Detail of Measurements

Sub Head:
S.No

Construction of Pump house.

Description

Nos

Length

Width

Height

Qty

Long wall

3.13

0.90

0.75

4.22

Short wall

1.33

0.90

0.75

1.80
6.02
Cum

3.13

0.90

0.15

0.84

Short wall

1.33

0.90

0.15

0.36

Under floor
Pump house

2.00

2.00

0.10

0.40
1.60
cum

2
2
2
2

2.98
2.83
2.68
2.53

0.75
0.60
0.45
0.30

0.15
0.15
0.15
0.15

0.67
0.51
0.36
0.23

2
2
2
2

1.48
1.63
1.78
1.93

0.75
0.60
0.45
0.30

0.15
0.15
0.15
0.15

0.33
0.29
0.24
0.17
2.80
cum

2
2

2.46
2.00

0.23
0.23

0.30
0.30

0.34
0.28

1 Excavation in foundation trenches etc.in


earth work lift upto 1.50metre stacking the
excavated soil not more than 3mtr.clear from
the edge of the excavation and then rteurning
the stacked soil in 15cm.layers by ramming
and watering in pick work.

2 Providing and laying cement concrete 1;6:12


(1cement:6sand:12graded stone aggregate
40mm nominal size and curing complete
Long wall

3 Random rubble masonry/polygonal rubble


masonry (uncoursed/brought to courses)with
hard stones of approved quality in foundation
and plinth in CM 1:6(1cement:6sand)
Long wall
Ist step
2nd step
3rd step
4th step
Short wall
Ist step
2nd step
3rd step
4th step

4 Ist class brickls work using common burnt


clay building bricks in foundation and plinth
in cement mortor 1:6(1cement:6sand)
Long wall
short wall

0.62
cum
5 Providing and laying damp proof course 38
mm thick in cement concrete 1:2:4(1cement:
2sand:4graded stone aggregate 12.5mm
nominal size and curing complete
Long wall
short wall.
Deduction:
Door

2
2

2.46
2.00

0.23
0.23

1.00

0.23

6 Applying a coat of hot bitumen(mexphalt


80/100 or equivalent)using 1.70kg.
per square metre on DPC>
Qty.same as per item No.5

1.13
0.92
2.05
0.23
1.82
sqm.

1.82
sqm.

7 Ist class brick work using common burant


clay building bricks in CM 1:6(1cement:
6sand)in superstructure.
Long wall
short wall
Deduction:
Door
Windows
Ventilator
Lintels.
Door
Windows
Ventilator

2
2

2.46
2.00

0.23
0.23

3.00
3.00

3.39
2.76
6.15

1
1
1

1.00
1.20
0.75

0.23
0.23
0.23

2.10
1.30
0.45

0.48
0.36
0.08

1
1
1

1.30
1.50
1.05

0.23
0.23
0.23

0.15
0.15
0.15

0.04
0.05
0.04
1.05
5.10
cum

1
1
1
1

1.30
1.50
1.05
3.36

0.23
0.23
0.23
3.36

0.15
0.15
0.15
0.10

0.04
0.05
0.04
1.13
1.26
cum

Net qty.after deductions(6.15(-) 1.05)


8 Providing and laying cement concrete work
1:2:4(1cement:2sand:4graded stone
aggregate 20mm nominal size)and curing
complete excluding cost of form work
Lintels
Door
Windows
Ventilator
RCC slab
9 Providing tor steel reinforcement for RCC
work i/c bending,binding and placing in
position
Tor steel 1.26 cum @ 90kg.
10 Providing form work with steel plates 3.15mm
thick so as to give a rough finish i/c centri-

113.40
Kg

ng strutting and propping etc.flat surfaces


floors etc.upto floor 200mm in thickness
Pump house
Chajjas
Long wall
short wall
Sides & soffits of beams.
Door D. Hori.member
Vert. member
W. Hori.member
Vert. member
V. Hori.member
Vert. member

