A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
2AGC06-0300-00550879
Phin bn
GC 412
Work Statement
B iu tc s ca tuabin HyCon GC 412
Ti liu dng
Du ph duyt:
Thng tin
Ph duyt
D N:
D N THU IN A LI
Hp ng s 82/CHP-DEC-VSHK/ALUOI
CH U T:
CHP
CHP
CNG TY C PHN
THU IN MIN TRUNG
NH THU:
Rev.
Trang
M t
To bi
Ph duyt
bi
Ngy
A
B
C
D
E
F
Executing OU
VHH
Created by
Name
Sarodnik
Signature
RSar
Checked by
Name
Moser
Signature
FM
-1-
Approved by
Name
Gttken
Signature
MGt
Issue Date
2010-04-19
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
NI DUNG
1. Khi qut
1.1 Bn quyn
1.2 Ngi cung cp h thng
2. Phm vi cung cp
3. M t v chc nng thit b
3.1 M t phn cng
3.1.1
Cc mun in t
3.1.2
T iu khin ti ch
3.1.3
B khuych i u ra dng iu khin van t l
3.1.4
Ngun in
3.1.5
B khuych i m
3.1.6
Cc thit b pht sinh ?
3.1.7
B d tc d cht lng cao
3.1.8
B chuyn i v tr
3.1.9
o p lc/ct nc tnh
3.1.10
o tn s tnh
3.1.11
D tm ti
3.1.12
Trao i tn hiu
3.2 Cc yu cu k thut (h thng d liu ca b iu tc s ca tuabin)
3.3 Cc chc nng chnh ca b iu tc
3.3.1
Vng iu chnh tc
3.3.2
Tnh ton/iu khin lu lng
3.3.3
iu khin ti
3.3.4
Chuyn i khng dao ng
3.3.5
S thay i im t
3.3.6
D tm li c lp
3.3.7
Cc gii hn
3.3.8
Quan h vi phun-b li tia ca cc tuabin Pelton
3.4 Cc chc nng b sung ca b iu tc
3.4.1
Khi ng
3.4.2
Dng
3.4.3
Tt
3.4.4
Hin th thng s/u vo thng s
3.4.5
S hnh thnh gi tr gii hn
3.4.6
Gim st
3.4.7
iu khin vi phun trong khi khi ng
3.4.8
iu khin nhiu kim phun
4. Khi nim thit k
4.1 Cu trc v quy cch my mc
-2-
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
4.1.1
4.1.2
TM
GC 412
V
i y bn trong
4.1.3
Cc u ni
4.1.4
Cc hp u ni
4.2
Khi qut phn cng
4.3
Thit b o
4.3.1 Bng iu khin LCD ca b iu tc s
4.3.2 Hin th
4.3.3 Phn t iu khin
4.3.4 V d cc mn hnh ca bng iu hnh LCD ca b iu tc s
4.4
Cc m v tiu chun p dng
5.
Nguyn vt liu
6.
Cc ph tng
7.
Ph tr
8.
Cc thit b v dng c
9.
10.
Th nghim
11.
o to
12.
Vn hnh v bo tr
-3-
2AGC06-0300-00550879
Phin bn
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
1 General information:
1. Khi qut:
This document contains the description of the concept proposed for the
Digital Turbine Governor System of the A Luoi hydro power plant. The
solution described is based on the work package definition and later
discussions.
1.1 Copyright
1.1 Bn quyn:
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
Internet: http://www.voithhydro.com
Spare parts can be obtained from the system provider.
Internet: http://www.voithhydro.com
C th nhn cc ph tng t nh cung cp h thng.
2. Scope of supply:
The concept for the digital turbine control system considers the
following assumptions:
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
3.1 Cc m un in t:
-6-
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
For safety reasons no storage devices with moving parts are used. In
order to be able to operate the governor without problems even after a
power failure, the actual status of all adjustable parameters is stored in
resident memory and on a non-volatile storage volume (MMC).
The required input and output modules are assigned according to the
specific plant functions.
In order to detect breakdown or disturbances of the digital turbine
governor, a watchdog relay is provided to release protective functions
(emergency shut down).
3.1.2 Local control panel
The operation of the turbine governor is done by an operating panel.
This unit includes a liquid crystal display (LCD) with graphics
capability and a membrane keyboard with programmable
function keys and a numerical input field. The operating panel is
connected to the governor controller via bus interface (MPI).
