CLIENT

JOB
314200

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA

UNIT
000

QCP: G-000-ZA-E-09633
Rev.

PROJECT TITLE

GAS TREAT & COMPRESSION FACILITIES (GTC)

Sh. 1 of 16

14/01/06

Approved
Approverd

Necmi Yelercifci

QUALITY CONTROL PROCEDURE FOR


PAINTING WORK AT SITE

Comment Incorporated
1

G.Temizsoy

First Issue
0

G.Temizsoy

Ulvi Ozkan

Checked
Verified
Prepared

Description
Site Rev.

CONSTRUCTION CONTRACTOR

SNAMPROGETTI S.p.A.

CLIENT

Date

GAMA.VE.QCP.0100

Data file: 254342040.doc

JOB
314200

UNIT
000

QCP: G-000-ZA-E-09633
Rev.
Sh. 2 of 16

CONTENT

GENERAL........................................................................................................................................... 3
1.1
1.2

QUALITY CONTROL PLANNING.......................................................................................................4


2.1
2.2
2.3
2.4

SCOPE AND OBJECTIVE 3


TERMS AND DEFINITIONS.. 3
INFORMATION RELATED TO THIS DOCUMENT.
4
INSTRUCTION FOR PREPARATION AND ISSUING OF QCP AND ITP(S) ..5
GAMA RESPONSIBILITY 5
LOCAL REGULATIONS 6

ATTACHMENTS.................................................................................................................................. 6
3.1 ITP LIST......................................................................................................................................... 6
3.2 FORMS LIST.................................................................................................................................... 6
3.2.1 INSPECTION AND TEST REPORT FORMS:............................................................................................6

Data file: 254342040.doc

JOB
314200

UNIT
000

QCP: G-000-ZA-E-09633
Rev.
Sh. 3 of 16

GENERAL

1.1

Scope and Objective

1.1.1 This document provides minimum requirements to Gama Al-Moushegah Arabia Ltd. for
inspecting, checking and testing painting work during construction of Hawiyah - Gas Treat
& Compression Facilities (GTC).
1.1.2 This document is additional to GAMA PQP (Project Qulity Plan) and shall be read
toghether with other applicable contractual documentation.
1.2

Terms and definitions

1.2.1 The following terms and definitions are applicable to all GAMA specifications related to
quality requirements.
Gama

Gama Al-Moushegah Arabia Ltd.

Snamprogetti

Organization appointed by Client to perform the Works;

Client

Organization that receives the services related to the Works


provided by Snamprogetti and GAMA

TPI

Organization that receives the services related to the Works


provided by Snamprogetti and GAMA

PQP

Project Quality Plan: Gama document specifying the minimum


requirements related to the Works for Hawiyah NGL Recavery
Plant Project.

QAS

Quality Assurance Specification: Snamprogetti document specifying the


minimum requirements related to GAMAs QMSand QA/QC Manual specific
for the Works.

QCS

Quality Control Specification: Snamprogetti specification for quality control


requirements. This standard complement and compiles all applicable ITS(s).

ITS

Inspection and Test Standard: Snamprogetti standard listing in


chronological sequence all quality control activities and
responsibility related to the execution of required inspection and
tests. ITP (s) and relevant forms are issued as QCP enclosures.

QCP

Quality Control Procedure: Gama plan endorsing all quality control


requirements detailed in QCP and in other applicable contractual
documents. This plan complements and compiles all applicable ITP(s).

ITP

Inspection and Test Plan: Gama plan of inspection and tests


specified in ITP(s) and/or required by engineering and vendors
documents or elsewhere specified. ITP(s) shall provide references
to applicable procedures, acceptance criteria, documentation,
quality records and inspection attendance to be performed, in
chronological order, from initial inspection, throughout final

Data file: 254342040.doc

JOB
314200

UNIT
000

QCP: G-000-ZA-E-09633
Rev.
Sh. 4 of 16

inspections and mechanical completion. ITP(s) and relevant forms


shall be issued as QCP enclosures.
RFI

Request for Inspection: Written notification to be issued by Gama in


order to allow all parties involved to perform their inspection and
test witness as planned in the applicable ITP;

QA

Quality Assurance: Part of quality management focused on


providing confidence that quality requirements will be fulfilled;

QC

Quality Control: Part of quality management focused on fulfilling


quality requirements;

Calibration

Comparison of a measurement and test equipment with a


reference standard or with another one provided with better
tolerance in order to detect or to measure possible inaccuracies
and to document or eliminate them.

