BRUNEI DARUSSALAM
C & F Engineering
Sdn Bhd
Introduction
C & F Engineering is a private company established under the law of Negara Brunei Darussalam since 2000.
We are the Negara Brunei Darussalam formed the contractor with JKR (Jabatan Kerja Raya) standard trenchless
technologies including the provision of auger boring, horizontal directional drilling, underground utility installations,
electricity equipments installation and low voltage and high voltage power cable installation.
Our primary aim is to reduce the environmental impact of its clients infrastructure. Trenchless technology provide as
solution that reduces the environmental risks associated with open excavation. C & F Engineering does however
recognize that its activities still have the potential to cause harm.
C & F Engineering will act at all time to prevent pollution, use resource efficiently, and to limit the impact of our
operations upon other. C & F Engineering shall comply with legal requirements and other requirements applicable to its
activities. C & F Engineering are committed to continual improvement and aim to exceed its own and its clients
expectations.
For more detail, clients should contact C & F Engineering to determine if their requirements can be meet.
Capabilities
With the purchase of Vermeers D33X44 directional drill machine, C & F Engineering capable of installing conduits,
ducts and piping by horizontal directional drill raging 50 mm to 600 mm in diameter with distances typical up to 200
meters in one pull. Longer distances and large diameters can be achieved but need to be considered on a case by case
basis. The purpose of this document is to provide guidance on how the HDD is likely to be undertaken until such time as
a specialist contractor is contacted, the contents of this report should be treated as Provisional because there are
several options that could be employed depending on the type and size of the drilling machine used and the preference
of the contractor for other issues.
: Cummins 125/93KW
: 9299Kg
: 2,11M
: 2,08M
: 6,91M
: 14969Kg
Torque
: 10Ft
: 5957Nm
: 189Lpm
7m
Roadway
Water Surface
Starting
Point
Utility
Surface
Pilot Hole
Receiving
Point
1. Preparation of Site
An all-weather access to the entrance and exit sites for the HDD operation must be constructed and a level hard
standing area for the drill equipment prepared at each of these sites as follow:
location, pitch and roll the drill head. From this information the operator know the location of the drill head at all
times. The operator uses the information to maintain the preplanned path of the bore. The accuracy of the drilling is
verified by comparing the coordinates of the actual location of the drill bit against the plane drill profile. If these a
major difference between the actual and planned location of the drill bit, the operator is able to correct the actual
profile by pulling back to a correct position of the planned profile and begin re-drilling. Once the drill bit exits the
other end of the drill hole, the drill head is removed and a Reamer is attached to the drill string.
8 C & F ENGINEERING SDN BHD
Depending of the diameter of the pipe to be installed, several reaming with progressively large diameter reamers
may be necessary (i.e. with a 24 inch diameter pipe, the firs reaming could be with an 16 inch reamer, the second
reaming with a 24 inch reamer and the third reaming with a 32 inch reamer). During the reamer process, drilling fluid
is pumped under pressure thought the drill string to the reamer.
As the drill rig pulls the reamer back, drill pipe is attached continuously behind the reamer for the subsequent
reaming and pipe pulling operations.
When the bore hole has been reamed out to the correct diameter the back reamer is sent back down the bore one
and two more times to ensure that the hole is clear of any large object and that the slurry in the hole is well mixed.
This prepares the hole for the pipe to be pulled in. Once the driller is satisfied that the hole is clear and ready for the
pipe, the pull head is connected to the drill string via Swivel. The swivel prevents the clients pipe from rotation
during the pullback.
Prior the pullback, the clients pipe, which has had a pull head welded on to it, has be prepared and hydrostatically
tested by the client in a single length. The length being equivalent to or greater that the length of the drilled hole.
The clients pipe is the pulled back toward the exit area by the drill rig.
EXCECUTION
The Horizontal Directional Drilling Technology is a modern and innovative technology of pipe and cable lying, which
replaces the brutality of open cut trenches with gentle drilling through injection. It uses the principle of high pressure
injection of drilling suspensions, combined with the mechanical rotation of drilling tools.
The Steel pipe installing accuracy by HDD is provided by the permanent electromagnetic location of the drill head.
Trench less directional drilling with P.D.E. Technology is the ideal procedure for areas with certain specific features:
Areas where open cut trenches are difficult and expensive (railways, highways, roads, water courses, clay
sand, other existing installations, runways etc.).
