Winter 2014

CELEBRATING 80 YEARS

BUILDING A NATION
PAGE 4

MDs

MESSAGE
2014 is our 80th anniversary - a significant achievement in our industry.

The Thiess story begins in 1934, in the middle


of the Great Depression, when five brothers
Les, Pat, Bert, Cecil and Stan Thiess banded
together to pioneer our industry. Its a story of
courage, determination and entrepreneurship
that embodies the great Australian spirit. While
over 80 years many things have changed, our
tenacity to embrace innovation and keep moving
forward has stood the test of time.
From humble beginnings on Queenslands
Darling Downs, Thiess has grown into a multibillion dollar company, with an international
footprint across Australia, Indonesia, India
and New Caledonia.
Since those early days, weve seen remarkable
change economically, socially and politically.
From horse power to mechanical power, from
analogue to digital to fibre optics, from
earthmovers to the largest tunnel boring
machines ever used in Australia, Thiess has been
at the forefront of progress. From helping the

    

Australian and American Armies during WWII,


to connecting the nation through the Beef Roads
Network, to pioneering Australias coal export
industry, to distributing Toyota Land Cruisers
and playing a major role in the delivery of iconic
infrastructure that has helped shape our nation.
In our industries, we have a history of firsts
including:
1944 pioneering open-cut coal mining at the
Blair Athol Coal Mine in Central Queensland and
Muswellbrook Coal Mine in New South Wales
1958 becoming the first Australian company
to be awarded a major contract on the Snowy
Mountains Hydro-electric scheme
1962 exporting the first shipment of
Queenslands high-quality coking coal to Japan
1972 partnering with Petrosea to build the
Sembawang dry dock in Singapore one of the
largest dry docks in the world and the beginning
of our foray into Asia

1988 delivering Australias first immersed road


tube tunnel under Sydney Harbour
1993 securing some of the first privatised water
services contracts ever awarded in Australia
1996 remediating the Maralinga Nuclear Test
Site in South Australia - Australias most toxic site
2003 leading the trend in Public Private
Partnerships projects beginning with
Lane Cove Tunnel
2012 delivering Australias largest road
infrastructure project Airport Link in Brisbane
2012 completing the Southern Hemispheres
largest reverse osmosis desalination plant, the
Victorian Desalination Project
2013 mobilising the largest plant fleet in
Australia at Lake Vermont Coal Mine, including
12 new Liebherr T282 Ultra Class haul trucks and
two 800-tonne Liebherr 9800 excavators.

Along the way, we have navigated the highs


and lows of an ever-changing, competitive global
marketplace. In 1958, Thiess floated on the stock
exchange to make our work on the nationbuilding Snowy Mountains Hydro-electric
Scheme possible. This decision provided
the platform for growth and as the company
became more and more successful, it left Thiess
vulnerable to a corporate takeover. What was
unthinkable for the Thiess brothers happened in
dramatic fashion and in 1979, CSR set its sights
on Thiess mining interests, succeeding in a
hostile takeover. Following negotiations,
Sir Les bought back, with the help of Hochtief
and Westfield, the construction arm ensuring
the Thiess name continued. By 1983, Hochtief
had acquired Westfield shares and negotiated
with Leighton Holdings to sell Thiess in exchange
for increasing their shareholding of Leighton
Holdings to 40 per cent.

Hochtief has once again increased its share


in Leighton Holdings to nearly 70 per cent,
signalling change in our company once again.
As Hochtief continues to review the business,
I am confident that we will emerge bigger and
better as we have over the past 80 years.
While the sound of change heralds in the
background, our priority is to deliver our clients
even greater value. In Construction, three Thiess
projects were finalists in this years prestigious
Australian Construction Achievement Awards.
1.0!)/+*0%*1!0+ !(%2!.2%0(.+ /.%(
and energy infrastructure designed to help our
communities and industries grow. In Mining,
we are partnering with clients to maximise
opportunities for continual improvement.
Leveraging state-of-the-art technologies and
equipment, our people are managing some
of the industrys leanest operations with
outstanding safety and production rates.

In Services, our teams are also using leading


edge technology to give our clients the high
standards that communities demand.
As you are aware, Leighton Holdings is
restructuring the companys operating model
and Thiess will be moving forward with a focus
on building a global mining enterprise. While this
transition takes place, our number one priority
remains to serve our clients and deliver
excellence across all our projects.
1./0+.5%/0%0/+.!+10#.!0,!+,(!*
partnerships. We would not be here today if it
wasnt for our clients and business partners who
have allowed us to grow with them and work
alongside them to deliver extraordinary projects.
Thiess began with five inspirational entrepreneurs
and today I pay tribute to them and our talented
people who carry on their legacy.
BRUCE MUNRO
Managing Director!

    

80 YEARS STRONG
The Luna Park and Cloudland Ballroom earthworks (1939)

Inspecting Machinery at Blair Athol Coal Mine (1940s)

SINCE

1934

Mining at Callide Coalfield

The brothers brought the


countrys first D8 dozer (1940)

Burleigh Hill Roadworks (1930s)

The first Thiess Bros. company plane called Progress


revolutionised the way the brothers did business (1947)

    

Nick Vucelic holding explosives


at Blair Athol (1940s)

80 YEARS STRONG

BUILDING A NATION
Les

Cecil

Stan

Pat

Bert

Heifer Creek Cutting (1939)

DONT TELL US WHAT WE CANT DO,

TELL US WHAT WE CAN DO.

Set against the backdrop of the Great


Depression, five young brothers had a dream to
help build a nation. Joining forces, the brothers
- Les, Pat, Bert, Cecil and Stan registered
Thiess Bros. in Toowoomba in 1934. They turned
their unwavering passion for construction,
plant, innovation and taking on battles into
building an empire. These brothers-in-arms
had an uncanny ability for finding people
who may not have shared their name but did
share their can-do spirit which today we call
blue blood. Together, they broke ground and
persisted through incredible wins, personal loss,
enduring partnerships and much more. Their
tenacity created the foundation of a company

Working on the Snowy Mountains Hydro-electric Scheme (1959)

that has been part of Australias story, shaping


construction, mining and services history.
Their epic Aussie tale of entrepreneurship was
powered by vision, guts and determination that
have been immortalised in the words dont
tell us what we cant dotell us what we can do.
Eighty years later, Thiess is one of the countrys
leading construction, mining and services
contractors with operations in Indonesia, India
and New Caledonia. From the heart of Australia
at Uluru to almost every major port in the
country, weve been there. In many ways the
Thiess story is a small reflection of Australias
own coming of age.

    

80 YEARS STRONG

CONSTRUCTION

Pioneering
Construction
SINCE 1934, THIESS HAS BEEN THE FORCE BEHIND SOME OF

AUSTRALIAS MOST ICONIC INFRASTRUCTURE PROJCTS.


From so-called beef roads that were built
through outback Australia to move cattle around
the country and ports for export, to roads linking
new and developing towns that were springing
up to service a growing population, Thiess forged
an enviable reputation as a remote-area builder.
In 1958, Thiess became the first Australian
contractor to win work on the nations biggest
engineering masterpiece the Snowy Mountains
Hydro-electric Scheme. Three consecutive
contracts were completed over 25 years,
concluding with the construction of the Talbingo
Dam and Tumut 3 Power Station. By this time,
Thiess had successfully carried out one-quarter
of all contractual work on the scheme and it
set the business on its path for future success.
Thiess has since established a reputation
for delivering high-quality, large-scale and
technically-complex projects. Its capabilities span
highways and railways; airports, dams and ports;
hospitals and commercial buildings; through to
mine and energy infrastructure. In alliance and
joint ventures, Thiess has delivered some of
Australias award-winning and largest transport
infrastructure projects including Brisbanes
Airport Link, West Gate Freeway Upgrade and
EastLink in Victoria, and Sydneys Harbour and
Lane Cove Tunnels. The company has also been
responsible for some of the countrys most vital
regional and metropolitan rail projects.

1934

Thiess Bros.
registered

1939
Heifer Creek
    
Cutting, Qld

Preparing concrete
batches at Mt Isa,
Qld (1960s)

The company has built 84 dams in 80 years and


this experience in the water sector extends to the
provision of desalination and treatment plants,
pipelines and pump stations. In joint venture,
Thiess delivered the internationally-recognised
$3.5 billion Victorian Desalination Project,
the largest desalination plant in the Southern
Hemisphere.
Thiess has also emerged as a leader in the
delivery of specialist, technically-advanced
structural, mechanical, electrical and piping
projects across the energy and resources sectors.
Since 1986, the company has supported many
of Australias LNG projects including the recent
Chevron-operated Gorgon and Wheatstone
projects in Western Australia, and BG Groups
Queensland Curtis LNG project.
As one of the nations largest building
contractors, Thiess continues to offer flexible
and intelligent solutions to deliver fit-forpurpose health, Defence, correctional services
and commercial facilities. These are most
recently evidenced by the multi-award winning
redevelopment of the Royal North Shore Hospital
in Sydney, and the redevelopment and expansion
of the Lotus Glen Correctional Facility and
Lavarack Barracks in North Queensland.

1959
Snowy Mountains
Hydro-electric Scheme, NSW

1960
Beef Roads
Scheme, Qld,
NT, WA

Murray 1 Power Station Pressure Tunnel, NSW (1950s)

1974
Talbingo Dam and
Tumut 3 Power Station,
NSW

1989
Sydney Harbour Tunnel, NSW

1984
Wivenhoe
Dam, Qld

1991
Dawesville Channel,
WA

INDUSTRY

INSIGHT
Macrossan Bridge,
Qld (1961)

The next few years will be exciting for all of us in the


national infrastructure sector because of the scale of
projects that will be delivered and the scale of change
in the public sector that will inevitably occur to make
them possible.
Both of these themes are important as they point to
an exciting opportunity for Thiess and others.
Julius Dam, Qld (1973)
Constructing the Mt Isa Townsville Rail Line, Qld (1961)

From the Snowy Mountains Hydro-electric Scheme and


Sydneys Harbour Tunnel to some of the largest and most
complex energy, mining, transport and utility projects,
Thiess has delivered a legacy of projects that have, in
part, defined our national identity.
Indeed, Thiess was recently recognised alongside the
Commonwealth and Victorian Governments and other
companies for its role in the delivery of the highlycomplex Regional Rail Link Project in Victoria.
This proud legacy sees Thiess well positioned and
well-credentialed in engineering construction, with
a proven record to compete for a forward public
infrastructure programme that will be of an
unprecedented volume and scale.
As Thiess looks to the next 80 years, its likely that we
will see substantial changes to the roles of the public
and private sectors in infrastructure, particularly as the
public sector looks to bring down the costs of
infrastructure services.
From motorways through to complex health and social
infrastructure projects, public sector clients are looking
at how new thinking and new approaches can deliver
materially better outcomes.
Thiess commitment and track record in driving new
approaches, coupled with proven excellence in delivery,
leave the company well positioned to sustain and
enhance the proud record it has amassed over the
past eight decades.

Earthmoving equipment demonstration, Qld (1953)

BRENDAN LYON
$%!"4!10%2!!.
Infrastructure Partnerships Australia
Inspecting a derelict tank, PNG (1940s)

1999
Balambano Hydroelectric Dam, Indonesia

2007
Lane Cove Tunnel
Project, NSW

2005
Regional Fast
Rail Project - Vic

2012
Royal North Shore
Hospital, NSW

2012
Airport Link, Qld

2012
Victorian Desalination
Project, Vic

2013
2014
Hunter
Queensland Curtis
    
Expressway, NSW LNG Project, Qld7

2009
Epping to Chatswood
Rail Line, NSW
Image courtesy NSW Health

80 YEARS STRONG

MINING

Mining New Heights


BY THE EARLY 1940s, THE THIESS BROTHERS

HAD MINING IN THEIR SIGHTS.

Dragline in operation at
Callide Coal Mine, Qld (1940s)

The Muswellbrook Workshop, NSW (1940s)

With a national shortage of coal-fired energy,


they were at the forefront of a boom. The 1944
Blair Athol Coal Mine contract catapulted the
business into the sector, with the Muswellbrook
and Balmoral Coal Mine contracts soon to follow
the same year. These early mine projects were
formative in developing Australias coal industry.
Les Thiess ambitions led him to seek a market
overseas in Japan and what followed was one
of the companys most enduring partnerships
between Thiess, Mitsui and American company
Peabody. Having started prospecting in the late
1950s, Thiess Peabody Mitsui Coal Pty Ltd
started operations at Kianga-Moura coal mines
in 1962, exporting Queenslands first coking coal
to Japan. This relationship with Peabody
continues today where Thiess operates the
Burton Coal Mine on behalf of the company.
,,+.01*%0%!/+2!./!/+*0%*1! 0+!'+**
in 1988, PT Thiess Contractors was established
in Indonesia, quickly winning four of six mining
contracts. Thiess operations in Indonesia have
been among the companys most outstanding
success stories. This includes the industryleading Balikpapan Training Centre, which has
trained hundreds of locals, in turn raising the
standard of mining practices in Indonesia.

Kianga-Moura Mines, Qld (1960s)

('.+',!*10+( %*!/

1934

Thiess Bros.
registered

1962
Kianga and Moura
Coal Mines, Qld

1944
Blair Athol Coal Mine, Qld

    

1944
Muswellbrook
Coal Mine, NSW

1948
Callide Coal
Mine, Qld

1994
Mt Owen Coal Mine, NSW

1988
PT Thiess Contractors
Indonesia contracts

1995
Burton Coal Mine, Qld

Les surveying Muswellbrook Coal Mine, NSW (1940s)

INDUSTRY

INSIGHT

Australias minerals industry is a highly-competitive,


cyclical and globalised sector. To thrive, as Thiess has
done over 80 years, requires strength, agility and a
pioneering spirit.
In our industry, no two projects are ever the same.
Developing high-risk, high-cost, long-lived ventures
requires a commitment to continuous improvement
and a culture that embraces innovation.
Continuing growth and development of emerging
economies, particularly in Asia, will continue to underpin
long-term demand for Australias minerals, but supply
competition will be strong.

Today, Thiess is one of a select few contractors


worldwide with a mining capability that spans
planning and design, operations and technical
services, plant and asset management, product
handling and processing, and mine infrastructure
!2!(+,)!*01.!4,!.%!*!+)!/".+)
working with a range of mining clients in
different countries and with varying pit sizes,
complexities and conditions. In 2013 alone, we
mined more than 7 million tonnes of copper ore,
)%((%+*0+**!/+" +(* )%((%+*
BCM of overburden across 13 projects.

The rapid progress developing the rich natural


endowment of mining regions in Africa and South
America is one of the challenges the Australian industry
confronts - together with declining ore grades, escalating
capital costs, ongoing capacity constraints and additional
global scrutiny.
The highest standards of safety, a forensic approach
to productivity and cost management, and an approach
to the environment and community that exceeds
compliance are each critical to success in the modern
mining operation.

With a replacement value of $3 billion, Thiess


operates and maintains one of the largest and
most diversified mining fleets in Australasia. This
equipment and the companys experience helped
transform our clients resource projects into more
!%!*0* ,.+ 10%2!)%*!/1.1..!*03+.'
includes providing long-term mining services for
open-cut coal mines such as Lake Vermont,
Burton and Curragh North in Queensland;
03!* %*!%*!3+10$(!/.+)%*!*0
Hill Copper and Gold Mine in South Australia;
and the iron-ore producing Roper Bar Project in
the Northern Territory.

Thiess is well placed to develop the innovative systems


and processes to address these issues and participate
in the delivery of Australias next generation of minerals
projects.
The Minerals Council of Australia (MCA) advocates public
policy and operational practice for a globally-competitive
minerals industry that is safe, profitable, innovative and
environmentally and socially responsible. Thiess has been
a partner in this pursuit for 20 years. It is a valued
member of the MCA and the industry and we wish the
company, its shareholders, management and workforce
every ongoing success.

BRENDAN PEARSON
Chief Executive,
Minerals Council of Australia

1996
Collinsville
Coal Mine, Qld

2000
Senakin Mine,
Indonesia

2004
Curragh North
Coal Mine, Qld

2003
Mt Keith Mining
Alliance, WA

2007
Lake Vermont
Coal Mine, Qld

2005
Prominent Hill Copper
and Gold Mine, SA

2007
Tarong Coal Project
Meandu Mine, Qld

2010
Pakri Barwadih
Coal Mine, India

2007
2014
Wilpinjong Coal
Roper Bar
Project, NSW     
Iron Ore, NT

80 YEARS STRONG

SERVICES

The Services
Advantage
THE SERVICES BUSINESS COMPLETES THE MODERN

THIESS STORY, HAVING GROWN INTO A LEADING PROVIDER

OF INTEGRATED WATER, ENERGY, ENVIRONMENT, TELECOMMUNICATIONS

AND INFRASTRUCTURE MANAGEMENT IN JUST 27 YEARS.


