Professional Documents
Culture Documents
Quality Manual
Quality Manual
Foreword
Approvals
Revision Index
1. Scope
1.1 General
2. Normative References
10
10
10
10
11
4.2.1 General
11
11
11
12
5. Management Responsibility
12
12
12
12
5.4 Planning
13
13
13
13
13
13
13
13
5.6.1 General
13
14
14
6. Resource Management
14
14
14
6.2.1 General
14
14
6.3 Infrastructure
15
15
7. Product Realization
15
15
15
15
16
16
16
16
16
17
17
17
17
17
7.4 Procurement
18
18
18
18
18
18
18
19
19
19
19
20
8.1 General
20
20
20
20
21
21
21
21
8.5 Improvement
22
22
22
22
9. References
23
Foreword
The information presented in this document has been prepared following the ANSI/ISO/ASQ
9001:2008 American National Standards Quality Management Systems Requirements. There is no
hard copy distribution of this document. Hard copies and personal electronic copies of this document
are uncontrolled copies. The controlled, up-to-date copy available to all Parsons employees is posted
on the Parsons Corporate Policy Center.
Approvals
Prepared by:
Jeffrey W. Koontz
Title
Date:
February 7, 2012
Signature:
Jeffrey Koontz
Reviewed by:
Jeffrey W. Koontz
Title
Date:
February 7, 2012
Signature:
Jeffrey Koontz
Approved by:
Nick Hutchinson
Title:
Date:
February 7, 2012
Signature:
Nick Hutchinson
Revision Index
Rev. No.
0
Revision Index
Date
Approved Version
Revised in response to PTG external ISO
audit findings.
- Inclusion of and reference to
RoadMap (figure 1)
- Section 5.4.1, included reference to
Parsons 2008-2012 goals and
Core Value Metrics & EQMP
- Throughout, updated reference to
issued procedures
- Section 9, included reference to
issued procedures
11/18/2011
2/7/2012
Figure 1: Roadmap
1. Scope
This Quality Manual establishes a Quality Management System (QMS) for the projects and programs
within Parsons. The organizations Quality Management Systems main objective is to provide
products and services that consistently meet the clients requirements.
1.1 General
Parsons has developed its Quality Management System for the following purposes:
To demonstrate the ability of consistently providing products that meet client and applicable
statutory and regulatory requirements, and
To enhance client satisfaction through the effective application of the system, including
processes for continual improvement and the assurance of conformity to client, applicable
statutory and regulatory requirements.
Parsons develops and implements innovative, proven technologies, and applications to provide total
solutions for clients in transportation, defense, water/ waste water, industrial and commercial markets.
Parsons is a leader in providing program/project management, design, engineering, construction,
environmental, and technical services to major telecommunications carriers, equipment
manufacturers, federal and state/local governments, public institutions, defense contractors,
pharmaceutical and biotechnology firms, energy, petroleum and chemical manufacturers, and utility
agencies.
The Quality Management System established in this manual is implemented on the following types of
major processes on projects undertaken by Parsons including but not limited to the following:
Engineering and design services projects including planning, design, and engineering
support in the areas of architecture, civil, electrical, environmental controls, networks,
geology, mechanical, equipment, process and structural disciplines along with the
associated project management. These services typically result in specific deliverables such
as drawings, specifications, cost estimates, and studies.
The nature and scope of Parsons programs/projects vary from project to project and client to client.
Each Parsons program/project manager (PM), task manager, department manager, and section
manager is assigned the authority and responsibility for controlling processes affecting safety, cost,
schedule, quality and environmental compliance of their projects. This responsibility includes
implementing the requirements of this Quality Manual. Some projects will require client specified
institutional Quality Systems programs. While others may require customized client specified Quality
programs uniquely designed to meet client requirements. In those instances, the project specific
Quality Plans must the meet the requirements of ISO 9001: 2008.
