Encroachment Permits Manual - Figures
Encroachment Permits Manual - Figures
Receive
Permit OVERVIEW OF ENCROACHMENT
Application PERMIT PROCESS
Determine
Type of Project
Special Funded
Projects Determine Fee
and
Accept Application
Adopt-A-Highway
Projects
Request Perform
Additional Engineering Review Applicant
Information Deny
Appeal
from Permit
Process
Applicant Perform Technical Review
(If Needed) [By Other Caltrans Units]
See Figure 1.2
for an Overview
of the
Procedures for Developing Prepare
Special Funded Project Engineering
State Highway Evaluation Report
Projects (PEER)
If Required
Perform
Determine
Technical
Bonding Requirements
Review
Issue
Collect Additional Fee
Encroachment
(If Required)
Permit
Issue
Issue Distribute Permit to Other Caltrans Units Encroachment
Encroachment Permit as Required by Project Type Permit
Project
Task and Funding Responsibilities:
Approve County
Determine Encourage Sponsorship
Tax Measure Funds
Funding Sources by Local Entity
(Ballot Passed)
Prepare Provide Existing Provide Existing Prepare Project Cost Project Cost
Technical and Technical and Project Study Report
Initial Project Report $1,000,000 More Than
Financial Financial
(IPR) Information Information (PSR) or Less $1,000,000
Review, Complete Final Design, Review, Complete Final Design, Process Process Complete Final Design, Review,
Approval, Acquire Right of Way, Approval, Acquire Right of Way, Acquire Right of Way, Approval,
Permit Engineering Permit Engineering
and and Construct Project and and Construct Project Obtain Encroachment and
Oversight Oversight Evaluation Report Evaluation Report Permit, & Construct Project Oversight
* *
* Caltrans may agree to perform these activities at sponsor‘s cost. ** All landscaping projects.
1-7
Rev. 6/97
Figure 1.3
Roles and Responsibilities
CALTRANS RESPONSIBILIT Y
Permit Engineer
Determines Complexity
APPLICANTS RESPONSIBILITY
Conduct Meeting
with Reviewers and YES
Complex?
Applicants
NO
Preliminary
Review
Inform Applicant of
Information Needed NO Accept as Submit Applicant Prepares
(In Writing) Complete? Revisions Revisions
YES
NO Review by Permit
Complex? Engineer or Inspector
YES
District Review
Approve?
(Sometimes HQ Review
60 Needed)
DAYS YES NO YES
MAX
Request
Revisions?
NO
Rev. 7/97
1-8
Figure 4.1 TIME LIMITS FOR ENVIRONMENTAL ANALYSIS
Application Received
Caltrans Is Caltrans Is
Lead Agency Responsible Agency
30 30
days days
max. max.
Is Application Is Application
Complete, Including Complete,
Environmental Including Approved
Portion? EIR/ND/Cat.Ex.?
yes no no yes
45
days 0
max. days
no yes
Lead Agency
Complete Approves or 180
days
1 ND Disapproves Project max.
year
max.
180
days
max.
Carrier
Carrier or Carrier or
casing casing
Chair
Bored hole
Grout
Ground or pavement
▲
Cover
Sidefill Overfill
▼
Concrete
▼
Pipe Pipe Pipe
Ground or pavement
On
Concrete hanger
On
On cradle bracket
or piers
Pipe
Fill Fill