The Services business began in 1987 when
the team repurposed an earthmoving fleet
to manage landfill contracts in Queensland.
Thiess won all of Brisbane City Councils landfill
management contracts while delivering step
changes in safety, productivity and innovation.
This success led to new areas including, water,
remediation, energy, telecommunications and
infrastructure where the team quickly gained a
reputation for optimising the life of clients
//!0/0$.+1#$!%!*00!$*+(+#%!/

Waste Hawk truck with the first side-loader grab arm, NSW (1989)

In water, Services forged long-term partnerships


with Melbourne Water and South East Water as
governments began to outsource more services.
Within a few short years, Thiess had fitted its
South East Water fleet with the latest GPS
technology and real-time data reporting
a revolution at the time for the industry. In 1995,
Services acquired the Hydrographic Services
Group from the Rural Water Corporation of
Victoria, which proved instrumental to building
Thiess environmental monitoring capability.
Today, Thiess is delivering key contracts in
environmental monitoring and water maintenance
services, including a major program for
Sydney Water.
With its first remediation contract in the 1990s,
Thiess rapidly became Australias leading
contractor delivering challenging projects such
as the Maralinga Nuclear Test Site, 90 per cent

1934

Thiess Bros.
registered

10

1987
Wollongong City
    
Council collection
contract

1998
Maralinga Nuclear
Test Site Remediation

1993
Melbourne Water and
South East Water contracts

1993
Homebush Bay
remediation
projects

Port Kembla Processing Plant, NSW (2007)

of the Homebush Bay remediation works for


0$!5 *!5(5),%/!**5/5%*
Hong Kong (now Hong Kong Disney) and the
internationally-acclaimed Hunter River
Remediation Project in Newcastle.
Thiess powered on, winning key energy contracts
with Ergon and Energex in Queensland and
Western Power in WA. Thiess and client teams
work side-by-side to maintain services and
restore connections in the wake of natural disasters.
In 2007, the business moved into asset and
facilities management as Thiess saw the future
%*+,!.0%+*/* )%*0!**! + 5
+1.0!)/.! !(%2!.%*# +*0.0/"+.
Royal North Shore Hospital and the Victorian
Desalination Plant.
Thiess moved into telecommunications, winning
major Telstra contracts and further expanding
market share through joint venture company
Silcar. After the full acquisition of Silcar, its
communications, energy and infrastructure
services have been integrated with the broader
Services team. Today, the business is delivering
its biggest contract the National Broadband
Network across Queensland, New South Wales
and the ACT, and stands ready to deliver more of
the largest publicly funded national infrastructure
project since the Snowy Mountains Scheme.

2002
Pennys Bay Remediation
Project, Hong Kong

2000
Major Tesltra contracts
through Silcar

2002
Water Corporation of
Western Australian Alliance
(Swan Water)

Pipeworks for South East


Water, Vic (19932012)

INDUSTRY
Maralinga Rehabilitation,
SA (2000)

INSIGHT

Looking back over 80 years, Thiess should be immensely


proud of its contribution to building the nations
infrastructure including countless major road, rail and
dam projects. While not always widely recognised, Thiess
has provided the foundations to many important works
often in a behind-the scenes yet incredibly important way.
Wellcome Australia remediation
Cabarita, NSW (1995)

In addition to construction, the company has also had


an ongoing role, providing key services to a number
of industries. This commitment to the welfare of the
broader community is reflected in the operations and
maintenance of major utilities including energy and water.

Little Manly Point remediation, NSW (1991)

Thiess has always had a strong focus on safety and


best practice and this is well known throughout the
construction, services and related industries. Its also
acknowledged at a government level as a result of
the many partnerships across Australia which have
delivered high-quality infrastructure and services.
The Australian Industry Group has had a long and
positive relationship with Thiess. We have worked
together on developing and advocating many policies
and approaches that have improved the delivery of
important infrastructure.
Congratulations again on this incredible milestone.

INNES WILLOX
Chief Executive,
Australian Industry Group
Melbourne Water maintenance contract, Vic (19932012)

2004
Ergon energy contract

2008
Royal North Shore Hospital
& Victorian Desalination
Plant O&M JV contracts

2005
Energex energy contract

2010
Western Power
energy contract

2009
Hunter River
Remediation Project

2012
Platypus Remediation
Project

2011
NBN contract in
Qld, NSW and ACT

2013
Five-year Sydney Water contract

    

11

CO NT E NTS

CONSTRUCTION

04

MINING

Building
a nation

Surprising new role for Sydney


monorail delivers benefits

22

Relationship contracting key to


advancing industry outcomes
Taking relationship contracting to a new
level could hold the key to our future

Celebrating 80 years of achievement


across Construction, Mining and Services

New CFO
takes the helm

20

Creative reuse of monorail


steel fast tracks NWRL

18

32

Pushing
productivity
boundaries at
Mt Owen
92TWENTY a step change
program is improving maintenance
!%!*%!/0 03!* %*!%*
New South Wales

Thiess welcomes Theresa Mlikota to

0$!.+(!+"$%!"%**%(!.

44

Six community groups have


benefited from the latest

round of funding from Thiess


community grants program

SERVICES

Community groups
receive $50K boost

38

New gauges
cut flood
monitoring
costs
A new flood monitoring device
created by Thiess is delivering
cost savings of up to $40,000
on traditional fixed-monitoring
stations

23

26

Alliances
set new road
benchmarks

Aerial innovation achieves


remarkable outcomes
Two worlds have combined to achieve
remarkable survey outcomes

28

Alliance models continue


to deliver infrastructure
excellence

Iman contract
unites a tribe
A fledgling Indigenous enterprise has
landed a major contract with Thiess

Photographer credit: Christian Pearson (Misheye)

34
35

Radar technology
fundamental to success
Leading radar technology is overcoming

formed a unique relationship to deliver

at Burton Coal Mine in Central Queensland

significant savings at Prominent Hill


Copper and Gold Mine

Experience, track record


secures NT contract
Thiess has returned to iron ore mining

Mobile technology
transforms
maintenance delivery
Thiess Assets and Infrastructure teams move
to a full mobility platform is transforming the
clients approach to planned and responsive

42

$%!//* (%!*0 %*!.(/$2!

challenging site and environment issues

with a contract in the Northern Territory

40

36

Integrated mining
team drives savings

asset maintenance

Fostering local talent


in New Caledonia
The team delivering operations and
)%*0!**! /!.2%!/00$!
Koniambo Power Station is set to leave
behind a proud legacy

IN BRIEF

RTL PRAISED

for firefighting response


Employees working on the Thiess-led RTL joint
venture at Morwell in Victorias Latrobe Valley
have been praised for their role fighting an
out-of-control bushfire which spread to the
Hazelwood open-cut mine.
The team was on hand to support emergency
/!.2%!/* +1.(%!*06!(3++
in an attempt to extinguish the blaze and stop
it spreading. While the initial fire was contained,
a change in weather conditions saw it move
quickly within the mine.
The entire Morwell mine fire was finally declared
safe after more than 45 days of intensive
firefighting.
RTL Mining and Earthworks General Manager
Craig Nuttall said the team made a significant
contribution helping to battle the blaze while
maintaining its commitment to deliver mining
services safely.

We provided around 100 team members, as well


as plant and equipment to help in the firefighting
effort on a 24/7 basis until the blaze was
extinguished, he said.
We also ensured
mining operations
continued to
operate smoothly,
providing support
to all of our
Latrobe Valley
clients including

Hazelwood, Loy
Yang Power and
EnergyAustralia.

I would like to thank all of


the contractors, agencies
and individuals who
worked on the fire [and]
assisted in dealing with
the challenges facing our
Morwell and Latrobe Valley
communities.

George Graham, Asset Manager,


It was a
GDF SUEZ Hazelwood
significant effort
by all involved, particularly our site management
and labour during what was undoubtedly a
%1(00%)!* 0$!5 % %03$%(!)%*0%*%*#
no reportable safety incidents.

NICB MEETS KEY TARGETS


WORLD-LEADING
METHODOLOGY

The Shortland to Sandgate section of the


Newcastle Inner City Bypass (NICB) has
+,!*! 0+0./%#*((%*#0$!+),(!0%+*
of the $143 million four-lane carriageway
between Sandgate Road at Shortland and
the Pacific Highway at Sandgate.
Thiess assumed responsibility to complete the
Shortland to Sandgate section of the NICB in
July 2012, in an Alliance with the Roads and
Maritime Services of NSW (RMS).
The project involved building 1.8 kilometres of a
four-lane, divided road, including five specially14

    

EXEMPLARY

SAFETY RECORD

designed bridges built to combat the soft soil


in the surrounding wetlands and limit
environmental impacts.
Project Manager Matt Quinn said the team
delivered the project with world-leading
construction methodology including launching
twin bridges over the Main North Rail Line
one of Australias busiest rail corridors using
hydraulically-linked jacks incorporated into the
temporary launch bearings. It was one of just
a few times this method had been used in
Australia.

100% GREEN
RATING

The team achieved an exemplary safety record


with zero lost time injuries and 100 per cent
green rating from client inspections. This was
in recognition of our exceptional environmental
management which included sediment basins
to control run-off and providing habitats for
the endangered green and Golden Bell Frog.
Work will continue in the area as the project
team rebuilds the existing roundabout near the
Hunter Wetlands Centre on Sandgate Road and
the southbound on-ramp to the Jesmond to
Shortland bypass.

IN BRIEF

REMEDIATION
PROJECTS
EXCEED 130

Thiess Services team has successfully


remediated a former gasworks site in
Toowoomba for Energex, bringing the total
number of completed remediation projects
to more than 130.
The $20 million project took two years to
complete and was awarded based on Thiess
earlier success on a similar project in West End,
Brisbane.

and the by-products, which include ash and tar,


are highly odorous when disturbed.
As part of the remediation project, Thiess
removed more than 113,000 tonnes of
contaminated material to depths of 10 metres.
During works, the team controlled odours by
using a large purpose-built diffusive odourcontrol enclosure, including fragranced misting
sprays to neutralise any escaping smells.

The site had been contaminated by the


manufacturing process used to make gas

NEW CONTRACT
TO POWER
SA & NSW

CONTRACT EXTENDED
AT CURRAGH NORTH
Meeting the expectations of client Wesfarmers
Resources through improved performance and
!%!*%!/$/.!/1(0! %*$%!///!1.%*#
four-year, $570 million contract extension at
Curragh North Coal Mine in the resource-rich
Bowen Basin.

A reputation as a trusted partner


has helped Thiess Asset and
Infrastructure business unit secure a
)%((%+*2!5!.,!.0%+*/*
%*0!**! +*0.0"+."+1.
diesel power stations three in South
Australia and one in New South Wales.
The unique contract involves
maintaining and operating four super
peaker stations which only power up
when the electricity pool price rises
above $300 Mw per hour.
Its a significant contract for client
Infratil because they rely on these
power stations to be fully operational
and ready to perform at the optimum
level during peak electricity times
throughout the year, Project Manager
Infratil Power Erik Rimsa said
The contract was awarded based on
our solid reputation delivering reliable
power station asset operation and
management on projects including
the TRUenergy Yallourn Power Station
Alliance and Loy Yang Power Station
Alliance in Victoria.

$10

MILLION

5-YEAR

O&M

84 DAMS
IN 80 YEARS
Thiess is set to undertake its 84th
dam project after securing a contract
from Melbourne Water to upgrade the
Greenvale Reservoir.

Executive General Manager Australian Mining


Michael Wright said the new agreement is
testament to Thiess ability to adjust to changing
market conditions and complements our current
10-year agreement signed in 2010.
Wesfarmers decision not to go to market is
testament to the working relationship developed
throughout the life of the project.

4-YEAR
EXTENSION

$570

MILLION

The project firmly positions Thiess as the


countrys leading dam contractor, having
delivered more projects than any other
company.
Greenvale Reservoir has a 27.5 million litre
storage capacity and was constructed in
1971. It is Melbournes largest urban dam,
located just 20 kilometres from the CBD.
Thiess has been engaged to upgrade
the earth dam in order to utilise its full
storage capacity so it can meet growing
demand and to ensure it complies with
new design guidelines.
15

IN BRIEF

MD CHAMPIONS DIVERSITY

Achieving real change in gender diversity requires


committed and inspirational leaders working
together to achieve better outcomes.

Thats what Thiess Managing Director


Bruce Munro told CEDAs recent Women in
Leadership Forum, following the release of the
first Queensland Male Champions of Change
(QMCC) report, Get in the Game.
The message was reiterated by all of the
champions on the panel, who also addressed
the 900-strong crowd in Brisbane.
The QMCC members were selected for their
willingness to improve diversity and inclusion
in their particular workplaces and represent a
range of Queensland-based companies including
Ausenco, Aurizon, A P Eagers, Cardno, Super
Retail Group, Wesfarmers Resources, Bank of
Queensland and the University of Queensland.

.1!.!.)! $%!//+))%0)!*00+
addressing gender imbalance, particularly in
the male-dominated mining and construction
industries.
To begin with, we have to immerse ourselves
in the agenda or as the title of the report
suggests, Get in the Game, Bruce said.
We need to move past developing ideas and
focus on taking action, and thats a leadership
challenge that we all need to take up.
Partnering with other leaders to look at gender
imbalances and committing to doing something
about it makes good business sense.

As business leaders, its beholden on us to lead


change and I look forward to a day when gender
equity is part of our culture.
As detailed in the report, Thiess has also
participated in pay equity reviews and has
facilitated focus groups and roundtable
discussions with women from across the
businesses and we will ensure this continues.
I am convinced that diversity will improve our
business, but that can only be achieved through
an inclusive culture where different perspectives
are heard and valued, Bruce said.
I have two daughters and I would like to think
that they have as much opportunity as my sons
have in any industry, doing any role they choose.

ROY HILL SMPEI WORKS

CONTRACT SECURED
Thiess has been awarded a $330 million contract
5)/1*#0++*/0.100$!)%*!,.+!//
plant facilities for the Roy Hill iron ore mine in
Western Australia.
The contract includes construction of the
structural, mechanical, piping, electrical and
instrumentation works (SMPEI) which are being
designed and supplied by Samsung.

16

    

The company has a long association with iron


ore projects in the Pilbara and this contract
represents a continuation with a new client.
Work is expected to commence on site in July
and generate up to 1,000 jobs for approximately
14 months.
The Roy Hill deposit is located about 280
kilometres south of Port Hedland.

$350

MILLION

JULY
START
1000

JOBS

IN BRIEF

WOMEN IN MINING

13.1%
IN 2013

STRATEGY WINS ACCOLADES


THE OVERALL FEMALE PARTICIPATION RATE AT THIESS AUSTRALIAN MINING BUSINESS HAS
NEARLY TREBLED IN JUST TWO YEARS, RISING FROM 4.7 PER CENT IN 2011 TO 13.1 PER CENT
AT THE END OF 2013.

4.7%
IN 2011
FEMALE PARTICIPATION AT
THIESS AUSTRALIAN MINING

This commitment to gender diversity has been


recognised with four major industry awards and
puts the company on track to increase female
participation to 17 per cent by 2015.
Australian Minings efforts to promote gender
inclusion and accelerate the progression of
women into senior management roles have
earned top honours with the resource industrys
peak national employer group.
The Women in Mining strategy won the
Australian Mines and Metals Association
Australian Women in Resources Alliance Award
in recognition of the industry-leading strategies
to help attract and retain women in the
workplace.

Thiess Diversity Advisor Penny Hamilton, Mining Superintendent Leah Ross

The team has also been acknowledged by


the New South Wales Minerals Council as the
Best Company Initiative at its annual Women in
Mining Awards and the Excellence in Leadership
Women in Resources category at the South

Australian Premiers Community Excellence


Awards.
There was further recognition at the Queensland
Resources Council Resource Awards for Women
when Leah Ross, Mining Superintendent at
1..#$+.0$3+*0$!10/0* %*#,!.0+.
Award. As Thiess first female superintendent,
Leah has been a trailblazer for women in the
industry.
Thiess Executive General Manager Australian
Mining, Michael Wright, paid tribute to his teams
diversity commitment.
I am proud to say that the energy and focus
that our team has put into diversity is starting
to make a real impact, not only in our business,
but across the industry, he said.
Research indicates a diverse workforce increases
an organisations effectiveness, resulting in
improved services to clients.

and Mining Coordinator Lauren Beresford at the Queensland Resources


Councils Resources Awards for Women

TEAM CELEBRATES

NINE YEARS LTI FREE

THE CONSTRUCTION TEAM ON THE SOROWAKO PROJECT IN INDONESIAS


SOUTH SULAWESI REGION HAS CELEBRATED A SIGNIFICANT SAFETY MILESTONE,
ACHIEVING MORE THAN 6 MILLION PROJECT HOURS LOST TIME INJURY (LTI) FREE.
Thiess commenced working on the Sorowako
Project in 1996, conducting maintenance, civil
and construction works to support PT Vale
Indonesias nickel process plant facilities and
mine. The team has not had a LTI since 2004.
Thiess Project Manager Yosia Rantemangiling
(pictured) said the outstanding accomplishment

reflects the effort of every single team member.


Safety is a priority for everyone on the project
we all want to go home safe every day,
Yosia said.
This achievement reflects the teams dayin, day-out commitment which has remained
constant for more than nine years.

6HOURS
MILLION
LTI FREE
    

17

NEW CFO

TAKES THE HELM


$%!//3!(+)! $!.!/ (%'+00+0$!.+(!+"$%!"%**%(!.
in April, following the departure of Sue Palmer who announced her retirement
late last year after a successful three years in the role.
Theresa brings to Thiess more than 20 years experience, having worked
primarily across the resources sector in a number of senior finance positions.
Joining Thiess in its 80th year, Theresa and her team will help lead the
company through the next important phase of its evolution and continue
to deliver robust governance structures that will underpin the companys
continued success.

18

    

MORE THAN

20
YEARS
EXPERIENCE
WHAT ATTRACTED YOU TO THIESS?
It was the passion of the people that I found compelling.
When I met with MD Bruce Munro he spoke about the
companys culture and he used the term band of brothers.
Culture permeates an organisation from the top down and
the strong Thiess culture is testament to Bruces leadership
and values. The passion of the Executive Team is also palpable
and Im looking forward to working with them to make Thiess
*!2!*/0.+*#!.* )+.!!%!*0+.#*%/0%+*%* %*#
workplace where the people are united in their focus isnt
easy and its a great privilege to have found the real deal.

FROM THE OUTSIDE LOOKING IN, WHAT


DO YOU BELIEVE HAS BEEN THE KEY TO THIESS
SUCCESS OVER THE PAST 80 YEARS?
Its that entrepreneurial spirit which is so ingrained in the
companys DNA. Thiess has been a trailblazer in many respects
especially when you think of how far its come from a
humble road builder on the Darling Downs to an industry leader
in Australia. This longevity stems from its agility and innovative
thinking, as well as its ability to continually evolve to meet
market opportunities. These strengths have been prevalent
since the beginning and remain key to Thiess future.