SATIP

Saudi Aramco Tipical Inspection Plan

SAIC

Saudi Aramco Inspection Checklist

SATR

Saudi Aramco Test Report

MDT

Snamprogetti Test Report

GTR

Gama Test Report

E-LogBook

New Saudi Aramco software managing Saudi Aramco SATIPs and


SAICs and electronic RFI Request For Inspection.

1.2.2 Any other terms related to quality and not listed above shall conform to section 3 Term
and Definition of ISO 9000:2000 Quality Management System Fundamentals and
vocabulary.

QUALITY CONTROL PLANNING

2.1

Information Related to this Document

2.1.1 This document includes the ITP(s) and forms, listed under Paragraphes 3.1 and 3.2, to be
implemented for inspection, tests and certification to be carried out during site activities
related to painting work.

2.1.2 The ITPs are of two different types:


ITP planning general inspections and tests related to initial quality verification, common to
the construction discipline under examination, such as document review, personnel and
equipment verification, ambient conditions, etc. This ITP and relevant inspection and
testing activities are coded with series n. GAMA -VE.0001.XX.
ITP planning specific inspections and tests of painting work to be carried out on Main
Item such as Isometrics or Lines, Steel Structures, Pumps, Vessels, etc., which
can be traceable in engineering drawings. This ITP(s) and relevant inspection activities
are coded with series n. GAMA-VE.0101.XX.

Data file: 254342040.doc

JOB
314200

UNIT
000

QCP: G-000-ZA-E-09633
Rev.
Sh. 5 of 16

2.1.3 Inspection checklists and tests reports have been taken from applicable SATIP (Saudi
Aramco Typical Inspection Plan) and adapted to the specific site construction scope of
work as following tables:
TABLE NO. 1
SATIP-H-100-01 / PAINT APPLICATIONOF LIQUID COATING SYSTEMS FOR INDUSTRIAL FACILITIES
CHECKLISTS

TEST REPORT

FILING

SAIC-H-2010

NIL

Checklist: E-Log Book

SAIC-H-2023

NIL

Checklist: E-Log Book

SAIC-H-2024

NIL

Checklist: E-Log Book

SAIC-H-2025

NIL

Checklist: E-Log Book

SAIC-H-2026

GTR.VE.CDQ.0001 (SATR-H-2004)

Checklist: E-Log Book


Test Report: QC Dossier

SAIC-H-2027

GTR .VE.CDQ.0101(SATR-H-2006)

Checklist: E-Log Book


Test Report: QC Dossier

SAIC-H-2028

NIL

Checklist: E-Log Book

SAIC-H-2029

GTR.VE.CDQ.0101 (SATR-H-2006)

Checklist: E-Log Book


Test Report: QC Dossier

SAIC-H-2030

NIL

Checklist: E-Log Book

SAIC-H-2031

GTR .VE.CDQ.0101 (SATR-H-2006)

Checklist: E-Log Book


Test Report: QC Dossier

SAIC-H-2032

NIL

Checklist: E-Log Book

SAIC-H-2033

NIL

Checklist: E-Log Book

SAIC-H-2034

GTR. VE.CDQ.0102 (SATR-A-2011)

Checklist: E-Log Book


Test Report: QC Dossier

SAIC-H-2070

GTR .VE.CDQ.0103 (SATR-H-2008)

Checklist: E-Log Book


Test Report: QC Dossier

NIL

GTR .VE.CDQ.0002

Not Used

a) This table will be completed at site by Construction Contractor to summarize the actual checklists,
test reports to be used for the Project as well as the filing method (i.e. E-Log Book or/and QC Dossier,
see example provided in Doc. No. 000-ZA-E-09616).
b) Construction Contractor shall identify and mark as NA all non applicable checkpoints listed in
SAICs.