All program and/or project personnel are responsible for and have the authority and organizational
freedom to identify quality problems that affect safety, cost, schedule, quality, and environmental
compliance. This responsibility includes the ability to recommend solutions and limit or control further
Parsons Quality Manual
2. Normative References
The following are reference documents from which this Quality Manual was derived. While the
reference documents are generic standards, this Quality Manual develops the Parsons specific
approach to achieving the goals of the ISO standards.
ISO 9001:2008
ISO 9000:2005
ISO 9004:2000
ISO 19011:2002
ISO 10012:2003
10
g) These processes are managed by the Parsons organization in accordance with the
requirements of ISO 9001:2008.
When Parsons subcontracts any process that affects product conformity to requirements, the Project
team and subcontractor shall ensure control over such processes. The type and extent of control to be
applied to these outsourced processes shall be defined within the Program/Project Management Plan
(PMP) and throughout the procurement process. Supplier and subcontractor controls will be
demonstrated through the monitoring established though the Project Management Plans or other
procurement documentation.
11
Ensuring that documents of external origin determined by Parsons to be necessary for the
planning and operation of the quality management system are identified and their distribution
controlled,
g) Preventing the unintended use of obsolete documents, and to apply suitable identification to
them if they are retained for any purpose.
5. Management Responsibility
5.1 Management Commitment
Parsons Executive and Senior Management provide evidence of its commitment to the development
and implementation of the Parsons Quality Management System and continually improving its
effectiveness by the following:
a) Communicating within the Parsons organization the importance of meeting client as well as
statutory and regulatory requirements,
b) Establishing the Quality Policy,
c) Ensuring that quality objectives are established,
d) Conducting management and/or project reviews,
e) Ensuring the availability of resources.
12
5.4 Planning
5.4.1 Quality Objectives
Parsons Executive and Senior Management ensure that quality objectives, including those needed to
meet requirements for its products and services are established at relevant functions and levels within
the Parsons organization. The Parsons 2008-2012 statement provides an overview of current
business goals and objectives. Management ensures quality objectives are measurable and consistent
with the Quality Policy. Quality Core Value Metrics in addition to the Enterprise Quality Management
Program provide the platform for objectives to be collected, reported and analyzed.
13
include assessing opportunities for improvement and the need for changes to the Quality Management
System, including the Quality Policy and quality objectives as described in established procedures.
Directives and records resulting from these management reviews are maintained.
6. Resource Management
6.1 Provision of Resources
Parsons Executive, Senior, and Project Management determine and provide the resources needed for
the following:
a) Implementation and maintenance the Quality Management System and to continually improve
its effectiveness,
b) Enhancement of client satisfaction by meeting client requirements.
14
b) Where applicable, provide training or take other actions to achieve the necessary competence,
c) Evaluate the effectiveness of the actions taken,
d) Ensure that its personnel are aware of the relevance and importance of their activities and how
they contribute to the achievement of the quality objectives,
e) Maintain appropriate records of education, training, skills, and experience.
6.3 Infrastructure
Parsons Executive, Senior, and Project Management determine, provide, and maintain the
infrastructure needed to achieve conformity to product and/or services requirements. Infrastructure
includes, as applicable, the following:
a) Buildings, workspace, and associated utilities,
b) Equipment as well as hardware and software,
c) Supporting services (such as transport, communication or information systems).
7. Product Realization
7.1 Planning of Product Realization
Parsons plans and develops the processes needed for product realization. Planning of product
realization is consistent with the requirements of the other processes of the Quality Management
System.
In planning product and/or service realization, Parsons determines the following, as appropriate:
a) Quality objectives and requirements for the product and/or service,
b) The need to establish processes and documents, and to provide resources specific to the
product/service,
c) Required verification, validation, monitoring, measurement, inspection, and test activities
specific to the product and/or service and the criteria for product and/or service acceptance,
d) Records needed to provide evidence that the realization processes and resulting product
and/or service meet requirements.
The output of this planning results in a Project Management Plan (PMP) suitable for the program
and/or projects method of implementing its operations.
