Pavement Design Feb2014
Pavement Design Feb2014
3nos
Harvesting
Season -I
(Boro)
Harvesting
Season -2
( Aus & Jute
)
Harvesting
Season -3
(Aman &
Veg)
Vehicles
increases in
Harvesting
Season
iii) Project
completion
time=
Dec
Nov
Oct
Sep
Aug
July
June
April
March
Feb
Jan
May
365 Days
2years
Cycle
CARS,JEEPS,VANS,
MATADOR,
THREE WHEELERS
ETC.
MOTOR CYCLES
AND SCOOTERS
Agricultural
Tractor Trailors & Mini
Trucks
2697
2949
3869
99
1935
1349
1475
1935
50
968
ADT / Average
2023
2212
2902
75
1452
Total PCU
927
2026
1330
204
3990
10.2
trucks
Description
Buses
Animal drawn
vehicle
HCV
MCV
10.2
0.31
2.58
2.58
6
Laden
Condition
Unladen
Condition
Overloadin
g by 20%
VDF
.
1.5
0.019
0.31
0.31
7.2
12.24
12.24
VDF
VDF
Note -III:- a)
3.6
0.65
5.35
5.35
8477
15181
As per Clause -7.2/ Table -10, IRC-73/1980, 3.80m wide carriage way suitable for total PCU upto 2500,
5.50 m wide carriage way suitable for total PCU 2500 to 5000,
7.0 m wide carriage way suitable for total PCU 5000-10000
Assuming :i) Uniform traffic growth rate , r=
6%
ii) Design life period
(n)
10
year
Cumulative Equivalent Standard Axel Load (ESAL ) application over design life :(Cl:- 3.4.4 of IRC :SP -72/2007)
2945
33351230
AADT on project is 15873 which is considerably high. So requirement of correction for solid wheel charts (SWC) is not relevant as
described in clause -3.4.6 of IRC : SP -72/2007
As ESAL = 33351230 is greater than 10,00,000 ESAL application, pavement design should be carried out as per IRC : 37 -2001, (REF.:- Clause -8(Viii) of IRC :
SP : 72-2007
Assistant Engineer
Basirhat Highway Sub-Divn
P.W.(Roads) Direct.
To
12.11.2013
19.11.2013
(Date)
From
ADT
/ Peak Season
Date
District :-
Hour
Road clasification :-
KM/ Millage :-
(Date)
Date
Widening & Strengthening of Dhamdhemia more to Katiahat Road for a length of 9.00Km (For Connecting Ghojadanga Land
Customs at Indo- Bangladesh Border ) from existing 5.50m width to 7.0m width in the district of North 24 Pgs under Barasat
Highway Division-I
North 24-Parganas
Fast Vehicle
CARS,JEEPS,VANS,MATADOR,
THREE WHEELERS ETC.
Buses
West Bengal
State :-
Remarks
Slow Vehicle
Trucks
MOTOR CYCLES
AND SCOOTERS
Total
Col 5 to 8
ANIMAL DRAWN
VEHICLES
CYCLES
Hour
Others
( Agricultural
Tractor Trailors & Mini
Trucks)
Total
Col 10 to 12
10
11
12
13
12.11.13
06 a.m.
13.11.13
06 a.m.
3330
1904
3895
9129
2428
106
2534
13.11.13
06 a.m.
14.11.13
06 a.m.
3046
1944
3968
8958
2785
104
2889
14.11.13
06 a.m.
15.11.13
06 a.m.
2849
1906
3885
8640
2692
86
2779
15.11.13
06 a.m.
16.11.13
06 a.m.
2983
1995
3976
8953
2711
97
2808
16.11.13
06 a.m.
17.11.13
06 a.m.
3020
1936
3759
8715
2789
101
2890
17.11.13
06 a.m.
18.11.13
06 a.m.
2647
1937
3711
8295
2692
93
2785
18.11.13
06 a.m.
19.11.13
06 a.m.
2766
1924
3892
8582
2782
104
2886
Average
2949
1935
3869
8753
2697
99
2796
1475
968
1935
4377
1349
50
1398
AADT / * Note - 1
1838
1206
2412
5456
1681
62
1743
14398
2659
6015
1853
68
1922
Total average motorised & non motorized vehicles per day as counted
2026
1330
= (2026+0+1330+2659+6015+0+1853+68+1922)
PCU Equivalency
(Table 9, IRC-73 / 1980)
Total PCU
0.5
2026
3990
1330
NOTE - 1:
Average Annual Daily Traffic (AADT) as counted, e.g. for full sized Trucks
=[{968 Nos.X365 Days+3-harvesting seasonsx( 1935-968 ) nos.x(0.4x2.5months x30days )} / 365 days] Nos.=1206nos.
NOTE - 2:
Average Annual Daily Traffic (AADT) on project completion, e.g. for full sized Trucks
=[{1206 Nos. X (1+0.05) power (2-years) = 1330 nos.