EXTENSIVE

RESOURCES

SECTOR KNOWLEDGE

WHAT ARE THE GREATEST MARKET CHALLENGES


THAT COMPANIES LIKE THIESS FACE?
The industries in which we operate are becoming increasingly
price competitive as the number of competitors grows and the
2+(1)!+"*!33+.' %)%*%/$!/1.#.!0!/0$((!*#!%/0+
deliver excellence on our projects while delivering greater value
to our clients. Moving forward, we will need to be even more
,.+ 10%2!!%!*0* 001*! 0++1.(%!*0/*!! /+#!0$!.
with my team, we will ensure the systems and processes we
have in place continue to support us and deliver the best
possible outcomes for our clients and partners.

JOINED THIESS

APRIL 2014

WHAT DO YOU SEE AS THE BIGGEST


OPPORTUNITIES FOR THIESS
IN THE FUTURE?
Theres a list of exciting infrastructure projects being planned
in Australia in the years ahead that Thiess is well positioned to
deliver. These include the Toowoomba Second Range Crossing
and Brisbanes Bus and Train Project (BaT) in Queensland, as
well as the WestConnex M4 Widening Project in Sydney and
East West Link packages in Victoria.
In services, the demand for optimising the long-term value of
our clients assets will increase as major infrastructure projects
are completed and come on line.
Coal development in the Galilee Basin and iron ore production
in the Northern Territory and Western Australia continue to
present many opportunities for our mining business, despite
5(%().'!0 +3*01.*/$+.!3!3%((+*0%*1!0+
focus on emerging markets in Asia. These are all important
opportunities for Thiess and Im very excited to be in a position
to support the companys continued growth and future success.

    

19

CREATIVE REUSE OF

MONORAIL STEEL
FAST TRACKS NWRL

AN INNOVATIVE SOLUTION TO REDUCE COMMUNITY IMPACT FROM


CONSTRUCTION OF THE NORTH WEST RAIL LINK (NWRL) PROJECT

22

HAS GIVEN THE FORMER SYDNEY MONORAIL A SURPRISING NEW


   
 

ROLE IN DELIVERING THE CITYS RAIL FUTURE.

 
 

23

ALLIANCES SET NEW


  

25

DRIVING
GREATER VALUE


26

   
ACHIEVES
REMARKABLE
 

27

 
 

28


UNITES A TRIBE

29

 
 
    
CHALLENGE

30

FIRST UNDERSEA
  
LNG INDUSTRY WINS
SUSTAINABILITY
AWARD

Sixty steel beams removed from the monorail last


year many from Pitt Street in the CBD have
been refurbished and used to build a temporary
road bridge at the site of the new Norwest railway
station. Norwest is one of eight new stations on
Australias biggest public transport project.
Project Director for the Thiess John Holland
Dragados (TJHD) Joint Venture which is delivering
the tunnel and station civil contract for NWRL,
Terry Sleiman, said his team was looking around
for the steel needed to build the bridge when they
heard the demolition of the Sydney Monorail was
underway.

We immediately said well take that and began


working on a design that could use the monorails
beams to form the main structural part of the
temporary bridge, he said.
There were substantial benefits in purchasing the
monorail sections from the demolition company
that went beyond the substantial savings on the
costs of raw steel.
The monorails box girder design and beam
lengths eliminated the need for precast concrete
panels in the formwork and enabled us to pursue
a much simpler construction methodology using
bridge girders.

THE NORTH WEST RAIL LINKS TWIN 15KM


TUNNELS ARE THE LONGEST RAIL TUNNELS
TO BE BUILT IN AUSTRALIA, FORMING PART OF
SYDNEYS BIGGEST PUBLIC TRANSPORT PROJECT
SINCE CONSTRUCTION OF THE HARBOUR BRIDGE
ALMOST A CENTURY AGO.

THE FIRST NORTH WEST RAIL LINK TUNNEL


BORING MACHINE (TBM) WILL BE IN THE
GROUND BEFORE THE END OF OCTOBER AS
WORK MOVES FORWARD RAPIDLY ON THE
$8.3 BILLION INFRASTRUCTURE INVESTMENT.
THE REMAINING THREE TUNNEL BORING
MACHINES WILL FOLLOW SHORTLY AFTER.

It also means demolition will be simpler,


potentially saving several months off the typical
removal schedule expected for a bridge with a
traditional beam design.
.%#%*(,(*/,.+,+/! (+/%*#.++'$+((+32!
at the intersection of Norwest Boulevard for up
to three years to allow the underground train
station to be built.
We met the challenge to minimise disruption to
the community using a temporary bridge
constructed at road level which would allow the
road to re-open and the excavation of the new
station to continue underneath, Terry said.

This would mean Brookhollow Ave was only


closed for about four months while the
temporary bridge was built.
The monorail beams were welded and
refurbished in Sydneys west to make 29 bridge
girders, weighing between 11 and 17 tonnes each
and spanning more than 32 metres in length.
Due to their size, they could only be transported
from the fabrication workshop to the site
between the hours of midnight to 5am,
Terry said.

measures were implemented such as using slings


rather than chains to reduce noise that might
affect nearby residents.
The complex operation took place over three
nights, eliminating the need to unload and re-lift
during the day.
This solution helped minimise the impact on local
0.* 0$!+))1*%05* .! 1! 0$!
safety risks associated with a second lift.

*..%2(0$!53!.!(%"0! %.!0(5%*0+,(!
using a 200-tonne crane and a number of

    

21

RELATIONSHIP CONTRACTING

KEY TO ADVANCING
INDUSTRY OUTCOMES

THE WORLD OF CONTRACTING BRINGS A UNIQUE SET OF CHALLENGES


AS PARTIES OFTEN FACE COMPETING INTERESTS IN THE PURSUIT OF
DELIVERING LARGE-SCALE AND COMPLEX INFRASTRUCTURE.

Thiess Managing Director Bruce Munro says if our


industry is to prosper in the future, we need to
find better and smarter ways that allow us to
reduce the extraordinary waste in tender costs,
equitably share the risk, unlock innovation and
collaboration, and drive overall project
performance. He believes the key to reaching
these outcomes is for clients and contractors to
take relationship-style contracts to a new level.
If our industry is serious about cutting costs and
!+)%*#)+.!!%!*0/%),(!/0.0%*#,+%*0
is to eliminate the enormous waste caused by an
archaic and flawed tendering process that tries
to equate low price with value.
Australian contractors are spending an excessive
amount of money on bid costs. I would suggest
up to half a per cent of the project value. The
industry (including resources and infrastructure)
procures approximately $120 billion worth of
work each year and as each project invites three
companies to tender, contractors will spend up
to $1.8 billion in tendering costs. This equates in
real terms to $900 million wasted on losing. If we
include the cost of engaging subcontractors, we
could add an additional 40 per cent, bringing
the real cost of lost tenders to approximately
$1.2 billion annually.

Australian contractors are


spending an excessive amount
of money on bid costs.

Its little wonder international contractors claim


Australia as the most expensive market in which
to tender globally.
With limited opportunities and lots of
competition, its certainly a buyers market.
Clients only have to sit back and watch as
2222

    


    

competitive forces drive prices down, pressuring


margins and putting profitability at risk.
A relationship style of contract that is
underpinned by transparency of cost, risk sharing
and a team approach incentivised to deliver
great outcomes will achieve the best price and
remove the potential battlefield of disputes that
in most cases arise when conventional contracts
are used.
Modern-day alliancing has its origins in the UK
where it was first used in the mid-90s to enable
step change improvements in the delivery of
complex offshore oil and gas projects. Sydney
Water Corporation embraced the idea of
alliancing to deliver a complex wastewater
project that had to be ready in time for the
5 *!5(5),%/
Thiess, like many other contractors, has seen
firsthand the benefits that alliances bring. Its
evident on projects like the recently-completed
M80 Ring Road Upgrade and West Gate Freeway
Upgrade in Victoria, and the award-winning
Hunter Expressway Stage 2 Project in New
South Wales.
These large complex projects delivered
exceptional results, many exceeding KPIs and
stretch targets. But the real value gained is the
enduring relationships and even more
importantly, the opportunity to bring innovation
to the fore in a culture that values good ideas
and team work.
Alliances continue to evolve in the UK with new
models emerging. These include ProCure21, a
national framework agreement implemented by
government whereby six key contractors have
been selected, via one tender process, to deliver
10 years of capital investment projects.
Delivering excellence is the driver as it forms the
basis of future work. This process eliminates
wasteful tendering costs and incentivises
performance in project delivery.
A similar framework has been implemented
closer to home. The Melbourne Water Program

Service Providers Framework is being used in


Victoria and two joint ventures, one of which is
the Thiess/Black and Veatch JV, tender for the
projects as part of the Water Plan 3 Capital
Program. The value of this program over the
five year Water Plan 3 period (July 2013
to June 2018) is $1.04 billion or approximately
$200 million per annum and individual packages
of work will be awarded on an ongoing,
competitive basis.
There are also other models to consider that
have been used on mega projects overseas.
$!/!%*(1 !0$! +* +*(5),%/* 0$!
15 billion Crossrail project where government
appointed the private sector to take the lead in
delivering the packages of work. In contrast to
the single delivery partner model adopted by the
(5),%!(%2!.510$+.%05.+//.%($/
assigned two private partner organisations - the
Programme Partner and the Project Delivery
Partner - working under a strict governance
structure imposed by Department of Transport.
Interestingly, on the surface this appears similar
to an EPCM but the big difference is the
introduction of an innovation incentive available
to all contractors on site.
There is a subtle shift that needs to happen here
one that requires a change in mindset, a
willingness to engage early and as one team.
0*!! /0+! .%2!*5(! !./$%,5/
and executives who are prepared to challenge
the status quo and take a leap of faith that
theres a better way to move our industry forward.
Staying tuned to our clients, our markets and the
global economy is vital to ensuring success. If we
consider where we find ourselves today, there is
clearly a need that goes beyond our futile
attempts to drive down costs one that requires
early engagement, transparency and allows
innovation to be unleashed. Thats why taking
relationship contracting to a new level could
hold the key to our future.

MULTIPLE M80 INNOVATIONS

ENHANCE SAFETY
CONSTRUCTED IN A LIVE TRAFFIC ENVIRONMENT, WITH MORE THAN 142,000 VEHICLES
CONTINUING TO USE THE ROAD EACH DAY, THE M80 RING ROAD UPGRADE HAS SET NEW
STANDARDS FOR MAJOR ROAD PROJECTS IN VICTORIA.

LOCATION Melbourne, VIC


CLIENT VicRoads
VALUE $660 million

2014 AUSTRALIAN
CONSTRUCTION AWARD

DATE July 2009 July 2013

FINA LIST

Delivered by the Tulla Sydney Alliance (TSA)

Under the largest single contract ever awarded


by VicRoads, the 9.7km Calder Freeway to
Sydney Road section was delivered safely, on
time and on budget by the Thiess-led Tulla
Sydney Alliance despite weather delays and
the significant risks associated with working
next to a major road corridor.
To overcome significant safety challenges, the
team developed the award-winning anti-gawk
screen design, significantly reducing the risk of
employees being injured at work.
The screens traditionally used were not rated
for impact and the team recognised a new
design was needed to guard workers against
large and heavy missiles, like runaway truck
tyres, which could inflict serious injury. It also
needed to address the critical risk of maintenance
workers having to remove old or damaged

/.!!*/%*(%2!0.* 0$!.%/'0+ .%2!./


".+)/.!!*//3%*#%*#+10%*0+(%2!0.
The result was a revolutionary impact-rated
screen, capable of withstanding a truck tyre
travelling at 80km/hr. More than 4,000 of the
screens were installed between the Calder
Freeway and Sydney Road to protect the
workforce. They are now being used extensively
on the Regional Rail Link: Footscray-Deer Park
project and are now considered industry-best
practice by VicRoads.
The Alliance also worked collaboratively with
VicRoads to design out maintenance issues.
Asset handover information was provided in
a timeframe surpassing other projects and
was presented via an online portal a format
VicRoads has now adopted for future projects.

TSA implemented a wide range of innovations to deliver value-for-money and leave


a legacy that has made road construction safer in Victoria.
,.+0+05,!"+.*10+)0! 0.+*!
placement and removal machine eliminated
3+.'!./!4,+/1.!0+(%2!0.
.%,+ )+1*0! /,!! )!./!*/1.!
greater compliance with roadwork speed
limits, delivering a first for Victoria

23

    


1% !(%*!/"+.1/!+".1' +1*0!
Attenuators to improve safety and achieve
consistency were developed and since adopted
by VicRoads

!((+3(%*!).'%*#)* 0! "+.
construction sites on the M80 Upgrade,
and now under consideration by VicRoads
for all construction works throughout Victoria

HUNTER EXPRESSWAY EMBODIES

ENGINEERING
EXCELLENCE

2014 NATIONAL
INFRASTRUCTURE AWARD
CONTRACTOR EXCELLENCE

W INNER

LOCATION Hunter Valley, NSW


CLIENT Roads and Maritime Services (RMS)
VALUE $885 million
DATE August 2010 August 2013

ALLIAN
SET NEW

2014 AUSTRALIAN
CONSTRUCTION AWARD

Delivered by Hunter Expressway Alliance


THE HUNTER EXPRESSWAY ALLIANCE TRAVERSED THE
RUGGED SUGARLOAF RANGE, NAVIGATING UNDULATING

FINA LIST

FORESTS, WATERCOURSES AND AREAS OF CULTURAL


HERITAGE, TO DELIVER ONE OF THE LARGEST AND MOST
COMPLEX PROJECTS IN NEW SOUTH WALES HISTORY.
Completing Stage 2 of the $1.7 billion Hunter
Expressway, the Thiess-led Alliance reduced
the amount of on-site construction in this
environmentally and culturally-sensitive area
by using precast segmented balanced cantilever
bridges. In total 177 column segments and
566 deck segments weighing up to 110 tonnes
each were produced to millimetre accuracy
and transported through the ranges via purpose
built access tracks.
A launching gantry 165 metres long, 16 metres
high and weighing approximately 1,000 tonnes
was used to erect the deck segments to
75 metre-long bridge spans.
,0%)%/0%+*/0.0!#%!/%*(1 ! "+1/%*#
concept design and approvals on minimising
disturbance to vegetation, erosion management
and sediment control. Achieving outstanding

    

results, the team reduced clearing below the


agreed targets and managed cross drainage
sites and temporary controls to above-industry
standards.
The team also faced the logistical challenge of
drilling and filling the old mine workings and
simultaneously constructing the sub-structure
for the viaduct bridges in the steep terrain.
Requiring meticulous planning, out-of-the-box
thinking and precise coordination, it necessitated
one of the most sophisticated mine fill projects
to date and provided significant improvements
over standard industry practice. The supply of
grouting materials was a major operation
involving trucking of 174,000 tonnes of fly ash
and 13,500 tonnes of cement via access tracks
to the sites specially-adapted grout batch plants.

$40
MILLION
BELOW OVERALL TARGET

OUTTURN COST

COMPLETED MORE THAN

5 WEEKS

AHEAD OF SCHEDULE
PRESERVED AND
PROTECTED IMPORTANT

HERITAGE ITEMS

CES

ROAD BENCHMARKS

    

25

Photographer credit: Christian Pearson (Misheye)

SMART DESIGN

BOOSTS WEST GATE FREEWAY CAPACITY

2011 AUSTRALIAN
CONSTRUCTION
ACHIEVEMENT AWARD
W INNE R

SMART DESIGN ON THE AWARD-WINNING WEST GATE FREEWAY UPGRADE IN


MELBOURNE REDUCED TRAVEL TIMES AND INCREASED TRAFFIC CAPACITY BY
26 PER CENT, REJUVENATING MELBOURNES TRANSPORT SPINE AND PROVIDING
A SAFE, FREE-FLOWING JOURNEY FOR COMMUTERS.

LOCATION Melbourne, Victoria


CLIENT VicRoads
VALUE $600 million
DATE0+!.!!)!.

Focused on delivering exceptional project


outcomes, the alliance team made extensive
changes to the concept design to drive
significant improvements in functionality.
Innovations included the revised layout of the
Montague Street interchange to a single point
urban diamond, providing 30 per cent more
0.)+2!)!*0* ,%05"+.0.0+
queue safely.
The upgrade involved the construction of
elevated viaducts, ramps and a new intelligent
freeway management system, amid the
complex environment of Victorias busiest
road corridor. With more than 160,000 vehicles
passing through this section of the freeway
every day, the project site was an intense live

FOUR MONTHS

AHEAD OF SCHEDULE

0.!*2%.+*)!*03%0$(%)%0! +*/0.10%+*
access. Smart planning required only six of
the 16 full freeway closures originally planned,
.!0%*#"1.0$!.!%!*%!/
+((+3%*#0$!/0#! .),+,!*%*#/%*0+!.
2009, travel speeds on the freeway improved
by an average of 20 kilometres per hour
westbound and 10 kilometres per hour
eastbound during peak travel times.
As part of an award-winning alliance, Thiess
completed the West Gate Freeway Upgrade
- part of the largest state-funded road project
in Victorias history - more than four months
ahead of schedule and within budget.

ON BUDGET

Delivered by West Gate Freeway Alliance

The project team also implemented


sustainability initiatives that set new industry
benchmarks and contributed to changes in
VicRoads environmental specifications.

$!,.+&!0/.+*"++0,.%*03/.! 1!
by 34 per cent through the use of alternative
materials and the recycling material from the
demolition of the existing eastbound onramp
*/+)!.!/0. %0%+*(+*.!0!3/
replaced with the environmentally-friendly
E-Crete, which results in up to 80 per cent
"!3!.2 emissions and uses up to 65 per
cent less water.

$!0!)2+% ! 1/%*#)3 of landfill
space by eliminating more than 12,000 truck
movements on public roads and reducing
fuel consumption by 11,000 tonnes of carbon
dioxide equivalent.
    
