N-1710
ENGLISH
E
07 / 2014
CO
ONTEC
C
Comiss
o de Normalizzao
Tcnica
Coding of Technica
al Engin
neering
Docume
D
ents
SC-12
General Design Stand
dards
2nd Amendm
ment
CONTE
ENTS OF THE
T
1st AME
ENDMENT - 04/2012
- Figure
e 1:
Include of Note 5.
- Subse
ection 6.6.1:
Alteratio
on of text.
- Subse
ection 7.1:
Alteratio
on of text.
- Subse
ection 7.4.1:
Alteratio
on of text.
- Subse
ection 7.5.3:
Alteratio
on of text.
CONTE
ENTS OF THE
T
2nd AMENDMENT
T - 07/2014
- Figure
e1:
Alteratio
on of text in Note
N
3,Note 4 and Note 5
5.
Include of Note 6
- Subse
ection 6.3.5:
Alteratio
on of text.
PROPE
ERTY OF PETROBRAS
2 pages
-NP-1-
N-1710
ENGLISH
E
2nnd Amendm
ment
- Subse
ection 6.6.1:
Alteratio
on of text.
07 / 2014
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Procedure
This Standard replaces and cancels its previous revision.
The CONTEC - Authoring Subcommittee provides guidance on the
interpretation of this Standard when questions arise regarding its contents. The
Department of PETROBRAS that uses this Standard is responsible for adopting
and applying the sections, subsections and enumerates thereof.
CONTEC
Comisso de Normalizao
Tcnica
SC - 12
General Design Standards
Introduction
PETROBRAS Technical Standards are prepared by Working Groups - WG
(consisting specialized of Technical Collaborators from Company and its Subsidiaries), are
commented by Company Units and its Subsidiaries, are approved by the Authoring Subcommittees SCs (consisting of technicians from the same specialty, representing the various Company Units and
its Subsidiaries), and ratified by the Executive Nucleus (consisting of representatives of the Company
Units and its Subsidiaries). A PETROBRAS Technical Standard is subject to revision at any time by its
Authoring Subcommittee and shall be reviewed every 5 years to be revalidated, revised or cancelled.
PETROBRAS Technical Standards are prepared in accordance with PETROBRAS Technical
Standard N-1. For complete information about PETROBRAS Technical Standards see PETROBRAS
Technical Standards Catalog.
.
PROPERTY OF PETROBRAS
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Summary
Foreword.................................................................................................................................................. 4
1 Scope................................................................................................................................................... 4
2 Normative References......................................................................................................................... 4
3 Terms and Definitions.......................................................................................................................... 4
4 Basic Directive..................................................................................................................................... 5
5 Structure of Coded Number................................................................................................................. 5
6 Concepts of Basic Groups................................................................................................................... 6
6.1 Identification of Document Language (Group 0) .................................................................... 6
6.2 Document Category - Annex A (Group 1).............................................................................. 6
6.3 Identification of Facility Annex B (Group 2)......................................................................... 7
6.4 Areas of Activities - Annexes C and E (Group 3)................................................................... 8
6.5 - Class of Services, Materials and Equipment - Annexes D and F (Group 4)...................... 9
6.6 Source Code Document (Group 5) ...................................................................................... 10
6.7 Chronology (Group 6) ......................................................................................................... 11
7 Coding Applications........................................................................................................................... 11
7.1 How to fill in spaces.............................................................................................................. 11
7.2 Identification of Industrial Equipment ................................................................................... 11
7.3 Identification of Piping Lines ................................................................................................ 11
7.4 Application Instructions ........................................................................................................ 11
7.5 Illustrative Examples ............................................................................................................ 13
7.5.1 Example 1 .................................................................................................................... 13
7.5.2 Example 2 .................................................................................................................... 13
7.5.3 Example 3 .................................................................................................................... 13
7.5.4 Example 4 .................................................................................................................... 14
7.5.5 Example 5 .................................................................................................................... 14
7.5.6 Example 6 .................................................................................................................... 14
7.5.7 Example 7 .................................................................................................................... 14
7.5.8 Example 8 .................................................................................................................... 15
7.5.9 Example 9 .................................................................................................................... 15
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Figure
Figure 1 - Basic Groups........................................................................................................................... 5
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Foreword
This Standard is the English version (issued in 11/2010) of PETROBRAS N-1710 REV. M 11/2010. In
case of doubt, the Portuguese version, which is the valid document for all intents and purposes, shall
be used.
1 Scope
1.1 The objective of this Standard is to secure uniformity and systematize the coding of technical
engineering documents issued in paper or electronic form relating to PETROBRAS facilities so that
they can be filed in an organized manner and information can be easily retrieved.