2.2

Instruction for Preparation and Issuing of QCP and ITP(s)

2.2.1 Gama shall endorse QCS-000-ZA-E09623, and re-issue the same as site QCP using the
title block provided in the left side of the front page.
2.2.2 Gama shall revise QCS-000-ZA-E09623, with no change to be made in the ITSs preassigned QC Coding system. If additional QC Codes are required, the same shall be
numbered adding an alphanumeric suffix to the preceding available QC Code. New QC
Codes shall be approved by Snamprogetti.
2.2.3 During the execution of the Works Gama shall revise and update, as and when required,
the QCP(s) and relevant ITP(s) to incorporate any other pertinent requirements set forth
in standards, design codes, recommended practices, safety design, referred hereafter or
included elsewhere in the contractual docments.
2.2.4 Prior to start construction work QCP(s) and ITP(s) shall be submitted to Snamprogetti at
site for review and approval.

Data file: 254342040.doc

JOB
314200

UNIT
000

QCP: G-000-ZA-E-09633
Rev.
Sh. 6 of 16

2.3

GAMA responsibility

2.3.1 Gama shall prepare and update any other necessary QCP(s), ITP(s), and quality
procedures to include all inspections, examinations and tests required to verify the quality
of the Works. The above documents shall be timely submitted to Snamprogetti for review
and approval in order to ensure their availability prior starting of the painting work.
2.3.2 Gama shall notify all inspection and tests by filling up each pertinent SAIC to be submitted
as RFI. When the new Saudi Aramco E-Log Book system will be made available and
functional, Gama shall shift from manual to electronic RFI process. Gama has to submit
personnel name from his organization requiring access to the E-Log Book system.
2.3.3 Gama shall perform and record all inspections, examinations and tests required and shall
carry out all the works necessary for the preparation of inspections, examinations and
tests, including adequate scaffolding for safely witnessing the inspection.
2.3.4 Gama shall provide, for the execution of quality testing, inspection and measurements all
necessary equipment, tools and shall made available on request to Snamprogetti and
Client the applicable international Standards and Codes.
2.3.5 Gama shall issue inspections, examinations and tests reports immediately after the
completion of each inspection activity. All reports shall be approved and signed off by
Gama prior to submit them to Snamprogetti for review or approval, as appropriate.
2.3.6 Snamprogetti or other Parties signature on inspection, examination and test reports do
not release the Gama from its responsibilities.
2.4

Local Regulations

2.4.1 Inspections and tests required by local regulations are out from the scope of this
specification. However, they shall be strictly adhered to and documented by Gama. Copy
of such records shall be submitted to Snamprogetti.
2.4.2 When local regulations are less stringent than the applicable design codes, the latter shall
prevail. Gama shall negotiate the matter with the Authorities concerned and keep
Snamprogetti informed of any resulting deviation from design requirements.
3

ATTACHMENTS

3.1

ITP List

3.1.1

GENERAL ITP
ITP GAMA-VE-0001
sampling tests

3.1.2

SPECIFIC ITP
ITP GAMA-VE-0001

3.2

General Painting Materials, Equipments and system application

Paint application on metallic internal and external surfaces

Forms List

3.2.1 Inspection and test report forms:


a)

GENERAL

GTR.VE.CDQ.0001

PAINTING EQUIPMENT CHECK SHEET

GTR.VE.CDQ.0002

SYSTEM APPLICATION SAMPLING TESTS REPORT

Data file: 254342040.doc

JOB
314200

UNIT
000

QCP: G-000-ZA-E-09633
Rev.
Sh. 7 of 16

b)

SPECIFIC

GTR.VE.CDQ.0101

IN-PROCESS INSPECTION REPORT OF FIELD PAINTING

GTR.RV.CDQ.0103

HOLIDAY TEST REPORT

3.2 List of Not Applicable SAIC and their item numbers


SAIC NO
SAIC-H-2031
SAIC-H-2027
SAIC-H-2028
SAIC-H-2028
SAIC-H-2030
SAIC-H-2032
SAIC-H-2034
SAIC-H-2033
SAIC-H-2033
SAIC-H-2026

ITEM NO (N/A)
B2
A6,A7,A8,A9,C7,D13,D15,D17
A4,A5,A6,A7
B2,
A4,A5,A6,C1,
B1,B2,B3,B4,B5,B6,B7,B8
A1,A2,A3,A4
A6,A7,A9,A10,A11,C1,E1,E2,E3,F1,F2,F3,F4,F5,G5,H1
H2,I3,K1,K2,K3,K4,L1
F2

Data file: 254342040.doc

CLIENT

SAUDI ARAMCO OIL COMPANY

JOB

UNIT

314200

000

PLANT LOCATION

QCP:G- 00-ZA-E-09633

HAWIYAH SAUDI ARABIA


PROJECT TITLE

Rev.

GAS TREAT & COMPRESSION FACILITIES (GTC)

ITP No.GAMA-VE 0001


Title: DOCUMENT REVIEW, GENERAL PAINTING MATERIALS,
EQUIPMENTS AND SYSTEM APPLICATION SAMPLING TESTS.

QC CODE
0001

01

VE

0001

02

VE

0001

03

VE

0001

04

VE

0001

05

Involvement

Acceptance
Criteria

Verifying
Document

CC

QC

SP

Document review:
- Coating procedure
- Blasters and painters qualification &
certification card
- Etc
Verification
of
painting
and
blasting
equipments adequacy (pressure system
components of Airless spray equipment,
pressure gages,..,etc.)
Verification painting and abrasives products to
be used (Manufacturer Data Sheet, abrasive
material certificate,..,etc.)

SAES-H-100
SAES-H-101
SAEP-316

SAIC-H-2023
SAIC-H-2010

E-Log Book

SAES-H-100
SAES-H-102

SAIC-H-2026

GTR..VE.CDQ.0001

SAES-H-100

SAIC-H-2024

E-Log Book

Monitoring of the correct storing, handling and


issuing of painting materials
-Check adequacy of storage
-Check paints batches expiring dates
-Check implementation of first-in first-out
handling method
Testing
samples
for
painting
system
compliance
-Check cutting adhesion
-Check tear adhesion

SAES-H-100

SAIC-H-2025

Site Register

Notes
TP

CO

CL

(SATR-H-2004)

()

Site register to be
maintain by GAMA at
paints storage area

Paints
storage
verification
to
be
performe
every
two

E-Log Book
Job Spec.
ASTM D-3359
DIN ISO 4541

ITEMS

Reference
Document

Description

VE

DISCIPLINE
PAINTING

Sh. 8 of 16

MDT.VE.CDQ.0002

NOT APPLICABLE

ORGANIZATION CODE

INVOLVEMENT CODE

CC GAMA

CO Snamprogetti Commissioning

P Perform

W Witness

QC QC Gama

TP Laboratory / Third Party

S Surveillance

H Hold Point

SP Snamprogetti Supervision

CL Client

R Review
Data file: 254342040.doc

CLIENT

SAUDI ARAMCO OIL COMPANY

JOB

UNIT

314200

000

PLANT LOCATION

QCP:G- 00-ZA-E-09633

HAWIYAH SAUDI ARABIA


PROJECT TITLE

Rev.

GAS TREAT & COMPRESSION FACILITIES (GTC)

ITP No.:GAMA-VE - 0101


Title: PAINT APPLICATION
EXTERNAL SURFACES
QC CODE
VE

VE

0101

0101

ON

METALLIC

INTERNAL AND

Description
01

02

Verification of surface preparation:


-Steel imperfection
-Surface appearance after sandblasting
-Sandblasting profile
-Cleanliness
-Contaminants and soluble salts
-Etc.
Daily recording of meteorologic and ambient

DISCIPLINE
PAINTING

0101

03

Daily recording of painting application data


-Paint drying and polymerization
-Overcoating time
-Film appearance and evenness
-Contaminants and soluble salts
-Etc.

ITEMS

Reference
Document

Acceptance
Criteria

SAES-H-100

SAIC-H-2027

Involvement

Verifying
Document
GTR.VE.CDQ.0101

TP

C
O

CL

Notes

C
C
P

Q
C
H

SP
W

Site register to be

maintained by CC at
painting area. Report to
be submitted toSP every
week
Site register to be

(SATR-H-2006)

SAES-H-100

Site Register

()

condition
-Ambient temperature monitoring
-Humidity monitoring
VE

Sh. 9 of 16

SAES-H-100

SAIC-H-2028
SAIC-H-2030

Site Register

()

maintained by CC at QC
office
To be performed by
CC once at the start of
each activity and then
every two weeks until
confidents
of
good
workmanship is reached

GTR..VE.CDQ.010

1
(SATR-H-2006)

ORGANIZATION CODE

INVOLVEMENT CODE

CC GAMA

CO Snamprogetti Commissioning

P Perform

W Witness

QC QC Gama

TP Laboratory / Third Party

S Surveillance

H Hold Point

SP Snamprogetti Supervision

CL Client

R Review
Data file: 254342040.doc

CLIENT

SAUDI ARAMCO OIL COMPANY

JOB

UNIT

314200

000

PLANT LOCATION

QCP:G- 00-ZA-E-09633

HAWIYAH SAUDI ARABIA


PROJECT TITLE

Rev.