Heavily urbanized areas (buildings and underground installations, crossings etc.).
Areas which impose the protection of environment (protected parks, reservations, archaeological sites etc.)
PILOT DRILL
From the start pit, the remotely controlled drill head is advancing underground. The high pressure drilling
suspension from the rotating drill head does accomplish the pilot hole. This suspension (Water, Bentonite and
/or special additives) is dislocating the soil, larger spoils being pressed against the tunnel wall and finer particles
being transported along the tunnel with the drilling fluid to the start pit. (Pilot will maintain required depth from
the lowest invert of the last pipe).
REAMING
After the drill head reaches accurate the target pit, the adequate reamer for the job will be attached. Rotating
the reamer through the pilot hole, it will widen it, to enable the simultaneous of the product.
1. Ripper Reamer
HDD back reamers designed for high mixing and pumping action in sticky clay ground
conditions. Carbide cutters are precisely placed to provide smooth even
cutting action.
2. Fluted Reamer
Vermeer fluted reamers include robotically applied carbide mesh grit hard
facing to add longevity. And theyre available with rotary or Shark Teeth to
create an aggressive cutting action. Ideal for rugged ground
conditions ranging from hard pan and soft rock to cobble.
REAME
RR
C&F
SENSOR TEHNIQUE
The three-dimensional localization of the drill head is based on electromagnetic wave emission from a
transmitter mounted in the drill tool. A data receiver (with a data screen) above the ground is receiving the
signals send by the transmitter. So the
precise position of the drill head can be
located.
PITCH Point
C&F
LOCATOR
The data di splay screen is streamlined to provide transmitter roll, pitch, signal strength and temperature in a single
column view. The locating display is free from clutter.
TRANSMITTER
Its picture-driven menu structure removes language as a barrier to using the system anywhere in the world. The menu
and screen views are easily navigated with a single switch/trigger interface.
The real-time, birds-eye view provides operators with critical on-the-fly steering ability and directly contributes to on-thejob productivity and moneysaving opportunities.
The complete system includes a handheld receiver, F Series display, and battery charger rechargeable lithium-ion
batteries to power the receiver and remote display, DC power cable as an option to power the remote display from the
drill rig, and carry case.
The DigiTrak LWD (Log-While-Drilling) DataLog System allows you to collect and store drill data electronically.
The data is recorded using an F5 receiver and then it is uploaded to a computer for analysis, printing, saving, and emailing. The following types of data can be measured and recorded with the LWD DataLog system:
Depth
Pitch
Elevation change (surface topography)
Fluid pressure, when using an F5 fluid pressure transmitter
Pullback force and mud pressure, when using a DigiTrak TensiTrak transmitter
Transmitter heading information, when using a DigiTrak SST (steering) transmitter
System Components include the following:
F5 Receiver A locater or receiver with DataLog menus used to display and record transmitter data; the data is then
uploaded from the receiver to a computer.
F5compatible Transmitter A battery- or cable-powered device located in the drill head with sensors that
continuously measure and transmit information about the below-ground drill head or product pull-force that the aboveground receiver detects and displays.
LWD Software The computer application used for uploading data from the receiver to a computer and for working
with the uploaded data in the computer.
Upload Adapter A USB device required for the computer to communicate with the F5 Receiver to upload data.