2.00

2.00

4.00

1x2
1x2

3.36
2.46

0.45
0.45

3.02
2.21

1
1x2
1
1x2
1
1x2

1.00
1.30
1.20
1.50
0.75
1.05

0.23
0.23
0.23
-

0.15
0.15
0.15
Total

0.23
0.39
0.28
0.45
0.17
0.31
11.06
sqm

2.00

2.00

4.00

1x2
1x2

3.36
2.46

0.45
0.45

Total

3.02
2.21
9.23

4
4

2.00
2.46

3.00
3.00
Total

24.00
29.52
53.52

1
1
1

1.00
1.20
0.75

2.10
1.30
0.45
Total

2.10
1.56
0.34
4.00
49.52
sqm

13 40mm thick cement concrete flooring 1:2:4


(1cement:2sand:4graded stone aggregate
20mm nominal size)laid in one layer
finished with a floating coat of neat cement
Pump house
Door

1
1

2.00
1.00

2.00
0.23

Total

4.00
0.23
4.23
sqm

14 Providing wood work in frames of doors,


windows and other frames wrought framed
and fixed in position.
Ist class deodar wood
Door.
Hori.member
Vert.member
Windows. Hori.member
Vert.member

1
1x2
2
2

1.00
2.10
1.20
1.30

0.10
0.10
0.10
0.10

0.08
0.08
0.08
0.08

0.01
0.03
0.02
0.02

11 6mm cement plaster to ceiling in cement


mortor 1:4(1cement:4sand)
Pump house
RCC chajjas
Long wall
short wall
12 15mm cement plaster in single coat on fair
side of brick walls for interior plastering upto
floor two level i/c arrises,internal rounded
angles,chamfers in CM 1:6(1cement:6sand)
Pump house
Inside
Outside
Deduction:
Door
Windows
Ventilators
Net qty.after deductions(53.52 (-) 4.00

Ventilator. Hori.member
Vert.member

15 Providing and fixing panelled glazed or


panelled and glazed shutters for doors
windows and clerestory windows 40mm thick
Ist class deodar wood.
Door
Ventilator
Windows

2
2

0.75
0.45

0.10
0.10

0.08
0.08
Total

0.01
0.01
0.101
cum

1
1
1

0.865
0.615
1.065

2.0325
0.315
1.165
Total

1.76
0.19
1.24
3.19
sqm

16 Providing 40x4mm flat iron hold fast 40cm


long i/c fixing to frame with 10mm dia bolt
and embedding in cement concrete block
30x10x15cm.1:3:6
Door
Ventilator
Windows

1x2x3
1x2x2
1x2
Total

17 Providing and fixing anodized,aluminium


sliding door bolt anodized.
300x16mm
Door

18 P/F aluminium tower bolt(barrel type)


anodized 150x10mm
Door
Windows
Ventilator

6
4
2
12
Nos.

1
No.

1x2
1x2x2
1x2
Total

2
4
2
8
Nos

19 P/F alumnium handles anodized transparent or dyed to required shade and colour.
Door
Windows
Ventilator

1x2
1x2
1x1
Total

2
2
1
5
Nos.

20 White washing with lime on undecorated


wall surfaces two coats to give an even shade
i/c throughly brooming the surface
Qty.same as per item No.11 +12
(9.23 + 49.52)

21 Providing and fixing MS round or square

58.75
sqm

bars at required spacing in wooden spacings in wooden frames of windows and


clerestory windows.
Wiondows
Ventilator

1
1

12.00
6.00

1.30
0.45

Total

18.30 Rmt x 0.89 kg


Add 10% wastage
Total
22 Applying priming coat over new wood and
wood based surfaces after and including
preparing the surface readymixed paint
brushing wood primer pink.
Door
Windows
Ventilator

2.25
2.25
2

1.00
1.20
0.75

2.10
1.30
0.45
Total

23 Painting two coats on new wood and wood


based surfaces with enamel paint to give an
even shade i/c cleaning the surface with
enamel paint other than white.
Qty.same as per item No.22

15.60
2.70
18.30
Rmt
16.29
1.63
17.92
kg

4.72
3.51
0.68
8.91
sqm

8.91
sqm.