1.2 This Standard is intended to standardize the terminology of the areas of activities.
1.3 This Standard is not applicable to the coding or numbering of purchase orders and material
supply authorizations.
1.4 This Standard may be applied to the coding of documents provided by manufacturers.
[Recommended Practice]
1.5 This Standard is applied to technical engineering documents relating to facilities, which are issued
in the design, construction, assembly, commissioning, and operation phases, as of its date of
issuance.
2 Normative References
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies..
PETROBRAS N-1521 - Identification of Industrial Equipment;
PETROBRAS N-1522 - Identification of Industrial Piping;
PETROBRAS N-2064 - Issuance and Revision of Design Documents.
NOTE
For documents referred in this Standard and for which only the Portuguese version is
available, the PETROBRAS department that uses this Standard should be consulted for any
information required for the specific application.
3.1
facility
operational facilities, such as: production fields, terminals, pipelines, refineries, vessels, as well as
administrative facilities
-NP-1-
N-1710
REV. M
ENGLISH
E
11 / 2010
3.2
number
coded n
it is the alphanumerric unit which
h identifies th
he documentt and is obtained by the oorderly comb
bination of
epresenting the various basic
b
groupss comprising it
codes re
3.3
groups
basic g
g the coded number
elementts comprising
4 Basiic Directive
e
oded numbe
er the basic groups
g
are orrdered from most
m
genera
al to most speecific.
In the co
5 Structure of Co
oded Numb
ber
he criterion in Section 4,, the coded number sha
all be made up of 7 bas
sic groups
5.1 Acccording to th
ordered as describe
ed in Figure 1.
1
Annex B
Annex C
(or E)
G
Group
1
Group 2
Group 3
Group 4
Gro up 5
Group
G
6
ocument
Do
C
Category
Identification
of
Facility
Areas
of
Activities
Class of serv
vices,
Equipmen
nt,
And Materials
Sourcee Code
Docuument
Ch
hronology
Annex A
Grou
up 0
Identification
o
of
Language
LL
N
Note
4
Annex D
(or F)
ABBB.CC ABBBB
AAA
No
otes 1, 4 and Notes 2, 4
Notes 4 and
a 5
5
and 5
LL
LL
No
otes 3
an
nd 5
AAA
Where:
L
is th
he letter;
A
A, B, C are the numbers
s.
as.
NOTE 1 Mandatoryy differentiating characterrs for all area
NOTA 2 Differentia
ating a character used on
nly in the cas
se of repetitio
on (from thee first area off repeated
activity).
NOTA 3 Source Co
ode Document (Group 5)) shall be consulted on th
he intranet too PETROBRAS on the
page of NO
ORTEC.
NOTA 4 The Annex A (Group 1), Annex B (Group 2)), Annexes C or E (Grooup 3), Anne
ex D or F
ex G (Indexx of Revision) shall be consultedd on the in
ntranet to
(Group 4)) and Anne
PETROBR
RAS, on the page
p
of NOR
RTEC.
NOTA 5 It is accep
pted the use
e of letters codes on The
T
Annex A to F wherre the numb
bering are
exhausted
d.
NOTA 6 It is accep
pted the use
e of numberss on the Sou
urce Code Document
D
whhen the cara
acters are
exhausted
d.
Figure
e 1 - Basic Groups
e basic group
ps comprising the coded number, as shown in FIG
GURE 1, aree described below:
b
5.2 The
a)
b)
c)
d)
e)
f)
g)
Identificcation of Lan
nguage (Grou
up 0);
Annex A - Document Category (Group 1);
Annex B - Identifica
ation of Facil ity (Group 2));
es C or D - Area
A
of Activi ty (Group 3);
Annexe
Annexe
es D or F - Class
C
of Serv ices, Equipm
ment and Matterials (Grouup 4);
Source
e Code Document (Group
p 5);
Chrono
ology (Group 6).
5
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
5.3 In the number, the codes referring to the basic groups are separated by hyphens, as shown in
Figure 1.
6.1.1 This is the basic group that identifies the language in which the document was issued and it
shall be used only for languages other than Portuguese.
6.1.2 This group is comprised of one letter and its configuration is illustrated below:
Group 0
Identification of Language
6.1.3 The following characters shall be used to distinguish the language of the document:
I
A
F
L
E
D
6.1.4 This group is intended to indicate the language of a document, when the document is issued in
versions with more than one language, or to demonstrate the single language in which the document
was issued.
