Aims:
The aim of this module is to provide the trainee with an appreciation of the general layout and construction of
the component parts that form part of the BFB combustor
Objectives:
3.
4.
5.
6.
7.
8.
9.
Trainee
Initials
Trainer
Initials
RA
MS
OM
DRG
References:
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major components which make up the combustion air systems
To discuss the effect that air distribution within the furnace can have on emission levels
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
Describe the normal operation of the combustion air and re circ air
systems.
5.
Describe the flow path of primary, secondary and tertiary air and state
their purpose.
6.
7.
Describe the main upset conditions, which may cause the combustion
air or PA air systems to stop and outline the required operator response.
8.
Describe how the distribution of air through the furnace can affect
combustion control and emission levels
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major components which make up the water & steam systems
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
Describe the main upset conditions, which may cause the water & steam
systems to stop and outline the required operator response.
6.
Discuss the importance of good feed water and steam quality control.
7.
8.
PPC
OM
References:
DRG
Enmas
P&ID 031
10-01-02-3052
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major component parts of the condensate and feed water systems
To discus their function
To discuss the need for and means of achieving feed water dosing
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
Identify the major component modules of the condensate and feed water
system during a site walk around
Familiarisation with PLC HMI
3.
Describe how the boiler feed water storage tank level is maintained
4.
5.
6.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major components which make up the Biogas & natural gas systems
Trainee
Initials
Trainer
Initials
RA
MS
Identify the major components, which make up the Biogas & natural gas
systems
2.
Describe the function and principal of operation of the Biogas & natural
gas systems.
3.
Identify the location of the boiler house main bio gas & natural gas
isolation valves.
4.
Identify the upset conditions, which may cause the Biogas & natural gas
systems to go into disturbance and outline the required operator
response.
5.
6.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major component parts of the blow down systems
To discus their function
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
Identify the major component modules of the blow down system during
a site walk around
2.
3.
4.
5.
6.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
To identify the major components which make up the sand dosing systems
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
6.
7.
Identify the upset conditions, which may cause the sand dosing system
to go into disturbance and outline the required operator response.
8.
9.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Enmas
P&ID 040
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major components which make up the lime dosing systems
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
6.
Identify the upset conditions, which may cause the limestone dosing
system to go into disturbance and outline the required operator
response.
7.
8.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Enmas
P&ID 040
Signature
Date
Trainee
Trainer
Manager
Database Updated:
To identify the major components which make up the ash removal system
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
Identify the upset conditions, which may cause the ash systems to go
into disturbance and outline the required operator response.
6.
7.
Describe the methodology for monitoring the requirement for and for
the arranging of ash uplifts.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major components which make up the Demin water system
Trainee
Initials
Trainer
Initials
RA
MS
2.
Identify the major component, which make up the demin water treatment
system
3.
Identify the function of the chemicals used within the water treatment
plant
4.
5.
Identify the upset conditions, which may cause the demin system to go
into disturbance and outline the required operator response.
6.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major components which comprise the over fire & combustor burners
2.
Describe the function and principal of operation of the over fire burner.
3.
4.
5.
6.
Identify the upset conditions, which may cause the burners to go into
disturbance and outline the required operator response.
7.
8.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Trainee
Initials
Trainer
Initials
RA
MS
Objectives:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
6.
Describe the castle key safety interlock system used within the ESP
7.
Identify the upset conditions, which may cause the ESP to go into
disturbance and outline the required operator response.
8.
9.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Enmas
P&ID 035
Signature
Date
Trainee
Trainer
Manager
Database
Updated:
Objectives:
Trainee
Initials
Trainer
Initials
RA
MS
2.
Describe the function of the major component parts of the CECON unit
3.
Explain when and how the CECON unit bypass can be used.
4.
Identify the upset conditions, which may cause the CECON unit to go
into disturbance and outline the required operator response.
5.
6.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database
Updated:
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
6.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database
Updated:
Objectives:
To identify the major component parts of the HP steam system
To discus their function
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major component parts of the MP steam systems
To discus their function
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major component parts of the LP steam systems
To discus their function
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
To identify the major component parts of the steam turbine assembly
To discus their function
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
Identify those fault events which will result in an automatic shut down
of the steam turbine
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Objectives:
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated:
Learning Outcomes:
Trainee
Initials
Trainer
Initials
RA
MS
2.
3.
4.
5.
State the difference between a Cold, Warm or Hot Start of the turbine.
6.
Describe the turbine vibration monitoring system and outline the at least
six events which would cause a turbine trip
7.
References:
IP-APPM
PROCEDURE
PPC
OM
DRG
Signature
Date
Trainee
Trainer
Manager
Database Updated: