CUBE TESTING REPORT AT SITE
Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and Commissioning Successfully,01 yr. DLP
Water Pumping Station and Raw Water Twin Main."
PROJECT :
OWNER :
JOB NO :
SL No.
Date of
casting
Item of work
Location
Mix
Identificat
ion marks
of cube
FOR L&T
Date of
testing
Size of
cube
(mm)
Weight
of cube
Load
(KN)
Compressive
strength of
indivisual cube
Average
compressive
strength
N/Sq.mm.
N/Sq.mm.
REPORT NO:
DATE:
ting, Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw
Acceptability
Sign.of AE/EE
Remarks
Sign. Contrator.
For DJB
LTCG/DWSS/FM-15
Rep No.
Date
Waste Water Recycle at the President's Estate: 2MLD Sewage Treatment Plant.
OWNER:
President Secretariat
Name of Structure:
Grade of Concrete
Drawing No.
Qty. (M3)
Location
Slump
ITEM Description
S.No.
1
Reinforcement Checked
10
Access provided
11
Safety arrangements
12
Area Lighting
13
14
YES /NO
Remarks
15
16
Laboratory notified
Cement Qty.(Bags)
FOR L&T
For CPWD
LTCG/PE/FM-03
REPORT NO:
DATE:
PROJECT :
Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw
Water Pumping Station and Raw Water Twin Main."
OWNER :
Name of Unit:
DRG NO.:
MEMBER
BAR NO.
DIA OF BARS
NO. PER
MEMBER
NO. OF
MEMBER
TOTAL NO. OF
BARS
CUTTING
LENGTH
TOTAL LENGTH
FOR L&T
SHAPES
FOR DJB
LTCD/DWSS/FM-21
Rep No:
DATE:
OWNER :
JOB NO :
Tested by:
Location of sample :
Approved by:
Sulphite
SL.NO.
Depth (m)
Sulphate
Chloride
PH Value
Remarks
%
ppm
ppm
ppm
LTCD/DWSS/FM-24
REPORT NO:
PILING REPORT
DATE:
Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Project: Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw Water
Pumping Station and Raw Water Twin Main."
OWNER:DELHI JAL BOARD
JOB NO :
Transmission Main No.
TP No.
Spread No.
To
TP No.
Description
SL No.
PILE NO.
N. GROUND LEVEL
CUT OF LEVEL
TIP LEVEL
BORING COMPLETION
BORE DEPTH
10
PILE LENGTH
11
12
CONCRETE :
GRADE
SLUMP
CUBES TAKEN
THEORITICAL QTY.
ACTUAL QTY.
REINFORCEMENT :
Main Bar
Dia in mm
Length in Mtr.
No.
Lap
Dia in mm
Length in Mtr.
No.
Spacer ring
Dia in mm
Length in Mtr.
No.
Spiral/helical
Dia in mm
Length in Mtr.
No.
Lap
Dia in mm
Length in Mtr.
No.
ABSTRACT
FOR L&T
For DJB
LTCD/DWSS/FM-33
REPORT NO:
DATE:
PROJECT :
Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw Water
Pumping Station and Raw Water Twin Main."
OWNER :
JOB NO :
Contractor :
Date of Sampling:
Location/Work area:
Sampled by:
Date of testing:
Weight of sample:
IS SIEVE SIZE
WEIGHT
RETAINED (Gms)
Cuml Weight
retained(Gms)
% Cuml Weight
retained(Gms)
% Passing
Passing % Limit
40 MM
100
20 MM
85-100
12.5 MM
Remarks
100
10 MM
0-20
85-100
4.75 MM
0-5
0-20
2.36 MM
0-5
Pan
RESULTS :
FOR L&T
For DJB
LTCD/DWSS/FM-38
PROJECT :
OWNER :
JOB NO :
Contractor :
Date of Sampling:
Location/Work area:
Sampled by:
Date of testing:
IS SIEVE SIZE
Weight of sample:
WEIGHT
RETAINED
(Gms)
Cuml Weight
retained(Gms)
% Cuml Weight
retained(Gms)
% Passing
Passing % Limit
10 mm
100
4.75 mm
90-100
2.36 mm
75-100
1.18 mm
55-90
600 micron
35-59
300 micron
8-30
150 micron
0-10
Pan
FM
FOR L&T
For DJB
LTCD/DWSS/FM-40
OWNER:
Name of Building:
Concrete Element & Location:
Approved Drawing No.:
Y= Yes, N=No and NA= Not Applicable
S.No.
Date
Name of Activities
1
2
3
4
5
6
Concrete started on
Concrete completed on
Curing satisfactory
Cube strength (------- days)
Concrete surface condition
Any repairing required
FOR L&T
Time:
Time:
Engineer in
charge/Authorized
person
For DJB
LTCD/DWSS/FM-54
Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and Commissioning Success
PROJECT :
Raw Water Pumping Station and Raw Water Twin Main."
Mix Proportions:
For 1 M
(a.)
(b.)
(c.)
(d.)
Water
Cement
Sand...
Coarse aggregate
Ltr./M
Kg./M
Kg./M
Kg./M
%
%
Kg. x
Kg. x
Liters.