6.1.5 Should the body of the document contain more than one language, the user shall be coded the
document based on the language the user considers to be the most important. If one of the languages
involved is Portuguese, this group shall not be used.
6.2.1 The area of activity is associated with an installation (Annex B), or parts of a system that
develops in a specific function.
6.2.2 This group is comprised of two letters and its configuration is illustrated below:
Annex A
Document Category
LL
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
6.3.1 This is the basic group that identifies the facility to which the document refers. The Annex B
presents a list of codes.
6.3.2 This group is composed of two sets of characters, separated by a period, as illustrated below:
Annex B
Identification
of Facility
ABBB.CC
6.3.3 The first character, indicated by the letter A in the block of 6.3.2, identifies the area of
operations of PETROBRAS, in line with the following criterion:
0
1
2
3
4
5
6
7
8
9
Area
former
6.3.4 The three characters after the first group, indicated by the letter B in the block of
6.3.2, identify the facilities of each area of operations.
6.3.4.1 When the character indicated by the letter A takes on a value of 3 (E&P - Production Area),
the first B indicates the Business Unit of E&P, starting from 0 to 9 and then from A to Z (excluding
letters I and O).
6.3.4.2 When the character, indicated by the letter A takes on a value of 3 (E&P -Production Area),
the second and third B indicate the Production Field, starting from 00 to 99 and then from 0A to 0Z
(excluding letters I and O), 1A to 1Z (excluding letters I and O), 2A to 2Z (excluding letters I
and O) and so forth up to 9A to 9Z (excluding letters I and O).
-NP-1-
N-1710
REV
V. M
ENGLISH
E
11 / 2010
n the cases 0,
0 5, 6, 7, 8 and 9 listed in 6.3.3, the
e creation of codes for neew facilities relating
r
to
6.3.5 In
the field
ds of Annex B,
B indicated by BBB in the of 6.3.2,, is the exclu
usive responssibility of NO
ORTEC, to
which a specific request shall be
e made.
When a docu
ument covers
s more than one facility, the prevailing one mayy be considered in the
6.3.7 W
coding.
Examples of Annex
A
B:
6.3.8 E
PLE 1
EXAMP
For codin
ng the faciility of Uba
arana production field of Potiguaar Basin we
w have:
3418.00 - E&P-UN-RN
NCE - Campo
o de Produ
o Ubarana;
PLE 2
EXAMP
For coding
g the facility
y of productio
on field of Xaru
X
2 we have: 3432..02 - E&P-UN
N-RNCE Campo de
e Produo Xaru
X
- Plata
aforma de Xa
aru 2 (PXA-2
2);
PLE 3
EXAMP
For coding
g the facility of Ilha Dgu
ua, of Pipelines and Terminals of thee Southeast we have:
4150.30 - Terminal of Ilha Dgua;
PLE 4
EXAMP
For codin
ng the facility of Pressidente Gettlio Vargas
s Refinery (REPAR) we
w have:
5295.00 - Refinaria Pre
esidente Gettlio Vargas -REPAR;
PLE 5
EXAMP
For coding
g the facility
y of Fazend
da Gameleira
a Production
n Field of E
E&P-UN-BA we have:
310A.00 - E&P-UN-BA
A - Fazenda G
Gameleira Production
P
Fie
eld.
odes. The
6.4.1 The Annexess C and E present a list of areas off activities with the correesponding co
nex C and An
nnex E is ind
dicated below
w.
configurration of Ann
A
Annexes
C an
nd E
A
Areas
of Activ
vities
ABBBB
sed wheneve
er the area of
o activity app
plies to FRO
ONAPE ships
s. In which
6.4.1.1 The Annex E shall be us
he numbering
g of Annex B (Identificatio
on of Facility
y) shall begin with 48.
case, th
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
6.4.2 The area of activity is associated with an installation (Annex B), or parts of a system that
develops in a specific function.
6.4.2.1 The first digit (A), which is optional, is used to distinguish the areas of repeated activities or
alternative designs for the same facility. Thus, this differentiation shall only be used when the areas of
activities of one and the same facility are essentially similar, such as, for example: repeated process
units.
6.4.2.2 The four last digits identify the nature of the area of activity.
6.4.3 When a document covers more than one activity, the prevailing one shall be considered in the
coding. A typical example is a process unit covering a small product treatment unit.
6.5.1 Consisting of three digits that represent specific services, equipment or materials used in a
particular area of activity. The configuration of Annex D and F is indicated below. Annexes D and F
present the list of service classes with the corresponding codes.
Annex D and F
Class of Services, Equipment
and Materials
AAA
-NP-1-
N-1710
REV
V. M
ENGLISH
E
11 / 2010
ning cases.