17 C & F ENGINEERING SDN BHD
Part Numbers
Depth Range
65 ft (19.8 m)
Frequencies
Battery Type
2 C-cell alkaline (20 hr awake; 200 hr sleep) or 1 SuperCell (70 hr awake; 400 hr sleep) or
2 SAFT LSH14 (40 hr awake; 400 hr sleep)
Maximum Temperature
220F (104C)
Length x Diameter
Weight
1.65 lb (748 g)
Pressure Range
Pitch Sensitivity
0.1%
Roll Data
24-position clock
CROSS COMPLETED
VERMEER
No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
D33x44
NAVIGATOR
Client
Location
HSE
DHJ - SWEE
LSL
Department Electrical Services Brunei
Primetek
SPAD
Department Electrical Services Brunei
DHJ
Galfar Pembinaan/Bina Mega
Department Electrical Services Brunei
DHJ
Wee Ta
HSE
Wee Ta
Department Electrical Services Brunei
Date Completed
29 October 2009
03 November 2009
7 November 2009
13 November 2009
16 November 2009
25 November 2009
10 January 2010
17 February 2010
7 April 2010
6 July 2010
8 July 2010
9 July 2010
10 July 2010
11 July 2010
17 July 2010
19 July 2010
21 July 2010
22 July 2010
26 July 2010
29 July 2010
26 August 2010
31 August 2010
25 October 2010
7 November 2010
8 November 2010
9 December 2010
6 January 2011
7 January 2011
12 January 2011
1 March 2011
30 March 2011
25 March 2011
30 March 2011
2 May 2011
7 May 2011
12 May 2011
20 May 2011
Services
Bundle
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Telecom
Electrical
Water Line
Electrical
Electrical
Water line
Electrical
Water Line
Electrical
Length (M)
65
45
45
86
33
46
150
50
35
24
21
30
29
26
60
32
24
50
38
36
22
15
32
22
22
30
30
37
24
34
37
46
38
16
12
28
24
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
25 July 2011
28 July 2011
4 August 2011
12 August 2011
13 August 2011
15 August 2011
6 November 2011
25 December 2011
30 December 2011
26 January 2012
3 February 2012
10 February 2012
18 February 2012
5 March 2012
8 March 2012
4 April 2012
5 April 2012
8 April 2012
14 April 2012
17 April 2012
22 April 2012
26 April 2012
9 May 2012
16 May 2012
18 May 2012
20 May 2012
27 May 2012
6 June 2012
4 June 2012
6 June 2012
11 June 2012
16 June 2012
7 July 2012
1 August 2012
8 August 2012
6 August 2012
20 August 2012
8 October 2012
14 October 2012
17 October 2012
25 November 2012
30 November 2012
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
33
28
66
24
24
110
95
15
102
60
24
36
12
24
80
50
85
33
28
22
29
30
50
25
51
20
48
45
27
27
64
54
35
24
54
53
136
24
36
33
58
54
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
110.
111.
112.
113.
114.
115.
116.
117.
118.
119.
120.
121.
Wee Ta
DHJ
C&F Engineering
Department Electrical Services Brunei
Berakas Power Management Company
C&F Engineering/DES
Berakas Power Management Company
BHFT
15 December 2012
20 December 2012
5 February 2013
8 February 2013
2 February 2013
25 January 2013
23 January 2013
19 January 2013
14 March 2013
30 December 2012
18 February 2013
18 February 2013
20 February 2013
22 February 2013
25 February 2013
1 March 2013
3 March 2013
8 April 2013
11 April 2013
16 April 2013
25 April 2013
29 April 2013
6 May 2013
21 May 2013
23 July 2013
31 May 2013
24 July 2013
6 June 2013
16 June 2013
21 June 2013
23 June 2013
26 July 2013
27 July 2013
28 July 2013
2 August 2013
10 September 2013
25 October 2013
12 September 2013
14 September 2013
16 September 2013
20 July 2013
6 September 2013
Water pipe
Electric
Electric
Electric
Electric
Electric
Electric
Electric/Telephone
36
36
58
58
150
30
30
36
230
17
24
26
30
32
36
13
20
86
70
84
54
43
38
110
46
41
204
18
30
36
36
30
36
48
48
36
108
36
36
36
57
42
122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.
145.
146.
147.
148.
149.
150.
151.
152.
153.
154.
155.
156.
157.
158.
159.
160.
161.
162.
163.