GAS TREAT & COMPRESSION FACILITIES (GTC)


ITP No.:GAMA-VE - 0101
Title: PAINT APPLICATION
EXTERNAL SURFACES
QC CODE
VE

0101

03A

ON

METALLIC

INTERNAL AND

DISCIPLINE
PAINTING

Sh. 10 of 16

ITEMS

Description

Reference
Document

Acceptance
Criteria

Inspection of primer coat prior to top coating

SAES-H-100

SAIC-H-2029

Involvement

Verifying
Document
GTR..VE.CDQ.010

C
C
P

Q
C
H

SP

TP

C
O

CL

1
(SATR-H-2006)
VE

VE

0101

0101

04

04A

Inspection and measurement of dry/cured


paint of coat film thickness

SAES-H-100

Inspection of repair/touch-up of painting

SAES-H-100

SAIC-H-2031

GTR.VE.CDQ.0101

(SATR-H-2006)
SAIC-H-2032

GTR.VE.CDQ.0101

(SATR-H-2006)
VE

0101

04B

Safety color coding stencilling of identification


on equipment / piping

SAES-H-100

SAIC-H-2033

VE

0102

05

Holiday test (if required by Job Spec.)

Job Spec.

SAIC-H-2070

E-Log Book

GTR.VE.CDQ.0103

(SATR-H-2008)
VE

0101

05A

Final painting inspection punchlisting

SAES-H-100

SAIC-H-2034

GTR.VE.CDQ.0102

(SATR-A-2011)

ORGANIZATION CODE

INVOLVEMENT CODE

CC GAMA

CO Snamprogetti Commissioning

P Perform

W Witness

QC QC Gama

TP Laboratory / Third Party

S Surveillance

H Hold Point

SP Snamprogetti Supervision

CL Client

R Review
Data file: 254342040.doc

Notes

CLIENT

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA


GAS TREAT & COMPRESSION FACILITIES (GTC)
PAINTING EQUIPMENT CHECK SHEET
(SATR-H-2004)

EQUIPMENT

ENGINEERING DOCUMENT n.

SUPPLIER DOCUMENT n.

UNIT NUMBER
1

UNIT

314200

000

QC CODE

REPORT N.

GAMA-VE.0001.01

PROJECT TITLE

TAG/ITEM

JOB

ITP REFERENCE
REFERENCE
GAMA-VE-0001

Page
1 of 2

CODE/SPECIFICATION

REMARKS
2

A. Compressors
Capacity
No. of Manifold Outlet
Size of Air Hose
Gauges
Grounding
Oil Leaks
Air Hose condition
Air hose connections
Outlet connections and
valves (1-1/2" or 2")
B. Air Storage Drum
Size/Capacity
Pressure Test Certificate
Revalidation Test
Relief Valve Calibration
Pressure Gauges
C. Blasting Pots : Type
Capacity
Condition of Pot
Mixing Valves
Oil & Moisture traps
Air Hose Size
Air hose condition
D. Blasting Hose:
Size (3 to 4 times nozzle
orifice)
Anti-static Hose
Couplings & Safety Pins
Deadman Switch fitted
E. Blast Nozzles
Size
Condition
INSPECTION NOTIFICATION REFERENCE

NOTES

RFI No.
ISSUE DATE:

GAMA

SNAMPROGETTI

CLIENT

NAME

NAME

NAME

NAME

SIGNATURE

SIGNATURE

SIGNATURE

SIGNATURE

Date

Date

Date

Date

Form code: GTR.VE.CDQ.0001-SH1

CLIENT

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA


GAS TREAT & COMPRESSION FACILITIES (GTC)
PAINTING EQUIPMENT CHECK SHEET
(SATR-H-2004)

EQUIPMENT

ENGINEERING DOCUMENT n.

SUPPLIER DOCUMENT n.

UNIT NUMBER
1

UNIT
000

QC CODE

REPORT N.

