Professional Documents
Culture Documents
Washington Union Presentation110614
Washington Union Presentation110614
AGENDA
GLX Project Update
Design Development & Community Input
Washington Street
Station Site Design
Station Design
Construction Sequencing
Union Square
Station Site Design
Station Design
Construction Sequencing
Upcoming Meetings
Q&A
Phase 1 Harvard & Medford St Rail Bridges; 21 Water Demo Award: Dec 2012/ Finish: Oct 2015
Phase 2/2A Lechmere to Washington Street/
Union Square Branch
Contracts 1 & 2 Long Lead Items & Utility Work
Contract 3 Millers River Drainage & Fitchburg Mainline
Contract 4 Balance of Phase 2/2A Work
Fall 2014
Winter 2014-15
Spring 2015
Service Begins:
Lechmere, Washington St. & Union Sq.:
December 2017
Gilman Sq., Lowell St., Ball Sq. & College Ave.: Summer 2020
COMMUNITY CONCERNS/ISSUES
Washington Street
Station entrances and orientation to the neighborhood
Pedestrian experience under the bridge
Community Path connections to the Station and neighborhood
Public art
Union Square
Station entrances and orientation
Pedestrian connections and experience
Station and Bus Route connections
Public art
WASHINGTON STREET
STATION SITE DESIGN
10
11
12
13
14
15
16
ACCESSIBILITY DIAGRAM
17
WASHINGTON STREET
STATION DESIGN
18
20
21
EAST ENTRY
26
EAST ENTRY
28
LOBBY ENTRY
29
WEST ENTRY
31
LOBBY ENTRY
32
LOBBY ENTRY
33
SOUTH ELEVATOR
34
SOUTH ELEVATOR
35
TRACK LEVEL
36
41
WASHINGTON STREET
CONSTRUCTION
SEQUENCNG
42
UNION SQUARE
STATION SITE DESIGN
43
44
45
46
47
48
49
ACCESSIBILITY DIAGRAM
50
UNION SQUARE
STATION DESIGN
51
53
LOWER ENTRY
57
CONCOURSE AT PLATFORM
60
CONCOURSE AT PLATFORM
69
73
UNION SQUARE
CONSTRUCTION
SEQUENCNG
74
75