4.8,3
Tools, lifting tackle and special appliances for all equipment supplied
under this Contract,
4,8.4
4.8.5
4.8,6
4.8,7
Special tools and maintenance equipment for all plant and equipment
supplied under this Contract.
4.8,8
4,8.9
First
4,8.10 Consumable and spare parts for commissioning period and up to PAC of
the units.
4.8,11 Marked up drawings, As-built drawings including modifying the relevant
existing as-built drawings (what is final as-built drawings),
4.8.12 Commissioning and test procedures,
4,8.13 Start-up commissioning & warranty period services.
4,8.14 Vendor manuals.
4.8.15 Performance test.
4.8.16 Test equipment.
4.8.17 Inspection sheets for all equipment.
4.8.18 Permanent and portable lube Oil/control oil purification equipment.
S.
4.9
4.10
CONTRACTOR shall provide six [6] new service vehicles for COMPANY Project
Staff as detailed in the Scope of Work and Technical Specifications, PTS No.
07EG908.
5.1
5,2
CONTRACTOR shall provide all Start-Up Spare Parts for the PROJECT that are
required during testing and commissioning up to Preliminary Acceptance of the
PROJECT, pursuant to Paragraph 6.1 of Schedule "An of this CONTRACT.
5.3
CONTRACTOR shall deliver these Start-Up Spare Parts toget:1er with the
materials and equipment for the PROJECT,
5.4
8-3
Qurayyah Combined Cycle Power Plant, Extension 1 [Block 6]
\~ .. ~ ~"",.....ll ~.."..:.1'
E.ner;:;y
Up Spare Parts that may actually be required during testing and commissioning
up to Preliminary Acceptance of the PROJECT.
6.
7.
5.5
Prior to the start of testing and commissioning, CONTRACTOR shall ensure that
it has at ~he WORK SITE sufficient quantity of all Start-Up Spare Parts that may
be required during testing and commissioning up to Preliminary Acceptance of
the PROJECT.
5.6
CONTRACTOR shall turn over to COMPANY all unused Start-Up Spare Parts
upon Preliminary Acceptance of the PROJECT.
6.1
CONTRACTOR shall, provide during the entire Warranty Period for the
PROJECT, One (1) fully qualifIed and experienced Warranty Engineer for each
discipline Mechanical, Electrical a lac for the WORK.
6.2
6.3
6.4
The Warranty Engineers shall be made available from the issuance of the
Preliminary Acceptance Certificate for the first GTG Unit to the end of the
Warranty period for this CONTRACT.
6.5
Warranty engineers duty time shall be six (6) days a week ten (10) hours a
day 0700 hrs to 1700 hrs.
6.6
WORK LOCATION
CONTRACTOR shali perform and complete the PROJECT within the property area of
the existing Qurayyah Combined Cycle Power Plant at the specific location deSignated
on the Drawings as Block 6.
8.
8.1
8.2
8.3
Any delay in the performance of the WORK that may result from failure of
CONTRACTOR to coordinate, as necessary, the performance of the WORK, with
the Contractor for Contract No. 30621127/00 shall be CONTRACTOR's own
~esponsibllity and shall not be a reason to extend any of the Critical Milestone
dates set forth in Attachment II to this Schedule "B" or be made as an excuse
for failure to complete any portion of the WORK within the WORK SCHEDULE
described in Paragraph 13 of Schedule "A" of this CONTRACT.