    

24 26

DRIVING GREATER VALUE

ON WESTCONNEX

IN LATE 2012, THE NEW SOUTH WALES GOVERNMENT TOOK AN ALTERNATIVE APPROACH
TO HELP SHAPE ITS WESTCONNEX PROJECT, HIGHLIGHTING THE BENEFITS OF SEEKING
CONTRACTOR EXPERTISE AT THE BEGINNING OF THE PROJECTS LIFE CYCLE.
The Government initiated an Industry Partner
Development Scheme, commissioning
organisations from the construction industry
to lead a review of the various sections of the
project, ensuring the best value-for-money
solution was part of the project planning process.
Its this early consultation with industry that
can help deliver the best possible transport
solution, greater value for taxpayers and set a
benchmark for the way major projects are
shaped in the future.
Linking Sydneys west and south-west with
the CBD, Sydney Airport and Port Botany, the
WestConnex project is currently Australias
most significant transport undertaking. The
Government selected Thiess to lead a consortium
to develop plans for the Airport Access Link
and Inner West Tunnel.
Thiess General Manager Tunnelling, Steve Wille,
said the contractor-led review provided valuable
input into the WestConnex reference scheme.
The Government had previously commissioned
a number of consultant-led feasibility studies but
further development work towards a reference
design benefited from construction input,
Steve said.

functionality and our task was to find the


solution which best met all of their objectives.
While our core business will always be
construction, our involvement during the early
stages of major projects like this, ensures
constructability is built in from the very
beginning. It also means our clients can make
value for money decisions due to our thorough
knowledge of the project costs and construction
methodology.
Steve said all clients would benefit from seeking
contractor expertise in the very early stages of
major projects.
By looking at the project from a construction
point of view, we can offer the client an extra
level of value engineering which they are not
going to get elsewhere, he said.
The client benefits because they have all of this
information early and can ensure the best ideas
are fed into a concept design and the
development of the Environmental Impact
Statement.
We believe there is much more scope for this
type of work to be done with all of our clients
and hopefully reduce the timeframe for large
projects coming to the market.

The client was very explicit - they needed to


create significant savings without compromising

    


    

25 27

23800

23830

23850

23880

23900

23910

23920

23930

CT

24150

24200

24250

24300

24350

24400

24450

24500

24550

24600

24650

24700

24750

24800

24850

24900

24950

25000

25050

25100

25150

25200

25250

25300

25350

25400

25450

25500

25550

25600

TC

25650

25860

25870

25880

25930

25950

25980

26000

26030

26050

26080

26100

26130

26150

26180

26200

26230

26280

26320

27370

27360

27350

27340

27330

27320

27310

27300
27290

27280

27270

27260

27250
27240

28030

28020

28000
28010

27990

27980

27970

27950
27960

27940

27930

27920

27900
27910

27890

27880

27870

27850
27860

27840

27830

27820

27800
27810

27790

27780

27770

27750
27760

27740

27730

27720

27700
27710

27690

27680

27670

27650
27660

28430

28420

28400
28410

28390

28380

28370

28350
28360

28340

28330

28320

28300
28310

28290

28280

28270

28250
28260

28240

28230

28220

28200
28210

28190

28180

28170

28150
28160

28140

28130

28120

28100
28110

28090

28080

28070

28050
28060

28040

28800
28810

28790

28780

28770

28760

28750
28740

28730

28700
28690

29220

29200
29210

29190

29180

29170

29150
29160

29140

29130

29120

29100
29110

29090

29080

29070

29050
29060

29040

29030

29020

29000
29010

28990

28980

28970

28950
28960

28940

28930

28920

28900
28910

28890

28880

28870

28850
28860

28840

28830

29600
29610

29590

29580

29570

29550
29560

29540

29530

29520

29500
29510

29490

29480

29470

29450
29460

29440

29430

29420

29400
29410

29390

29380

29370

29350
29360

29340

29330

29320

29300
29310

29290

29280

29270

29250
29260

29240

29230

30010

30000

29990

29980

29970

29960

29950
29940

29930

29920

29910

29900
29890

29880

29870

29860

29850

29840

29830

29820

29800
29810

29790

29780

29770

TC 29733.792 29730

29750
29760

29740

29720

29700
29710

29690

29680

29670

29650
29660

29640

29630

29620

30840

30830

LR54.625
999.999
31050

31040

-3006.315
L 2594.563

-2994.000
R L 2582.148

31030

31020

120
30970130

L13350'51"
145.375

31020

31010

31000

90
100

30990

110
30980
31000

30990

30960

30950
140
30980

30970

30940
30930

TC

640
630
620
610

600

30810
0.000

30820

10

646.715

30810

590
30790

20

30850

30800

30780

30

30860

30790

580

CT
30770

40

30870

570

TC

CT

TC
30760

50

30880

30780
60

30890

30770

30760

560

550

30740

70

30900

30890
30880

30870

30860
30850

30840

30830
30820

30800

30750

30740

540

530
533.347

30750

30720

31010

150
160

30960
170

30950

180

30940
190

30930
200.000
200

30920

210

30910

31030

31060

220

30900

31040

31070

230

31080

31070

31100

31060

31090

31050

1800.000
RL 100.000

31080

31110

31090

31120

31130

31120

31150

31110

31140

31100

31130

31160

31140

31170

1371'50"
L 65.905

31180

31200

31160

31190

31150

31230

31280

31240

31270

31230

31260

31220

31330

31290

31320

31280

31350

31300

31310

31340

31380

31340

31370

31330

31360

31320

31400

31350

31360

31390

31430

31390

31420

31380

31410

31370

31450

31400

31410

31440

31480

31440

31470

31430

31460

31420

31450

31460

31500

31490

31510

31470

31520

31480

31530

31490

31500

31510

31550

31540

31550

31750

31740

31690

31730

31680

31720

31670

31710

31660

31650

31700

31690

31640

31680

31630

31670

31620

31660

31600

31610

31650

31640

31590

31630

31580

31620

31570

31610

31560

31600

31590

31540

31580

31530

31570

31520

31560

31800

31790

31740

31780

31730

31770

31720

31760

31710

31700

31850

31840

31790

31830

31780

31820

31770

31810

31760

31750

31900

31890

31830

31840

31880
31870

31820

31860

31810

31800

31950

31890

31880
31870

31850

31860

31940

31930
31920

31910

32000

31940

31990

31930

31980

31920

31970

31900

31910

31960

32050

32100

32150

32080
32070

32050

32060

32220

32200

32240

32310

32230

32290

32300

32250

32260

32300

32310

32350

32360

32400

32410

32450

32460

32500

32510

32550

32560

32690

32700

32680

32600

32700

32710

32740

32810

32720

32730

32790

32800

32780
32770

32690

32760

32670

32650

32660

2021'22"
L 705.513
32640

32680

32740

32750

32730
32720
32710

32620

32630

2022'54"
L 705.792

32610

32670

32590

32660

32570

32580

32640

32650

32630
32620

32540

32610

32520

32530

32590

32600

32580
32570

32490

32560

32470

32480

32540

32550

32530
32520

32440

32510

32420

32430

32490

32500

32480
32470

32390

32460

32370

32380

32440

32450

32430
32420

32340

32410

32320CT
32321.316

32330

32390

32400

32380
32370

32290

32360

32270

32280

32340

32350

32330
CT 32315.940 32320

32280

32210

32270
32260

32190

32180

32240

32250

32170

32230

32150

32160

32220

32210

32130
32120

32100

32110

32140

32190

32200

32180

32170

32160

32090

32140

32130
32120
32110

32040

32090

32030

32080

32020

32070

32000

32010

32060

31990

32040

31980

32030

31970

32020

31950

31960

32010

32790
32780
32770

32750

32760

32820

32800

32810

This is Thiess innovation at its best, Bill said.


Were improving safety, saving time and vastly
increasing the data we have on any one project.

31310

REVOLUTION IS UNDERWAY.

31270

THE NEXT BIG INNOVATION MIGHT EMERGE, BUT AT THIESS, ANOTHER

31260

MINING AND CIVIL CONSTRUCTION, ITS HARD TO IMAGINE WHERE

31300

31250

AMID THE BULK EARTHWORKS AND MASSIVE MACHINERY OF MODERN

31290

ACHIEVES REMARKABLE
OUTCOMES

31250

31200

31210

31240

-60.000
LR 38.972

31190

31220

31180

31210

31170

370
380

404.877

400

390

90

30910

30730
30720

520

500

510
30730

350

80

5356'34"
L 113.368

100

30920

30700

110

80

120

70

30710

130

54.625 60

30700

490
30680

140
141.637

427.450
430
443.465

440
450
460

470
480
30680
30710

30690

30650

TC

50

25.000
LR29.794
3462'38"
L 27.240

CT

30660
270

40

30640
30670

30610
290

30

30620

280

RL -75.000
89.882

410

30690

30630
30660

30650

30600
300

20

30620
30590

310

10

30670

30610

30600
30580

320

0.000

400
397.657

370

30590
30580

RL -75.000
78.089

30560
340

L12236'27"
16.015

420

360

30550
350

25.000
R
L 29.794

390
380

340

330

30640

30550

30530

30500
30490

30480
1662'38"
L 14.301
263.821260

150
145.954

30460

25.000
LR29.794
CT

TC
30410

120
30410

30630

480

RL -60.000
73.745

30400

510

5419'33"
L 120.925

30390

30380

100
90
80
70

30570
330

30430

30420
470

210

30420
490

190

30570
30540
360

270

500

200

30450
440

230

30440

450

180

30560
30530
370

240

30460

430

260

30540
30510

390

220
CT 219.698

30430

460

30440

140
130
30360

30340

60
30350

530

170

30510

410

250

30360
520
521.737

110
30330

30310

40
30340

30
20
10

30520
30520

30500

30490

30480
30470

CT

30450

540

160

384.745380

30330

30320
TC

280

550

TC 246.938

TC
420.609
420
414.539

30290

CT

276.732

560

CT

30310
570

290

30290

590

300

30400

30390

30380

30370

30320

30280
30300

30470

580

5627'54"
L 145.954

30280
600

310

30270

610

320

50

0.000
30260

30240

30230
30260

30210

30200
30190

30180

30160

30150
30140

30130

30120

30110

30100
30090

30080

30070

30060

30050
30040

30030

30020

6948'16"
L 2096.580

6947'45"
L 2097.481

28820

28720

28710

28680

28670

28650
28660

28640

28630

28620

28600
28610

28590

28580

28570

28550
28560

28540

28530

28520

28500
28510

28490

28480

28470

28450
28460

28440

26630

R 2994.000
L 1993.950

R 3006.000
L 2001.490

27380

26330

27390

26310

26300

26330

27400

26290

26320

27410

26280

26310

27420

26270

26300

26260

26290

26250

27430

26240

26270

27440

26230

26260

27450

26220

26250

26210

26240

26200

27460

26190

26220

27470

26180

26210

26170

27480

26160

26190

26150

27490

26140

26170

26130

26160

26120

27500

26100

26110

26140

27510

26090

26120

26080

26110

26070

27520

26050

26060

26090

27530

26040

26070

26030

26060

26020

27540

26000

26010

26040

27560

25990

26020

25980

26010

25970

27550

25950

25960

25990

27570

25940

25970

25930

25960

25920

27580

25900

25910

25940

27230

27220

TC 12763.088
12760.556

27590

25890

25920

25880

25910

25870

26540
14000

26790

26770

26760

26740
26770

26760

26720

26710

26750

26740

26730

26690

26720

26710

26700

26690

26680
26670

26660

26650

26640

26620
26610

26600

26590

26580
26570
26560

26550

26530

26520
26510

26500

26490

26480
26470
26460

26430
26450

26440
26430
26420

26410

26380

26400

26390
26380
26370
26360
26350

26340

27170

27210

27150
27190

27200

27180

27170

27120
27160

27100

27140
27150

27130

27120

27070

27110

27050
27100

27090

27080

27070

27020
27060

27000

27050

27040

27030

27020

26970
27010

26950

27000

26990

26980

26970

26920

26960

26950

26940
26930
26920

26910

26870

26860
26900

26890

26880

26840
26870

26860

26820

26810

26850

26840
26830
26820

26810

26800

26790
26780

27620

27610

27590
27600

27580

27570

27560

27540
27550

27530

27520

27510

27490

27500

27480

27470

27460

27440
27450

27430

27420

27410

27390
27400

27380

27370

27360

27340
27350

27330

27320

27310

27290

27300

27280

27270

27260

27240
27250

28010

27990
28000

27980

27970

27960

27940
27950

27930

27920

27910

27890
27900

27880

27870

27860

27840
27850

27830

27820

27810

27790
27800

27780

27770

27760

27740
27750

27730

27720

27710

27690
27700

27680

27670

27660

27640
27650

CT 27630.174
27630

28410

28390
28400

28380

28370

28360

28340
28350

28330

28320

28310

28290
28300

28280

28270

28260

28240
28250

28230

28220

28210

28190
28200

28180

28170

28160

28140
28150

28130

28120

28110

28090
28100

28080

28070

28060

28040
28050

28030

28020

28790
28800

28780

28770

28760

28740
28750

28730

28720

28710

28690
28700

28680

28670

28660

28640
28650

28630

28620

28610

28590
28600

28580

28570

28560

28540
28550

28530

28520

28510

28490
28500

28480

28470

28460

28440
28450

28430

28420

29190
29200

29180

29170

29160

29140
29150

29130

29120

29110

29090
29100

29080

29070

29060

29040
29050

29030

29020

29010

28990
29000

28980

28970

28960

28940
28950

28930

28920

28910

28890
28900

28880

28870

28860

28840
28850

28830

28820

28810

29590

29580

29570

29560

29540
29550

29530

29520

29510

29490
29500

29480

29470

29460

29440
29450

29430

29420

29410

29390
29400

29380

29370

29360

29340
29350

29330

29320

29310

29290
29300

29280

29270

29260

29240
29250

29230

29220

29210

29990

29980

29970

29960

29940
29950

29930

29920

29910

29890

29900

29880

29870

29860

29840

29850

29830

29820

29810

29790

29800

29780

29770

29760

29740

29750

29730 TC 29726.753

29720

29710

29690
29700

29680

29670

29660

29640
29650

29630

29620

29610
29600

30370

30350

30300

30270

30250

30220
30240

30250

30230

30220

30170

30210

30190

30200

30180

30170

30160

30140

30150

30130

30120

30110

30090

30100

30080

30070

30060

30040
30050

30030

30020

30010
30000

12770

12780

27610

25850

25860

25900

25890

14010

12800

12790

27600

25840

14020

12750

12760

12810

12820

12830

12770

12747.548

27620

25830

14030

12850

12840

12780

12790

27640

25820

14040

14050

12810

12800

CT 27636.310 27630

25800

25810

25850

25840

25790

25830

25780

25820

25770

25810

14060

14000

14010

14070

14020

14080

14030

14090

14100

14040

26830

25750

25760

25800

25790

25740

25780

25730

25770

25720

25760

25700

25710

25750

25740

25690

25730

25680

25720

25670

25710

25660

25636.224

14110

14050

14060

14120

14070

14130

14080

14140

14150

14090

26850

TC

25650

25700

25690

25640

25680

25630

25670

25660

2561025620

25600

14100

26880

2558025590

14160

14110

14170

14120

14180

14130

14190

14200

14140

26890

25630

25634.820 25640

2561025620

2556025570

25550

14150

26900

2558025590

2553025540

2556025570

2551025520

25500

14470

14210

14160

14220

14170

14230

14180

14240

14250

14190

26910

2553025540

2548025490

2551025520

2546025470

25450

14480

14200

26930

2548025490

2543025440

2546025470

2541025420

25400

14490

14500

14260

14210

14270

14220

14280

14230

26940

2543025440

2538025390

2541025420

2536025370

25350

14510

14240

14290

14300

26960

2538025390

2533025340

2536025370

2531025320

25300

14520

14250

26980

2533025340

2528025290

2531025320

2526025270

25250

14480

14530

14310

14260

26990

2528025290

2523025240

2526025270

2521025220

25200

14490

14540

14550

14320

14270

27010

2523025240

2518025190

2521025220

2516025170

25150

14500

14510

14560

14330

14280

27030

5140

2518025190

251302

2516025170

2511025120

25100

14520

14570

14290

14340

14350

27040

2513025140

2508025090

2511025120

2506025070

25050

14530

14580

14300

27060

2508025090

2503025040

2506025070

2501025020

25000

14540

14590

14600

14360

14310

27080

2503025040

2498024990

2501025020

2496024970

24950

14550

14560

14610

14370

14320

27090

2498024990

2493024940

2496024970

2491024920

24900

14570

14620

14380

14330

13550

13150

13140

27110

2493024940

2488024890

2491024920

2486024870

24850

14580

14630

14340

14390

14400

13560

13570

13580

13160

13170

13180

27130

2488024890

2483024840

2486024870

2481024820

24800

14590

14640

14650

14350

13600

13590

13200

13190

27140

24790

2483024840

2477024780

2481024820

24760

24750

14600

14610

14660

14410

14360

13610

13620

13560

13570

13630

13640

13650

13580

13590

13660

13670

13600

13610

13620

13680

13690

13700

13630

13640

13140

13210

13220

13230

13150

13160

27160

2478024790

2473024740

2476024770

2471024720

24700

14620

14670

14420

14370

13650

13710

13720

13660

13670

13730

13740

13750

13680

13690

13760

13700

13710

13770

13780

13720

13730

13790

13800

13740

13810

13750

13760

13770

13780

13820

13830

13840

13850

13790

13250

13240

13170

13180

13190

13260

13270

13280

13200

13210

13220

13230

13290

13300

13328.993

13240

13310

13320

CTP
13330

13250

13260

27180

2473024740

2468024690

2471024720

2466024670

24650

14630

14680

14430

14380

13860

13800

13810

13350

13340

13270

13280

13290

12860

12870

12880

12820

12830

12840

12890

12900

CT 12922.442

12850

12860

12910

12920

12930

12870

27190

2468024690

2463024640

2466024670

2461024620

24600

14640

14690

14700

14390

14440

14450

13870

13820

13300

13360

13370

13380

13310

12950

12940

12880

12890

27200

2463024640

2458024590

2461024620

2456024570

24550

14650

14660

14710

14400

14410

14460

13880

13830

13890

13900

13840

13400

13390

13320

13330

13340

13410

12900

12910

12960

12970

12980

12920

27210

2458024590

2453024540

2456024570

2451024520

24500

14670

14720

14420

13910

13850

13860

13920

13870

13930

13880

13940

13950

13890

13350

13360

13420

13430

13370

13000

12990

12930

12940

27220

2453024540

2448024490

2451024520

2446024470

24450

14680

14730

14430

13960

13900

13910

13970

13920

13980

13930

13990

13940

13450

13440

13380

13390

13460

12950

12960

13010

13020

13030

12970

27230

2448024490

2443024440

2446024470

2441024420

24400

14690

14440

13950

13960

13400

13410

13470

13480

13420

13050

13040

12980

12990

13060

13000

13010

13020

13070

13080

13090

13030

13040

13110
13100

TC 13126.108

618.382

400

AERIAL INNOVATION

26340

2443024440

2438024390

2441024420

2436024370

24350

14960

26350

2438024390

2433024340

2436024370

2431024320

24300

14950

26360

2433024340

2428024290

2431024320

2426024270

24250

14940

26370

2428024290

2423024240

2426024270

2421024220

24200

14930

26390

2423024240

2418024190

2421024220

2416024170

24150

24133.196

24140

2418024190

14920

26400

24120

24130 CT

2416024170

24110

24100

14910

26410

24090
24080

24120

2413024140

24131.793

24070

24110

24060

24050

24100

24090

24040

24080

24030

24070

24020

24060

24000

24010

24050

24040

23990

24030

23980

24020

23970

24010

14920

26420

23950

23960

24000

23990

23940

23980

23930

23970

14900

26440

23920

23960

14910

26450

23900

23910

23950

23940

14890

26460

23890

14900

26470

23880

14880

26480

23870

14890

26490

23850

23860

23890

14870

26500

23840

23870

23830

23860

23820

14880

26510

23800

23810

23840

14870

26520

23790

23820

23780

23810

23770

14850

26530

23750

23760

23790

14840

240

23780

23740

23770

23730

23760

23720

14830

26540

23710

23700

14820

250

23750

23740

14760

260

23730

23690

23720

23670.599

23680

23710

23670
TC

14750

24439'56"
L 96.645

23700

23650

23660

23690

15250

RL -100.000
101.128

23680

23640

23670

23630

23660

23671.042

15240

L30236'27"
6.070

TC

23620

15223.332

25.000
RL 29.794

23650

23600

23610

23640

15230

23419'33"
L 120.925

23630

23590

23620

23580

23610

23570

15200

210

23600

23550

23560

23590

15200

190

23580

23540

23570

23530

23560

23520

15190

180

23550

23500

23510

23540

15170

200

23530

23490

15180

170

23520

23480

15150

240

23510

23470

15140

250

23500

23450

23460

23490

15150

220
CT 219.726

23480

23440

23470

23430

23460

23420

15130

160

23450

23400

23410

23440

15120

TC 234.027
230

23430

23390

23420

23380

23410

23370

15350

15110

150

23400

23350

23360

23390

15360

15120

22541'59"
L 141.637

23380

23328.269

23340

23370

CT

23330

23360

23320

15370

15100

270

23350

23300

23310

23340

15330

15380

15090

26550

23330

23290

23320

23328.712

23280

15340

15390

15400

15100

280

CT

23310

23270

15350

15360

15410

15080

26560

23260

23250

15370

15420

15090

290

23300

23290

15380

15070

300
300.000

23280

23240

23270

23230

23260

23220

3138'47"
L 1503.028
15430

15080

26570

23210

23200

15390

15440

15070

CT

23250

23240

3138'47"
L 1503.028

15450

15050

310

23230

23190

15400

15410

15460

15060

320

23220

23180

15420

15470

15050

330

23210

23170

15430

15480

15030

26580

23150

23160

23200

23190

23140

23180

23130

23170

23120

23160

23100

23110

23150

23140

23090

23130

23080

23120

23070

23110

23060

23050

15440

15490

15500

15040

340

23100

23090

23040

23080

23030

23070

23020

23060

23000

23010

15450

15460

15510

15020

350

23050

23040

22990

23030

22980

23020

22950

22960

22970

23010

15770

15470

15520

15030

26590

22940
22930

15780

15480

15530

15010

365.905 360

23000

22990

22980

22920

22970

22900

22910

22960

16230

16240

16250

15790

15800

15490

15540

15550

15000

26600

22890

16260

16270

16280

16290

16300

16230

16240

15810

15500

15510

15560

14990

26610

22850

16250

16310

16320

16260

16270

16330

16340

16350

16280

16290

16360

16300

16310

16370

16380

16320

15820

15520

15570

14980

TC

22950

22940

22880

22930

22870

22920

22860

22910

22840
22830
22820

22800

22810

20350

20300

16400

16390

16330

16340

16410

15830

15780

15840

15850

15790

15530

15580

15060

31312'24"
L 353.502

22900

22890
22880

22870
22860

22790

22780

22770

22750

20400

20390

20380

20370

20360

20340

17060

17070

17080

16650

16350

16360

16420

16430

16370

15800

15540

15590

15600

15040
31315'26"
L 360.914

22850

22840

22830

22760

22820
22810

22740

20450

20410

20420

20430

20440

20330

20320

20310

20290

2024020250

17450

17100

17090

16660

16670

16680

16450

16440

16380

16390

16460

15860

15810

15870

15820

15880

15830

15890

15900

15840

15550

14990

26620

22720

22730

22790

22800

22700

22710

21460

21470

21100

21090

21110

21120

20710

20720

20730

20740

20750

20800

20760

20770

20780

20790

20810

20620

20630

20500

20460

20470

20480

20490

20280

20270

20230

17460

17470

17110

17120

17130

16700

16690

16400

16410

16470

16480

16420

15850

15610

15560

14970

26630

22650

22780
22770

22690

22760

22670

22680

22740

22750

21500

21480

21490

21510

21520

21150

21130

21140

21160

21170

20850

20820

20830

20840

20860

20650

20700

20640

20660

20670

20680

20690

20520

20530

20540

20550

20560

20570

20580

20590

20600

20610

20510

20260TC 20259.888

20220

20210

2019020200

20180

20170

20160

17500

17480

17490

17510

17520

17150

17140

17060

17070

17080

17160

17170

17180

17090

16710

16720

16730

16660

16500

16490

16430

16440

16510

15910

15860

15920

15870

15930

15880

15940

15950

15890

15620

15570

14980

26640

22630

22640

22660

22730

22720

22710

22600

22610

21550

21530

21540

21560

21570

21200

21180

21190

21210

21220

20900

20870

20880

20890

20910

20420

20430

20440

2014020150

20130

20120

20110

2009020100

20080

20070

20060

2004020050

20030

20020

20010

1999020000

19980

19970

19960

1994019950

19930

19920

19910

1989019900

19880

19870

17550

17530

17540

17200

17190

17100

17110

17120

17130

17210

17220

17230

17140

16750

16740

16670

16680

16690

16760

16770

16780

16700

16710

16450

16460

16520

16530

16470

15960

15900

15910

15970

15920

15980

15930

15990

16000

15940

15630

15580

14970

26650

22550

22620

22690

22700

22680

22590

22580

22570

21600

21580

21250

21230

21080

21090

20950

20920

20700

20710

20720

20730

20740

20750

20760

20770

20780

20930

20940

20960

20970CT 20968.910

20610

20620

20630

20640

20460

20470

20480

20490

20450

20370

20380

20390

20360

20340

20330

20240

20140

19860

1984019850

19830

19820

19810

1979019800

19780

17440

17560

17570

17250

17240

16800

16790

16720

16730

16740

16810

16820

16830

16750

16760

16550

16540

16480

16490

16560

16010

15950

15960

16020

15970

16030

15980

16040

16050

15990

15590

15640

15650

14960

26660

22500

22670

22660

22560

22640

22540

22530

22520

22510

22490

22480

22450

22650

22630

22620

22610

22590

22470

21460

21590

21610

21620

21470

21110

21240

21260

21270

21120

21100

21000

20790

20800

20810

20820

20830

20840

20980

20990

21010

21020

20860

20850

20660

20670

20680

20690

20650

20520

20530

20540

20550

20560

20570

20580

20590

20600

20510

20500

20410

20400

20350

20320

20310

20260

20270

20280

20290

20300

TC 20251.782
20250

20230

20220

20210

20160

20170

20180

20190

20200

20150

20130

20120

20110

20060

20070

20080

20090

20100

20050

19770

19760

1974019750

19730

19720

19710

1969019700

19680

19670

19660

1964019650

19630

19620

19610

1959019600

19580

19570

19560

1954019550

19530

19520

19510

20040

20030

20020

20010

19960

19970

19980

19990

20000

19930

19920

19910

19890

19880

19870

19790

19780

19770

1949019500

19480

19470

19460

1944019450

19430

19420

19360

19370

19380

1939019400

19410

19940

19950

19900

19860

19810

19820

19830

19840

19850

19800

19760

19730

19720

19710

19120

19110

1909019100

19080

19070

19060

1904019050

19030

19020

18200

1934019350

19330

19320

19310

1929019300

19280

19270

19260

1924019250

19230

19220

1919019200

19180

19170

19160

19690

19680

18250

18210

18220

18230

18240

19210

19740

19750

19700

18300

18260

18270

18280

18290

17600

17580

17450

17460

17470

17480

17590

17610

17620

17150

17160

17170

17260

17270

17280

17180

16850

16840

16770

16780

16790

16860

16870

16880

16500

16510

16570

16580

16060

16000

16010

16070

16020

16080

16030

16090

16100

16040

15600

14950

26670

22400

21650

21630

21480

21490

21300

21280

21130

21140

21050

21030

20870

20880

20890

20900

20910

21040

21060

21070

21080

20920

20930

20940

18350

18310

18320

18330

18340

1914019150

19670

19590

19490

18400

18360

18370

18380

18390

19130

19660

19610

19620

19630

19640

19650

19600

19580

19570

19560

19510

19520

19530

19540

19550

19500

19480

19470

19460

19410

19420

19430

19440

19450

19400

18450

18410

18420

18430

18440

19010

CT 18651.876
18650

18600

18500

18460

18470

1899019000

18980

18970

18960

1894018950

18930

18920

18910

1889018900

18880

18870

18860

19390

19380

19370

19360

19330

19320

19310

19240

19230

19220

19140

19130

19120

1884018850

18830

18820

1879018800

18810

19340

19350

19260

19270

19280

19290

19300

19250

19210

19160

19170

19180

19190

19200

19150

19110

19090

19080

19070

19060

19040

19030

19020

19010

18990

18980

18970

18960

18940

18780

18770

18760

1874018750

18730

18720

18710

1869018700

18680

18670

18660

18640

18630

18620

18610

18590

18580

18570

18550

18560

18540

18530

18520

18510

18490

18480

17650

17490

17300

17290

17190

16900

16890

16800

16810

16820

16830

16840

16910

16920

16930

16600

16590

16520

16530

16110

16050

16060

16120

16070

16130

16080

16140

16150

16090

15660

15610

14940

26680

22350

22600

22460

22440

22430

22420

22410

22390

22380

22580

22570

22560

22540

22550

22530

22520

21850

21840

21860

21870

21880

21890

21910

21920

21930

21900

21950

22000

21940

21960

21970

21980

21990

21510

21640

21660

21670

21520

21500

21160

21290

21310

21320

21170

21150

18210

18220

18230

18240

18200

17850

17830

17840

17860

17500

17510

17520

17630

17640

17660

17670

17200

17210

17220

17310

17320

17330

16950

16940

16850

16860

16870

16880

16890

16960

16970

16980

16610

16540

16100

16110

16160

16170

16120

15670

15620

14930

26700

22050

22010

22020

22030

22040

22370

22300

22250

22100

22060

22070

22080

22090

22360

22340

22330

22320

22310

22290

22280

22270

22260

22240

22230

22220

22150

22110

22120

22510

22490

22500

22480

22470

22460

22430

22440

22450

22420

22200

22210

22190

22180

22170

22160

22140

22130

21840

21850

21860

21870

21880

21890

21900

21910

21920

21930

21940

22410

22380

22390

22400

22370

22360

22340

22330

22320

21960

21970

21980

21990

21950

21700

21680

21530

21540

21350

21330

21180

21190

18260

18270

18280

18290

19100

19050

19000

18950

18930

18920

18910

18880

18870

18860

18840

18830

18820

18810

18790

18780

18770

18760

18310

18320

18330

18340

18250

17900

17870

17880

17890

17910

17920

17930

17940

17950

18000

17960

17970

17980

17990

18010

17820

17830

17840

18020

18030

18040

18050

18100

18060

18070

18080

17850

17860

17870

17880

17890

18090

18110

18120

18130

18140

18150

18160

18170

18180

18190

17900

17910

17920

17930

17940

17950

17960

17970

17980

17990

18000

18010

18020

18030

18040

17700

17530

17540

17550

17560

17680

17690

17710

17570

17580

17590

17350

17230

17240

17260

17340

17360

17370

17250

17000

16990

16900

16910

16920

16550

16560

16620

16630

16640

16570

16580

16590

16130

16180

16190

16200

16140

15680

15630

15250

R -2994.000
L 460.750

26730

22010

22020

22030

22040

22000

21560

21690

21710

21720

21570

21550

21210

21340

21360

21370

21220

21200

18360

18370

18380

18390

20950

CT 20958.561

20960

20970

20980

20990

21000

21010

21020

21030

21040

18410

18420

18430

18440

18300

18060

18070

18080

18090

18050

17750

17720

17730

17740

17760

17610

17600

17400

17270

17280

17290

17380

17390

17410

17300

17310

17320

17420

17430

17440

17330

17340

17010

16930

16940

17020

17030

4027'50"
L 342.330

26750

22060

22070

22080

22090

21750

21730

21580

21590

21600

21610

21740

21760

21770

21620

21630

21640

21400

21380

21230

21240

21250

21260

21390

21410

21420

21270

21280

21060

21070

21050

18460

18350

18890

18900

18850

18740

18730

18720

18710

18690

18680

18670

18660

18640

18630

18620

18610

18570

18580

18590

18600

18490

18470

18480

18400

18110

18120

18130

18140

18100

17800

17620

17630

17640

17770

17780

17790

17810

17820

17650

17660

17670

17680

17690

17700

17710

17720

17730

17740

17750

17760

17770

17780

17790

17350

17360

17370

17380

17390

17050

17040

16950

16960

16970

16980

16990

4027'50"
L 342.330

26780

22110

21800

TC 21804.653

21780

21790

21810

21660

21670

21650

R 1694.000
L 1523.615

26800

22140

22130

22120

22050

22350

22310

22260

22270

22280

22290

22300

22210

22220

22230

22240

22250

22160

22170

22180

22190

22200

22150

22100

R 1706.000
L 1534.408

21820

21830

21680

21690

21700

21710

21720

21730

21740

21750

21760

21770

21780

21790

21800

21810

21820

21830

TC 21794.304

21450

21430

21440

21290

21300

21310

21320

21330

21340

21350

21360

21370

21380

21390

21400

21410

21420

21430

21440

34855'51"
L 835.743

21450

34855'51"
L 835.743

Not only do we get to collect the data


much faster, we also get accurate information
on stockpiles which we didnt have time to
get before.

Thiess Chief UAV Controller Bill Norwood


regularly flies the 26.5 kilometre Pacific
Highway upgrade project between Frederickton
and Eungai in New South Wales. Hes fully CASA

The first component is a sophisticated model


aircraft or unmanned aerial vehicle (UAV) with long
battery life and advanced remote control system.

R -3006.000
L 709.022

Thiess Survey Manager for the project, Ben


Dixon, says the aerial survey is a fantastic
innovation.
The result is a visual and data-rich virtual project
which shows the volume of material moved since
the last flight and the volumes remaining to meet
the design profile.

Now through the vision and innovation of Thiess


spatial engineering team, two worlds have
combined to achieve remarkable survey
outcomes.

R -2994.000
L 706.778

certified and applies the diligence of a pilot to


every flight.

The essential second component is


extraordinarily powerful software that automates
the flight plan, manages the output of the
aircrafts onboard camera and turns the visual
and GPS data into volumetric information.

Until now, the need to continually assess bulk


material volumes has required regular field
surveys. Constantly sending surveyors into
the project is labour intensive and potentially
dangerous with people operating in close
proximity to heavy machinery.

