Conversion 55%
New built 25%
Redeployment 20 %
2 phases should be taken into account:
Tanker Service
FP(S)O Service
Life extension: when the asset exceeds its design life
MCE Deepwater Development 2014 - Madrid
Contents
RAO Roll
RAO Pitch
RAO Roll
RAO Pitch
Corrosion
Which are the results of feasibility study and in terms of strength and fatigue ?
What are the necessary repairs to face the FPSO service life ?
Structural Analysis
Structural Analysis
Input for the structural analyses :
Capacity plan
Weight distribution
Loading
conditions,
Loading/Unloading
FINDINGS
10
Turret-Hull Interface
Hopper knuckle
Topsides stools
MCE Deepwater Development 2014 - Madrid
11
Structural Analysis
Outputs of structural analysis
Remaining life assessment
Inspection plan definition based on hot spot maps
Determination of repair/modification solution
To avoid further cracking
To insure sufficient corrosion margin
To avoid integrity issues resulting in production down time
To avoid hot work or dry dock
Area 1
Area 2
Area 3
Area 4
12
Classification Society
Project Team
Inspection Plan
Site inspectors
Contractor
department
Safety
Maintenance
department
department
13
Conclusion
CONVERSION
Tanker service
FPSO service
Trading routes
Sites conditions
Surveys
Structural analysis
Structural analysis
14