Professional Documents
Culture Documents
Material: S. No. Unit
Material: S. No. Unit
Material: S. No. Unit
LS-10
LS-11
LS-12
LS-13
LS-14
LS-15
LS-16
LS-17
LS-18
LS-19
LS-20
LS-21
LS-22
LS-23
LS-24
LS-25
LS-26
LS-27
LS-28
LS-29
LS-30
LS-31
LS-32
LS-33
LS-34
LS-35
LS-36
H/Bad
Gujrat
Sialkot
G/Wala
Chakwal
Jhelum
Attock
R/Pindi
N/Sahib
Kitchen Expenses (tea, meat, milt fuel fat & appliances) Ch. 3 Item 16 (i)
Lantern, Patromax lamp depreciation and K. oil consumption Ch. 3 Item 16 (i)
Medical Charges
Kitchen Utensil, cost of repair and replacement etc. Ch. 3 Item 16 (i)
Construction of Temporary Island (Ch. 6 Item 7 (i)
Carriage of material to site of work (Boring Material) (Ch. 6 Item 7 (i)
Hire charges of plant (Ch. 6 Item 8 (a) & (b)
Hire charges of assembling bunch cable wire cutter stressing, jack Hydraulic
pump, conce, fixer grout injecting pump relievable observation and supply of
recorded data of stresses. (Ch. 6 Item 20)
Repair of plate for the down struts spacers (Ch. 6 Item 21)
Hire charges of wire cutter stressing, Jack, Hydraulic pump relievable cone,
observation and supply of recorded data of stress. (Ch. 6 Item 21)
Fixture (Ch. 9 Item 18)
Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii)
Nail & Screws bolt and brackets (Ch. 12 Item 24 (a)
Accessories for fixing of Eave Board (Ch. 12 Item 28 (b)
Cost of Putty and Nails (Ch. 12 Item 44 a)
Electricity Charges (Ch. 12 Item 51)
Hold Fast (Ch. 12 Item. 57 b)
Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16)
Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch. 18 Item 10)
Excavation and fixing (Ch. 18 Item 18 (iv) a)
Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a)
Painting and lettering (Ch. 18 Item 18 (iv) a)
Fixing manhole frame & cover including carriage to site (Ch. 21 Item. 15)
Rental Charges of T&P (Ch. 21 Item. 19 a i)
Carriage from store to site of work for reverse rotary drilling reg complete set
and generator set etc. (Ch. 23 Item 5 (a) i)
Mix. Expenditure (Ch. 23 Item 5 (a) i)
Taking and preserving box 2 lbs sample of strata. (Ch. 23 Item 7)
23 Item 7)
Sealing the water sample and providing necessary packing etc.(Ch. 23 Item 7)
Handling charges (Ch. 23 Item 7)
C. Oil (Ch. 23 item 17 i & ii)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 3" (Ch. 23 Table 19 C)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 4" (Ch. 23 Table 19 C)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 5" (Ch. 23 Table 19 C)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 6" (Ch. 23 Table 19 C)
Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 8" (Ch. 23 Table 19 C)
S/Pura
LS-01
LS-02
LS-03
LS-04
LS-05
LS-06
LS-07
LS-08
Unit
Kasur
MATERIAL
Okara
S. No.
Lahore
INPUT RATES OF LUMPSUM ITEMS FOR BI-ANNUAL PERIOD (1st FEBRUARY, 2014 TO 31st JULY, 2014)
330
330
330
330
330
330
330
330
330
330
330
330
330
44
44
44
44
44
44
44
44
44
44
44
44
44
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
550
550
550
550
550
550
550
550
550
550
550
550
550
880
880
880
880
880
880
880
880
880
880
880
880
880
550
550
550
550
550
550
550
550
550
550
550
550
550
440
440
440
440
440
440
440
440
440
440
440
440
440
220
220
220
220
220
220
220
220
220
220
220
220
220
10
10
10
10
10
10
10
10
10
10
10
10
10
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
13
13
13
13
13
13
13
13
13
13
13
13
13
17
17
17
17
17
17
17
17
17
17
17
17
17
44
44
44
44
44
44
44
44
44
44
44
44
44
13
13
13
13
13
13
13
13
13
13
13
13
13
220
220
220
220
220
220
220
220
220
220
220
220
220
24
24
24
24
24
24
24
24
24
24
24
24
24
44
44
44
44
44
44
44
44
44
44
44
44
44
88
88
88
88
88
88
88
88
88
88
88
88
88
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
660
660
660
660
660
660
660
660
660
660
660
660
660
52
52
52
52
52
52
52
52
52
52
52
52
52
44
44
44
44
44
44
44
44
44
44
44
44
44
22
22
22
22
22
22
22
22
22
22
22
22
22
33
33
33
33
33
33
33
33
33
33
33
33
33
22
22
22
22
22
22
22
22
22
22
22
22
22
Page 1 of 4
R.Y.Khan
B/Nagar
Lodhran
B/Pur
K/Wal
Vehari
P/Pattan
Sahiwal
R/Pur
D.G.Khan
Layyah
M/Garh
Multan
Bhakkar
M/Wali
Khushab
S/Godha
T.Tsing
Jhung
Chiniot
F/Bad
N/Wal
M.B.Din
INPUT RATES OF LUMPSUM ITEMS FOR BI-ANNUAL PERIOD (1st FEBRUARY, 2014 TO 31st JULY, 2014)