Detail of Measurements
S.No

Description

Nos

Length

Width

Height

Qty

Excavation in foundation trenches etc.in


earth work lift upto 1.50metre stacking the
excavated soil not more than 3mtr.clear from
the edge of the excavation and then rteurning
the stacked soil in 15cm.layers by ramming
and watering in pick work.
Long wall

10.59

0.90

1.20

22.87

Short wall

2.43

0.90

1.20
Total

10.50
33.37
Cum

Providing and laying cement concrete 1;6:12


(1cement:6sand:12graded stone aggregate
40mm nominal size and curing complete
Long wall

10.59

0.90

0.13

2.48

Short wall

2.43

0.90

0.13

1.14

Under floor
Chowkidar Room & Office
Toilet

2
1

3.60
1.80

3.10
3.10

0.10
0.10
Total

2.23
0.56
6.41
Cum

2
2
2
2
2
2

10.48
10.37
10.26
10.14
10.03
9.92

0.79
0.68
0.57
0.45
0.34
0.23

0.23
0.23
0.23
0.23
0.15
0.30

3.81
3.24
2.69
2.10
1.02
1.37

4
4
4
4
4
4

2.54
2.65
2.76
2.88
2.99
3.10

0.79
0.68
0.57
0.45
0.34
0.23

0.23
0.23
0.23
0.23
0.15
0.30
Total

1.85
1.66
1.45
1.19
0.61
0.86
21.84
Cum

2
2

9.92
3.10

0.23
0.23

0.15
0.15

0.68
0.21

Ist class brick work using common burnt


clay building bricks in foundation and plinth
in cement mortor 1:6(1cement:6sand)
Long wall
Ist step
II nd step
III rd step
IV th step
V th step
VI th step
Short wall
Ist step
II nd step
III rd step
IV th step
V th step
VI th step

Providing and laying plinth beam 15 Cm.


thick in cement concrete 1:2:4(1cement:
2sand:4graded stone aggregate 12.5mm
nominal size and curing complete
Long wall
short wall.

Total

Applying a coat of hot bitumen(mexphalt


80/100 or equivalent)using 1.70kg.
per square metre on DPC.
Long wall
short wall.

2
2

9.92
3.10

0.23
0.23
Total

Deduction:
Door D1
D2
Windows
Ventilator
Lintels.
Door (D+D)
D1
Windows W
Ventilator V

2
4

9.92
3.10

0.23
0.23

3.00
3.00
Total

2
1
4
1

1.05
0.75
1.20
0.60

0.23
0.23
0.23
0.23

2.10
2.10
1.20
0.45

13.69
8.56
22.25
Cum
1.01
0.36
1.32
0.06

1
1
4
1

2.33
1.05
1.50
0.90

0.23
0.23
0.23
0.23

0.15
0.15
0.15
0.15
Total

0.08
0.04
0.21
0.03
3.12

Net qty.after deductions(22.25(-) 3.12)

4.56
1.43
5.99
sqm.

Ist class brick work using common burant


clay building bricks in CM 1:6(1cement:
6sand)in superstructure.
Long wall
short wall

0.90
Cum

Providing and laying cement concrete work


1:2:4(1cement:2sand:4graded stone
aggregate 20mm nominal size)and curing
complete excluding cost of form work
Lintels.
Door (D+D)
D1
Windows W
Ventilator V
RCC slab

Providing tor steel reinforcement for RCC


work i/c bending,binding and placing in
position
Tor steel
Plinth Beam
Lintels & R.C.C. Slab

19.13
Cum.

1
1
4
1
1

2.33
1.05
1.50
0.90
10.82

0.23
0.23
0.23
0.23
4.46

0.15
0.15
0.15
0.15
0.12
Total

0.90 @90 Kg.