15
7.2.2
Parsons reviews the requirements related to its products and/or services. This review is conducted
prior to Parsons commitment to supply a product and/or service to the client (e.g. submission of
proposals, acceptance of contracts or work orders, acceptance of changes to contracts or work
orders), and to ensure the following:
a) Product and/or service requirements are defined,
b) Contract or work order requirements differing from those previously expressed are resolved,
c) Parsons has the ability to meet the defined requirements.
Records of the results of the review and actions arising from the review are maintained.
Where the client provides no documented statement of requirements, the client requirements shall be
confirmed by the Parsons organization before acceptance. Where product or service requirements
are revised, Parsons shall ensure that relevant documents are amended and that relevant personnel
are made aware of the changed requirements.
16
17
7.4 Procurement
7.4.1 Procurement Process
Parsons ensures that procured products and/or services conform to specified procurement and
subcontract requirements. The type and extent of control applied to suppliers and the procured
products and/or services depends upon the effect of the products and/or services on subsequent
product realization or the final product and/or service.
Parsons evaluates and selects suppliers based on their ability to supply products and/or services in
accordance with Parsons requirements. Criteria for selection, evaluation, and re-evaluation shall be
established. Records of the results of evaluations and any necessary actions arising from the
evaluation shall be maintained, as necessary.
7.4.2
Procurement Information
Procurement and subcontract information shall describe the product and/or service requirements,
including the following, where appropriate:
a) Requirements for approval of products, procedures, processes and equipment,
b) Requirements for qualification of personnel,
c) Quality Management System requirements.
The Parsons organization ensures the adequacy of procurement and subcontract requirements prior
to their communication to the supplier.
18
any processes where deficiencies become apparent only after the product is in use or the service has
been delivered.
Validation shall demonstrate the ability of these processes to achieve planned results.
The Parsons organization has established arrangements for these processes including the following,
as applicable:
a) Defined criteria for review and approval of the processes,
b) Approval of equipment and qualification of personnel,
c) Use of specific methods and procedures,
d) Requirements for records,
e) Revalidation.
19
e) Protected from damage and deterioration during handling, maintenance, and storage,
In addition, Parsons will assess and record the validity of the previous measuring results when the
equipment is found not to conform to requirements. Parsons then takes appropriate action on the
equipment and any product affected. Records of the results of calibration and verification shall be
maintained.
When used in the monitoring and measurement of specified requirements, the ability of computer
software to satisfy the intended application shall be confirmed. This will be undertaken prior to initial
use and reconfirmed as necessary.
8.2.2
Internal Audit
The Parsons organization conducts internal audits at planned intervals to determine whether the
Quality Management System:
a) Performs as planned,
b) Meets the Quality Management System requirements established to ISO 9001: 2008 by
Parsons,
c) Is effectively implemented and maintained.
The audit program is planned, taking into consideration the status and importance of the processes
and areas to be audited, as well as the results of previous audits. The audit criteria, scope, frequency,
and methods are defined. Selection of auditors and conduct of audits shall ensure objectivity and
impartiality of the audit process. Auditors shall not audit their own work.
The responsibilities and requirements for planning and conducting audits, and for reporting results and
maintaining records are defined in a documented procedure. Records of the quality audits and results
are maintained.
Program and project management responsible for the area being audited ensures that corrections and
corrective actions are taken without undue delay to eliminate detected nonconformities and their
20
causes. Corrective action processes follow established procedures. Follow-up activities include the
verification of the actions taken and the reporting of verification results.
21
c) Characteristics and trends of processes and products including opportunities for preventive
action,
d) Suppliers/subcontractors.
8.5 Improvement
8.5.1 Continual Improvement
The Parsons organization continually improves the effectiveness of the Quality Management System
through the use of the Quality Policy, quality objectives, audit results, analysis of data, corrective and
preventive actions, and management review.
22
9. References
Quality Operating Policy
Policy & Procedure Development
Project Document Management
Project Records Management
Quality Assurance Audits (Internal/Supplier)
Identification, Control and Disposition of Nonconforming Products
Conditions Reporting
Client Feedback & Assessment Core Policy
Client Assessments / Project Feedback Procedure
Quality Systems Management Review
Source Inspection
23