flatness
Treatment of Joint
Cleaning and Waxing
COMMENT

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0032 Rev.0

Approved by
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

PLUMBING & SANITARY FIXTURE INSPECTION


REPORT
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location

(subcon
logo)

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

I. PLUMBING WORK
Check Location, Elevation & Slope
Installation of Pipes
Connection of Sanitary Hardware to Pipe
Accepted
Water Flow & Service Test
II. SANITARY FIXTURE
Equipment Location
Alignment and Level of Installation
Tightness of screw and / or bolts & nuts
Cleaning Condition
Function Test
COMMENT

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0033 Rev.0

Approved By
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

ROOFING AND SIDING INSPECTION REPORT


Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM

Project Title
Job No
Client
Main Contractor
Drawing No.
Revision
Sheet

Sub-Contractor
Report No.
Date
Page

Equipment / Location Name

(subcon
logo)

DD/MM/YY
of
:

:
:

Item of Inspection

Result
Accepted Rejected

Approved
Sub-Con
TSC

Reviewed
JOB PMTS

Remarks

Installation of Framing
Installation of Roof & Accessories
Lapped Joint ( Length & Width )
Condition of Fastening

COMMENT

Involvement Party

Performed By
Sub-Contractor

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0034 Rev.0

Approved by
TSC

Reviewed by
JOB PMTS

TPI
(If applicable)

GENERAL PUNCH LIST

(subcon
logo)

SYSTEM / SUB SYSTEM NO.

PUNCH LIST NO.

SYSTEM DISCRIPTION

DATE

TEST PACKAGE NUMBER

DISCIPLINE

REFERENCE DOC/DWG/SPEC.

EQUIPMENT / AREA
COMPLETION DATE
DESCRIPTION

ITEM

PUCH LIST CATEGORY

VERIFICATION CLOSE OUT

ORIGINATOR
PLAN

ACTUAL

REMARKS
A or B

SUB CON

TSC

JOB PMTS

SUB CON

TSC

JOB PMTS

Category A - Item must be complete before Mechanical Completion The System at Approval of JOB Pertamina Medco E & P Tomori Sulawesi
Category B - Item can be complete after Mechanical Completion The System at Approval of JOB Pertamina Medco E & P Tomori Sulawesi
Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0035 Rev.0

Performed by
Sub-Contractor

Approved by
TSC

Reviewed By
JOB PMTS

TPI
(If applicable)

(subcon
logo)

INSPECTION, MEASUREMENT & TEST EQUIPMENT CALIBRATION LOG


Subcontractor Name :
NO.

EQUIPMENT / INSTRUMENT
IDENTIFICATION NO.

Form Code : SNO-Q-FM-0036 Rev.0

DESCRIPTION
SIZE-RANGE

MANUFACTURER
MODEL No.

MANUFACTURER SERIAL
NUMBER

CALIBRATION DETAILS
Calibration Date

Exp. Date

Certificate Number

Tag Number

REMARKS

(subcon
logo)

WELDER LIST
Project Title
Job No
Client
Main Contractor
Sub-Contractor
NO

WELDER NAME

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0037 Rev.0

:
:
:
:

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi.
Tripatra-Samsung Consortium

:
WELDER
STAMP

WPS / PQR NO

STANDARD /
REFERENCES

Performed by
Sub-Contractor

TEST COUPON
BASE
METAL

JOINT
DISEGN

DIAMETER
(Inch)

THICKNESS
(mm)

Approved By
TSC

Rev.

Date

Sheet

RANGE QUALIFIED
WELDING
PROCESSES

POSITION

WELDING
PROGRESS

BASE
METAL

JOINT
DISEGN

Reviewed By
JOB PMTS

DIAMETER
(Inch)

THICKNESS
(mm)

WELDING
PROCESSES

POSITION

TPI
(If applicable)

WELDING
PROGRESS

REMARKS

(subcon
logo)

WPS / PQR MATRIX


Project Title
Job No
Client
Main Contractor
Sub-Contractor
NO

:
:
:
:

Senoro Gas Development Project


9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi.
Tripatra-Samsung Consortium

DESCRIPTION

Involvement Party

Signature

Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0038 Rev.0

WPS/PQR NO

STANDARD /
REFERENCES

TEST COUPON
BASE
METAL

Performed By
Sub-Contractor

JOINT
DISEGN

DIAMETER
(Inch)

Rev.

Date

Sheet

RANGE QUALIFIED

THICKNESS
(mm)

WELDING
PROCESSES

Approved by
TSC

POSITION

WELDING
PROGRESS

BASE
METAL

JOINT
DISEGN

DIAMETER
(Inch)

Reviewed By
JOB PMTS

THICKNESS
(mm)

WELDING
PROCESSES

POSITION

WELDING
PROGRESS

PWHT

HARDNESS

TPI ( if applicable )

REMARKS