6.5.1.2 Annex D shall be used in the remain
aracter indica
ated by the l etter A sha
all begin from
m zero to 9 and then fro
om A to Z
6.5.2 The third cha
(excludiing letters I and O).
e of docume
ents referrin
ng to assem
mblies of con
nnected equuipment belo
onging, to
6.5.3.4 In the case
ss of the equ
uipment perfo
orming the main
m
function will prevail. Example:
distinct service classses, the clas
pump units sh
hall be coded
d as pumps.
motor-p
Examples of Annex
A
D and
d F:
6.5.4 E
PLE 1
EXAMP
For coding
g a document relating to ffoundations: according to
o Annex D: 1120 - Founda
ations.
EXAMP
PLE 2
For coding
g class of serrvice 181: La
andscaping.
EXAMP
PLE 3
For coding
g a documen
nt referring to
o the speed regulator
r
of Power
P
System
m and Tank Cleaning:
325 - Spee
ed Regulatorr.
10
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Group 5
Source Code Document
LLL or LLA
6.6.2 When this Standard is applied to manufacturers documents, it is recommended that a specific
code be used for equipment manufacturers and code ZZZ for the other ones. [Recommended
Practice]
6.6.3 Codes beginning with the letter P are to be used only for the PETROBRAS departments.
7 Coding Applications
7.1 How to fill in spaces
As a general rule, in coding a document all spaces referring to the 7 basic groups shall be filled in,
except for the caracter used for differentiating the language, two optional numbers of
Annex B and the differentiating number of Annex C or E, when they are not applicable.
7.2 Identification of Industrial Equipment
For identification of equipment, as described in PETROBRAS N-1521, shall be used the area code of
activity (Annex C) or plant (Annex B).
For the identification of pipe lines, as described in PETROBRAS N-1522, shall be used on the area
code of activity (Annex C).
7.4.1 The indices of each of the categories of documents shall be identified by the same code of the
category, with group 6 - Chronology, being numbered as 000 (zero, zero, zero). Exceptionally, the
use of four numbers shall be permitted in those cases in which the chronology exceeds the hundreds.
11
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
7.4.3 The code indicating the revision shall be placed in the appropriate field, as described in
PETROBRAS N-2064.
7.4.4.1 When oil and gas pipelines are characterized as transport facilities, the code for identifying the
facility (Annex B) corresponds to the pipeline right of way. The area of activity (Annex C) is suitable
within the Pipelines item. As to the service class (Annex D), the corresponding code shall be
considered (see example in 7.5.5).
7.4.4.2 The pipelines of the production regions shall be coded as independent facilities (Annex B)
within the following criteria:
a) pipelines interconnecting distinct production regions (example: GASEB - code 3103.10);
b) trunk lines receiving production from distinct fields.
7.4.4.3 The other pipelines, in the following cases, shall be coded with the code for installation of
origin, considering the direction of product flow:
a)
b)
c)
d)
e)
f)
7.4.4.4 The code for area of activity (Annexes C or E) shall correspond to the type of pipeline (oil
pipeline-6510, gas pipeline-6520, alcohol pipeline-6530) (see example in 7.5.6).
7.4.5.1 Fixed platforms are considered facilities according to the coding in Annex B.
7.4.5.2 Modular platforms shall be coded as to the area of activity (Annexes C or E) by their various
operational systems (process, utilities). The use of codes for modules (1 400) shall be restricted to the
specific parts of the actual module, such as its structure, for instance. This application is mainly
intended for documents used for manufacturing, construction and assembly of those modules. Flow
sheets and electrical diagrams are coded by units or systems. (example: code 5140).
7.4.5.3 Non-modular platforms are divided, in the general case, as to areas of activity into jacket,
deck, helideck, flare, gas-lift system, water injection system, processing units, utilities, and
accommodations. In that case they shall be identified by the code of the corresponding area of activity.
7.4.6.1 Stationary drilling units are coded as E&P - Drilling Area, code 2000.00 of Annex B Identification of Facilities.
12
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
7.4.6.2 Stationary production units are identified as E&P - Production Area, facilities on mobile units,
code 3010.00, connected to the corresponding mobile unit, ship, semi-submersible unit, TLP, SPAR
etc.
7.4.6.3 For designs presenting various alternatives for the same production
field A (Annexes C or E) for differentiation [see examples in 6.4.4 d) and 7.5.7].
field,
use
7.5.1 Example 1
The first Descriptive Memorandum (Memorial Descritivo - MD) for drilling of the laboratory of
Guarulhos Terminal, prepared by ABAST-LOG/GGO-TRAN (former ABAST-TRAN).