NOTE - 3:
The local information transpires that after improvement of the road bus service will be provided along the road
Assistant Engineer
Basirhat Highway Sub-Division
P.W.(Rds)Dett.
15873
0.5
927
204
14
A)
Design Data :
i)
ii)
iii)
1268
2015 : A = P (1 + r) x
=
1268
x (1 + 0.05) power -2
1398
: 5.0%
v)
10
vi)
3.50
vii)
B)
Design Calculation :
ii)
0.50
iv)
Plain/Rolling
Hilly
0 -- 150
1.5
0.5
150 -- 1500
3.5
1.5
4.5
2.5
L.D.F.(F)
1.00
0.50
0.40
11.23
msa
Say,
11.23
msa
mm
:
Total pavement thickness provide 765 mm at centre of
existing road
:- 350mm
1) 225mm thick Jhama metal
2) 150mm Sand Bats
: 1) 40mm thick BC
2)100 mm thick DBM
2) 275 mm thick WMM
:
Assistant Engineer
Basirhat Highway Sub-Division
P.W.(Rds)Dett.
10 Year
365X[(1+0.05)10-1]x 1398
xVDFx0.5x(1/0.05)x10-6msa
764
Widenning
Strengthening
Other Road
=
Total pavement thickness for CBR = 3 % and Design Traffic =
11.23 msa
(Intrapolated from Plate-1 & 2, Page- 26 of IRC : 37,2012)
Proposed pavement composition
15 Year
iii)
NH / SH
3.00
i)
years
(Table :4.2,
Page-8 of
IRC:37,2012)
iv)
Pavement Design
Widening & Strengthening of Dhamdhemia more to Katiahat Road for a length of 9.00Km (For Connecting Gojadanga Land
Customs at Indo- Bangladesh Border ) from existing 5.50m width to 7.0m width in the district of North 24 Pgs under Barasat
Highway Division-I
A)
Design Data :
i)
ii)
iii)
2015 : A = P (1 + r) x
=
1268
x (1 + 0.075) power -2
1465
: 7.5%
:
10 years
vi)
3.50
vii)
: 3.159
B)
Design Calculation :
0.40
ii)
=
Total pavement thickness for CBR = 3.159 % and Design
Traffic = 10.6 msa
(Intrapolated from Plate-2, Page-30 & 31 of IRC : 37,2001)
iv)
150 -- 1500
More than
1500
3.5
1.5
4.5
2.5
Single-lane
L.D.F.
(F)
1.00
0.75
0.40
1.5/1.
2/0.90
Duel C/W
iii)
Com.Vehicle Plain/Rolli
Hilly
Per Day
ng
0 -- 150
1.5
0.5
i)
(Table :1 of
IRC:37,2001)
iv)
v)
365X[(1+0.075)10-1]x 1465
xVDFx0.40x(1/0.075)x10-6msa
10.59
msa
Say,
10.60
755 mm
:
Total pavement thickness provide 765 mm
Widenning
Strengthening
Assistant Engineer
Basirhat Highway Sub-Division
P.W.(Rds)Dett.
: 1) 40mm thick BC
2)125 mm thick DBM
2) 300mm thick WMM
msa
WiWidening & Strengthening of Taki- Murarisha- Bhebia- Chaital road (Sh-2 ) from 12.00 kmp to 20.80
kmp under Barasat Highway Division No.-I, under North 24-Parganas
A) Widening & Strengthening of Taki- Murarisha- Bhebia- Chaital road (Sh-2 ) from 12.00 kmp to 16.00
kmp
B) Widening & Strengthening of Taki- Murarisha- Bhebia- Chaital road (Sh-2 ) from 16.00 kmp to 20.80
kmp
West Bengal Compensatory Entry Tax Fund Head
INDEX
:-
Page:-
:-
Page:-
Trafic Sensus
:-
Page:-
:-
Page:-
Detailed Report
:-
Page:-
Widening & Strengthening of Taki- MurarishaBhebia- Chaital road (Sh-2 ) from 12.00 kmp to 16.00
kmp
Bill Of Quantities
:-
Calculation of quantities
To
To
Page:-
To
13
:-
Page:-
14 To
24
:-
Page:-
25 To
26
:-
Page:-
27
Sketch of Drain
:-
Page:-
28
Analysis of rate
:-
Page:-
29 To
:-
Page:-
38
:-
Page:-
39 To
40
Widening & Strengthening of Taki- MurarishaBhebia- Chaital road (Sh-2 ) from 16.00 kmp to 20.80
kmp
Bill Of Quantities
:-
Page:-
41 To
46
Calculation of quantities
:-
Page:-
47 To
58
:-
Page:-
59 To
60
:-
Page:-
61
Sketch of Drain
:-
Page:-
62
Analysis of rate
:-
Page:-
63 To
:-
Page:-
73
:-
Page:-
74 To
37
72
75