1.18 Tender Section B PDF
1.18 Tender Section B PDF
AUTHENTICATED BY
(SR. MANAGER - E & P)
Tre.wrommewp....,.......af
.
SI. No.
-4.
_ .. ______ __
Average
I-st Test
Final test
Age of r Weight of
Location where
concreting
of First
of
G d oion
D ate
of orae
Results
cube in
cube in
done during
Result
Concrete is
Test
Concrete
Casting
day
in
the
28 days
Kg.
days
7 days
used
Results
bags
alli
Average
of Final
Results
ME
IM
_____
_ .
HPCL
'''''
- El
..-M--
__.
_. ._.
Signature
--
Act
Taken
Lab Ref.
/1111111
IIIIIIIIIIIMMIIIIIII
____
__
1-
11-111111- IIIIMIIIIIIIIIIIIMIIIII
Contracto
AND IS ISSUED TO
AUTHENTICATED BY
(SR. MANAGER - E & P)
SOURCE &
INVOICE REF
DATE OF
RECEIPT
6MM
8MM
10MM
12MM
16MM
20MM 25MM
32MM
6MM
8MM
10MM
12MM
16MM
20MM
REMARKS
25MM 32MM
TOTAL (MT)
BALANCE QTY AS PER RA BILL NO.
6MM
8MM
10MM
12MM
(.t4T)
P .evious
16MM
20MM
25MM
32MM
Hindrance Register
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
AND IS ISSUED TO
TO
SITE FOR USING FROM NOW.
AU THENTICATED BY
(SR. MANAGER - E & P)
HINDRANCE REGISTER
SI. No.
Nature of Hindrance
Date of
Occurrence
...
Date of
Removal
Period
Hindrance
Overlapping
Period
Net
Extention
Extention
Reccommended
Remarks
BOOK NO. :
AUTH ENTICATED BY
(SR. MANAGER - E & P)
>I. No.
Material Description
Date Sent
to Lab
Date of
Testing
Lab Report
Ref.
Result
Remarks
Signature of
Site-Engineer
Periodical Checking
Signature of HPCL Office'
EIC
HQO-IC
9a
9b
Level Book
THIS IS TO CERTIFY THAT THIS REGISTER
CONTAINS PAGES SERIAL NUMBER FROM
AND IS ISSUED TO
TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY
(SR. MANAGER - E & P)
NEAR
FOR THE
PROJECT
Date
1
Station
Name
2
Back
Distance
3
Fore
Distance
4
Back Bearing
Fore Bearing
Height of
instrument
7
TO
Back
Level
8
Fore
re
Level
9
Difference
_
Rice
10
Fall
Reduced Level
Remarks
11
12