3.1.3 Output amplifier for proportional valve control
Digital output amplifier for the control of the positioning devices are
delivered. On them the opening setpoint is compared with the opening
actual value (4-20 mA) and, depending on the difference, the pertinent
servo valve is controlled via an adjustable gain (positioning control
loop).
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
3.1.8 Cc b chuyn i nh v:
V tr ca cc vi phun/b li tia s c xc nh bi cc b chuyn i
nh v tuyn tnh. V tr ng tng ng vi mt tn hiu u ra 4mA cn
-9-
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
p sut ca ng ng p lc s c xc nh bi mt b chuyn i p
lc ring bit c lp ti ng ng p lc, trc MIV. Tn hiu ct nc
lm vic s c tnh bi tn hiu p lc ny.
3.1.10 o tn s lm vic:
The load actual value is estimated by the unit control system either as
020 mA signal, corresponding to a generator output of -20100MW. 3.1.12 Trao i tn hiu:
3.1.12 Signal exchange
For signal exchange with outside supplies, floating contacts are
provided. For binary input/output signals relays are used to isolate the
digital input/output. Analog signals are decoupled via buffer amplifiers.
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
CPU:
Siemens Simatic S7 315-2DP, single CPU
B nh:
256 kByte RAM
Micro Memory Card (MMC) dng d phng
Memory:
256 kByte RAM
Micro Memory Card (MMC) for backup
K thut lp rp:
Cc thit b m un cng vi thanh ci lp ray
Mounting Technique:
Modular devices with bus for mounting rail
Speed control:
Setting range of the setpoint adjustment
Permanent speed droop (bp)
Proportional gain (Kp)
Damping time constant (Td)
Derivative gain (Kv)
Derivative decay time (T1v)
Insensitivity (ix/2)
Derivative: o hm/vi phn Decay: suy gim
Load control:
2AGC06-0300-00550879
Phin bn
-10 ...
+10 %
0 ...
10%
0.1 ...
20
0.1 ...
100s
0 ...
10
0 ...
10s
< 2 x 10 -4
iu chnh tc :
Phm vi ci t khi iu chnh im t
-10 ...
+10 %
Vng tc c nh dc ca c tnh tc (bp) 0 ...
10%
Di H s t l (Kp)
0.1 ...
20
Hng s thi gian gim chn vi phn (Td)
0.1 ...
100s
Di pht sinh vi phn (Kv)
0 ...
10
Thi gian gim pht sinh Thi gian (st gim?) vi phn (T1v) 0 ...10s
khng nhy cm (ix/2)
< 2 x 10 -4
iu khin ti:
Phm vi ci t khi iu chnh im t
Di t l (Kp)
- 11 -
0 ...
100%
0.02 ... 10
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
Setting range of the setpoint adjustment
Proportional gain (Kp)
Damping time constant (Td)
Frequency / load droop (bp)
0 ...
0.02 ...
0.1 ...
0.1 ...
TM
GC 412
100%
10
100s
10%
2AGC06-0300-00550879
Phin bn
0.1 ...
0.1 ...
100s
10%
m tng i:
bnh hng nm
0 ... +45C
- 20 ... +65 C
< 75 % trung
95 % thi gian ngn
khng cho php c
s ngng t
p sut kh quyn
tng ng vi cao
Electromagnetic compatibility:
Tnh tng hp in t:
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
2AGC06-0300-00550879
Phin bn
GC 412
3.3.1
Vng iu chnh tc :
The speed governor is a PID(P) governor (governor parameters variable iu khin theo tc l kiu iu khin theo tham s PID (P), ngha l
according to the operating condition). There are 3 sets of parameters:
cc tham s iu tc ny thay i theo iu kin vn hnh. C ba b iu
chnh tham s:
- one for no-load operation (optimized for synchronization);
- Cho vn hnh khng ti: dng ti u ha cho ng b;
- one for isolated operation (high damping);
- Cho trng hp vn hnh c lp: khi c s dao ng ln;
- and one for network parallel operation (low damping).
- Cho trng hp vn hnh song song vi h thng: khi dao ng b.
3.3.2 Flow control/ Flow calculation
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
Gii hn lu lng:
C th iu chnh gii hn lu lng khi mun, chng hn nh gii hn
ti my pht hin ti, nhng thng th gii hn ny c ci t l 100%.
Maximum opening:
Vic gii hn lu lng l rt hiu qu trong tt c cc ch iu khin
thm ch trong khi khi ng tuabin.
Each nozzle opening can be limited separate by a fixed maximum value m cc i (ln nht):
(adjustable via the parameter input).
m ca mi vi phun c th b gii hn bi mt im t c nh ln
Minimum flow:
nht (c th iu chnh c thng qua u vo thng s).