18800

18750

18700

18650
CT 18645.142

18560

18510

18520

18530

18540

18550

18500

18450

18160

18170

18180

18190

18150

17810

17800

17400

17410

17420

17000

17010

17020

17030

17040

16600

16610

16620

16630

16640

16150

16210

16220

15640

15690

15700

15320

16160

15650

15310

15710

15300

15660

15340

15290

15720

15670

15330

15280

15730

15680

15320
15270

15740

15690

14860

CT

14810

15310

15260

15300

15290

15240

15750

14860
14848.206
14850
CT

14862.418

14800

15280

15230

16170

15700

14840
14790

15270

15220

15760

14830
14780

15260

15210

15201.708
TC

TC
15220

15170

15710

14820
14770

15210

15160

16180

15720

14810
14760

14800
14790
14740

15190

15140

16190

15730

14780
14730

15180

15130

17430

17050

16650

16200

15740

14740

14750
14700

14450

13970

13500

13490

13430

13440

13510

13520

13450

13460

13470

13530

13540

13480

13490

13050

13060

13120

13130

13070

13080

13090

    

26

14460

13980

13500

13510

13520

13530

13540

R -2200.000
L 202.885

R -4412.000
L 1533.425

14710

14470

13990

13550

13100

13110

33827'17"
L 203.667

13120

R -4402.600
L 159.354

13130

34031'43"
L 2.532

R -4400.000
L 2100.658

14770

14720

15160

15110

16210

15750

15020

15760

15010

R 3993.685
L 3428.544

227'23"
L 1606.640

R -3006.000
L 462.597
16220

15770

15000

R 4006.000
L 3443.433

226'43"
L 1608.012

80

210

220
230
240

250

260

CT
272.661
270

280
290

300
310
320
330

380

340

370
CTP

50

350

60

400

50

40
30

10

20
459.063

420

410

TC 1.603
0.000

430

R 90.000
L 124.471

CT

62.828

40

60
360

30

360

70

370

1144'7"
L 88.962

500
TC

380 324.194
TC

390

402.877
400

R
30.000
L 62.828

320
310

L18621'7"
24.810

300
290
280
270
260

250

450

440

390

460
490

520

548.024
550

530
540

560

570

580

590

1890

50

1880
1870

1840
1830

170

1790

130
30.000
LR62.828

140

R
30.000
L 62.828

30617'23"
L 631.946
TC 70.979

120

30

40

110

470
480
510

14130'23"
L 253.042

1770

9659'43"
L 52.780

1780

1750

1760

710

160

680
37250

1800

1810

690

150
151.861

37260

1820

670

CT

37270

700

70

37280

660

30

37290

37300

1850

1860

640

40

37260

37310

650

62.828
180
60

37270

630

190
CTP

37280

37320

620

200

1900

37330

1740

1730

720.000

230

37290

37340

1910

610
1920

37350

CT 667.219

240

37300

1930

R -400.000
L 119.195

600

RL-75.000
58.703

L29339'6"
15.491

200

80

190
110

180

90

170

100

160

-600.000
LR201.867

150

30.000
LR62.828

140

30

130

40

120

20

110

10

100

60

90

50

79.949
80

TC 24.810

TC

70

70

L2920'48"
19.459
0.000

60

83.51380

50

90

40

CT

30

100

20

110

10

110

0.000

90

940

100

950

960

970

120

1390

980

350

R -150.001
L 51.201

23239'1"
L 44.394

90
100

110
120

130
150

140

CT

160

180.000

170
166.257

L2126'51"
13.743
1400

1410

990

340

130

1420

1000

1010

1020

1030

330

334.592

RL30.000
62.828
CTP

140

1430

39160

1440

39170

1040

38729.859

1050

1060

CT
38730

20

170

150

39180

1070

38740

38750

1080

38270

37760

160

1450

1460

39190

39200

39203.910

1470

CT

1480

39210

1490

39220

39170

39230

1500

1510

39180

39240

1090

38760

38770

38780

1100

1110

38790

38800

1120

38730

38280

10

180

0.000
188.485

37770

170

1520

39250

39181.085

39190

1530

CT

39200

1130

1118.602

38740

38810

38290

38300

37780

180

39260

1540

39210

39270

39220

39280

1550

1560

39230

CT

1140

38750

38760

38770

38820

38830

38840

38850

1150

1160

38780

38790

38310

37790

190

1570

39290

39300

39240

1580

1170

38860

38870

38800

38810

38320

L12253'27"
130.215

37800

200

39620

1590

39310

39250

39260

1180

38880

38820

38330

38280

37810

4644'33"
L 172.334

L31134'14"
79.054

39630

39270

39320

1600

1610

39330

39280

1190

38890

38900.921
TC
38900

38830

38840

38290

38340

38350

37770

210

39640

39650

39290

1200

1210

38910

38920

38850

38860

38300

37820

220

39660

1620

39340

39350

1630

1220

38930

38870

38360

38310

37780

230

39670

1640

39360

39300

39310

1230

1219.646

38880

38940

38950

TC

1240

38890

38960

38879.903

38370

38320

38380

38330

38390

38400

38340

37830

L31255'43"
162.351

39680

39320

TC

38900

38910

38970

1250

1260

38980

38350

37790

37840

37850

240

39690

39700

39630

39330

39370

1650

1660

39380

1670

1270

38920

38930

38990

39000

1280

38940

38410

38360

38420

38370

38430

38380

38440

38450

740
38390

37800

37810

37860

250

39640

39340

39390

39400

1673.964

39410

39350

39360

39420

39370

1290

38400

260
37820

37870

260

39710

39430

39380

38950

39010

39020

38960

760

38460

38410

37830

37880

270

39720

39650

39660

39390

39440

39450

39461.843

1300

1310

38970

39030

39040

38420

37840

37890

37900

290300
37850

37860

37910

280

39730

39670

TC
39460

39400

39410

39470

39420

39480

39430

39490

39500

39440

1320

39050

38980

38990

38430

38470

770

38480

780

38490

38500

790

38440

37870

37920

50

60

290

39740

39750

39680

39510

39450

39460

39520

39470

39000

38510

800

38450

38460

70

37880

37930

300

39690

39760

39530

39480

1330

1319.487

39060

CT

1340

39070

39010

810

R 340.000
L 219.973

38520

38470

80

37890

37940

37950

90
85.593

310

39770

39700

39710

39780

39797.076

39720

39790

39730

39540

39550

39490

39080

39020

39030

1350

1360

39090

39100

1370

39040

1380

39110

39050

39060

39120

39070

39130

39080

39140

39150

39090

820

38530

38480

CT

37900

320

39740

39560

39500

39510

39570

39591.530

39520

39580

39100

39110

830

38540

38550

38490

840

100

37910

330

39750

39530

39590

CT

39600

39540

39120

38560

38500

38510

340350
37960

110

37920

37970

120

37930

37980

130

336.555

32552'39"
L 12.492

39760

39610

39550

39560

39130

850

860

38570

38520

360
R -1100.000
L 192.713

37940

37990

140

1940

37310

37360

1950.942
1950

1960

37320

37370

CT

1970

37330

37380

1980

37340

1720

1510

1460

1410

1360

36760

36810

1370

36770

36820

1380

36780

36830

1390

36790

36840

36850

1400

36800

36810

36860

1420

36820

36870

1430

36830

36880

1440

36840

36890

36900

1450

36850

36860

36910

1470

36870

36920

1480

36880

36930

1490

36890

36940

36950

1500

36900

36910

36960

1520

36920

36970

1530

36930

36980

1540

36940

36990

37000

1550

36950

36790

36800

1350

36780

1340

36770

1330

36760

1320
1310

36740

36750

1300
1290

1280
1270
1260

1250
1240
1230
1220
1210

1120

1100

36490

36540

36550

1110

36500

36510

36560

1090

36480

36530

1080

36470

36520

1070

1050

36440

36490

36500

1060

36450

36460

36510

1040

36430

36480

1030

36420

36470

1020

1000

36390

36440

36450

1010

36400

36410

36460

990

36380

36430

980

36370

36420

970

36350

36360

36410

950

36340

36390

36400

960

940

36330

36380

930

36320

36370

920

36300

36310

36360

180

900
890

36270

36310

36250

36260

230

870
871.080

220

CT

880

36320

36280 210

36330

190200

36290

36340

36350

910

L30416'56"
46.196

39770

39570

39140

870

38580

38530

370
38000

1990

37390

37400

2000

2010

37350

37360

37410

2020
2018.870

2030

37370

37420

TC

2040

37380

1560

36960

37010

1570

36970

37020

1580

36980

37030

1590

36990

37040

37050

1600

37000

36520

850

36240

36290

36300
240250

860

840

260

36280

270

820
290

293.952

36260

280

830

36270

R
-300.000
L 79.026

39780

39767.508

39580

39150

880

38590

37950

150

37390

37430

2050

2060

37440

37450

2070

37400

1610

37010

37060

1130

36570

800

36240

36250

810

790

36230

780
770

760

750

740
730

720

710

700

690

1340

610

1320

560

36010

1290

550

1280

35950

35960

570

35970

36020

580

1300

1310

35980

36030

590

35990

36040

36050

600

1330

36000

36010

36060

620

36020

36070

630

1350

1360

36030

36080

520
510

35960

1240

500

1230

35900

35910

35970

35920

530

35980

1255.144
1250

1260

35930

540

CT

1270

35940

35990

36000

490

1220

480
470
460

35910

1190

410

35860

420

35800

35810

35870

430

35820

35880

440

35830

35890

35900

35840

450

1180

35850

35860

35920

1200

35870

35930

1210

35880

35940

35950

35890

35790

35810

370

35760

35820

380

35770

35830

390

35780

35840

35850

400

35790

35800

351.320
350

360

CT

340

35780

330

35770

320

35760

300

35750

310

290
280
270

870

35580

35590

35600

850

860

830

820

35550

790

780

770

750

760

35500

35400

35410

35450

35350

35360

35400

35360

35370

35380

35390

35350

35300

450

460

35250

35210

35200

360

370

35160
35150

35100

35050

35000

34950

34930

60

30

40

0.000

10

34900

34850

34700

34800

34750

34700

34650

34600

34550

34540

34560

34569.731
34570CT

34580

34590

34610

34620

34630

34500

34450

34400

34350

34300

34010

34020

34030

34040

34250

33880

33890

33450

34200

34170

34180

33730

33740

33750

33760

33770

33780

33790

33800

33810

33820

33830

33840

33850

33860

33870

33880

33890

33900

33910

33920

33930

33940

33950

33960

33970

33980

33990

34000

34010

34020

34030

34040

33720

33700

33710

33690

33680

33670

33650

33660

33600

33550

34050

34060

34070

34080

34090

34100

34150

34110

34120

34130

34140

34160

33500

33640

33630

33620

33610

33590

33580

33570

33560

33540

33530

33520

33510

33490

33480

33470

34190

34210

34220

34230

33970

33980

33990

34000

33910

33920

33930

33940

33900

33790

33690

33460

33400

34240

34260

34270

34280

34290

34310

34320

34330

34340

34160

34170

34180

34190

34200

34210

34220

34360

34370

34380

34390

34230

34240

34250

34260

34270

34280

34290

34410

34420

34430

34440

34300

34310

34320

34330

34340

34460

34470

34480

34350

34360

34370

34380

34390

34490

34510

34520

34530

34400

34410

34420

34430

34440

34450

34460

34470

34070

34080

34090

34100

34110

34120

34130

34140

34150

34060

34050

33960

33950

33870

33860

33810

33820

33830

33840

33850

33800

33780

33770

33760

33710

33720

33730

33740

33750

33680

33670

33660

33440

33430

33420

33410

33390

33380

33350

33700

33610

33620

33630

33640

33650

33570

33580

33590

33600

33560

33530

33370

33360

33340

33300

33540

33550

33520

33510

33480

33490

33500

33470

33330

33320

33310

33290

33250

33460

33430

33440

33450

33420

33410

33270

33280

33380

33260

33240

33230

33200

33390

33400

33370

33360

33340

33350

33330

33220

33210

33190

33180

33170

33150

33320

33310

33290

33300

33280

33270

33260

33160

33140

33130
33120

33100

33110

34480

34490

33220

33230

33240

33250

34500

34510

34520

34530

34540

34560

34550

CT 34557.912

34640

34660

34670

34570

34580

34590

34680

34690

34710

34600

34610

34620

34630

34720

34730

34740

34640

33090
33080

33210

33190

33200

33180
33170

33160

TC 33026.829

33050

33060

33070

33140

33150

33130

33120

33040

33110

33030

33000

33010

33020

33080
33070

32990

33060

33090

33100

34650

34660

34670

34760

34770

34780

34680

34690

34710

34720

32950

32960

32970

32980

33040

33050

33030
33020

32940

33010

34790

34810

34820

34830

34730

34740

32900

32910

32920

32930

32990

33000

TC 33021.732

34750

34760

34770

34840

34860

34870

34880

34780

34790

34810

50

32850

32980
32970

32890

32960

32870

32880

32940

32950

32860

34890

34910

34920

34800

70

20
TC 18.500

80

34820

34830

34840

32840

32910

32920

32930

90
CT 91.208

100
TC 100.043

110

34940

34960

34970

34980

34990

35010

35020

35030

34930

34940

34960

34950

34850

34860

34870

120

130

34880

34890

140

34900

34910

34920

150

160

170

180

190

35038.698
35040TC

35060

35070

34970

34980

34990

35080

35090

35110

200

210

220

230

240

35000

35010

35020

35030

35120

35130

35140

35040

250

260

270

280

290

TC 35026.172

35050

35060

35070

35080

35090

35170

35180

35190

35110

35100

380

390

35120

35130

400
TC 401.079

410

420

35140

35220

35230

35240

430

440

35150

35160

35170

35180

470

480

490

35190

35260

35270

35280

35290

500

510

35200

35210

35220

520

530

540

35230

35240

35310

35320

35330

35340

550

560

570

35250

35260

35270

580

590

35280

35290

600

610

620

630

35300

35310

35320

35330

35340

35410

35420

35430

35440

35370

35380

35390

35460

35470

35480

35490

35420

35430

35440

35510

35520

35450

35460

35470

35530

35540

800

810

35480

35490

35560

35570

840

35500

35510

35520

35530

35540

880

LR402.657
890.000

CT

39590

32410'25"
L 354.477

32518'14"
L 205.545

The Geoview Dashboard gives our


clients an advantage by removing the
need for intermediary consultants,
which is a significant cost saving,
Jeremy said.

0/(.! 5+(/0!.%*#!%!*%!/
and creating significant cost savings.
The system is completely mobile
and it features a drop-down menu,
guaranteeing data input is consistent
across all operators.

This ensures were creating accurate


reports, allowing for more informed
decision making, he said.

It provides a much clearer picture


of the projects geotechnical profile
including ground stability, soil
permeability and temperature. This
improves safety, allowing the team to
make changes to the construction plan
where necessary.
SCAN THIS QR CODE
TO SEE THE UAV IN ACTION

38600

160

37960

38010

2080

37410

37460

1620

37020

37070

36530

640
641.437

1370

36040

36090

890

35550

35610

35620

210

35560

35570

35630

220

900

910

190

890

38540

170

37970

2090

37420

37470

1630

37030

37080

1140

36580

TC

650

36101.265
CT36100

1380

920

35580

35640

35650

230
35590

930

160

900

390400
38020

37430

37480

1640

37040

37090

37100

36540

36590

660

35600

940

240

35660

35670

35610

35620

950

960

150

910

180

37980

38030

2100

2110

37440

37490

1650

37050

1150

36600

1390

36050

36060

250
35680

35690

35700

260

35630

970

140

38610

190

37990

38040

2120

37500

1660

37060

37110

1160

36550

36560

670

36110

980

35640

35710

990

35650

35660

70

920

38550

410
38050

2130

37450

37460

37510

1670

37070

37120

1170

36610

680

36070

36120

1400

1410

36080

36130

35720

35670

1000

1010

80

640

60

930

200

37470

37520

1680

37080

37130

36570

1420

36083.195

36090

36140

36150

CT

1430

35730

35680

1020

650

50

38620

210

38000

38010

38060

220

37480

37530

1690

37090

37140

37150

1700
1700.777

37100

37110

1180

36620

1440

36100

36110

36160

35740

35690

1030

90
660

40

38560

430
38020

38070

230

38030

38080

240

37490

37540

37550

TC

1710

37160

36580

1450

36120

36170

1460

36130

36180

1470

1040

35700

35710

670

30

38630

38040

38090

38100

250

37500

37510

37560

37120

1190

36630

1480

36140

36190

36200

35720

1050

1060

35730

1070

35740

1080

680

20

38570

260

38050

37520

37570

37170

36590

36640

1490

36150

36160

36210

1090

35750

100

690

10

927.406

270

38060

38110

37530

37580

37130

1200

36650

1500

1100

1110

700

38640

280

38070

38120

37540

37590

37600

37180

36600

36610

36660

36170

36220

1510

36180

1120

110
710

-30

38650

290

38080

38130

L13255'43"
79.949

300

38090

38140

38150

310

37550

37560

37610

37140

37190

37200

36620

36670

36190

1520
1522.321

1530

TC

1130

720

310

300

-40

38580

320

38100

38110

38160

330

38120

38170

340

38130

38180

37570

37620

37150

37160

37210

36630

36680

1540

36200

36210

1140

120

730

-20

330

340

C
T -51.337
-50

CTP

350

37580

37630

37170

37220

36640

36690

36700

36220

-3000.000
R L 229.643

38590

360

38140

38190

38200

37590

37640

37180

37230

36650

36660

36710

36230

32023'36"
L 290.117

38660

38600

370

38150

70
37650

2210

38670

380

38160

38210

38222.465

37600

37610

2180

38610

TC

38170

38220

90100
37660

2140

38680

750

38620

730

38700

720

38690

710

38630

690700

38640

707.433
TC

38710

680

38720

38650

670

38660

660

38670

R 2000.000
L 507.394

38680

38180

560
395.247 390

540550

38690

570
38230

530

R 2100.000
L 99.841

39160

38700

38190

38240

520

38720

580
38250

510

38714.252 38710

38210

38260

590600
38203.81338200

37620

37670

75.486

490500

R -2012.000
L 302.989

R 3000.000
L 168.979

THE COST OF INSTRUMENTATION MONITORING, POTENTIALLY SAVING UP TO


CT

TC

37630

37680

2240

38220

37640

37690

37700

2230

610
38230

37650

37660

2220

620
38240

130
37710

21902200

630
38250

37670

2241.334

140150
37720

143.410
RL-400.000

380

640650
38260

37680

37730

3326'45"
L 67.927

480

R -2000.000
L 301.182

0.000

$1 MILLION IN GEOTECHNICAL MONITORING COSTS ON INDIVIDUAL PROJECTS.