GAMA-VE.0001.01

PROJECT TITLE

TAG/ITEM

JOB
314200

ITP REFERENCE
REFERENCE
GAMA-VE-0001

Page
2 of 2

CODE/SPECIFICATION

REMARKS
2

F. FBE Powder Application Equipment For external FBE Coating of Field Girth Welds (SAIC-H-2013)
Condition of induction Coil heaters
Powder Application Equipment
F. Airless Spray System
Spray Pump Type/Model
Pressure Ratio
No. of Spare Filters
Hand Set
Liquid Line Zise
Hand Set Condition
Gauges
Spray Gun Tip Size
Condition of Reversible
No. of Machines on Site
Spare Hand Set
Spare Tip
Tools
G. Conventional Spray System
Air Supply Hose Connection
Oil & Moisture Separator
Spray Hand Set
Condition of Paint Mixers
H. Paint Mixers
Type
Size

INSPECTION NOTIFICATION REFERENCE

NOTES

RFI No.
ISSUE DATE:

GAMA

SNAMPROGETTI

CLIENT

NAME

NAME

NAME

NAME

SIGNATURE

SIGNATURE

SIGNATURE

SIGNATURE

Date

Date

Date

Date

Form code: GTR.VE.CDQ.0001-SH2

JOB

UNIT

314200

000

QC CODE

REPORT N.

CLIENT

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA

G-VE.0101.01,03,03A,04

PROJECT TITLE

GAS TREAT & COMPRESSION FACILITIES (GTC)

ITP REFERENCE

Page

GAMA-VE-0101

1 OF 2

IN-PROCESSING INSPECTION REPORT OF FIELD PAINTING


(SATR-H-2006)
TAG/ITEM

ENGINEERING DOCUMENT n.
START
TIME

READING

SUPPLIER DOCUMENT n.

MID-POINT

OTHERS

CODE/SPECIFICATION

Crew
Supvr.

QC
Insp.

SP
Insp.

Saudi
Aramco
Insp.

Crew
Supvr.

QC
Insp.

SP
Insp.

Saudi
Aramco
Insp.

DATE
Steel Surface Temp
Dew Point Temperature /Relative
humidity
Blasting Nozzle Pressure
Air Quality/Blotter Test

RESULT

accepted

Item Description (PIPE/SPOOL/WELD JOINT


NUMBER)

Rejected

Drw No/Line No:

N/A

SURFACE PREPARATION
A. Chemical cleaning required?
( Yes / No / N.A )
1. Solvent Clean (TYPE:
_________)
2. Detergent Wash
3. Steam Clean
B. Grinding required and
accepted ?
C. Abrasive Blasting:

Abrasive size:

abrasive type:

2. Anchor
Pattern:______________
3 Degree of
Cleanliness:_________
4. Chloride Tests (Max=40
mg/sqm)

Remarks:

INSPECTION NOTIFICATION REFERENCE


RFI No.
ISSUE DATE:

GAMA

SNAMPROGETTI

CLIENT

NAME

NAME

NAME

NAME

SIGNATURE

SIGNATURE

SIGNATURE

SIGNATURE

Date

Date

Date

Date

Form code: GTR.VE.CDQ.0101-SH1

CLIENT

JOB

UNIT

314200

000

QC CODE

REPORT N.

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA

G-VE.0101.01,03,03A,04

PROJECT TITLE

GAS TREAT & COMPRESSION FACILITIES (GTC)

ITP REFERENCE

Page

GAMA-VE-0101

2 OF 2

IN PROCESS INSPECTION REPORT OF FIELD PAINTING


(SATR-H-2006)
TAG/ITEM

ENGINEERING DOCUMENT n.

SUPPLIER DOCUMENT n.

CODE/SPECIFICATION

DFT Gage sr. n. .. shall be verified for calibration at the beginning and end of each shift using plastic shims as per SSPC PA2 Standard
COATING SPECIFICATION : APCS._____________Primer/Intermediate/Top coat. Other_______________
Product Name_____________________________________ SAMS S/N______________________________
Manfacture Date_____________ Batch No._____________________________ Color__________________
Product Name Thinner_____________________________ SAMS S/ No._____________________________
MIXING & OTHER REQUIREMENTS
Ratio of Thining____________ Mixing Acceptable_________________Mixing Completed at______________
InductionTime (completed)______________________ Pot Life_____________________________________
Application by Brush/Airless/Conventional Tip Size/Pressure______________________________________
Primer/Intermediate/Top Coat
Application

Item Description

RESULT

ACC
REJ
.
NOTE: All Non-Explosionproof lightining are disconnected prior to the start of painting
Pipe Surface Free of Flash
Rusting/ Re-coat interval Accept

Crew
Supvr.