MD - 4300.06-8222-114-PDT-001.
Category:
MD - Descriptive Memorandum;
Facility:
4300.06 Guarulhos Terminal;
Area of Activity:
8222 - Laboratory;
Service Class:
114 - Drilling;
Origin:
PDT - ABAST-TRAN;
Chronology:
001.
7.5.2 Example 2
th
The 5 piping plan issued by ABAST-REF referring to the Delayed Coking Unit (first Unit) of RPBC.
DE-5210.00-2212-200-PDI-005.
Category:
DE - Drawing;
Installation:
5210.00 - Presidente Bernardes Refinery (RPBC);
Area of Activity:
2212 - Delayed Coking Unit (1st Unit);
Service Class:
200 - Piping;
Origin:
PDI - ABAST-REF;
Chronology:
005 - 5th drawing.
7.5.3 Example 3
The drawing of towers issued by CENPES referring to the second Delayed Coking Unit of REVAP. By
comparing examples 2 and 3 (7.5.1 and 7.5.2), note that the number for differentiating the area of
activity is only used after the occurrence of the second area of repeated activity.
13
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
DE - 5285.00-22212-550-PPC-001.
Category:
DE - Drawing;
Facility:
5285.00 - Henrique Lage Refinery (REVAP);
Area of Activity:
22212 - Delayed Coking Unit (2nd Unit);
Service Class:
550 - Towers;
Origin:
PPC - CENPES;
Chronology:
001 - 1st drawing.
7.5.4 Example 4
The second Data Sheet of tube bundle heat exchangers belonging to the oil processing unit of the 3rd
Platform of Ubarana Field, of E&P-UN-RNCE, issued by E&P.
I-FD-3418.03-1220-451-PEP-002.
Document issued in English: I;
Category:
FD - Data Sheet (Folha de Dados - FD);
Facility:
3418.03 - Ubarana Production Platform 3 (PUB-3) of the Ubarana
Production Field of E&P-UN-RNCE;
Area of Activity:
1220 - Oil Processing Unit;
Service Class:
451 - Tube Bundle Heat Exchangers;
Origin:
PEP - E&P;
Chronology:
002 - 2nd Data Sheet.
7.5.5 Example 5
The 15th Piping drawing issued by ABAST-LOG/GGO-TRAN referring to the Natural Gas Pipeline of
the Barra do Furado - Campos Elseos Pipeline Right of Way of former TORGU.
DE-4150.52-6521-200-PDT-015.
Category:
DE - Drawing;
Facility:
4150.52 - Pipeline Right of Way of Barra do Furado -Campos Elseos
of DTSE (former TORGU);
Area of Activity:
6521 - Natural Gas Pipeline;
Service Class:
200 - Piping;
Origin:
PDT - ABAST-TRAN;
Chronology:
015 - 15th drawing.
7.5.6 Example 6
The 8th piping drawing issued by E&P referring to the riser originating at Agulha Production Platform 1
(PAG-1) of E&P/UN-RNCE.
DE-3416.01-6510-200-PEP-008.
Category:
DE - Drawing;
Installation:
3416.01 - Agulha Production Platform 1 (PAG-1) of Agulha Production
Field of E&P/UN-RNCE;
Area of Activity:
6510 - Oil pipeline;
Service Class:
200 - Piping;
Origin:
PEP - E&P;
Chronology:
008 - 8th drawing.
7.5.7 Example 7
This is the Technical Specification (Especificao Tcnica - ET) for two alternative designs for the
Barracuda Field in the bidding phase, a Tension Leg Well Platform (TLWP) and a SPAR platform.
14
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
ET-3010.47-11200-941-PGT-002 (TLWP-1);
ET-3010.47-21200-941-PGT-002 (SPAR-1);
Category:
ET - Technical Specification;
Facility:
3010.47 - Barracuda Production Platform P-41;
Area of Activity:
11200 - Production (TLWP-1);
21200 Production (SPAR-1);
Service Class:
941 - Design Engineering - Basic Design Data;
Origin:
PGT - GETINP - E&P;
Chronology:
002 - 2nd Technical Specification.
7.5.8 Example 8
The 3rd drawing of the bilge pump issued by FRONAPE and common to all Ataulfo Alves class
tankers is exemplified below:
DE-4850.00-0376-110-PTF-003;
Category:
DE - Drawing;
Facility:
4850.00 - Ataulfo Alves Class;
Area of Activity:
0376 - Bilge;
Service Class:
110 - Bilge Pump;
Origin:
PTF - PETROBRAS - ABAST-TRAN - FRONAPE;
Chronology:
003 - 3rd drawing of Pump.