AmberHigh
Department Electrical Services Brunei
Berakas Power Management Company
Syarikat Hajahmas Sdn Bhd
Berakas Power Management Company
Department Electrical Services Brunei
ASTAL Engineering
I-WATER Contactor
Department Electrical Services Brunei
Perumahan Katok-B
Kg. Perpindahan Rimba Spg.177
Kg. Mata-Mata Spg. 74-59
Jalan Muara Kg. Sungai Tilong
Jalan Lailai Wijaya Kg. Mata-Mata
Kg. Jerudong Spg.396-53
Berakas Garison Jalan Pemancha
JL. Stadion, Kg. Anggrek Desa
JL. Sungai Tilong, Kg. Sungai Tilong
JL. Muara, Kg. Sungai Hanching
JL. Lubok Sigurun
Sekolah Menengah Sayyidina Hassan, Kg. Kilanas
Masjid Muhammad Bolkiah, Kg. Serusop
JL. Sungai Akar Spg.40, Kg. Sungai Akar
JL. Bengkurong-Masin, Kg. Masin
JL. Mulaut, Kg. Masin
Jerudong Park Medical Centre1
Jerudong Park Medical Centre2
JL. Muara, Kg. Sabun
JL. Junjongan, Kg. Junjongan
JL. Kulapis Bebatik
JL. Mulaut, Kg. Agau
JL. Mulaut-Limau Manis Spg.125, Kg. Sungai Tampoi
Perumahan Kg. Rimba Spg. 177
JL. Tunku 1
JL. Tungku 2
JL. Dato Ratna, Kg. Bribi
JL. Pangiran Babu Raja, Kg. Beribi
JL. Mabuhai, Kementerian Belian dan Sukan
Indonesian Embassy
Malaysian Highs commissioner
JL. Muara, Kg. Delima
JL. Kuala Belait
JL. Tungku Spg.162
Roundabout JL. Gadong Estate
JL. Subok, Sungai Akar
Airbase Military of Brunei
JL. Bebatik-Kilanas
JL. Muara, Kg. Manggis
Under Bridge RIPAS flyover
Muara-Tutong Highway
JL. Pasir Berakas, Kg. Lambak Kiri
18 September 2013
29 July 2013
20 September 2013
22 September 2013
27 September 2013
29 September 2013
30 October 2013
24 December 2013
23 January 2014
28 January 2014
12 February 2014
14 February 2014
15 February 2014
21 February 2014
27 February 2014
01 March 2014
07 March 2014
13 March 2014
18 March 2014
22 March 2014
26 March 2014
29 March 2014
01 April 2014
04 April 2014
01 June 2014
03 June 2014
06 June 2014
08 June 2014
10 June 2014
11 June 2014
12 June 2014
14 June 2014
17 June 2014
28 June 2014
7 July 2014
8 July 2014
12 July 2014
12 August 2014
16 August 2014
24 August 2014
28 August 2014
1 September 2014
Water pipe
Electric
Electric
Water pipe
Electric
Water pipe
Electric
Electric
Water
Electric
Electric
Sewerage
Electric
Electric
Electric
Electric
Electric
Water pipe
Water pipe
Electric
18
12
38
38
20
34
30
84
21
21
24
18
24
33
33
18
30
42
53
36
16
18
12
53
30
84
54
60
36
48
36
42
62
36
80
48
72
24
65
32
33
30
164.
165.
166.
167.
168.
169.
170.
29 September 2014
03 October 2014
22 October 2014
26 October 2014
29 October 2014
01 November 2014
Electric
Electric
Electric
Telephone Line
54
72
36
36
36
30
Job Completed
47
41
35
20
20
2009
2010
2011
2012
2013
2014
CERTIFICATED
SITE PHOTO
Client
: BERAKAS POWER MANAGEMENT COMPANY (BPMC)
Project : Proposed HV/CD (Cable Duct)
Product Bundle
: 8 X 180mm.DIA.HDPE X 72m
Location
: Rimba
Year
: 2014
Client
: BERAKAS POWER MANAGEMENT COMPANY (BPMC)
Project : Proposed HV/CD (Cable Duct)
Product Bundle
: 4 X 180mm.DIA.HDPE X 250m
Location
: Jalan Berakas
Year
: 2014
SAFETY MESSAGES
SAFETY MESSAGES
General safety messages appear in the safety section. Specification safety messages are in appropriate section of the manual
where potential hazard may occur if the instruction or procedures are not followed.
!
!
!
!
DANGER
CAUTION
WARNING
DANGER Imminent hazard which, if not avoided, will result in in serious personal injury or death.
CAUTION Potential hazard or unsafe practices which, if not avoided, will result in in serious personal injury or death.
WARNING Potential hazard or unsafe practices which, if not avoided, will result in in serious personal injury or death.
INDEX
INTRODUCTION..... 1
LOCATOR.. 14
CROSS COMPLETED. 19
CERTIFICATE COMPETENCY.. 24
SITE PHOTO.... 28
SAFETY MESSAGES.. 32