QC
Insp.

SP
Insp.

Saudi
Aramco
Insp.

Crew
Supvr.

QC
Insp.

SP
Insp.

Saudi
Aramco
Insp.

N/A

Average Wet Film Thickness.


Free of application related defects
Final Cure
Time/S.Temp___________
REMARKS:

Visual Inspection & DFT Check


Primer/Intermediate/Top Coat

Item Description

RESULT
ACC.

REJ.

N/A

A. Prime/First coat have


uniform, appearance
B. Free of visible holidays, fish
eyes lumps, sags & runs
C. DFT Readings:
Pt. 1
a. Min. Reqd.
Pt. 2
DFT:_______
* Minimum of 5
separate spot
measurements
(average of 3 gage
readings for each
spot) spaced
randomly over each
10m(100ft) to be
measured.

Pt. 3
Pt. 4
Pt. 5
Pt. 6
Pt. 7
Pt. 8
Pt. 9
Pt. 10
INSPECTION NOTIFICATION REFERENCE

NOTES

RFI No.
ISSUE DATE:

GAMA

SNAMPROGETTI

CLIENT

NAME

NAME

NAME

NAME

SIGNATURE

SIGNATURE

SIGNATURE

SIGNATURE

Date

Date

Date

Date

Form code: GTR.VE.CDQ.0101-SH2

CLIENT

JOB

UNIT

CLIENT

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA

JOB

UNIT

314200

000

QC CODE

REPORT N.

G-VE.0101.01,03,03A,04

PROJECT TITLE

GAS TREAT & COMPRESSION FACILITIES (GTC)

ITP REFERENCE

Page

GAMA-VE-0101

2 OF 2

IN PROCESS INSPECTION REPORT OF FIELD PAINTING


(SATR-H-2006)
TAG/ITEM

ENGINEERING DOCUMENT n.

SUPPLIER DOCUMENT n.

CODE/SPECIFICATION

DFT Gage sr. n. .. shall be verified for calibration at the beginning and end of each shift using plastic shims as per SSPC PA2 Standard

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA

314200

000

QC CODE

REPORT N.

GAMA-VE.0102.05
ITP REFERENCE

Page

GAMA-VE-0101

of

PROJECT TITLE

GAS TREAT & COMPRESSION FACILITIES GTC)

HOLIDAY TEST REPORT


TAG/ITEM

ENGINEERING DOCUMENT n.

SUPPLIER DOCUMENT n.

CODE/SPECIFICATION

(SATR-H-2008)
LINE/
EQUIPME TEST LOCATION
NT

VISUAL CHECK
REF.DWG.

REMARKS
ACCEPT

REJECT

HOLIDAY TEST
COATING
SYSTEM_______________________________________________

COATING DFT__________________________________

TYPE OF COATING

TYPE OF TEST EQUIPMENT

VOLTAGE REQUIREMENT

No. of HOLIDAYS

REPAIRED WITHIN FIELD CALIB.


RESULT
PERIOD
ACCEPT

RELEASE FOR BACKFILLING:

YES

NOT

REMARKS
REJECT

CLIENT

JOB

UNIT

314200

000

QC CODE

REPORT N.

SAUDI ARAMCO OIL COMPANY


PLANT LOCATION

HAWIYAH SAUDI ARABIA


PROJECT TITLE

GAS TREAT & COMPRESSION FACILITIES (GTC)

G-VE.0101.01,03,03A,04
ITP REFERENCE

Page

GAMA-VE-0101

2 OF 2

IN PROCESS INSPECTION REPORT OF FIELD PAINTING


(SATR-H-2006)
TAG/ITEM

ENGINEERING DOCUMENT n.

SUPPLIER DOCUMENT n.

CODE/SPECIFICATION

DFT Gage sr. n. .. shall be verified for calibration at the beginning and end of each shift using plastic shims as per SSPC PA2 Standard
INSPECTION NOTIFICATION REFERENCE

NOTES

RFI No.
ISSUE DATE:

GAMA

SNAMPROGETTI

NAME

NAME

NAME

NAME

SIGNATURE

SIGNATURE

SIGNATURE

SIGNATURE

Date

Date

Date

Date

Form code: GTR.RV.CDQ.0103