7.5.9 Example 9
The 1st engine room layout issued by FRONAPE referring to the modification implemented only in the
Ataulvo Alves Class Cartola tanker.
DE-4850.02-5000-000-PTF-001;
Category:
DE - Drawing;
Facility:
4850.02 - Ataulfo Alves Class, Cartola tanker;
Area of Activity:
5000 - Engine Room Layouts;
Service Class:
000 - General;
Origin:
PTF - PETROBRAS - ABAST-TRAN - FRONAPE;
Chronology:
001 - 1st exclusive engine room layout for this tanker.
15
-NP-1-
N-1710
REV. M
ENGLISH
INDEX OF REVISIONS
REV. A, B, C, D, E and F
There is no index of revisions.
REV. G
Affected Parts
Description of Alteration
Annex A
Revised
Annex B
Revised
Annex C
Revised
Annex D
Revised
Annex E
Revised
Index of Revisions
Included
REV. H
Affected Parts
Description of Alteration
1.1
Revised
5.1
Revised
6.3.4 to 6.3.6
Revised
6.4.1
Revised
6.6.1
Revised
REV. J
Affected Parts
Description of Alteration
5.1
Revised
6.2.3
Revised
6.3.5
Revised
6.5.2
Revised
6.5.3
6.5.4
Renumbered
6.7
Revised
7.4
Revised
7.5.1 to 7.5.7
Revised
IR 1/3
11 / 2010
-NP-1-
N-1710
REV. M
ENGLISH
REV. K
Affected Parts
Description of Alteration
1.2 to 1.3
Eliminated
1.2 to 1.6
Renumbered
5.1
Revised
6.1.4
Revised
6.1.6 to 6.1.7
Included
6.4.1
Revised
6.4.1.1 a 6.4.1.2
Included
6.5.1
Revised
6.5.1.1. to 6.5.1.2
Included
6.5.4
Revised
7.5.8 to 7.5.9
Included
REV. L
Affected Parts
Description of Alteration
1.5
Revised
Figura 1
Revised
Eliminated
6.3.8
Revised
6.4.1
Revised
6.4.4.1
Revised
6.4.4
Revised
6.5.1
Revised
6.5.5.1
Revised
6.5.4
Revised
7.5.2
Revised
7.5.3
Revised
7.5.4
Revised
7.5.6
Revised
7.5.7
Revised
IR 2/3
11 / 2010
-NP-1-
N-1710
REV. M
ENGLISH
REV. M
Affected Parts
Description of Alteration
6.4.2
Revised
6.5.3.2.
Revised
7.2
Revised
7.3
Revised
IR 3/3
11 / 2010
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Department
Telephone
Key
TIC/TIC-E&P/TICDT-RIO
816-3667
K007
CENPES/GTEC/ITPI
812-6106
BP22
CENPES/EB-E&P/EPEP
812-2406
CQG8
TRANSPETRO/PRES/SE/ENG/POE/CID
811-9242
XVBT
CENPES/PDP/TMEC
816-1565
Q080
TIC/TIC-E&P/DTEP
814-2613
K004
E&P-ENGP/IPP/EISA
814-2675
Q008
UN-BC/ENGP/EIS
861-2519
QM42
ENGENHARIA/IEEPT/IECN/PS
819-0284
UPG5
GE-LPGN/PLGN/PSL
819-4428
CTL7
ENGENHARIA/IEEPT/EEPTM/EAPR
819-3586
SGNJ
TIC/TIC-E&P/TICDT-BC
861-0995
FRAJ
TRANSPETRO/PRES/SE/ENG/POE/CID
811-9137
TSLK
E&P-ENGP/IPP/EISA
814-0539
BZJ5
TIC/TIC-G&E/SNT
819-4220
WSMX
819-3078
ERQE
Guest(s)
Max Yukio Minato
Norma Roseli de Oliveira
Technical Secretary
Flvio Miceli
ENGENHARIA/AG/NORTEC-GC
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
3.2
coded number
it is the alphanumeric unit which identifies the document and is obtained by the orderly combination of
codes representing the various basic groups comprising it
3.3
basic groups
elements comprising the coded number
4 Basic Directive
In the coded number the basic groups are ordered from most general to most specific.
Annex C
(or E)
Group 1
Group 2
Group 3
Group 4
Group 5
Group 6
Document
Category
Identification
of
Facility
Areas
of
Activities
Class of services,
Equipment,
And Materials
Source Code
Document
Chronology
Annex A
Group 0
Identification
of
Language
LL
Note 4
ABBB.CC ABBBB
Notes 1 and 4 Notes 2 and
4
Annex D
(or F)
AAA
Note 4
LLL
Note 3
AAA
Where:
L
is the letter;
A, B, C are the alphanumeric.