5.90 @ 90Kg.
Total

0.08
0.04
0.21
0.03
5.55
5.90
cum

81.00
531.00
612.00

Kg.
9

Providing form work with steel plates 3.15mm


thick so as to give a rough finish i/c centring strutting and propping etc.flat surfaces
floors etc.upto floor 200mm in thickness
Chowkidar Room & Office
Toilet
Chajjas
Long Side
short side

2
1

3.60
1.80

3.10
3.10

22.32
5.58

2
2

10.82
3.56

0.45
0.45

9.74
3.20
40.84
sqm

Total
Sides & soffits of beams.
Plinth Beam
Long Side
Short Side
Lintel & Beams
Door D+D Hori.member
Vert. member
Door D1 Hori.member
Vert. member
W. Hori.member
Vert. member
V. Hori.member
Vert. member

10

6mm cement plaster to ceiling in cement


mortor 1:4(1cement:4sand)
Chowkidar Room & Office
Toilet
Chajjas
Long side
short side

2
2

9.92
3.10

0.15
0.15

2.98
0.93

2
2
1
2
4
4*2
1
2

1.05
2.33
0.75
1.05
1.20
1.50
0.60
0.90

0.23

2
1

3.60
1.80

3.10
3.10

22.32
5.58

2
2

10.82
3.56

0.45
0.45

9.74
3.20
40.84
sqm

0.15
0.23
0.15
0.23
0.15
0.23
0.15
Total

Total

11

15mm cement plaster in single coat on fair


side of brick walls for interior plastering upto
floor two level i/c arrises,internal rounded
angles,chamfers in CM 1:6(1cement:6sand)
Chowkidar Room & Office
Inside
Toilet
Outside Long Side

2x2 (3.60+3.10)
2(1.80+3.10)
2
9.92

2.90
1.50
3.565

0.48
0.70
0.17
0.32
1.10
1.80
0.14
0.27
8.89
sqm

77.72
14.70
70.73

Short Side

3.56

3.565
Total

25.38
188.53
sqm

Deduction:
Door D
D1
Windows W
Ventilators V

2
1
4
1

1.05
0.75
1.20
0.60

2.10
2.10
1.20
0.45
Total

4.41
1.58
5.76
0.27
12.02
Sqm
176.51
sqm

2
1

3.60
1.80

Net qty.after deductions(188.53 (-) 12.02


12

40mm thick cement concrete flooring 1:2:4


(1cement:2sand:4graded stone aggregate
20mm nominal size)laid in one layer
finished with a floating coat of neat cement
Chowkidar Room & Office
Toilet

3.10
3.10
Total

13

Cement plaster skirting ( up to 30 cm. height


) with cement mortar 1:3 (15 mm thick)
Chowkidar Room & Office
Toilet

2*2
2

(3.60+3.10)
(1.80+3.10)

0.10
1.50
Total

14

15

Providing wood work in frames of doors,


windows and other frames wrought framed
and fixed in position.
Ist class deodar wood
Door. D
Hori.member
Vert.member
Door. D1
Hori.member
Vert.member
Windows. Hori.member
Vert.member
Ventilator. Hori.member
Vert.member

2
2x2
1
2
4x2
4x3
2
2

1.05
2.10
0.75
2.10
1.20
1.20
0.60
0.45

Providing and fixing panelled glazed or


panelled and glazed shutters for doors
windows and clerestory windows 40mm thick
Ist class deodar wood.
Door D
Door D1
Ventilator
Windows

2
1
1
4*2

0.925
0.625
0.495
0.5275

0.12
0.12
0.10
0.10
0.12
0.12
0.12
0.12

22.32
5.58
27.90
sqm

2.68
14.70
17.38
sqm

0.075
0.075
0.075
0.075
0.065
0.065
0.065
0.065
Total

0.02
0.08
0.01
0.03
0.07
0.11
0.01
0.01
0.34
cum

2.0375
2.0375
0.345
1.095
Total

3.77
1.27
0.17
4.62
9.83

sqm
16

17

Providing and fixing wire gauge shutters


using galvanised M.S. wire gauge of designation 85 G with wire of dia 0.56 mm for
doors windows and c/windows.
Ist class deodar wood. 40 mm thick.
Door D
Ventilator
Windows

2
1
4*2

Providing 40x3mm flat iron hold fast 40cm


long i/c fixing to frame with 10mm dia bolt
and embedding in cement concrete block
30x10x15cm.1:3:6
Door D
Door D1
Ventilator
Windows

0.925
0.495
0.5275

2.0375
0.345
1.095
Total

2x2x3
1x2x3
1x2x1
4x2x2
Total

18

Providing and fixing anodized,aluminium


sliding door bolt anodized.
300x16mm
Door D
Door D1

2x1
1x1
Total

19

P/F aluminium tower bolt(barrel type)


anodized 150x10mm
Door D ( Panelled )
Door D1
Door D (Wiregauge)

2x1x2
1x1x2
2x1x2
Total

100x10 mm
Panelled & Glazed
Windows
Ventilator
Wiregauge
Windows
Ventilator

3.77
0.17
4.62
8.56
sqm

12
6
2
16
36
Nos.