38270

37690

37740

37750

37190

36670

1590

36720

1580

37240

36680

170

1570

3160'27"
L 829.697
36730

160

1560

37700

37200

36690

140150
1640

37210

36700

1647.542

36710

128.218
130

120

CT

110

1630

37710

37220

36720

100

90

1620

37720

37230

36730

80

70

1550

1610

L3416'56"
165.734
1601.346
1600
CT

37730

37240

36740

30

40

50

145.000
LR 67.202

2170
2162.280

CT
2270

180

2250

160

80
2260

170
162.351
TC

TC
150

37740

140

37750

130

37760

110

120
2300

R -85.000
L 73.883
120

3565'31"
L 1.603
100

10

90

20

80

2160
60

CT
70

2150

50

30

0.000

40

40
TC 37.845

37250

36750

10

1150

1160

200

R -2288.000
L 1057.023

TC 61.016
60

1170

180

R -2300.000
L 1062.566

170

854.066
RL-1800.000

130
740

-10
34633'39"
L 81.768
320
CT 319.311

32890

32900

32880
32870
32860

34312'45"
L 468.967

350

32840

32850

34312'45"
L 468.260

-59.427

RL1700.000
219.268
32832830

R -2380.000
L 1542.902

33910'15"
L 8.835

31922'30"
L 267.176

L743'40"
41.016

250.166
RL890.000

CT 2292.534

310
RL30.000
62.828

30

20

20

10

10

180

0.000

160

110
2290

CTP

470

33116'42"
L 171.062

10

39600

20

Weve been able to tailor it so its


customised to individual projects like
the Frederickton to Eungai (F2E) and
Moreton Bay Rail projects in New South
Wales and Queensland respectively,
he said.
R -2368.000
L 1536.180

RL-200.000
72.708
L3600'0"
18.500

CT 20.000
20

0.000

RL -60.000
20.000

31644'33"
L 2121.200

35154'14"
L 37.845

379.709

460

R -500.000
L 191.196

32126'58"
L 101.044
33116'42"
L 165.651

32239'1"
L 257.932

32239'1"
L 417.444
30

R 2800.000
L 129.687

THIESS TECHNICAL SERVICES GROUPS GEOVIEW DASHBOARD IS SLASHING


50

The dashboard provides up-to-the


minute information on all geotechnical
indicators and has been used to
successfully monitor the stability of
excavation, tunnelling and construction
projects.
31644'33"
L 2120.618

360

330
R -90.000170
L 80.881

340

240250
330

320
160

230
320

220
310

280
370
364.218
CT
130

0.000
188.485

140

RL-90.000
47.748

150

270
350
125.657
120
CTP

420
9813'59"
L 70.979

290

210

300

190200
280

180

270

160

250

170
260

150
240

R -50.000
2311.993
L 10.397
2310
230

130

210

140

220

125.657
120
200

2280

190

440450
32130'23"
L 309.654

R 2012.000
L 510.439

44.394 40
TC

39610

39598.529

60

39780.000

TC

70

39620

80

Principal Engineer Geotechnical


Jeremy Kruger said Geoview was
created in-house to give our clients a
competitive edge by replacing current
geotechnical monitoring procedures
which are hugely expensive and labour
intensive.
29428'17"
L 8.090

GEOVIEW DASHBOARD

SLASHES COSTS

Technical Services Group Engineer Dr Darren Huang demonstrates the features of the Geoview Dashboard

To get the same information from the


ground would take all my surveyors
weeks, now we can build an accurate
report in a few days.

Manager of Thiess Spatial Engineering


Services Del Rains believes surveying,
planning and environmental monitoring
by UAV will become the norm.

Its only limited by some computing


processes, but ultimately, the
opportunities and benefits are endless,
he said.

27

    

LR121.863
-340.000

220
210

0.000
10

20

50

100

60

70

90
80

IMAN CONTRACT

unites a tribe
A FLEDGLING INDIGENOUS ENTERPRISE HAS LANDED A MAJOR CONTRACT WITH THIESS ON THE QCLNG PROJECT
JUST A YEAR AFTER IT WAS ESTABLISHED TO GENERATE JOBS AND BREAK THE CYCLE OF LOCAL UNEMPLOYMENT.

)*,!.0%+*/05 0 3/+.*+10+"
unanimous Iman community decision to channel
traditional land revenue into a sustainable
business venture.
Initially focusing on land management, and
weed and seed control, around the western
.(%*#+3*/0+3*+" %(!/ )*,!.0%+*/
set its sights on much bigger opportunities.
Now after a rigorous tender process, Iman
,!.0%+*/$/)%((%+*/%0!+!(!*%*#
contract with Thiess and will employ up to
100 local people.
"+.)!...%/0!. )* .0%*+5(!/,!*0
10 years in the criminal justice system where he
regularly saw the depths of despair among
Indigenous people.
Now, having traded his suit for hi-vis PPE and
$%/+!"+.*%* 1/0.%( !,+0%* %(!/ .0%*
is dispatching the most essential of all human
commodities, hope.
In a letter to Thiess MD Bruce Munro, Martin
stressed the enormous significance of the
contract to his people.
This contract allows our tribe to share this land
with dignity and optimism for the future,
Martin wrote.

We no longer need to observe others from


all over the country coming to our region and
making great careers and lives for themselves.
We too can now be part of that economic fabric.
Not only can we now experience genuine
economic advancement, we can also apply our
earnings to protect and enrich our cultural and
social obligations that we have to our community.
A contract like this unites a tribe and comforts
a tribe because there is a sense of justice that
comes with participating economically on our

It goes without saying that the


best way to close the gap, in
the long term, is to empower
Aboriginal people to address
the gap issues

MARTIN DOYLE
   
  

tribal land. The impact that a steady pay cheque


has on Aboriginal families is severely underestimated.
As an Aboriginal barrister, I can tell you that
Aboriginal homes that have at least one stable
income earner experience less domestic violence,
greater school attendance and more positive
health outcomes than homes with no primary
income earner.
It goes without saying that the best way to
close the gap, in the long term, is to empower
Aboriginal people to address the gap issues
ourselves through employment and education.
The Iman people understand that there are
genuine business requirements that must be
met before contracts like this can be awarded.
We know we had to build capacity and in effect
meet you halfway.
Your willingness to contract with our company is,
to me, evidence that your company is willing to
meet all Indigenous people half-way and we are
very grateful and promise to not let you down,
Martin concluded.
Martin also acknowledges the support of QGC
through its Indigenous Participation Plan and the
valuable business assistance provided by Social
Ventures Australia.

.0%*+5(!!*0.!3%0$0$! )*,!.0%+*/0!)

28

    

TEAMWORK

OVERCOMES QCLNG LOGISTICS


CHALLENGE

TEAMWORK IS THE KEY TO OVERCOMING THE MASSIVE LOGISTICAL CHALLENGE OF WORKING


ON THE WIDESPREAD QUEENSLAND CURTIS LNG (QCLNG) PROJECT IN THE SURAT BASIN,
ACCORDING TO PROJECT DIRECTOR JOE DUJMOVIC.

Thiess has passed a major milestone in its


contract with QGC to deliver upstream
compression facilities, having now mobilised
on 21 sites for the four Central Processing Plants
(CPPs) and 17 Field Compression Stations
(FCS) which are spread over a distance of
200 kilometres from Dalby, on the Darling Downs,
north-west to Wandoan.
The company has handed over to QGC the
first of four CPPs which deliver processed and
compressed gas to the export pipeline for
transmission to QGCs liquefaction plant on
Curtis Island.

$2.4B
TOTAL CONTRACT VALUE
1,600

EXTRA JOBS CREATED

17
FIELD COMPRESSION
STATIONS

2,600
PEAK WORKFORCE

The completed Ruby Jo CPP near Dalby is a


significant construction project in its own right,
but its just one component in the vast network
of upstream compression facilities in the Surat
Basin.
If it was all in one location it would be challenging
enough, but 21 locations spread over such a large
.!#.!0(5%*.!/!/0$! !#.!!+" %1(05
Joe explains.
Were getting people to come from all over
Australia and then sending them off to 21 sites,
all the while keeping control of project supplies,
delivery, quality, systems and most importantly,
ensuring this is done safely thats where the
challenge lies.
A dedicated travel and accommodation team
ensures the right people end up on the right
job site, while a centralised warehouse has been
established in Chinchilla to track, dispatch and
monitor the movement of materials and
equipment.

There are also specialist quality and safety teams


based at each site, and a best-practice program
in place which captures new ideas and innovations
and incorporates them into a central guidebook.
The learnings will significantly benefit phase two
of the project.
Joe is quick to stress that delivery of the project
is a team effort.
We are a team consisting of Thiess, our key
subcontractors and suppliers and importantly,
QGCs people with gas expertise integrated
within the team. No-one company has the
resources to deliver the whole project, Joe says.
Thiess Regional Manager on the Ruby Jo CPP,
Darryl Schultz, says QCLNG is a great
demonstration of Thiess capability.
We are now effectively delivering everything
from bulk earthworks, detailed excavation,
concrete civil works, structural work, piping and
electrical and instrumentation works, Darryl says.
Andrew Kinsey is in charge of delivering the
Jordan CPP and is preparing to gear up for the
process piping phase.
Its a very big job. Well be ramping up to a
total crew size of close to 450 people on this
site alone. This is very specialist work and Thiess
is now a leader in the field, Andrew says
The scale of the pipework is obvious even to the
layman, but not so obvious is the intricate
electrical and instrumentation work.
Each of the four CPPs requires more than
300 instruments and more than 100,000 metres
of cable to connect and interface with QGCs
Upstream Control Room in Chinchilla.

    

29

FIRST UNDERSEA CROSSING FOR QLDS LNG INDUSTRY

WINS SUSTAINABILITY AWARD


THE EXTRAORDINARY SUCCESS OF THE NARROWS CROSSING TUNNEL
CONSTRUCTED BY THIESS FOR SAIPEM AUSTRALIA AND SANTOS GLNG
HAS BEEN CAPPED OFF WITH A MAJOR AWARD.

FAST FACTS

30

LOCATION: Gladstone Harbour

EXTERNAL DIAMETER: 4m

TBM LENGTH: 100m

PROJECT AWARDED: September 2012

INTERNAL CONCRETE DIAMETER: 3.4m

TUNNELLING STARTED: April 2013

TUNNEL LENGTH: 4.3km

TBM WEIGHT: 277 tonnes

SCHEDULED COMPLETION: August 2014

    

The extraordinary success of the Narrows


Crossing tunnel constructed by Thiess for
Saipem Australia and Santos GLNG has been
capped off with a major award.

compression and decompression, similar to that


required for divers.
Thiess General Manager Tunnelling Steve Wille
says it was tough.

In a major coup for construction in the oil and


gas industry, Thiess, Saipem
Australia and Santos GLNG
won the 2014 Queensland
Premiers Innovation in
Sustainable Technologies
2014 QUEENSLAND
Award and was a runnerPREMIERS INNOVATION
up for the overall Premiers
IN SUSTAINABILITY
Sustainability Award.

TECHNOLOGIES AWARD

The 4.3 kilometre undersea


tunnel was recognised
because it provided a conduit
for Saipem Australia to
install the Santos GLNG gas
transmission pipeline without
the marine environment
disturbance associated with alternative methods
such as dredging or trenching.

WINNER

It was fitting recognition for the project which


has received plaudits for its engineering
standards and contribution to the local
community.
The quality of the finished tunnel is a tribute to
Thiess tunnelling team which overcame major
geological challenges on their undersea journey
to Curtis Island.
Tunnelling had to stop mid-journey for the crew
to repair the cutter-head, an operation which is
!40.!)!(5 %1(0* +),(!4+!//0$!
cutter-head, 2.4 bar of compressed air pressure
was required to prevent soil and water ingress.
This meant repair crews had to go through

It cant be understated how


%1(00$!+* %0%+*/3!.!
and Im extremely proud of
the way our people fixed the
cutter-head and brought the
machine home, Steve said.
The tunnelling operation
employed a team of 75 people
and required a total of more
than 420,000 man-hours to
complete.

The TBM excavated


approximately 55,000 cubic
metres of earth which is
being used by the Gladstone
Regional Council to rehabilitate an ash pond
associated with a coal fired power station.
Named Rose-Ella by the children at the local
Rosella Park State School, the four-metre
diameter, 277 tonne TBM lined the tunnel as
it went, installing more than 21,750 pre-cast
concrete segments. The TBM was recovered
piece by piece via a shaft on Curtis Island in a
process that took nine days. It was then barged
to the mainland and transported to Brisbane.
The completed tunnel was stripped of all services
and thoroughly cleaned before being flooded
with seawater in early March in preparation for
Saipem Australia to install the pipeline. The water
provided buoyancy for the concrete-coated pipe
as it was pushed through the tunnel from the
mainland.

    

31

PUSHING

PRODUCTIVITY

BOUNDARIES AT MT OWEN

34

 
  
SUCCESS

35

 



36

INTEGRATED MINING
TEAM DRIVES
SAVINGS

A STEP CHANGE PROGRAM INTRODUCED AT THE THIESS-OPERATED MT OWEN MINE IN THE


NEW SOUTH WALES HUNTER VALLEY IS IMPROVING MAINTENANCE EFFICIENCIES, RESULTING
IN BETTER EQUIPMENT AVAILABILITY AND INCREASED PRODUCTIVITY.
Building on the success of last years Target
6,000 project which aims to achieve 6,000
operational hours annually from both 996B
excavators, the 92TWENTY initiative is taking
operations at the mine to another level.
The focus is to achieve annual equipment
availability of 92 per cent and produce 20 million
equivalent BCMs, a stretch target according
to Thiess General Manager Mining, Douglas
Thompson.
03!*%/$%#$(5+),(!4.!/+1.!3$%$
often results in selective mining practices being
used to optimise coal recovery. In this context,
$%!2%*#0$%/05,!+",.+ 10%2%050 03!*
will be a benchmark performance by the team,
Douglas said.
Hitting the target will require a whole-of-site
collaboration and precision timing, but it can be
done.
The team made the decision to change preoperational procedures and shift change
protocols which has significantly reduced down
time and increased productivity.
Maintenance crews are working to ensure
70 per cent of total down time is for planned
maintenance work. The crews closer
collaboration with the production teams is also

bringing about changes in how the machines are


operated, resulting in reduced accident damage.
The team has also regained 90 minutes of
production every week following the introduction
of a new site-wide system which has cut blasting
shut-down times in half.
This has been achieved by the drill and blast
team agreeing on set times for blasting each
week, providing the operations team with
advanced notice so they can plan their breaks
accordingly. This in turn allows the plant team
to streamline the refuelling process, so the
equipment is available as soon as blasting is
finished.
$! 03!*0!)%/,1/$%*#%0/!("0+*
!%!*%!/+* %(5/%/+1#(//%
The team is looking at every aspect of the
operation to see how we can improve.
Fleet is redirected to other work areas as
operations change and its this type of innovative
mine planning and infield correction that we are
driving across our business.
We most certainly can achieve the 92TWENTY
target and I think we will find towards the back
end of the year it will be a goal that will be
celebrated and become normal practice.

Closer collaboration between


maintenance and production teams

Refining blasting program

Keeping machines
running at shift change

92TWENTY

92% AVAILABILITY 20M BCM WASTE OUTPUT

Improving tyre management by


monitoring early equipment failure
Streamlining on-site
refuelling

Targeting 70% scheduled


plant maintenance

    

33

RADAR TECHNOLOGY
LEADING RADAR TECHNOLOGY AT THE BURTON COAL MINE IN CENTRAL QUEENSLAND
IS OVERCOMING THE ISSUES ASSOCIATED WITH A CHALLENGING HIGHWALL DESIGN,
220-METRE DEEP PIT AND HEAVY REGIONAL RAINFALL.
The introduction of a slope stability radar
12 months ago is helping the team adjust mine
,(**%*#* +,!.0%+*/!%!*0(53$%(!
mitigating safety risks through the precise
monitoring of ground movement.
The radar tracks the movement of the slope
in real time and can be monitored remotely.
Its widely accepted as the best practice
technology for safety, according to Project
General Manager Gus Jorquera.
The monitoring system at the Burton Mine is
world class and is fundamental to our mining
operation, Gus said.

Given the geology of the mine and the depth


of the pit, we expect there to be some instability
in the slope and the radar allows us to track what
is occurring 24/7.
Thiess Strategic Mine Planning Manager
Dr Mehmet Doktan said the multiple daily
readings also inform both short and long-term
mine planning of the pit.
Knowing well in advance if an area we are
mining is becoming unstable gives us the time
we require to safely relocate the crew and
equipment and seal off the area, he said.
We also use the data to refine our long-term
mine planning activities such as the orientation

of working faces, the calculation of batter angles


and positioning of barriers.
He said the technology had proven itself in the
past on other Thiess mining projects which had
similar slope stability issues.
The radar allows us to safely mine sections of
the project that would otherwise be considered
too high risk. Without this key tool, we would
effectively be leaving coal in the ground.
The Queensland-developed technology is used
at mine sites around the world and there are
currently two radars in use at the Peabodyowned Burton Mine.

Dr Mehmet Doktan is a Mining


and Geotechnical Engineer with
more than 30 years international
experience.
.%#%*((5".+) 6)%.%*1.'!5
Mehmet completed a degree
in mining engineering and was
awarded a scholarship from
the Turkish Coal Enterprise to
undertake a Masters and PhD at
the University of Newcastle upon
Tyne in England.

34

    

Prior to joining Thiess in 2012,


he worked for a number of
organisations including Sinclair
Knight Merz, RungePincockMinarco,
the JKMRC, CRCMining, BMA, Anglo
American and the University of
Queensland.

EXPERIENCE,
TRACK RECORD

SECURES NT CONTRACT

DA RW I N

Roper Bar
Iron Ore Project

THIESS HAS RETURNED TO IRON ORE MINING IN THE NORTHERN TERRITORY,


SECURING A THREE-YEAR, $135 MILLION MINING CONTRACT FOR WESTERN
DESERT RESOURCES ROPER BAR PROJECT.

Thiess will supply 140 staff and mining


equipment to move approximately 80 million
tonnes of overburden and ore from the remote
greenfield iron ore mine, 600 kilometres southeast of Darwin.
Western Desert Resources Managing Director
Norm Gardner said the company was delighted
to award its mining services contract to a
%!.*!+*0.0+.3%0$*!4,!.%!*!
management team and proven track record.
Thiess has developed a low-cost, sustainable
mining solution for Roper Bar that will help us
become one of northern Australias leading iron
ore producers, Norm said.
$%(!0$!+*0.0+%((5/0.0! %*
*1.5
the team has been working with Western Desert

Resources since November


last year, providing on the
ground mobilisation and
project support.