NOTE 1 Mandatory differentiating characters for all areas.
NOTA 2 Differentiating a character used only in the case of repetition (from the first area of repeated
activity).
NOTA 3 Document Origin (Group 5) shall be consulted on the PETROBRAS intranet on NORTECGCs page.
NOTA 4 The Annex A (Group 1), Annex B (Group 2), Annexes C or E (Group 3), Annex D or F
(Group 4) and Annex G (Index of Revision) shall be consulted on the intranet to
PETROBRAS, on the page of NORTEC-GC.
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
6.5.1.1 Annex F shall be used whenever the area of activity applies to FRONAPE ships. In which
case, the numbering of Annex B (Identification of Facility) will begin with 48.
6.5.2 The third character indicated by the letter A shall begin from zero to 9 and then from A to Z
(excluding letters I and O).
6.5.3 A document shall be classified in a general group or in subgroups of Annex D with some
flexibility, depending on the complexity of the project under consideration. Thus, the directives set out
in 6.5.3.1 to 6.5.3.4, shall be adopted.
6.5.3.1 Drawings and documents involving different subjects of one and the same group or subgroup
shall be coded with the general class of that group or subgroup. Thus, a piping plan, for instance,
involving pipes (subgroup 210), valves (subgroup 220), and fittings (subgroup 240), will be assigned
the code 200 (general piping); a specification for valves covering different types will be given the code
220.
6.5.3.2 It is recommended that the drawings of specific details are encrypted with the corresponding
specific code. As an example, may be mentioned the design of a special valve that should receive the
code 229. [Recommended Practice]
6.5.3.3 Specifications, Data Sheets, Material Requisitions and others similar documents, originating
the purchase of materials, shall be coded with the corresponding specific code. For instance,
requisitions for valves shall be grouped in gate valves (code 221) and globe valves (code 222).
6.6.1 This is a basic group consisting of three letters. It identifies the issuer of the document
(PETROBRAS department or contracted firm). The codes relating to the PETROBRAS departments or
contracted firms shall be obtained from NORTEC-GC. The configuration of group 5 is indicated below:
10
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
Group 5
Source Code Document
LLL
6.6.2 When this Standard is applied to manufacturers documents, it is recommended that a specific
code be used for equipment manufacturers and code ZZZ for the other ones. [Recommended
Practice]
6.6.3 Codes beginning with the letter P are to be used only for the PETROBRAS departments.
7 Coding Applications
7.1 How to fill in spaces
As a general rule, in coding a document all spaces referring to the 7 basic groups shall be filled in,
except for the digit used for differentiating the language, dos optional digits of
Annex B and the differentiating digit of Annex C or E, when they are not applicable.
For identification of equipment, as described in PETROBRAS N-1521, shall be used the area code of
activity (Annex C) or plant (Annex B).
For the identification of pipe lines, as described in PETROBRAS N-1522, shall be used on the area
code of activity (Annex C).
7.4.1 The indices of each of the categories of documents shall be identified by the same code of the
category, with group 6 - Chronology, being numbered as 000 (zero, zero, zero). Exceptionally, the
use of four digits shall be permitted in those cases in which the chronology exceeds the hundreds.
11
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
7.4.6.2 Stationary production units are identified as E&P - Production Area, facilities on mobile units,
code 3010.00, connected to the corresponding mobile unit, ship, semi-submersible unit, TLP, SPAR
etc.
7.4.6.3 For designs presenting various alternatives for the same production
field A (Annexes C or E) for differentiation [see examples in 6.4.4 d) and 7.5.7].
field,
use
7.5.1 Example 1
The first Descriptive Memorandum (Memorial Descritivo - MD) for drilling of the laboratory of
Guarulhos Terminal, prepared by ABAST-LOG/GGO-TRAN (former ABAST-TRAN).
MD - 4300.06-8222-114-PDT-001.
Category:
MD - Descriptive Memorandum;
Facility:
4300.06 Guarulhos Terminal;
Area of Activity:
8222 - Laboratory;
Service Class:
114 - Drilling;
Origin:
PDT - ABAST-TRAN;
Chronology:
001.
7.5.2 Example 2
The 5th piping plan issued by ABAST-REF referring to the Delayed Coking Unit (first Unit) of RPBC.
DE-5210.00-2212-200-PDI-005.