Kg.+
Moisture% in sand
+Qty. of col.3
+Qty. of col.4
Kg.
Kg.
-Absorption
-Absorption
Kg./M
Kg./M
Kg./M
Kg./M
Liters/M
Kg./M
10mm
20mm
DJB
Rep No. :
Dt.
inting, Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works,
Moisture% in sand
+Qty. of col.3
+Qty. of col.4
-Absorption
-Absorption
-Qty. of col.4
(=) (=) -
Liters.
Liters.
Liters.
Kg.
=(+)
=(-)
(=)
(=)
(=)
(=)
Kg.
Kg.
L&T
L&T/DJB/DWSS/FM/
OWNER :
Location of sample :
Sl No.
Date of testing
Bulking % of
sand
1
2
3
4
5
6
7
8
9
10
11
12
DJB
L&T/DJB/DWSS/FM/
C DIVISION
Rep No:
DATE:
DJB/DWSS/FM/
L&T
Sign.of AE/EE
Sign. Contrator.
OWNER :
Sampled by
Sourc
Sl No.
Result
Determination
DJB
L&T
L&T/DJB/DWSS/FM/
Rep No:
DATE:
n, Laying &
yr. DLP And 05 yr.
and Raw Water Twin
Sampled by
Result
L&T/DJB/DWSS/FM/
CLIENT :-
REFERENCE DOCUMENT:-
IS 2720,Part-29
Source of material
Location
Volume of core (V)
gm/cc
CC
Date :-
FIELD DENSITY
Wt. of core + soil sample(W1)
(gm)
(gm)
(gm)
(gm/cc)
MOISTURE CONTENT
Moisture content by Rapid Moisture meter(%)
RESULTS
Field dry density Yd=100x {Yb/(100+w)}
(gm/cc)
REMARKS
Pass/ Fail
FM/LT/
FOR DJB
FOR L&T
OWNER :
Sorce
Material
Sampled by
SL No.
FOR DJB
Rep No:
DATE:
Remarks
Aggregate
cylindrical
measuring
internal dia.
7.5 cm and
depth 5 cm
Remarks
Very Strong
Strong
Satisfactory
Weak
FOR L&T
L&T/DJB/DWSS/FM/
Report N
Date:
Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of
SCADA system at Bhagirathi WTP & Distribution Area.
Grade of Concrete
SL.No.
For DJB
Vibrator
used
(Yes/No)
Qty. of water
added per bag of
cement (Ltrs)
Height of
speciment after
removal of Mould
slump
(mm)
Acceptability
of result or
action taken
Sign.of AE/EE
For L&T
L&T/DJB/BWTP/FM/
Sign. Contrator.
OWNER :
Source
Material
Sampled by
SL No.
FOR DJB
Rep No:
DATE:
Result
FOR L&T
L&T/DJB/DWSS/FM/
Material
Location :____________
Source
Sampled by
Sl. No.
Determination
FOR DJB
(14*X) / (Y+4)
Rep No:
DATE:
Result
FOR L&T
L&T/DJB/DWSS/FM/
Material
Location :________
Source
Sampled
by
Sl. No.
Determination
FOR DJB
Rep No:
DATE:
Result
FOR L&T
L&T/DJB/DWSS/FM/
Material
Location :________
Source
Sampled
by
Sl. No.
Determination
DLBD (Kg/M)
FOR DJB
L&T/DJB/DWSS/FM/
Rep No:
DATE:
Result
FOR L&T
L&T/DJB/DWSS/FM/
Section
Supporting Document
Date
Stage
Inspection
Page No.
Ref.
Total Pages
Record of Hydrotest
Form No.
Drg. No.
Structure Name
Location
1
2
3
4
5
6
7
8
Time
Reading of
Gauge in mm
Drop in mm
Rainfall
in mm
2.30 PM
1000
2.30 PM
1007
2.30 PM
1014
14
2.30 PM
1020
20
2.30 PM
1025
25
2.30 PM
1030
30
2.30 PM
1035
35
2.30 PM
1039
39
Date
23.10.2013
24.10.2013
25.10.2013
26.10.2013
27.10.2013
28.10.2013
29.10.2013
30.10.2013
Evaporation Cumml.Drop
in mm
in mm
Signature
L&T
RITES
Engr.
TPI
DJB
JE
AE
EE
mm
mm
mm
DJB
RITES
L&T
Section
Supporting Document
Date
Stage
Inspection
Page No.
Ref.
Total Pages
Record of Hydrotest
Form No.
Drg. No.
Structure Name
Location
1
2
3
4
5
6
7
8
Date
18.10.2013
19.10.2013
20.10.2013
21.10.2013
22.10.2013
23.10.2013
24.10.2013
25.10.2013
Time
Reading of
Gauge in mm
Drop in mm
Rainfall
in mm
Evaporation Cumml.Drop
in mm
in mm
2.30 PM
1000
2.30 PM
1006
2.30 PM
1012
12
2.30 PM
1018
18
2.30 PM
1023
23
2.30 PM
1029
29
2.30 PM
1035
35
2.30 PM
1041
41
Signature
L&T
RITES
Engr.
TPI
DJB
JE
mm
mm
mm
DJB
RITES
L&T
AE
EE