             

Thiess General Manager


Mining Western Region Viv Roberts said the
mobilisation phase had its challenges.
Weve had to deal with the issues that come with
working in the Top End including an unforgiving
wet season that created road closures not
to mention the intense heat but that hasnt
deterred us from staying on program, he said.
The majority of employees hired for the project
are local or will fly in from Darwin, in line with
Thiess policy of hiring locals first.

Thiess and Western Desert


Resources have also
committed to providing
opportunities for Indigenous
Australians.

We have a shared strategy with Western Desert


Resources to offer Indigenous Australians
training and employment opportunities, and this
includes a partnership with Rusca Bros Mining,
Viv said.
We have a target initially of around 15 per cent
Indigenous employment and envisage most
of these people will also come from the local
communities.
The Roper Bar Project workforce currently
comprises 20 per cent Indigenous workers.

    

35

INTEGRATED MINING TEAM

DRIVES

THIESS AND CLIENT OZ MINERALS HAVE FORMED A UNIQUE


RELATIONSHIP, REORGANISING THE STRUCTURE OF THEIR
MINING TEAMS TO DELIVER SIGNIFICANT SAVINGS AT SOUTH
AUSTRALIAS PROMINENT HILL COPPER AND GOLD MINE.

36

    

Since the implementation of the integrated team, productivity


has improved upwards of 10 per cent, with forecasts for project
cost savings of more than $40 million over the course of the
next year.

SAVINGS

General Manager Mining - Western Region Viv Roberts said


aligning the organisations operationally clearly demonstrates
Thiess flexibility and commitment to tailoring its services to
each individual contract.

$40

MILLION

FORECAST
COST SAVINGS

Every contract is unique and in a fluctuating economic


environment we are always looking at how we can better deliver
our services to match our clients needs, Viv said.
The new organisational structure at Prominent Hill is unlike
anything weve ever done before and its testament to the
/0.+*#.!(0%+*/$%,!03!!*$%!//*  %*!.(/
Bringing both teams together, literally under the one roof, has
.!/1(0! %*)+.!+,0%)1)* !%!*0/0.101.!

10%

INCREASE

IN PRODUCTIVITY

By working collaboratively, we have been able to implement a


series of cost saving initiatives through consolidating functions
and removing duplication of resources. We have proven its
possible to achieve more with less.
The new team approach has delivered a number of innovations
to increase productivity and better tailor its procedures to
meet mining requirements. This includes maximising haul truck
payloads, increased use of double benching and mining in three
flitches instead of four, providing an immediate 15 per cent
improvement against budget.
Arguably though, the biggest improvement is the adherence to
the mine plan.

ONE TEAM
APPROACH

With Thiess now actively involved in the planning stages we


are achieving significantly better compliance, with little to no
rework required, Viv said.
 %*!.(/!*%+. %*%*#*#%*!!. .'.)+* /% 0$!*!3
structure had removed the barriers necessary for the mine to
+,!.0!)+.!!%!*0(5* !!0%2!(5
Instead of two teams operating independently, we now have a
single, aligned unit focused on a common goal, Mark said.
!)+2%*#0$!..%!./$/.!0! !%!*%!//%#*%*0(5
improved communication and put us in a much better position
going forward.
I dont think we have reached the ceiling yet with
improvements and as a team we will continue to look for these.

    

37


... the gauge can
be set up and
operational
within 30
minutes, and can
be relocated as
floodwaters move.

40

 
 
 
MAINTENANCE
DELIVERY

42

 
   
  

NEW
GAUGES

CUT FLOOD
MONITORING
COSTS

A NEW FLOOD MONITORING DEVICE CREATED


BY THIESS ENVIRONMENTAL MONITORING
TEAM IS DELIVERING COST SAVINGS OF
UP TO $40,000 ON TRADITIONAL FIXEDMONITORING STATIONS.

The Portable Automated Logger System


(PALS) has been developed for around one-sixth
of the price and delivers a broader range
of environmental monitoring data which has
since been used by the Bureau of Meteorology.

Broken Creek flood map

THE PALS ADVANTAGE:


       
    
         
       

VDV Web Portal

PALS was created in response to shortfalls


identified in flood monitoring following the
2011 Victorian floods and has been used
successfully in three subsequent flooding events.
The Victorian Government has purchased 20
units which have been deployed across the State
and its anticipated other state governments and
local authorities will follow once the cost benefits
are realised.
Systems and Innovation Manager Michael
Wheaton said PALS filled the gaps in the fixed
flood monitoring network and eliminated the
need for manual water level readings.
The units provide government agencies and
emergency services operators with the most
accurate information to determine when

communities need to be evacuated and also


when people can return home, Michael said.
*!+*/%0!0$!#1#!*!/!01,*
operational within 30 minutes and can be
relocated as floodwaters move.
In 2011, authorities in Victoria underestimated
the receding flood that impacted on communities
and this eroded their confidence in emergency
services agencies to provide accurate updates.
PALS measures, transmits and displays water
level information from remote sites on the Thiess
Vista Data Vision (VDV) website to enable more
informed decision making and they have now
been successfully deployed to three subsequent
flooding events in Victoria, Michael said.

The units also have the potential to improve


environmental monitoring. The designs
versatility means components can be added and
removed to support other monitoring activities
including water quality, water level, dust and
noise monitoring. The device now also includes a
camera, with images transmitted back to the
Vista Data Vision website.
Environmental monitoring underpins the
majority of our operations whether it is mining,
construction or services, Michael said.
The units have the potential to deliver a whole
new range of data to our clients, which can only
help improve operations. Their low cost and high
value makes them indispensable in flood-prone
regions.
    

39

SERVICES

M O B I LE
T EC H N O LO GY
TRANSFOR MS
MAINTENANCE
DELIVERY

THIESS ASSETS AND INFRASTRUCTURE TEAMS MOVE


FROM A PAPER-BASED DELIVERY TO A FULL MOBILITY
PLATFORM IS TRANSFORMING QUEENSLAND URBAN
UITLILITIES (QUU) APPROACH TO PLANNED AND
RESPONSIVE MAINTENANCE OF ITS ASSETS.

GENERAL SUPERINTENDENT FOR


QUU OPERATIONS GARY SINNOTT
USES THIESS FIELD TECHNOLOGY
ON QUUS WATER ASSETS.

40

    

SERVICES

As South East Queenslands largest water


retail-distributor, QUU is responsible for the
maintenance of more than 100,000 fire hydrants
across its service area, as part of its Fire Hydrant
Maintenance Program.
Thiess has developed a Geographical Information
System (GIS) software solution for the
program that has enabled QUU to achieve the
maintenance service standards stipulated in its
#.!!)!*03%0$0$!1!!*/(* %.!!/1!
Service.
//!0 *"./0.101.!!.2%!/1!!*/(*
,!.0%+*/ *#!. (+()+00//% 0$!0/'
required a maintenance, planning and reporting
solution that minimised the substantial risks of
handling such large volumes of data.
A paper-based process would have required
significant administration for both QUU and
Thiess, and the quality of data captured would
have been poor, Malcolm said.
We collaborated with QUU to avoid failure
and identify a solution that was cost effective,
measurable and returned accurate high-quality
data, he said.

Together we determined that a GIS-based


solution provided on a mobile iPad platform was
necessary.
Thiess GIS team developed an app that enables
QUU assets to be located and a condition
assessment, including photos, to be recorded on
an iPad.
1..!3/%*/,!0* 1* !.0'!+* %0%+*
reporting and submit the information as live
maps direct to a GIS database that is fully
integrated to QUUs GIS system, saving time for
data extraction, transformation and data-loading
processes, Malcolm said.

QUU and Thiess collaborated


to develop a GIS software
solution that is cost effective,
measurable and returns
accurate high-quality data.

With the Fire Hydrant Maintenance Program


achieving its first year target in just 10 months,
the Thiess-driven innovation is an outstanding
success.
As a result of this program, we are now trialling
an expanded iPad application for the whole
maintenance cycle of QUUs water reticulation
network, Malcolm said.

QUU AND THIESS COLLABORATED TO DEVELOP A GIS SOFTWARE SOLUTION


THAT IS COST EFFECTIVE, MEASURABLE AND RETURNS ACCURATE HIGH-QUALITY DATA.
The benefits include:
Improved delivery through better forward
planning
High quality and accurate data that is easily
accessible to QUU for interrogation via a
web-portal
Critical data can be easily evaluated,
manipulated and integrated into QUUs GIS
system, saving time on data extraction,
transformation, and data loading processes

A streamlined process for auditing photos


and data collected from every hydrant
Reduced administration costs
Greater work productivity from field
crews who use the mapping function to
coordinate their work schedules and ensure
3+.'%/+),(!0! %*0$!)+/0!%!*0
geographical way.

    

41

SERVICES

FOSTE R I N G LO C A L TA L E N T

I N NE W C AL E DON IA

THE THIESS TEAM DELIVERING OPERATIONS AND MAINTENANCE (O&M)


SERVICES AT THE KONIAMBO POWER STATION IN KON, NEW CALEDONIA,
IS SET TO LEAVE BEHIND A PROUD LEGACY.

$!,.+&!0%*2+(2!/0$! +")+ !.*


integrated 350Mw power plant for the KNS
nickel smelter, one of the largest nickel mining
and smelting operations in the world.
$%!//,!.0%+*/ *#!.+3!.* * 1/0.%(
3!*+3*%!/% /%#*%*0,.0+"0$!
project involved supporting local engineering
graduates so that one day they could run the
plant themselves.
As part of delivering our contract, we have taken
12 graduates from the New Caledonian University
and equipped them with the skills to operate and
)%*0%*)+ !.*,+3!.,(*03!*/%
The comprehensive program involved an industry
familiarisation visit to Australia to view coal fired
and gas turbine power stations.
When they returned to New Caledonia, the
graduates started intensive training at the
power station under the close supervision of
our people, he said.

O&M
SCOPE

42

    

They are now enrolled in the French Canadian


power station operators course and some will
go on to become power engineers.
They are totally engaged and meeting worldclass safety performance records,
Importantly, there has been a zero drop-out rate
from this highly-motivated team.
This area of New Caledonia is largely agricultural
and mining based, and projects like this are
required to demonstrate long-term benefits for
the local community.
The power station is now in the later stages of
commissioning and is progressing towards
supplying around 100Mw of power to the two
nickel smelters.
1.!4,00.%*!./.!,.+1 +"0$!0!)/
achievements to date and continue to be
passionate about passing on their many years of
experience to this young and enthusiastic team.

Operations, maintenance management and asset


management of all electrical, mechanical, systems
in the power station and distribution network.

SERVICES

350Mw
GREENFIELD
POWER
STATION

2 x 3.5Mw black
start generators
2 x 45Mw gas turbines
2 x 135Mw fluidised
bed boilers +
associated steam
turbines

The local workforce on the


Koniambo power station
project had previously never
worked in an industrial
environment. Today, thanks
to the efforts of Thiess
Services team, they are
successfully operating
boilers, gas turbines and
complex power transmission
services.

OWEN DOWNIE
  
  

43

COMMUNITY

COMMUNIT Y GROUPS

R ECEIVE
$ 5 0 K BOOST

THE BURNETT INSTITUTE


public health program
targeting groups with
complex health issues

SIX COMMUNITY GROUPS LOCATED


NEAR THE REGIONAL RAIL LINK
PROJECT (RRL) IN MELBOURNE
HAVE BENEFITED FROM THE LATEST
ROUND OF FUNDING FROM THIESS
COMMUNITY GRANTS PROGRAM.

COMMUNITY WEST INCORPORATED


community education program to
support those affected by family
violence and sexual assault

The groups, from the Maribyrnong and


Brimbank municipalities in Melbournes
west, are sharing $50,000 in funding as
part of Care, Thiess corporate and social
responsibility program.
Executive General Manager Strategic
Communication Mary-Jane Bellotti said
the initiative builds on Thiess strong and
generous culture of giving.
As an organisation involved in projects
across Australia, we realise the importance
of supporting those communities where we
live and work, she said.
Weve already provided more than
$250,000 to organisations targeting the
areas of education, environment and health.

LOAVES AND FISHES


FOODBANK
purchase of a cold storage
van for food parcels

THE SMITH FAMILY


provides specialist
after school support
for children in need

These latest grants highlight our support


for local initiatives that need extra funding
to create brighter futures.

ST VINCENT DE PAUL
SOCIETY VICTORIA
provide essential school
items to local families
TOMORROW FOUNDATION
support to young refugees

More information about Thiess community grants can be found at

communitygrants.thiess.com.au

44

    

P RO G RA M CH A N N E LS

PEO P L E S PASSI ONS


THIESS CORPORATE SOCIAL RESPONSIBILITY (CSR) FRAMEWORK, Care, IS HARNESSING THE
PASSION OF THOUSANDS OF THIESS EMPLOYEES AND DELIVERING MORE SUSTAINABLE VALUE
TO CLIENTS, STAKEHOLDERS AND LOCAL COMMUNITIES.
Launched in 2012, the program builds on
the companys generosity, guiding companywide community investments and promoting
opportunities for participation via charity
partnerships, fundraising and donations,
workplace giving, volunteer leave, community
grants, disaster relief funding, and Indigenous
engagement.
Thiess Executive General Manager Strategic
Communication Mary-Jane Bellotti says the
flexibility of the program is paying dividends.
Care has a comprehensive framework to ensure
theres synergy from our community contributions,
yet it allows significant room for our projects and

people to connect with the charities of greatest


value to them, Mary-Jane said.
Since Cares introduction, reported giving
has increased to $2 million and Thiess three
corporate partnerships with the Royal Flying
Doctor Service, International RiverFoundation
and The Engineering Link Group have collectively
benefited from $1 million in funding.
Thiess is now in the top 8 per cent of Australian
companies currently matching employee
giving and the structure has enabled dozens of
employees to volunteer hundreds of hours to help
charities in the education, health and environment
sectors.

$1M

GI VE N TO OU
R
CH AR IT Y PA
RT NE RS

TOP 8%

OF AU ST RA LI
AN CO M PA NI
ES
CU RR EN TLY
M AT CH IN G
EM PL OY EE GI
VI NG

450 HOURS

OF VO LU NT EE
R LE AV E

SC H O O L CHILDREN B E N E F IT
F R O M ST V IN N IE S S U P P O RT
THE ST VINCENT DE PAUL SOCIETY IN
VICTORIA IS USING ITS FUNDING TO
ESTABLISH A ME-2 ACCOUNT TO HELP
CHILDREN IN THE MELBOURNE SUBURBS
OF BRAYBROOK AND SUNSHINE WITH
ESSENTIALS FOR SCHOOL.
In the first few months of the year, the Society
receives many calls from parents struggling to
cover the cost of sending their children to school.
Many spend the school year without the basic
tools they need to support their education, often
resulting in them falling behind in their studies
* $2%*# %1(0500%*#%*3%0$+0$!.$%( .!*

The fund is providing local children with new


school back-packs, lunch boxes and water
bottles, pen and pencil sets, vouchers for school
uniforms, shoes and books, as well as grants to
cover excursions and school camps.
Families can access multiple items through the
program, depending on their circumstances and
the needs of their child. The fund is available
right throughout the school year, ensuring that
children and families can get the support they
need, when they need it.
The Me-2 fund could benefit up to 150 children
and their families.

    

45

HEAD OFFICE

CORPORATE OFFICE
Level 5
179 Grey Street
South Bank QLD 4101
Tel: +61 7 3002 9000

CONSTRUCTION

NSW/ACT
Level 23
52 Martin Place
Sydney NSW 2000
Tel: +61 2 8045 1000

QLD
Level 7
189 Grey Street
South Bank QLD 4101
Tel: +61 7 3121 8500

VIC/SA/TAS/NZ
Level 9
417 St Kilda Road
Melbourne VIC 3004
Tel: +61 3 9864 8888
Level 2
101 Flinders Street
Adelaide SA 5000
Tel: +61 8 8274 5200

MINING

MINING HEAD OFFICE


Thiess Place
Level 5
143 Coronation Drive
Milton QLD 4064
Tel: +61 7 3037 5000

WESTERN REGION
Level 2
. 0.!!0
West Perth WA 6005
Tel: +61 8 6218 3737

SERVICES

SERVICES HEAD OFFICE


The Precinct 2, Level 1
10 Browning Street
West End QLD 4101
Tel: +61 7 3169 8300

VIC
25-37 Huntingdale Road
Burwood VIC 3125
Tel: +61 3 9273 7600

NSW
Level 3
88 Phillip Street
Parramatta NSW 2150
Tel: +61 2 8892 5900
111 Vanessa Street
Kingsgrove NSW 2208
Tel: +61 2 9375 3200

INDONESIA
HEAD OFFICE

PT THIESS CONTRACTORS
INDONESIA JAKARTA
HEAD OFFICE
Ratu Prabu 2
Jl. TB. Simatupang Kav. 1B
Jakarta 12560
Indonesia
Tel: +62 21 2754 9999

WA
Level 19, The Forrest Centre
221 St Georges Terrace
Perth WA 6000
Tel: +61 8 9214 4200

DIRECTIONS

Winter 2014

AUSTRALIA

INDIA

12649

HEAD OFFICE

THIESS INDIA PVT LTD


5B RDB Boulevard
(+'
Sector V, Salt Lake
Kolkata 700091
West Bengal India
Tel: +91 33 4010 5300

Directions is published by Thiess Pty Ltd. It is

Head Office

Contact

published with due care and attention to accuracy.


If you do find information that is inaccurate,
incomplete or out of date, please contact us.

Level 5
179 Grey Street
South Bank Queensland 4101
T: +61 7 3002 9000
F: +61 7 3002 9009

directions@thiess.com.au
Copyright Thiess Pty Ltd
2014. All rights reserved.

THIESS.COM
Published by Thiess Pty Ltd
ABN 87 010 221 486

You might also like