S. No.
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
880
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
440
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
660
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
Page 2 of 4
LS-01
LS-02
LS-03
LS-04
LS-05
LS-06
LS-07
LS-08
LS-09
LS-10
LS-11
LS-12
LS-13
LS-14
LS-15
LS-16
LS-17
LS-18
LS-19
LS-20
LS-21
LS-22
LS-23
LS-24
LS-25
LS-26
LS-27
LS-28
LS-29
LS-30
LS-31
LS-32
LS-33
LS-34
LS-35
LS-36
LS-37 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 10" (Ch. 23 Table 19 C)
LS-38 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 12" (Ch. 23 Table 19 C)
LS-39 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 15" (Ch. 23 Table 19 C)
LS-40 Providing and fixing temporary wooden tapered plug of hard wood to each end
of pipe line for 18" (Ch. 23 Table 19 C)
LS-41 Soldering etc. (Ch. 24 Item 5 i)
LS-42 Locking arrangement (Ch. 24 Item 44 i)
LS-43 Extra labour for shuttering (Ch. 24 Item 44 i)
LS-44 Testing Fee (Ch. 24 Item 75 a & b)
LS-45 Leatheride Paper (Ch. 24 Item 76 i)
LS-46 Carriage from store to site (Ch. 24 Item 42 a)
LS-47 Carriage to site of work (Ch. 25 Item 41 a)
LS-48 Carriage to site of work (Ch. 25 Item 41 b)
LS-49 Electric charges with electrode (Ch. 24 Item 42 a)
LS-50 Sewing charges (Labour) (Ch. 26 Item 4)
LS-51 Cost of Polish & Nails (Ch. 26 Item 20)
LS-52 Rope, rags, etc. (Ch. 26 Item 22)
LS-53 Filling cement bags with coal (Ch. 26 Item 27)
LS-54 Cotton Waste, Grease & Packing etc. (Ch. 26 Item 35 b)
LS-55 Accessories, repair and replacement portion (Ch. 26 Item 35 b)
LS-56 Spraying Machine (Ch. 26 Item 42)
END
END
END
H/Bad
Gujrat
Sialkot
G/Wala
Chakwal
Jhelum
Attock
R/Pindi
N/Sahib
S/Pura
Kasur
Unit
Okara
MATERIAL
S. No.
Lahore
INPUT RATES OF LUMPSUM ITEMS FOR BI-ANNUAL PERIOD (1st FEBRUARY, 2014 TO 31st JULY, 2014)
66
66
66
66
66
66
66
66
66
66
66
66
66
11
11
11
11
11
11
11
11
11
11
11
11
11
132
132
132
132
132
132
132
132
132
132
132
132
132
11
11
11
11
11
11
11
11
11
11
11
11
11
88
88
88
88
88
88
88
88
88
88
88
88
88
28
28
28
28
28
28
28
28
28
28
28
28
28
22
22
22
22
22
22
22
22
22
22
22
22
22
132
132
132
132
132
132
132
132
132
132
132
132
132
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
61
61
61
61
61
61
61
61
61
61
61
61
61
END
END
Page 3 of 4
END
END
END
END
END
END
END
END
END
END
END
R.Y.Khan
B/Nagar
Lodhran
B/Pur
K/Wal
Vehari
P/Pattan
Sahiwal
R/Pur
D.G.Khan
Layyah
M/Garh
Multan
Bhakkar
M/Wali
Khushab
S/Godha
T.Tsing
Jhung
Chiniot
F/Bad
N/Wal
M.B.Din
INPUT RATES OF LUMPSUM ITEMS FOR BI-ANNUAL PERIOD (1st FEBRUARY, 2014 TO 31st JULY, 2014)
S. No.
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
66
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
88
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
61
END
END
END
END
END
END
END
END
END
END
END
END
END
END
Page 4 of 4
END
END
END
END
END
END
END
END
END
LS-37
LS-38
LS-39
LS-40
LS-41
LS-42
LS-43
LS-44
LS-45
LS-46
LS-47
LS-48
LS-49
LS-50
LS-51
LS-52
LS-53
LS-54
LS-55
LS-56
END