2
1
3
Nos.

4
2
4
10
Nos.

4x2x2
1x1x2

16
2

4x2x2
1x1x2

16
2
36
Nos

Total

20

P/F alumnium handles anodized transparent or dyed to required shade and colour.
125 mm size.
Door D ( Panelled )
Door D1
Door D (Wiregauge)
Panelled & Glazed
Windows
Ventilator
Wiregauge
Windows
Ventilator

2x1x2
1x1x2
2x1x2

4
2
4

4x2x1
1x1x1

8
1

4x2x1
1x1x1

8
1
28
Nos

Total
21

White washing with lime on undecorated


wall surfaces two coats to give an even shade
i/c throughly brooming the surface
Qty.same as per item No.11 +12
(40.84 + 176.51)

22

Providing and fixing MS round or square


bars at required spacing in wooden spacings in wooden frames of windows and
clerestory windows.
Wiondows
Ventilator

217.35
sqm

4
1

12.00
6.00

1.20
0.45
Total

60.30 Rmt x 0.89 kg


Add 10% wastage
Total

23

Applying priming coat over new wood and


wood based surfaces after and including
preparing the surface readymixed paint
brushing wood primer pink.
Door D
Door D1

2.25*2
2.25*1

1.05
0.75

2.10
2.10

57.60
2.70
60.30
Rmt
53.67
5.37
59.04
kg

9.92
3.54

Windows
Ventilator
Wire Gauge Shutter
Door D
Windows
Ventilator

24

Sr. No.
1.

1.20
0.60

1.20
0.45

11.52
0.54

2*2
2*4
2*1

1.05
1.20
0.60

2.10
1.20
0.45

8.82
11.52
0.54

Total

46.41
sqm

Painting two coats on new wood and wood


based surfaces with enamel paint to give an
even shade i/c cleaning the surface with
enamel paint other than white.
Qty.same as per item No.22

Description
Excavation in foundations, trenches etc.
in earth work lift up to 1.50 mtrs stacking
the excavated soil not more than 3 mitrs
clear from the edge of excavation.
Pich work.
Pillars

2.

2*4
2*1

Providing form work with steel plates


3.15 mm thick welded with angle iron
In frame 30x30x5 mm
In Foundations,footings basis of

46.41
sqm

No.s.

12

Detail of Mearurement
length width height Qty.

1.50

1.20

1.20
25.92
Total - 25.92 cum

Columns etc.
plankings so as to give a rough finish
i/c centring shuttering.Foundations,
footings, bases of columns etc.
Pillars
IIIrd step
IIIrd step
IV th step

Ist & 2nd step


12x2
12x2
1.20
0.30
12x2
(1.20+0.45) - 0.20
2
12x2
(1.50+0.56) 0.20
2
12x2 (0.56+0.45) 0.70

1.50
8.64
3.96

0.30

10.80

4.94
16.96
Total-

Flat surfaces such as soffits and


suspended floors, roofs
Floors etc up to 200 mm in thickness
R.C.C. Slab
R.C.C. Chhaja
R.C.C. Chhaja

3
2
2

Sides and soffits of beams plinth beam


vertical sides
nn
18x2
Pillar beam Hori memb
18x1
Vertical memb
18x2
Shutter
Hori memb
2x1
Vertical memb
2x2
Total - 110.50 sqm.
R.C.C. Pillars

3.

4.

P/L cement concrete 1:4:8(1 Cement:


4 sand:8graded stone agg.40m.m
nominal size) and curing complete.
inFoundations and plinth.
Pillars
P/L cement concrete 1:1.50:3(1 Cement:
1.50 sand:3graded stone agg.20m.m
nominal size) and curing complete.

