Critical Safety issues in Marketing locations
Striving for improved performance
Design of Fire Safety System in POL Locations
A.K.Gupta
DGM(HSE) CO , IOCL
OISD 117
OISD 244 ( Draft V)
14, 12h
10m
18, 14h
18, 14h
10m
10m
10m
28, 14h
18, 14h
18, 14h
Largest
tank
10m
12m
10m
18, 15h
18, 14h
29, 15h
10m
Area - I
Area - II
Largest
tank
18, 14h
10m
10m
Largest
tank
18, 14h
18, 14h
Area - I
10m
18, 15h
18, 14h
10m
(A) Fire water requirement for area I ( Tank farm containing CR Tanks )
Cooling ( exposure protection)
X-1
Full surface fire ( foam application @ 5 lpm/m2)
X-2
Supplementary water ( 4X36 M3/Hr )
X-3
Total
X
OISD does not envisage fighting Full surface fire in CR tanks using
HVLRMs while working out fire water requirement.
14, 12h
10m
10m
10m
28, 14h
Largest
tank
Area - II
12m
29, 15h
(B) Fire water requirement for area II ( Tank farm containing FR Tanks )
Cooling ( exposure protection) *
Y-1
Rim seal fire ( foam application @ 12 lpm/m2)
Y-2
Supplementary water ( 4X36 M3/Hr )
Y-3
Total
Total
Z-1 (= Y-1)
Z-2
Z-3
C
Hydraulically
remotest
point
Sprinkler system
TANK
R+
30
R+
30
Tank on
Fire
Points to Ponder
Can requirement of Remote control, variable Flow
HVLRMs be relaxed for IFRTs?
Fire water hydrant header size augmentation - 49 sq
inch to be augmented to 98 sq inch.
14
14
20
Existing Fire
Water Header
14
Hydrant Line
15m
8m
8m
8m
T1
T2
10m
T3
10m
8m
T1, T2, T3 Tanks with 18 m
dia and 16 m height
8m
33m
8m
33m
8m
8m
48m