Category:
DE - Drawing;
Installation:
5210.00 - Presidente Bernardes Refinery (RPBC);
Area of Activity:
2212 - Delayed Coking Unit (1st Unit);
Service Class:
200 - Piping;
Origin:
PDI - ABAST-REF;
Chronology:
005 - 5th drawing.
7.5.3 Example 3
The drawing of towers issued by CENPES referring to the second Delayed Coking Unit of REVAP. By
comparing examples 2 and 3 (7.5.1 and 7.5.2), note that the digit for differentiating the area of activity
is only used after the occurrence of the second area of repeated activity.
13
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
3.2
coded number
it is the alphanumeric unit which identifies the document and is obtained by the orderly combination of
codes representing the various basic groups comprising it
3.3
basic groups
elements comprising the coded number
4 Basic Directive
In the coded number the basic groups are ordered from most general to most specific.
Annex B
Annex C
(or E)
Annex D
(or F)
Group 0
Group 1
Group 2
Group 3
Group 4
Group 5
Group 6
Identification
of
Language
Document
Category
Identification
of
Facility
Areas
of
Activities
Class of services,
Equipment,
And Materials
Source Code
Document
Chronology
LL
Note 4
ABBB.CC ABBBB
AAA
Notes 1, 4 and Notes 2, 4
Notes 4 and 5
5
and 5
LLL
Notes 3
and 5
AAA
Where:
L
is the letter;
A, B, C are the numbers.
NOTE 1 Mandatory differentiating characters for all areas.
NOTA 2 Differentiating a character used only in the case of repetition (from the first area of repeated
activity).
NOTA 3 Document Origin (Group 5) shall be consulted on the PETROBRAS intranet on NORTECGCs page.
NOTA 4 The Annex A (Group 1), Annex B (Group 2), Annexes C or E (Group 3), Annex D or F
(Group 4) and Annex G (Index of Revision) shall be consulted on the intranet to
PETROBRAS, on the page of NORTEC-GC.
NOTE 5 It is accepted the use of letter codes where the numbering is exhausted.
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
6.3.5 In the cases 0, 5, 6, 7, 8 and 9 listed in 6.3.3, the creation of codes for new facilities relating to
the fields of Annex B, indicated by BBB in the of 6.3.2, is the exclusive responsibility of CONTEC, to
which a specific request shall be made.
6.3.6 The last two characters indicated by the letter C in the block of 6.3.2 are used as the
Differentiating Code to indicate the parts of the facility situated in different geographic locations,
which are obligatory for the production, transportation and refining areas.
6.3.7 When a document covers more than one facility, the prevailing one may be considered in the
coding.
6.4.1 The Annexes C and E present a list of areas of activities with the corresponding codes. The
configuration of Annex C and Annex E is indicated below.
Annexes C and E
Areas of Activities
ABBBB
6.4.1.1 The Annex E shall be used whenever the area of activity applies to FRONAPE ships. In which
case, the numbering of Annex B (Identification of Facility) shall begin with 48.
-NP-1-
N-1710
REV. M
ENGLISH
11 / 2010
6.5.1.1 Annex F shall be used whenever the area of activity applies to FRONAPE ships. In which
case, the numbering of Annex B (Identification of Facility) will begin with 48.
6.5.2 The third character indicated by the letter A shall begin from zero to 9 and then from A to Z
(excluding letters I and O).
6.5.3 A document shall be classified in a general group or in subgroups of Annex D with some
flexibility, depending on the complexity of the project under consideration. Thus, the directives set out
in 6.5.3.1 to 6.5.3.4, shall be adopted.
6.5.3.1 Drawings and documents involving different subjects of one and the same group or subgroup
shall be coded with the general class of that group or subgroup. Thus, a piping plan, for instance,
involving pipes (subgroup 210), valves (subgroup 220), and fittings (subgroup 240), will be assigned
the code 200 (general piping); a specification for valves covering different types will be given the code
220.
6.5.3.2 It is recommended that the drawings of specific details are encrypted with the corresponding
specific code. As an example, may be mentioned the design of a special valve that should receive the
code 229. [Recommended Practice]
6.5.3.3 Specifications, Data Sheets, Material Requisitions and others similar documents, originating
the purchase of materials, shall be coded with the corresponding specific code. For instance,
requisitions for valves shall be grouped in gate valves (code 221) and globe valves (code 222).
6.6.1 This is a basic group consisting of three caracters. It identifies the issuer of the document
(PETROBRAS department or contracted firm). The codes relating to the PETROBRAS departments or
contracted firms shall be obtained from NORTEC-GC. The configuration of group 5 is indicated below:
10