3.775
13.815
8.90

8.22
0.45
0.45

3.775
0.45
3.775
0.34
3.775
0.34
1.80
0.34
2.10
0.23
12 (0.45+0.34)

#########

45.30sqm.

93.09
12.43
8.01
Total - 113.53 sqm.
61.15
23.10
23.10
1.22
1.93
4.95

1.50

46.92 sqm.

1.20

0.10

Lintels, beams, girders upto floor


Two level.
Pillars
IInd step
12
1.50
1.20
0.20
IIIrd step
12 x 1.50+0.56 x 1.20+0.45 0.20
2
2
IVth step
12
0.45
0.34
Total - 7.63 Cum.
Suspended,floors,roofs,landings
and beam etc. Plinth beam
Plinth beam
Beam under slab
18
3.775
RCC slab
Lintel&beams
Shutter

5.

12.915

2x1x2.10

8.90
3.775
0.34
18.48 cum
9.80
14.6 0.115

3x3
0.34

0.34

4.32
2.03
0.70

0.34
0.45
0.34
0.45
7.85
Total:-

0.23

1.28

5.44
5.19

0.33

G.Total:- 7.63+18.48+14.88=
40.99 cum
Column pillars posts etc.
12
0.45
0.34
4.50
8.26 cum
Providing mild steel/
tor steel reimforcement for
R.C.C. work i/c bending
Binding& placing in position
8 mmdia.
Rings in columns 1.33mx2 nosx45nosx12nos=1436.40mtr @ 0.39 kg= 560.00kg
Rings in plinth beam 550 nosx1.43 mtr.=786mtr@0.39kg=
307.00 Kg.
Rings in beams 550 nosx1.43 mtr.=706.00mtr@0.39kg=
307.00 Kg.
Rings in Slab 38 nosx8.90 mtr.=338.20mtr@0.39kg= 132.00 Kg.
Rings in Slab 18 nosx12.915 mtr.=232.47mtr@0.39kg= 91.00 Kg.
Total
1397
Add10 % wastage
139.7
Total

10 mmdia.

Extra bars
Add10 % wastage

33 nosx12.855m =630.00
80 nosx8.69m = 695.00
210 nos.x1.04 m = 218.00
Total=1543.00 @ 0.62 kg.

=956.66
95.66

Total

12 mmdia.
In Foundation 8x1.65 = 18.65
7x1.35 = 9.45
Total
In columns 6x6.40=38.40x12nos= 460.80@ 0.89

Plinth beam 4x115.91 =


4x10nos.x0.45 =
481.40 @ 0.89= 428.44
Beams
4x120.15
=
Total

= 28.10x12nos = 337.20

@ 0.89

=300.10

= 410.11

463.4
18.0
480.60 @ 0.89 = 427.73

1566.38
Add10 % wastage
Total

156.63
1723.01 Kg

16 mmdia.
In columns 6x6.40=25.60x12nos= 307.20@ 1.58
=485.37
Plinth beam 115.91x 0.67 = 77.65m x 2 nos.=155.31x1.58 = 245.40

Beams

2x 120.15

= 240.30

Add10 % wastage

2x120.15x0.50= 120.15
Total
569.51
= 360.45x1.58
Total
1420.38
142.04
Total
= 1562.42 Kg

Grand Total = 4016.20 Kg. or say 4016 Kg.


Boulder filling dry hand packed tightly as in
Wire crate apron bunds.
Under Floor

1
Cum.

7.
P/L cement conc 1:6:12 (1 cement 6 sand
12 graded stone agg. 40m.m nominal size)
and curing complete.
Under floor
2 Steps 2.00
Total- 10.35 cum

1
0.75

12.235
0.10
0.30

8.22

0.10

10.05

Sr.No.
8.

