Fieltd Operation Schedule For Preventive Actions - For 317 255 in UBS - QATAR and 317 109 in Jubail - KSA - R11
Fieltd Operation Schedule For Preventive Actions - For 317 255 in UBS - QATAR and 317 109 in Jubail - KSA - R11
Task Name
Duration
Start
Finish
2
3
4
T x 2 - 317 255
Field Operations on Cleats & Leads Systems horizontal Lower supports
Preparations (Safe Work Permit, dry air, nitrogen, the intermediate tanks, oil treatment machine,
vacuum pump, covering the transformer with tent or tarpaulin, etc. )
Draining the oil in HV Cable Boxes and Disconnecting HV Links
De-gassing of SF6 in LV GIS and Dismantling of LV Links
Site Tests of FRA and Insulation Resistance
Draining the oil in the main tank
Gas evacuation in the transformer
Preparation for entering the transformer
Entering in the transformer and Performing the modification on cleats & lead system on the active part
5
6
7
8
9
10
11
12
Vacuum for 24 hours, Filling with Nitrogen in order to check the Dew Point Measurement and wait for
the equilibirum
Vacuum and DEW POINT Measurement
Vacuum and Oil Filing into the main tank of the transformer and oil recycling
Quality Analysis of Insulation Oil + Total Dissolved Gas Test
Site Electrical Tests
Vacuuming and oil filling into HV Cable Box
PD Calibration of HighVolt Test Equipment at LV GIS Side, Vacuum on LV GIS
SF6 filling into LV GIS
Induced Over-Voltage Withstand Test and Partial Discharge Measurement
Draining the oil partially in the main tank for disconnection of the tertiary bushings, drianing the oil in
HV Cable Boxes, Re-storing HV links, Vacuuum for 24 hours
Filling the oil into the transformer partially and into HV Cable Boxes
Quality Analysis of Insulation Oil + Total Dissolved Gas Test
Filling SF6 gas into LV GIS
Treating the oil in the main transformer
Resting time for the oil in the transformer and preparations for energising
Pre - Commissioning of the accessories on transformer
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
JUBAIL SUBSTATION
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Project: Project1
Date: Wed 10/8/14
37 days
Mon 9/29/14
Tue 11/4/14
37 days
37 days
10 days
Mon 9/29/14
Mon 9/29/14
Mon 9/29/14
Tue 11/4/14
Tue 11/4/14
Wed 10/8/14
1 day
1 day
1 day
1 day
1 day
0 days
2 days
Thu 10/9/14
Fri 10/10/14
Sat 10/11/14
Sun 10/12/14
Mon 10/13/14
Mon 10/13/14
Tue 10/14/14
Thu 10/9/14
Fri 10/10/14
Sat 10/11/14
Sun 10/12/14
Mon 10/13/14
Mon 10/13/14
Wed 10/15/14
2 days
Thu 10/16/14
Fri 10/17/14
3 days
3 days
0 days
2 days
2 days
0 days
1 day
1 day
2 days
Sat 10/18/14
Tue 10/21/14
Thu 10/23/14
Fri 10/24/14
Sun 10/26/14
Mon 10/27/14
Tue 10/28/14
Wed 10/29/14
Thu 10/30/14
Mon 10/20/14
Thu 10/23/14
Thu 10/23/14
Sat 10/25/14
Mon 10/27/14
Mon 10/27/14
Tue 10/28/14
Wed 10/29/14
Fri 10/31/14
1 day
1 day
0 days
1 day
1 day
0 days
Sat 11/1/14
Sun 11/2/14
Sun 11/2/14
Mon 11/3/14
Tue 11/4/14
Tue 11/4/14
Sat 11/1/14
Sun 11/2/14
Sun 11/2/14
Mon 11/3/14
Tue 11/4/14
Tue 11/4/14
Mon 11/17/14
35 days
35 days
3 days
Tue 10/14/14
Tue 10/14/14
Tue 10/14/14
Mon 11/17/14
Mon 11/17/14
Thu 10/16/14
1 day
1 day
2 days
3 days
3 days
Fri 10/17/14
Sat 10/18/14
Sun 10/19/14
Tue 10/21/14
Tue 10/21/14
Fri 10/17/14
Sat 10/18/14
Mon 10/20/14
Thu 10/23/14
Thu 10/23/14
3 days
Fri 10/24/14
Sun 10/26/14
2 days
2 days
2 days
2 days
4 days
Fri 10/24/14
Sun 10/26/14
Tue 10/28/14
Thu 10/30/14
Thu 10/30/14
Sat 10/25/14
Mon 10/27/14
Wed 10/29/14
Fri 10/31/14
Sun 11/2/14
3 days
2 days
2 days
0 days
2 days
1 day
1 day
1 day
Mon 11/3/14
Thu 11/6/14
Sat 11/1/14
Sun 11/2/14
Sat 11/8/14
Mon 11/10/14
Tue 11/11/14
Wed 11/12/14
Wed 11/5/14
Fri 11/7/14
Sun 11/2/14
Sun 11/2/14
Sun 11/9/14
Mon 11/10/14
Tue 11/11/14
Wed 11/12/14
11/4
Task
Project Summary
Inactive Milestone
Progress
Split
External Tasks
Inactive Summary
Manual Summary
Deadline
Milestone
External Milestone
Manual Task
Start-only
Summary
Inactive Task
Duration-only
Finish-only
Page 1
ID
Task Name
Duration
Start
Finish
51
52
53
54
55
56
57
Project: Project1
Date: Wed 10/8/14
1 day
1 day
Thu 11/13/14
Fri 11/14/14
Thu 11/13/14
Fri 11/14/14
1 day
0 days
1 day
1 day
0 days
Sat 11/15/14
Sat 11/15/14
Sun 11/16/14
Mon 11/17/14
Mon 11/17/14
Sat 11/15/14
Sat 11/15/14
Sun 11/16/14
Mon 11/17/14
Mon 11/17/14
11/17
Task
Project Summary
Inactive Milestone
Progress
Split
External Tasks
Inactive Summary
Manual Summary
Deadline
Milestone
External Milestone
Manual Task
Start-only
Summary
Inactive Task
Duration-only
Finish-only
Page 2