Additionally, a minimum limitation is possible that becomes effective
after closing the circuit breaker (adjustable via the parameter input).
Power limitation:
The generated power of each machine can be limited, even with a
higher set point or under frequency influence. Normally such limitation
is used under maintenance recommendation and, at the same time,
keeps to unit in operation. The Joint Control can be used with such
limited machine, but the load distribution wont be uniform if the load
is set to a higher value.
Limitation of the operation area:
In order to consider the overload limits of the generator or cavitation
limits of the turbine the maximum value of nozzle opening is calculated
as a function of the operation point. For this purpose the maximum
flow is programmed as a function of head. The tabulated points may be
changed at will using the parameter input function. This module helps
to use the full admissible operation area of the machine in any case.
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
2AGC06-0300-00550879
Phin bn
GC 412
im trong bng tnh c th thay i khi mun bng cch s dng chc
nng u vo thng s. M un ny gip s dng ton b vng vn hnh
ca ng c trong bt c trng hp no.
3.3.8 Mi quan h gia vi phun v b li tia ca cc tuabin Pelton:
3.4.1 Startup
3.4.1
Via two adjustable speed limits the commands for switching on the
excitation and the synchronizer are issued.
3.4.2 Stopping
In case of a normal stop the nozzles are closed at an adjustable rate
down to closed position. When the circuit breaker has been opened the
nozzles are closed at maximum hydraulic closing speed to closed
position.
The deflector follows the nozzle according to the programmed nozzledeflector relationship. In this case all nozzles are closed simultaneously
(no multi-needle control).
Khi ng:
Ngng:
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
After reaching the no-load flow a signal is issued that can be used to
open the generator circuit breaker.
3.4.3 Shutdown
In case of an external failure a separate input for shutdown is activated.
By this the governor is set to stop too, but nozzles and deflectors are
closed at maximum speed.
3.4.4 Parameter input / Parameter indication
Without programming unit this function allows the indication and
editing of parameters, ranges, limit values and tabulated points for
curves (e.g. nozzle-deflector relationship). This function offers a
powerful but still easy to handle tool to perform most of the
maintenance work ever necessary during operation of the digital
governor. This can be done without using a complex programming
device.
If necessary all parameters can be changed using this function provided the user has appropriate access rights (controlled by password
input).
The parameters can be changed from the local operating panel.
The parameters such adjusted are also maintained in the event of a
power failure.
3.4.5 Limit value generation
The limit values of shaft speed and nozzle opening required by the
2AGC06-0300-00550879
Phin bn
Tt my:
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
power plant automation system are generated by the governor. All limit
values can be adjusted via the parameter input. Additional limit values
from any signal can be output by the governor on request.
3.4.6 Monitoring
All analog signals read into the governor are 4-20 mA signals and are
monitored for signal failure. The speed signal is checked as a function
of the nozzle position, i.e. if the nozzle have been opened for a certain
time, a speed signal must be available. In this way a failure of the speed
sensor is also monitored. Furthermore the setpoint-actual value
deviations of the nozzle / deflector position are monitored, i.e. a failure
of the opening control loop as well as a failure in the hydraulic
positioning devices are detected and a fault signal is issued.
The function of the governor program is monitored by a watchdog
relay.
Failure signal outputs:
2AGC06-0300-00550879
Phin bn
Cc u ra tn hiu s c:
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
all 6 nozzles are used. After reaching an adjustable speed 4 nozzles are
closed and only 2 nozzles are used to get a precise control during
synchronization. After closing the generator breaker the other nozzles
are activated if required in steps.
3.4.8 Multi-needle control
Due to the nonlinear nozzle characteristics the machine efficiency of
multiple-jet Pelton turbines with individual servomotors can be
improved by deactivating nozzles in case of part load condition. The
multi-needle control module calculates at any time the optimal number
of active nozzles for the actual operation point in order to get optimal
turbine efficiency. Furthermore the module manages changeover
conditions (when nozzles are activated/deactivated) in such a way that
flow is kept constant. Multi-needle control is a sub control of the
current active control mode and will only be used in network parallel
operation.
The order of the nozzles which will be activated / deactivated can be
defined via parameters using priorities for the individual nozzles.
Order: bc, th t, trnh t/ Lnh define: xc nh via: theo ng
Priorities: u tin. Individual: ring, c bit.
Example:
2AGC06-0300-00550879
Phin bn
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
2AGC06-0300-00550879
Phin bn
GC 412
If the difference between the new and old number of active nozzles is
higher than one, the action will take place step by step. That means that
in normal operation one nozzle after the other will be activated /
deactivated.
4 Design concept
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
The hardware of the digital turbine governor consists of the PLC, the
operating panel for the local operation, the output amplifiers for control
of the needles and deflectors as well as the additional equipment for the
measured value detection, signal decoupling or signal conversion. All
devices are mounted within the digital governor cubicle.
4.1.1 Housing
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
2AGC06-0300-00550879
Phin bn
GC 412
approx. 400 kg
Example for digital governor cabinet:
kg.
Di y l mu t iu tc:
B iu tc k thut s
Bng iu khin LCD
Cng tt tc
T xa/Ti ch
4.1.2 i dy bn trong:
All wiring will be multi stranded copper conductor with PVC insulation.
- 23 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
Power circuit wiring will be separate from control circuit. Wiring to door
mounted devices will be done similar to the internal wiring. Core
identification tags of internal wires are not realized.
Identification: nh dng, nhn bit Realized: thc hin
4.1.3 Terminals
2AGC06-0300-00550879
Phin bn
For control circuits type UK5N and also for measurement circuits and
analog-signals type UK5-MTK-P/P terminals will be provided. Both
types are screw terminals from make Phoenix and suitable for cable cross
sections of up to 2,5 mm. All terminals will be marked.
All I/Os of electronic cards will be connected to terminals.
Hardware overview:
4.2 Khi qut phn cng:
Drwg.-No.: 2.48-009384
4.3
Instrumentation
4.3.1 Digital governor LCD operator panel
Bn v s: 2.48-009384
4.3 Thit b o:
4.3.1 Bng iu khin LCD ca b iu tc s:
- 24 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
4.3.2 Indications
Among other things the following indications are provided at the digital
governor LCD operator panel:
- Speed (actual value and setpoint)
- Load (actual value and setpoint)
- Flow (actual value and setpoint)
- Flow limitation (actual value and setpoint)
- Head
- Deflector position of each deflector
- Nozzle position of each nozzle
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
Following main functions can be activated at the digital governor cabinet: Sau y l cc chc nng c th c kch hot ti t iu tc:
- Governor stop
- Governor start
- Emergency stop by a separate pushbutton
- Actual setpoint raise/lower
- Flow limitation raise/lower
- Switchover between the control modes
- Manual control of nozzles and deflectors
- Changing of parameters
- Switchover between local/remote and manual/auto
- Acknowledge of alarm messages
- Changing parameters
4.3.4 Examples for screens of digital governor LCD operator panel
- Ngng b iu tc.
- Khi ng b iu tc.
- Ngng khn cp bng mt nt n ring.
- Tng/gim im t thc t.
- Tng/gim gii hn lu lng.
- Chuyn mch gia cc ch iu khin.
- iu khin b li tia v vi phun bng tay.
- Thay i cc thng s.
- Chuyn mch gia iu khin ti ch/t xa, iu khin t ng/bng
tay.
- Nhn bit cc tin nhn bo ng.
- Thay i cc thng s.
4.3.4 Mt s mn hnh mu ca bng iu khin LCD b iu tc s
General overview
Khi qut:
- 26 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
Alarm screen
Mn hnh bo ng:
Parameter screen
Mn hnh thng s:
- 27 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
Mn hnh th vi phun:
- 28 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
5 Materials
Please refer to the device list of the digital turbine governor. Device list
5. Nguyn vt liu:
Hy tham kho danh mc thit b ca b iu tc s ca tuabin. Danh
- 29 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
6 Spare Parts
6. Cc ph tng:
Spare parts are delivered according to the contract. Spare part list with
devices in detail is provided after detailed engineering
7 Auxiliaries
Not applicable.
8. Cc thit b v dng c:
All tools, instruments and devices except those which are specially listed
for permanent supply and included in the price sheets will be provided on
temporary basis only and removed from site and returned after
completion of the work.
The supervisor will be bound to keep the contractor fully informed about
any technical and time problems that may exist at site, considering that
- 30 -
VOITH
A Li
D n thu in A Li
B iu tc ca tuabin k thut s Hycon
TM
GC 412
2AGC06-0300-00550879
Phin bn
the correctness of the full assembly of the equipment is part of the scope
of his work. The installation of the equipment by the contractor shall be
done by skilled workers in a workmanlike manner.
11 Training
11. o to:
- 31 -