Description
Nos
P/L Ist class brick work using common burnt clay
Building bricks in foundation and plinth in C.M.
1:06
In Steps
IInd Step

Ist Step
2
0.50
0.15
IIIrd Step
2
Total:-_
9.
Ist class brick work using common burnt clay
Building bricks in super structure in c.m. 1:6
Long walls
9
Deduction
Shutter
2
1.80
V
12
1.20
0.34
0.60
Lintel of shutter
2
2.10
0.34
0.23
2

2.00

Length

2.00
0.30
2.00
0.90cum

3.775
0.34
2.93
0.33

Width

Height

0.75
0.25

0.15

0.45

0.15

0.34

Qty.

0.15

4.15

47.93

2.80

(47.93) - (6.68)
Net Qty after Deductions
10 Cement concrete flooring 1:2:4 (1 cement : 2 sand :
4 graded stone agg. 20m.m. nominal size) laid in
one layer. 50 m.m. thick.
Store
1
12.235
8.22
Steps
2x3
2.00
0.25
3.00
Door
2x1
1.80
0.34
1.22
Deductions
Total:- 104.79 cum

3.42

41.25 cum

100.57

Pillar
2x 4
0.34
0.11
0.15
0.45
0.34
0.30
-do2
Total:0.45 Sqm
Net Qty. after Deduction.:( 104.79 ) - ( 0.45 ) = 104.34 Sqm
11.
6 m.m. cement plaster to cieling in C.M.1:3
(1 cement: 3 sand )
Store
1
12.235
8.22
100.57
Chhaja
2
12.235
0.45
11.01
-do2
8.90
0.45
8.01
Beam Side
2 x8
3.775
0.34
10.26
Total:129.85 Sqm
Sr.No.
Description
Nos Length Width
Height Qnty.
12.
15 m.m. cement plaster in single coat on fair side of
brick/concrete walls for interior plastering up to
floor two level including arrises internal
rounded angles etc.in c.m. 1:4(1cement:4sand)

Store in side walls


2
(12.235 +8.22)
4.50
101.04
Pillar
2x2 ( 0.45 + 0.34) 4.50
14.22
Pillar side
2x2
0.11
4.50
1.98
Out side walls
2
12.915
5.15
133.02
2
8.90
5.15
91.67
Total :341.93 sqm
Deductions
Door shutter
2
1.80
2.80
10.08
1.20
0.60
8.64
V
12
Total;18.72 sqm
Net Qty after Deduction:( 341.93 ) - ( 18.72 )
= 323.21 sqm.
13.
Supplying and fixing rolling shutter of approved make
of 80m.m. x1.25 m.m. M.S.patha shutters having
Width below 3.5 mters.
2
1.80
2.80 10. 08 sqm
14.
P/F 27.5 cm. long wire spring grade No.2 for rolling
Shutters .
2x2
4.00 No.s
15.
P/F top cover for rolling shutters
2x1x
1.80
3.60 Rmt
16.
P/F angle iron door, window c/window frame manufactured from steel iron section of 40x40x6m.m.
thickness i/c hinges, jamb etc.
Ventilators
V Hori memb
12x 2x
1.20
28.80
Vertical memb
12 x 3x 0.60
21.60
Total:50.40 Rmt.
17.
P/F steel glazed door, window and ventilators of
Standared rolled steel section, joints mitred and
Welded with 16x3.15 m.m. Hinges i/c providing and
Fixing of glass panes with glazing clips etc.
Ventilators
V
12
1.20
0.60 8.64 sqm.
18.
White washing with lime on undecorated wall
Surfaces two coats to give and even shade i/c
thoroughly brooming the surface.
+ No.
323.21
=
453.06 sqm
Same as 129.85
per Item
11 +12=

Chowkidar Room & Office

25.92 cum

al-

45.30sqm.

113.53 sqm.

46.92 sqm.

1.20

0.10

2.16 Cum

5.19

Total:-

14.88cum

1536.70 Kg
Or Say 1537.00 Kg.

.89

1052.32 Kg
Or say 1052 kg.

=300.10

12

8.22 0.30 29.59

eight

Qty.

0.45

47.93

Total:41.25 cum

100.57

104.34 Sqm

129.85 Sqm
eight Qnty.

6.68cum

341.93 sqm

18.72 sqm

10. 08 sqm

3.60 Rmt