NAME OF LINE : LILO ON 400KV WALUJ - NEW BSL LINE CKT-II AT 400KV ABAD-II ( THAPATI
TANDA ) S/S
Sl. No.
Item Description
Qty.
Unit
3910
b)
2 a)
a)
b)
4
a)
b)
c)
d)
e)
f)
5
6
Rate
Total
Amount
MT
77490
302985900
133
MT
97293
12939969
25
MT
135303
3382575
59
196
Set
Set
1846
5058
108914
991368
255
255
510
510
255
No
No
Set
Set
Set
327
261
506
506
5626
83385
66555
258060
258060
1434630
1000
1037
set
Km
648
317340
648000
329081580
175
Km
49815
8717625
Sl. No.
Item Description
a)
b)
8
a)
b)
c)
d)
9
a)
b)
c)
d)
e)
10
a)
b)
c)
d)
Tension clamps
Suspension clamps
Copper earth bond
M.S. Compression joint
Vibration damper
Supply of Insulator hardwares suitable
for 640 sq.mm AAA twin bundle
Conductor
Double Tension String (DTN)
Double 'I' Suspension String (DSN)
Single 'I' Suspension String (SSN)
Pilot Insulator String
TOTAL RS.
TOTAL RS IN CRORES
Qty.
Unit
Rate
Total
Amount
57090
54120
No
No
1095
1352
62513550
73170240
650
325
6120
1200
Set
No
set
No
880
406
1623
443
572000
131950
9932760
531600
328
346
600
100
1020
Set
Set
No
No
No
907
812
474
440
446
297496
280952
284400
44000
454920
984
1038
0
0
Set
Set
Set
Set
20295
15375
12915
11685
19970280
15959250
0
0
845100019
84.5100019
EXECUTIVE ENGINEER
E.H.V. CONST. DIVISION,
AURANGBAD
Item Description
Unit
Qty.
Survey
a)
Km
b)
2
Check survey
Excavation of pits for tower footing in
earthsoil of all types including removing
of excavated material beyond tower
limits up to 50 mtrs. Lead and all lifts,
shoring,
shuttering,
dewatering,
preparation of bed for foundation and
back filling after castin
a)
Rate
Total Amount
84.275
23362
1968832.55
Km
84.275
1454
122535.85
0
Cum
1000
546
546000
Cum
Cum
Cum
Cum
20826
762
20
12526
546
2339
1560
936
11370996
1782318
31200
11724336
0
a)
b)
4
1:3:6
1:1.5:3
Lime and sand padding (10:1) only for
foundations in B.C soil (if required)
cum
cum
cum
758
3990
910
7008
9345
2633
5312064
37286550
2396030
MT
244
69618
16986792
b)
c)
d)
e)
3
Sl.
No.
Item Description
Unit
59
1709
100831
No
196
2495
489020
MT
3841
11681
44866721
a)
Total Amount
No
8
1)
b)
9
a)
b)
10
Rate
Qty.
0
0
3000
4546
13638000
2000
1168
2336000
0
855800
748800
25283595.58
2200
1200
84.275
389
624
300013
177846422
17.7846422
EXECUTIVE ENGINEER
E.H.V. CONST. DIVISION,
AURANGBAD